80 FR 34315 - Drawbridge Operation Regulation; Pearl River, LA/MS

DEPARTMENT OF HOMELAND SECURITY
Coast Guard

Federal Register Volume 80, Issue 115 (June 16, 2015)

Page Range34315-34315
FR Document2015-14715

The Coast Guard has issued a temporary deviation from the operating schedule that governs the operation of the US 90 highway bridge (East Pearl River Bridge), a swing span bridge across the Pearl River, mile 8.8 between Slidell, St. Tammany Parish, Louisiana and Pearlington, Hancock County, Mississippi. The deviation is necessary in order to conduct electrical and structural repairs to the bridge. This deviation will allow the bridge to remain in the closed-to-navigation position for four consecutive days.

Federal Register, Volume 80 Issue 115 (Tuesday, June 16, 2015)
[Federal Register Volume 80, Number 115 (Tuesday, June 16, 2015)]
[Rules and Regulations]
[Page 34315]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-14715]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2015-0479]


Drawbridge Operation Regulation; Pearl River, LA/MS

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulations.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the operation of the US 90 highway 
bridge (East Pearl River Bridge), a swing span bridge across the Pearl 
River, mile 8.8 between Slidell, St. Tammany Parish, Louisiana and 
Pearlington, Hancock County, Mississippi. The deviation is necessary in 
order to conduct electrical and structural repairs to the bridge. This 
deviation will allow the bridge to remain in the closed-to-navigation 
position for four consecutive days.

DATES: This deviation is effective from 7 a.m. on Monday, July 20, 
2015, through 7 p.m. on Friday, July 24, 2015.

ADDRESSES: Documents mentioned in this preamble are part of docket 
[USCG-2015-0479]. To view documents mentioned in this preamble as being 
available in the docket, go to http://www.regulations.gov, type the 
docket number (USCG-2015-0479) in the ``SEARCH'' box and click 
``SEARCH.'' Click on Open Docket Folder on the line associated with 
this rulemaking. You may also visit the Docket Management Facility in 
Room W12-140 on the ground floor of the Department of Transportation 
West Building, 1200 New Jersey Avenue SE., Washington, DC 20590, 
between 9 a.m. and 5 p.m., Monday through Friday, except Federal 
holidays.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email Mr. Jim Wetherington, Bridge 
Administration Branch, Coast Guard; telephone 504-671-2128, email 
[email protected]. If you have questions on viewing the docket, call 
Cheryl Collins, Program Manager, Docket Operations, telephone 202-366-
9826.

SUPPLEMENTARY INFORMATION: Boh Bros. Construction Company, on behalf of 
the Louisiana Department of Transportation and Development, requested a 
temporary deviation from the operating schedule on the US 90 highway 
bridge (East Pearl River Bridge), a swing span bridge across the Pearl 
River, mile 8.8 between Slidell, St. Tammany Parish, Louisiana and 
Pearlington, Hancock County, Mississippi. The bridge has a vertical 
clearance of 10 feet above mean high water in the closed-to-navigation 
position and unlimited clearance in the open-to-navigation position.
    Navigation at the site of the bridge consists mainly of small tows 
with barges, some commercial sightseeing boats, and some recreational 
pleasure craft. Based on prior experience, as well as coordination with 
waterway users, it has been determined that this closure will not have 
a significant effect on these vessels. No alternate routes are 
available.
    In accordance with 33 CFR 117.486(b), the draw of the US 90 highway 
bridge shall open on signal; except that, from 7 p.m. to 7 a.m. the 
draw shall open on signal if at least four hours notice is given. 
Vessels that do not require an opening will be allowed to pass at the 
slowest safe speed. The bridge will be unable to open in the event of 
an emergency.
    The closure is necessary for the replacement of structural and 
electrical components of the draw span and two submarine cables. These 
operations will continue until completed and will not allow the normal 
operation of the bridge. Normal operations of the bridge will commence 
upon completion of the work. Notices will be published in the Eighth 
Coast Guard District Local Notice to Mariners and will be broadcast via 
the Coast Guard Broadcast Notice to Mariners System.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the effective 
period of this temporary deviation. This deviation from the operating 
regulations is authorized under 33 CFR 117.35.

    Dated: June 11, 2015.
David M. Frank,
Bridge Administrator, Eighth Coast Guard District.
[FR Doc. 2015-14715 Filed 6-15-15; 8:45 am]
 BILLING CODE 9110-04-P


Current View
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionNotice of deviation from drawbridge regulations.
DatesThis deviation is effective from 7 a.m. on Monday, July 20, 2015, through 7 p.m. on Friday, July 24, 2015.
ContactIf you have questions on this temporary deviation, call or email Mr. Jim Wetherington, Bridge Administration Branch, Coast Guard; telephone 504-671-2128, email [email protected] If you have questions on viewing the docket, call Cheryl Collins, Program Manager, Docket Operations, telephone 202-366- 9826.
FR Citation80 FR 34315 