80_FR_35440 80 FR 35322 - Availability of the Supplemental Draft Environmental Impact Statement for the Northern Integrated Supply Project, Larimer and Weld Counties, Colorado

80 FR 35322 - Availability of the Supplemental Draft Environmental Impact Statement for the Northern Integrated Supply Project, Larimer and Weld Counties, Colorado

DEPARTMENT OF DEFENSE
Department of the Army, Corps of Engineers

Federal Register Volume 80, Issue 118 (June 19, 2015)

Page Range35322-35323
FR Document2015-15055

The U.S. Army Corps of Engineers (Corps) Omaha District has prepared a Supplemental Draft Environmental Impact Statement (EIS) to analyze the direct, indirect, and cumulative effects of a water supply project called the Northern Integrated Supply Project (NISP or Project) in Larimer County and Weld County, CO. The purpose of the project is to provide the project participants with approximately 40,000 acre-feet (AF) of new, reliable municipal water supply annually through a regional project coordinated by the Northern Colorado Water Conservancy District (District). The participants in NISP requested new firm yield to meet a portion of their projected demand through 2060. The requests for new firm yield are based on the participants' analyses of their projected needs, the potential future demands as modeled by the District and verified by the Corps. NISP would result in direct impacts to jurisdictional waters of the United States (U.S.), including wetlands. The placement of fill material in these waters of the U.S. for the construction of water storage and distribution facilities associated with developing additional water supplies requires authorization from the Corps under Section 404 of the Clean Water Act. The District is the Permittee and Applicant, acting on behalf of the project participants. The Supplemental Draft EIS was prepared in accordance with the National Environmental Policy Act of 1969, as amended (NEPA), and the Corps' regulations for NEPA implementation (33 Code of Federal Regulations [CFR] Parts 230 and 325, Appendices B and C). The Corps, Omaha District, Denver Regulatory Office is the lead federal agency responsible for the Supplemental Draft EIS. Information contained in the EIS serves as the basis for a decision regarding issuance of a Section 404 Permit. It also provides information for local and state agencies having jurisdictional responsibility for affected resources.

Federal Register, Volume 80 Issue 118 (Friday, June 19, 2015)
[Federal Register Volume 80, Number 118 (Friday, June 19, 2015)]
[Notices]
[Pages 35322-35323]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-15055]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

Department of the Army, Corps of Engineers


Availability of the Supplemental Draft Environmental Impact 
Statement for the Northern Integrated Supply Project, Larimer and Weld 
Counties, Colorado

AGENCY: Department of the Army, U.S. Army Corps of Engineers, DoD.

ACTION: Notice of Availability.

-----------------------------------------------------------------------

SUMMARY: The U.S. Army Corps of Engineers (Corps) Omaha District has 
prepared a Supplemental Draft Environmental Impact Statement (EIS) to 
analyze the direct, indirect, and cumulative effects of a water supply 
project called the Northern Integrated Supply Project (NISP or Project) 
in Larimer County and Weld County, CO. The purpose of the project is to 
provide the project participants with approximately 40,000 acre-feet 
(AF) of new, reliable municipal water supply annually through a 
regional project coordinated by the Northern Colorado Water Conservancy 
District (District). The participants in NISP requested new firm yield 
to meet a portion of their projected demand through 2060. The requests 
for new firm yield are based on the participants' analyses of their 
projected needs, the potential future demands as modeled by the 
District and verified by the Corps. NISP would result in direct impacts 
to jurisdictional waters of the United States (U.S.), including 
wetlands. The placement of fill material in these waters of the U.S. 
for the construction of water storage and distribution facilities 
associated with developing additional water supplies requires 
authorization from the Corps under Section 404 of the Clean Water Act. 
The District is the Permittee and Applicant, acting on behalf of the 
project participants.
    The Supplemental Draft EIS was prepared in accordance with the 
National Environmental Policy Act of 1969, as amended (NEPA), and the 
Corps' regulations for NEPA implementation (33 Code of Federal 
Regulations [CFR] Parts 230 and 325, Appendices B and C). The Corps, 
Omaha District, Denver Regulatory Office is the lead federal agency 
responsible for the Supplemental Draft EIS. Information contained in 
the EIS serves as the basis for a decision regarding issuance of a 
Section 404 Permit. It also provides information for local and state 
agencies having jurisdictional responsibility for affected resources.

DATES: Written comments on the Supplemental Draft EIS will be accepted 
on or before August 4, 2015.

ADDRESSES: Send written comments regarding the Proposed Action and 
Supplemental Draft EIS to John Urbanic, NISP EIS Project Manager, U.S. 
Army Corps of Engineers, Omaha District, Denver Regulatory Office, 9307 
South Wadsworth Boulevard, Littleton, CO 80128, or via email to 
[email protected]. Requests to be placed on or be removed from 
the NISP mailing list should also be sent to this address.

FOR FURTHER INFORMATION CONTACT: John Urbanic, NISP EIS Project 
Manager, via phone at 303-979-4120, fax at 303-979-0602, or email at 
[email protected].

SUPPLEMENTARY INFORMATION: The Corps released a Draft EIS for NISP on 
April 30, 2008. After receiving comments on the Draft EIS during the 
public notice period and during the public hearings, the Corps 
determined that substantial additional analysis was needed and that the 
preparation of a Supplemental Draft EIS was required. The purpose of 
the Supplemental Draft EIS is to provide decision-makers and the public 
with information pertaining to the Proposed Action and alternatives, 
and to disclose environmental impacts and identify mitigation measures 
to reduce impacts. The District proposes to construct Glade Reservoir 
with a total storage capacity of approximately 170,000 AF. The District 
also proposes to construct the South Platte Water Conservation Project 
(SPWCP) which includes Galeton Reservoir with a total storage capacity 
of approximately 45,624 AF and support facilities. The Proposed Action 
would also involve rehabilitating an existing diversion dam and intake 
structure in the Cache la Poudre River and constructing a new forebay, 
pumping facility, and outlet channel. Glade Reservoir would inundate 
approximately 7 miles of U.S. Highway 287 and a section of the Munroe 
(North Poudre Supply) Canal, requiring a relocation of the highway and 
the canal east of their current alignments. Construction of a new 
pipeline from Glade Reservoir to the existing Horsetooth Reservoir, a 
part of the Colorado-Big Thompson project, is also proposed. 
Additionally, the SPWCP includes the construction of a new diversion 
dam and intake structure in the South Platte River, pumping facilities, 
and new pipelines for Galeton Reservoir.
    The purpose for the project is to provide additional firm annual 
yield to the 15 water providers and communities to address anticipated 
water demands associated with projected growth. Operations of the 
reservoirs involve an exchange of water that includes a diversion from 
the Poudre River at the Poudre Valley Canal for the District's Grey 
Mountain water right, SPWCP exchanges with Larimer-Weld Canal and New 
Cache Canal, and reservoir exchanges with Terry Lake, Big Windsor 
Reservoir, and Timnath Reservoir.
    In addition to the Proposed Action, the Supplemental Draft EIS 
analyzes three primary alternatives: (1) The No Action Alternative; (2) 
the Cactus Hill Reservoir (190,000 AF), SPWCP (45,624 AF Galeton 
Reservoir), and Poudre Valley Canal Diversion Alternative ; and (3) the 
Cactus Hill Reservoir (190,000 AF), SPWCP (45,624 AF Galeton

[[Page 35323]]

Reservoir), and Multiple Diversion Locations Alternative.
    The U.S. Environmental Protection Agency Region VIII, U.S. Fish and 
Wildlife Service, Bureau of Reclamation, Colorado Department of 
Transportation, Colorado Department of Natural Resources, Colorado 
Department of Public Health and Environment, and Larimer County 
participated as cooperating agencies in the formulation of the 
Supplemental Draft EIS.
    Public Open Houses and Hearings for oral/written comments will be 
held on:
    July 22, 2015 at the Hilton Fort Collins, 425 W. Prospect Road, 
Fort Collins, and July 23, 2015 at the Weld County Administration 
Building, 1152 O Street, Greeley. The Open House will be from 5 p.m. to 
6 p.m. The Hearings will begin at 6 p.m. Copies of the Supplemental 
Draft EIS will be available for review at:
    1. Colorado State University Morgan Library, 501 University Avenue, 
Fort Collins, CO 80523.
    2. Poudre River Public Library District-Old Town Library, 201 
Peterson Street, Fort Collins, CO 80524.
    3. Poudre River Public Library-Harmony Library, 4616 S. Shields 
Street, Fort Collins, CO 80526.
    4. University of Northern Colorado, James A. Michener Library, 
Greeley, CO 80639.
    5. Fort Morgan Public Library, 414 Main Street, Fort Morgan, CO 
80701.
    6. Windsor Recreation Center, 250 11th Street, Windsor, CO 80550.
    7. Northern Colorado Water Conservancy District, 220 Water Avenue, 
Berthoud, CO 80513.
    8. U.S. Army Corps of Engineers, Denver Regulatory Office, 9307 S. 
Wadsworth Boulevard, Littleton, CO 80128.
    Electronic copies of the Supplemental Draft EIS and its supporting 
documents may be obtained from the Denver Regulatory Office or its Web 
site at: http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Colorado/EISNISP

Kiel Downing,
 State Regulatory Program Manager, U.S. Army Corps of Engineers, Omaha 
District, Denver Regulatory Office.
[FR Doc. 2015-15055 Filed 6-18-15; 8:45 am]
 BILLING CODE 3720-58-P



                                                    35322                           Federal Register / Vol. 80, No. 118 / Friday, June 19, 2015 / Notices

                                                    other compliance requirements for small                 project called the Northern Integrated                 SUPPLEMENTARY INFORMATION:     The Corps
                                                    entities.                                               Supply Project (NISP or Project) in                    released a Draft EIS for NISP on April
                                                       2. The action may result in                          Larimer County and Weld County, CO.                    30, 2008. After receiving comments on
                                                    authorizing small entities to furnish the               The purpose of the project is to provide               the Draft EIS during the public notice
                                                    products to the Government.                             the project participants with                          period and during the public hearings,
                                                       3. There are no known regulatory                     approximately 40,000 acre-feet (AF) of                 the Corps determined that substantial
                                                    alternatives which would accomplish                     new, reliable municipal water supply                   additional analysis was needed and that
                                                    the objectives of the Javits-Wagner-                    annually through a regional project                    the preparation of a Supplemental Draft
                                                    O’Day Act (41 U.S.C. 8501–8506) in                      coordinated by the Northern Colorado                   EIS was required. The purpose of the
                                                    connection with the products deleted                    Water Conservancy District (District).                 Supplemental Draft EIS is to provide
                                                    from the Procurement List.                              The participants in NISP requested new                 decision-makers and the public with
                                                                                                            firm yield to meet a portion of their                  information pertaining to the Proposed
                                                    End of Certification
                                                                                                            projected demand through 2060. The                     Action and alternatives, and to disclose
                                                      Accordingly, the following products                   requests for new firm yield are based on               environmental impacts and identify
                                                    are deleted from the Procurement List:                  the participants’ analyses of their                    mitigation measures to reduce impacts.
                                                    Products                                                projected needs, the potential future                  The District proposes to construct Glade
                                                                                                            demands as modeled by the District and                 Reservoir with a total storage capacity of
                                                    Product Name/NSN(s)
                                                                                                            verified by the Corps. NISP would result               approximately 170,000 AF. The District
                                                    7210–00–205–3544—Cushion, Chair                         in direct impacts to jurisdictional waters             also proposes to construct the South
                                                    7210–00–205–3545—Cushion, Chair                         of the United States (U.S.), including                 Platte Water Conservation Project
                                                    Mandatory Source of Supply: Unknown
                                                    Contracting Activity: General Services
                                                                                                            wetlands. The placement of fill material               (SPWCP) which includes Galeton
                                                        Administration                                      in these waters of the U.S. for the                    Reservoir with a total storage capacity of
                                                                                                            construction of water storage and                      approximately 45,624 AF and support
                                                    Product Name/NSN(s)
                                                                                                            distribution facilities associated with                facilities. The Proposed Action would
                                                    2540–00–904–5680—Cushion Seat, Vehicular                developing additional water supplies                   also involve rehabilitating an existing
                                                    Mandatory Source of Supply: The Douglas                 requires authorization from the Corps                  diversion dam and intake structure in
                                                        Center, Skokie, IL
                                                    Contracting Activity: Defense Logistics
                                                                                                            under Section 404 of the Clean Water                   the Cache la Poudre River and
                                                        Agency Land and Maritime                            Act. The District is the Permittee and                 constructing a new forebay, pumping
                                                                                                            Applicant, acting on behalf of the                     facility, and outlet channel. Glade
                                                    Product Name/NSN(s)
                                                                                                            project participants.                                  Reservoir would inundate
                                                    MR 3202—Stay Put Elastics Asst                                                                                 approximately 7 miles of U.S. Highway
                                                                                                               The Supplemental Draft EIS was
                                                    MR 3216—Fashion Bobby Pin                                                                                      287 and a section of the Munroe (North
                                                    Mandatory Source of Supply: Association for             prepared in accordance with the
                                                        Vision Rehabilitation and Employment,               National Environmental Policy Act of                   Poudre Supply) Canal, requiring a
                                                        Inc., Binghamton, NY                                1969, as amended (NEPA), and the                       relocation of the highway and the canal
                                                    Contracting Activity: Defense Commissary                Corps’ regulations for NEPA                            east of their current alignments.
                                                        Agency                                              implementation (33 Code of Federal                     Construction of a new pipeline from
                                                    Product Name/NSN(s)                                     Regulations [CFR] Parts 230 and 325,                   Glade Reservoir to the existing
                                                                                                            Appendices B and C). The Corps,                        Horsetooth Reservoir, a part of the
                                                    MR 992—Duster, Lambswool
                                                    Mandatory Source of Supply: Industries of               Omaha District, Denver Regulatory                      Colorado-Big Thompson project, is also
                                                        the Blind, Inc., Greensboro, NC                     Office is the lead federal agency                      proposed. Additionally, the SPWCP
                                                    Contracting Activity: Defense Commissary                responsible for the Supplemental Draft                 includes the construction of a new
                                                        Agency                                              EIS. Information contained in the EIS                  diversion dam and intake structure in
                                                                                                            serves as the basis for a decision                     the South Platte River, pumping
                                                    Barry S. Lineback,                                                                                             facilities, and new pipelines for Galeton
                                                                                                            regarding issuance of a Section 404
                                                    Director, Business Operations.                                                                                 Reservoir.
                                                                                                            Permit. It also provides information for
                                                    [FR Doc. 2015–15122 Filed 6–18–15; 8:45 am]             local and state agencies having                          The purpose for the project is to
                                                    BILLING CODE 6353–01–P                                  jurisdictional responsibility for affected             provide additional firm annual yield to
                                                                                                            resources.                                             the 15 water providers and communities
                                                                                                            DATES: Written comments on the                         to address anticipated water demands
                                                    DEPARTMENT OF DEFENSE                                   Supplemental Draft EIS will be accepted                associated with projected growth.
                                                                                                            on or before August 4, 2015.                           Operations of the reservoirs involve an
                                                    Department of the Army, Corps of                                                                               exchange of water that includes a
                                                    Engineers                                               ADDRESSES:   Send written comments                     diversion from the Poudre River at the
                                                                                                            regarding the Proposed Action and                      Poudre Valley Canal for the District’s
                                                    Availability of the Supplemental Draft                  Supplemental Draft EIS to John Urbanic,                Grey Mountain water right, SPWCP
                                                    Environmental Impact Statement for                      NISP EIS Project Manager, U.S. Army                    exchanges with Larimer-Weld Canal and
                                                    the Northern Integrated Supply Project,                 Corps of Engineers, Omaha District,                    New Cache Canal, and reservoir
                                                    Larimer and Weld Counties, Colorado                     Denver Regulatory Office, 9307 South                   exchanges with Terry Lake, Big Windsor
                                                    AGENCY: Department of the Army, U.S.                    Wadsworth Boulevard, Littleton, CO                     Reservoir, and Timnath Reservoir.
                                                    Army Corps of Engineers, DoD.                           80128, or via email to nisp.eis@                         In addition to the Proposed Action,
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                                                                            usace.army.mil. Requests to be placed                  the Supplemental Draft EIS analyzes
                                                    ACTION: Notice of Availability.
                                                                                                            on or be removed from the NISP mailing                 three primary alternatives: (1) The No
                                                    SUMMARY:  The U.S. Army Corps of                        list should also be sent to this address.              Action Alternative; (2) the Cactus Hill
                                                    Engineers (Corps) Omaha District has                    FOR FURTHER INFORMATION CONTACT:   John                Reservoir (190,000 AF), SPWCP (45,624
                                                    prepared a Supplemental Draft                           Urbanic, NISP EIS Project Manager, via                 AF Galeton Reservoir), and Poudre
                                                    Environmental Impact Statement (EIS)                    phone at 303–979–4120, fax at 303–                     Valley Canal Diversion Alternative ; and
                                                    to analyze the direct, indirect, and                    979–0602, or email at nisp.eis@                        (3) the Cactus Hill Reservoir (190,000
                                                    cumulative effects of a water supply                    usace.army.mil.                                        AF), SPWCP (45,624 AF Galeton


                                               VerDate Sep<11>2014   19:33 Jun 18, 2015   Jkt 235001   PO 00000   Frm 00024   Fmt 4703   Sfmt 4703   E:\FR\FM\19JNN1.SGM   19JNN1


                                                                                    Federal Register / Vol. 80, No. 118 / Friday, June 19, 2015 / Notices                                               35323

                                                    Reservoir), and Multiple Diversion                      DEPARTMENT OF EDUCATION                                aids and services, and other
                                                    Locations Alternative.                                                                                         accommodations they need in order to
                                                                                                            Application for New Awards; National                   succeed, and are expected to comply
                                                      The U.S. Environmental Protection
                                                                                                            Center for Information and Technical                   with reasonable requirements that an
                                                    Agency Region VIII, U.S. Fish and
                                                                                                            Support for Postsecondary Students                     institution of higher education may
                                                    Wildlife Service, Bureau of
                                                                                                            With Disabilities                                      have concerning documentation of
                                                    Reclamation, Colorado Department of
                                                                                                            AGENCY: Office of Postsecondary                        disability and the need for
                                                    Transportation, Colorado Department of
                                                                                                            Education, Department of Education.                    accommodations under section 504 and
                                                    Natural Resources, Colorado                                                                                    the ADA.
                                                    Department of Public Health and                         ACTION: Notice.
                                                    Environment, and Larimer County                                                                                   Note: A more detailed explanation of the
                                                                                                            Overview Information                                   differences in rights and responsibilities of
                                                    participated as cooperating agencies in                                                                        students with disabilities in secondary
                                                    the formulation of the Supplemental                       National Center for Information and                  school and postsecondary institutions can be
                                                    Draft EIS.                                              Technical Support for Postsecondary                    found in two pamphlets issued by the
                                                      Public Open Houses and Hearings for                   Students with Disabilities                             Department’s Office for Civil Rights. They are
                                                                                                              Notice inviting applications for new                 ‘‘Transition of Students With Disabilities to
                                                    oral/written comments will be held on:
                                                                                                            awards for fiscal year (FY) 2015.                      Postsecondary Education: A Guide for High
                                                      July 22, 2015 at the Hilton Fort                                                                             School Educators,’’ available at:
                                                                                                            Catalog of Federal Domestic Assistance                 www2.ed.gov/about/offices/list/ocr/
                                                    Collins, 425 W. Prospect Road, Fort
                                                                                                            (CFDA) Number: 84.116D.                                transitionguide.html and ‘‘Students with
                                                    Collins, and July 23, 2015 at the Weld
                                                                                                            DATES:Applications Available: June 19,                 Disabilities Preparing for Postsecondary
                                                    County Administration Building, 1152
                                                                                                            2015.                                                  Education: Know Your Rights and
                                                    O Street, Greeley. The Open House will                    Deadline for Transmittal of                          Responsibilities,’’ available at: www2.ed.gov/
                                                    be from 5 p.m. to 6 p.m. The Hearings                   Applications: August 3, 2015.                          about/offices/list/ocr/transition.html.
                                                    will begin at 6 p.m. Copies of the
                                                    Supplemental Draft EIS will be available                Full Text of Announcement                                 Priorities: This notice contains one
                                                                                                                                                                   absolute priority and one invitational
                                                    for review at:                                          I. Funding Opportunity Description                     priority. In accordance with 34 CFR
                                                      1. Colorado State University Morgan                      Purpose of Program: The purpose of                  75.105(b)(2)(iv), the absolute priority is
                                                    Library, 501 University Avenue, Fort                    this program is to support a National                  from section 777(a) of the Higher
                                                    Collins, CO 80523.                                      Center for Information and Technical                   Education Act of 1965, as amended
                                                      2. Poudre River Public Library                        Support for Postsecondary Students                     (HEA) (20 U.S.C. 1140q(a)).
                                                    District-Old Town Library, 201 Peterson                 with Disabilities (the Center) to provide                 Absolute Priority: For FY 2015 and
                                                    Street, Fort Collins, CO 80524.                         technical assistance and information on                any subsequent year in which we make
                                                                                                            best and promising practices for                       awards from the list of unfunded
                                                      3. Poudre River Public Library-                       students with disabilities as they                     applicants from this competition, this
                                                    Harmony Library, 4616 S. Shields                        transition to or attend postsecondary                  priority is an absolute priority. Under 34
                                                    Street, Fort Collins, CO 80526.                         education. Institutions of higher                      CFR 75.105(c)(3), we consider only
                                                      4. University of Northern Colorado,                   education, as well as elementary and                   applications that meet this priority.
                                                    James A. Michener Library, Greeley, CO                  secondary schools, have legal                             This priority is:
                                                    80639.                                                  obligations under two civil rights laws                   Entities that can demonstrate the
                                                                                                            prohibiting disability discrimination,                 experience and capacity to improve
                                                      5. Fort Morgan Public Library, 414
                                                                                                            section 504 of the Rehabilitation Act of               postsecondary recruitment, transition,
                                                    Main Street, Fort Morgan, CO 80701.
                                                                                                            1973 (29 U.S.C. 794) and the Americans                 retention, and completion rates of
                                                      6. Windsor Recreation Center, 250                     with Disabilities Act of 1990 (ADA) (42                students with disabilities by providing:
                                                    11th Street, Windsor, CO 80550.                         U.S.C. 12101–12213). The technical                        1. Assistance to students and families.
                                                      7. Northern Colorado Water                            assistance and information provided by                 The Center must provide information
                                                    Conservancy District, 220 Water                         the Center can help students, parents,                 and technical assistance to students
                                                    Avenue, Berthoud, CO 80513.                             and educational officials in determining               with disabilities and the families of
                                                                                                            how to meet these obligations and                      students with disabilities to support
                                                      8. U.S. Army Corps of Engineers,                      ensure the rights of students with                     students across the broad spectrum of
                                                    Denver Regulatory Office, 9307 S.                       disabilities. In particular, the Center can            disabilities, including—
                                                    Wadsworth Boulevard, Littleton, CO                      assist students with disabilities and                     (a) Information to assist individuals
                                                    80128.                                                  their families in understanding that in                with disabilities who are prospective
                                                      Electronic copies of the Supplemental                 institutions of higher education,                      students of an institution of higher
                                                    Draft EIS and its supporting documents                  students with disabilities do not have                 education in planning for postsecondary
                                                    may be obtained from the Denver                         the same rights and protections they had               education while the students are in
                                                    Regulatory Office or its Web site at:                   in secondary school under section 504                  secondary school;
                                                    http://www.nwo.usace.army.mil/                          and the Individuals with Disabilities                     (b) Information and technical
                                                    Missions/RegulatoryProgram/Colorado/                    Education Act (IDEA), 20 U.S.C. 1400 et                assistance provided to individualized
                                                    EISNISP                                                 seq., for eligible children with                       education program teams (as defined in
                                                                                                            disabilities. Students with disabilities               20 U.S.C. 1414(d)(1)(B)) and teams
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    Kiel Downing,                                           and their parents need to understand                   determining services under section 504
                                                    State Regulatory Program Manager, U.S.                  the differences in these rights and                    of the Rehabilitation Act of 1973, as
                                                    Army Corps of Engineers, Omaha District,                responsibilities as they enter college and             amended, for secondary school students
                                                    Denver Regulatory Office.                               pursue postsecondary education.                        with disabilities, and to early outreach
                                                    [FR Doc. 2015–15055 Filed 6–18–15; 8:45 am]             Specifically, unlike students in                       and student services programs,
                                                    BILLING CODE 3720–58–P                                  secondary school, postsecondary                        including programs authorized under
                                                                                                            students are responsible for requesting                subparts 2, 4, and 5 of title IV of the
                                                                                                            the academic adjustments, auxiliary                    HEA, to support students across a broad


                                               VerDate Sep<11>2014   19:33 Jun 18, 2015   Jkt 235001   PO 00000   Frm 00025   Fmt 4703   Sfmt 4703   E:\FR\FM\19JNN1.SGM   19JNN1



Document Created: 2018-02-22 11:10:42
Document Modified: 2018-02-22 11:10:42
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of Availability.
DatesWritten comments on the Supplemental Draft EIS will be accepted on or before August 4, 2015.
ContactJohn Urbanic, NISP EIS Project Manager, via phone at 303-979-4120, fax at 303-979-0602, or email at [email protected]
FR Citation80 FR 35322 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR