80_FR_34517 80 FR 34402 - Trans-Pecos Pipeline, LLC; Notice of Application

80 FR 34402 - Trans-Pecos Pipeline, LLC; Notice of Application

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 115 (June 16, 2015)

Page Range34402-34403
FR Document2015-14740

Federal Register, Volume 80 Issue 115 (Tuesday, June 16, 2015)
[Federal Register Volume 80, Number 115 (Tuesday, June 16, 2015)]
[Notices]
[Pages 34402-34403]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-14740]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP15-500-000]


Trans-Pecos Pipeline, LLC; Notice of Application

    Take notice that on May 28, 2015, Trans-Pecos Pipeline, LLC (Trans-
Pecos), 1300 Main Street, Houston, Texas 77002, filed an application in 
Docket No. CP15-500-000 under section 3 of the Natural Gas Act (NGA), 
and Part 153 of the Commission's regulations requesting authorization 
to site, construct, and operate new natural gas facilities to import/
export natural gas between the United States to the Republic of Mexico 
at a point on the International Boundary in Presidio County, Texas, all 
as more fully set forth in the application which is on file with

[[Page 34403]]

the Commission and open to public inspection.
    Any questions regarding this application should be directed to 
Kelly Allen, Manager, Regulatory Affairs Department, Trans-Pecos 
Pipeline, LLC, 1300 Main Street, Houston, Texas 77002, or by calling 
(713) 989-2606 (telephone) or (713) 989-1205 (fax) 
[email protected].
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 5 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at http://www.ferc.gov. Persons unable to file electronically should 
submit an original and 5 copies of the protest or intervention to the 
Federal Energy regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    This filing is accessible on-line at http://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please email 
[email protected], or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern Time on June 30, 2015.

    Dated: June 9, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-14740 Filed 6-15-15; 8:45 am]
 BILLING CODE 6717-01-P



                                                    34402                          Federal Register / Vol. 80, No. 115 / Tuesday, June 16, 2015 / Notices

                                                    DEPARTMENT OF ENERGY                                    during the third quarter of 2016. The                  provide copies of their protests only to
                                                                                                            estimated cost of the project is                       the party or parties directly involved in
                                                    Federal Energy Regulatory                               $32,077,500.                                           the protest.
                                                    Commission                                                 Pursuant to section 157.9 of the                       Persons who wish to comment only
                                                    [Docket No. CP15–498–000]
                                                                                                            Commission’s rules, 18 CFR 157.9,                      on the environmental review of this
                                                                                                            within 90 days of this Notice the                      project should submit an original and
                                                    Eastern Shore Natural Gas Company;                      Commission staff will either: Complete                 two copies of their comments to the
                                                    Notice of Application for Certificate of                its environmental assessment (EA) and                  Secretary of the Commission.
                                                    Public Convenience and Necessity                        place it into the Commission’s public                  Environmental commentors will be
                                                                                                            record (eLibrary) for this proceeding; or              placed on the Commission’s
                                                       Take notice that on May 22, 2015                     issue a Notice of Schedule for                         environmental mailing list, will receive
                                                    Eastern Shore Natural Gas Company                       Environmental Review. If a Notice of                   copies of the environmental documents,
                                                    (Eastern Shore), 1110 Forrest Avenue,                   Schedule for Environmental Review is                   and will be notified of meetings
                                                    Dover, Delaware 19904, filed in the                     issued, it will indicate, among other                  associated with the Commission’s
                                                    above referenced docket an application                  milestones, the anticipated date for the               environmental review process.
                                                    pursuant to section 7(c) of the Natural                 Commission staff’s issuance of the final               Environmental commentors will not be
                                                    Gas Act (NGA) and Part 157 of the                       environmental impact statement (FEIS)                  required to serve copies of filed
                                                    Commission’s regulations, requesting a                  or EA for this proposal. The filing of the             documents on all other parties.
                                                    certificate of public convenience and                   EA in the Commission’s public record                   However, the non-party commentors
                                                    necessity authorizing Eastern Shore to                  for this proceeding or the issuance of a               will not receive copies of all documents
                                                    construct, own, operate and maintain                    Notice of Schedule for Environmental                   filed by other parties or issued by the
                                                    the System Reliability Project. The                     Review will serve to notify federal and                Commission (except for the mailing of
                                                    Project is designed to enhance the                      state agencies of the timing for the                   environmental documents issued by the
                                                    reliability and flexibility of Eastern                  completion of all necessary reviews, and               Commission) and will not have the right
                                                    Shore’s pipeline system to the benefit of               the subsequent need to complete all
                                                    all of its customers. Eastern Shore                                                                            to seek court review of the
                                                                                                            federal authorizations within 90 days of               Commission’s final order.
                                                    proposes to construct approximately 2.5                 the date of issuance of the Commission
                                                    miles of 16-inch diameter pipeline                                                                                The Commission strongly encourages
                                                                                                            staff’s FEIS or EA.                                    electronic filings of comments, protests
                                                    looping in New Castle County, DE, 7.6                      There are two ways to become
                                                    miles of 16-inch diameter pipeline                                                                             and interventions in lieu of paper using
                                                                                                            involved in the Commission’s review of                 the ‘‘eFiling’’ link at http://
                                                    looping in Kent County, DE and install                  this project. First, any person wishing to
                                                    1,775 horsepower (hp) of additional                                                                            www.ferc.gov. Persons unable to file
                                                                                                            obtain legal status by becoming a party                electronically should submit original
                                                    compression at Eastern Shore’s existing                 to the proceedings for this project
                                                    Bridgeville Compressor Station in                                                                              and five copies of the protest or
                                                                                                            should, on or before the comment date
                                                    Sussex County, DE. Eastern Shore                                                                               intervention to the Federal Energy
                                                                                                            stated below, file with the Federal
                                                    requests a predetermination for rolled-in                                                                      Regulatory Commission, 888 First Street
                                                                                                            Energy Regulatory Commission, 888
                                                    rate treatment, all as more fully set forth                                                                    NE., Washington, DC 20426.
                                                                                                            First Street NE., Washington, DC 20426,
                                                    in the application which is on file with                                                                          Comment Date: June 29, 2015.
                                                                                                            a motion to intervene in accordance
                                                    the Commission and open to public                       with the requirements of the                             Dated: June 8, 2015.
                                                    inspection.                                             Commission’s Rules of Practice and                     Kimberly D. Bose,
                                                       The filing may also be viewed on the                 Procedure (18 CFR 385.214 or 385.211)                  Secretary.
                                                    web at http://www.ferc.gov using the                    and the Regulations under the NGA (18                  [FR Doc. 2015–14739 Filed 6–15–15; 8:45 am]
                                                    ‘‘eLibrary’’ link. Enter the docket                     CFR 157.10). A person obtaining party                  BILLING CODE 6717–01–P
                                                    number excluding the last three digits in               status will be placed on the service list
                                                    the docket number field to access the                   maintained by the Secretary of the
                                                    document. For assistance, please contact                Commission and will receive copies of                  DEPARTMENT OF ENERGY
                                                    FERC Online Support at                                  all documents filed by the applicant and
                                                    FERCOnlineSupport@ferc.gov or toll                      by all other parties. A party must submit              Federal Energy Regulatory
                                                    free at (866) 208–3676, or TTY, contact                 five copies of filings made with the                   Commission
                                                    (202) 502–8659.                                         Commission and must mail a copy to                     [Docket No. CP15–500–000]
                                                       Any questions concerning this                        the applicant and to every other party in
                                                    application may be directed to William                  the proceeding. Only parties to the                    Trans-Pecos Pipeline, LLC; Notice of
                                                    Rice, King & Spalding LLP, 1700                         proceeding can ask for court review of                 Application
                                                    Pennsylvania Avenue NW., Suite 200,                     Commission orders in the proceeding.
                                                    Washington, DC 20006, by phone 202–                        However, a person does not have to                     Take notice that on May 28, 2015,
                                                    626–9602, by fax 202–626–3737, or by                    intervene in order to have comments                    Trans-Pecos Pipeline, LLC (Trans-
                                                    email wrice@kslaw.com.                                  considered. The second way to                          Pecos), 1300 Main Street, Houston,
                                                       Specifically, Eastern Shore states that              participate is by filing with the                      Texas 77002, filed an application in
                                                    the project will reinforce the Eastern                  Secretary of the Commission, as soon as                Docket No. CP15–500–000 under
                                                    Shore system to the extent required to                  possible, an original and two copies of                section 3 of the Natural Gas Act (NGA),
                                                    meet its firm contractual delivery                      comments in support of or in opposition                and Part 153 of the Commission’s
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    obligations under operating conditions                  to this project. The Commission will                   regulations requesting authorization to
                                                    similar to those encountered during the                 consider these comments in                             site, construct, and operate new natural
                                                    winters of 2014 and 2015. Eastern Shore                 determining the appropriate action to be               gas facilities to import/export natural
                                                    requests that the Commission issue the                  taken, but the filing of a comment alone               gas between the United States to the
                                                    requested authorizations on or before                   will not serve to make the filer a party               Republic of Mexico at a point on the
                                                    December 1, 2015. Eastern Shore                         to the proceeding. The Commission’s                    International Boundary in Presidio
                                                    anticipates placing the pipeline and                    rules require that persons filing                      County, Texas, all as more fully set forth
                                                    compression related facilities in-service               comments in opposition to the project                  in the application which is on file with


                                               VerDate Sep<11>2014   17:18 Jun 15, 2015   Jkt 235001   PO 00000   Frm 00040   Fmt 4703   Sfmt 4703   E:\FR\FM\16JNN1.SGM   16JNN1


                                                                                   Federal Register / Vol. 80, No. 115 / Tuesday, June 16, 2015 / Notices                                              34403

                                                    the Commission and open to public                       consider these comments in                             ENVIRONMENTAL PROTECTION
                                                    inspection.                                             determining the appropriate action to be               AGENCY
                                                       Any questions regarding this                         taken, but the filing of a comment alone
                                                    application should be directed to Kelly                                                                        [EPA–HQ–OW–2012–0803; FRL–9920–21–
                                                                                                            will not serve to make the filer a party               OW]
                                                    Allen, Manager, Regulatory Affairs                      to the proceeding. The Commission’s
                                                    Department, Trans-Pecos Pipeline, LLC,                  rules require that persons filing                      Final National Pollutant Discharge
                                                    1300 Main Street, Houston, Texas                        comments in opposition to the project                  Elimination System (NPDES) General
                                                    77002, or by calling (713) 989–2606                     provide copies of their protests only to               Permit for Stormwater Discharges
                                                    (telephone) or (713) 989–1205 (fax)                                                                            From Industrial Activities
                                                                                                            the party or parties directly involved in
                                                    Kelly.Allen@energytransfer.com.
                                                       Pursuant to section 157.9 of the                     the protest.                                           AGENCY: Environmental Protection
                                                    Commission’s rules, 18 CFR 157.9,                          Persons who wish to comment only                    Agency (EPA).
                                                    within 90 days of this Notice the                       on the environmental review of this                    ACTION: Notice of final permit issuance.
                                                    Commission staff will either: Complete                  project should submit an original and
                                                    its environmental assessment (EA) and                   two copies of their comments to the                    SUMMARY:     The EPA’s Regions 1, 2, 3, 5,
                                                    place it into the Commission’s public                   Secretary of the Commission.                           6, 7, 8, 9, and 10 are issuing their final
                                                    record (eLibrary) for this proceeding; or                                                                      2015 National Pollutant Discharge
                                                                                                            Environmental commentors will be
                                                    issue a Notice of Schedule for                                                                                 Elimination System (NPDES) general
                                                                                                            placed on the Commission’s
                                                    Environmental Review. If a Notice of                                                                           permit for stormwater discharges from
                                                                                                            environmental mailing list, will receive               industrial activity, also referred to as the
                                                    Schedule for Environmental Review is                    copies of the environmental documents,
                                                    issued, it will indicate, among other                                                                          Multi-Sector General Permit (MSGP).
                                                                                                            and will be notified of meetings                       This permit replaces the existing permit
                                                    milestones, the anticipated date for the                associated with the Commission’s
                                                    Commission staff’s issuance of the final                                                                       covering stormwater discharges from
                                                                                                            environmental review process.                          industrial facilities in the EPA’s Regions
                                                    environmental impact statement (FEIS)
                                                                                                            Environmental commentors will not be                   1, 2, 3, 5, 6, 9, and 10 that expired
                                                    or EA for this proposal. The filing of the
                                                    EA in the Commission’s public record                    required to serve copies of filed                      September 29, 2013, and provides
                                                    for this proceeding or the issuance of a                documents on all other parties.                        coverage for industrial facilities in areas
                                                    Notice of Schedule for Environmental                    However, the non-party commentors                      where the EPA is the NPDES permitting
                                                    Review will serve to notify federal and                 will not receive copies of all documents               authority in the EPA’s Regions 7 and 8.
                                                    state agencies of the timing for the                    filed by other parties or issued by the                The MSGP consists of 44 separate
                                                    completion of all necessary reviews, and                Commission (except for the mailing of                  regional EPA general permits that may
                                                    the subsequent need to complete all                     environmental documents issued by the                  vary from each other based on state or
                                                    federal authorizations within 90 days of                Commission) and will not have the right                tribal certifications and water quality-
                                                    the date of issuance of the Commission                  to seek court review of the                            based requirements. As with earlier
                                                    staff’s FEIS or EA.                                     Commission’s final order.                              permits, this permit authorizes the
                                                       There are two ways to become                                                                                discharge of stormwater associated with
                                                                                                               The Commission strongly encourages                  industrial activities in accordance with
                                                    involved in the Commission’s review of
                                                                                                            electronic filings of comments, protests               the terms and conditions described
                                                    this project. First, any person wishing to
                                                                                                            and interventions in lieu of paper using               therein. Industrial dischargers have the
                                                    obtain legal status by becoming a party
                                                                                                            the ‘‘eFiling’’ link at http://                        option to instead seek coverage under
                                                    to the proceedings for this project
                                                    should, on or before the comment date                   www.ferc.gov. Persons unable to file                   an individual permit. An individual
                                                    stated below, file with the Federal                     electronically should submit an original               permit may be necessary if the
                                                    Energy Regulatory Commission, 888                       and 5 copies of the protest or                         discharger cannot meet the terms and
                                                    First Street NE., Washington, DC 20426,                 intervention to the Federal Energy                     conditions or eligibility requirements in
                                                    a motion to intervene in accordance                     regulatory Commission, 888 First Street                this permit. The EPA is issuing this
                                                    with the requirements of the                            NE., Washington, DC 20426.                             permit for five years.
                                                    Commission’s Rules of Practice and                         This filing is accessible on-line at                DATES: The permit became effective on
                                                    Procedure (18 CFR 385.214 or 385.211)                   http://www.ferc.gov, using the                         June 4, 2015. This effective date is
                                                    and the Regulations under the NGA (18                   ‘‘eLibrary’’ link and is available for                 necessary to provide dischargers with
                                                    CFR 157.10). A person obtaining party                   review in the Commission’s Public                      the immediate opportunity to comply
                                                    status will be placed on the service list               Reference Room in Washington, DC.                      with Clean Water Act requirements in
                                                    maintained by the Secretary of the                      There is an ‘‘eSubscription’’ link on the              light of the expiration of the 2008 MSGP
                                                    Commission and will receive copies of                   Web site that enables subscribers to                   on September 29, 2013. In accordance
                                                    all documents filed by the applicant and                                                                       with 40 CFR part 23, this permit shall
                                                                                                            receive email notification when a
                                                    by all other parties. A party must submit                                                                      be considered issued for the purpose of
                                                                                                            document is added to a subscribed
                                                    5 copies of filings made with the                                                                              judicial review on June 22, 2015. Under
                                                                                                            docket(s). For assistance with any FERC
                                                    Commission and must mail a copy to                                                                             section 509(b) of the Clean Water Act,
                                                                                                            Online service, please email
                                                    the applicant and to every other party in                                                                      judicial review of this general permit
                                                                                                            FERCOnlineSupport@ferc.gov, or call                    can be requested by filing a petition for
                                                    the proceeding. Only parties to the
                                                                                                            (866) 208–3676 (toll free). For TTY, call              review in the United States Court of
                                                    proceeding can ask for court review of
                                                    Commission orders in the proceeding.                    (202) 502–8659.                                        Appeals within 120 days after the
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                       However, a person does not have to                      Comment Date: 5:00 p.m. Eastern                     permit is considered issued. Under
                                                    intervene in order to have comments                     Time on June 30, 2015.                                 section 509(b)(2) of the Clean Water Act,
                                                    considered. The second way to                             Dated: June 9, 2015.                                 the requirements in this permit may not
                                                    participate is by filing with the                                                                              be challenged later in civil or criminal
                                                                                                            Kimberly D. Bose,
                                                    Secretary of the Commission, as soon as                                                                        proceedings to enforce these
                                                    possible, an original and two copies of                 Secretary.                                             requirements. In addition, this permit
                                                    comments in support of or in opposition                 [FR Doc. 2015–14740 Filed 6–15–15; 8:45 am]            may not be challenged in other agency
                                                    to this project. The Commission will                    BILLING CODE 6717–01–P                                 proceedings. Deadlines for submittal of


                                               VerDate Sep<11>2014   17:18 Jun 15, 2015   Jkt 235001   PO 00000   Frm 00041   Fmt 4703   Sfmt 4703   E:\FR\FM\16JNN1.SGM   16JNN1



Document Created: 2018-02-22 10:23:04
Document Modified: 2018-02-22 10:23:04
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates5:00 p.m. Eastern Time on June 30, 2015.
FR Citation80 FR 34402 