80_FR_35452 80 FR 35334 - Columbia Gas Transmission, LLC; Notice of Application

80 FR 35334 - Columbia Gas Transmission, LLC; Notice of Application

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 118 (June 19, 2015)

Page Range35334-35335
FR Document2015-15111

Federal Register, Volume 80 Issue 118 (Friday, June 19, 2015)
[Federal Register Volume 80, Number 118 (Friday, June 19, 2015)]
[Notices]
[Pages 35334-35335]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-15111]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP15-495-000]


Columbia Gas Transmission, LLC; Notice of Application

    Take notice that on May 20, 2015, Columbia Gas Transmission, LLC 
(Columbia) 5151 San Felipe, Suite 2500, Houston, Texas 77056, filed an 
application pursuant to sections 7(b) and 7(c) of the Natural Gas Act 
(NGA) and the Federal Energy Regulatory Commission's (Commission) 
regulations seeking authorization to abandon approximately 33 miles of 
Line 138, an existing multi-diameter pipeline located in Fayette and 
Somerset Counties, Pennsylvania, Preston County, West Virginia, and 
Garrett County, Maryland. Columbia also proposes to construct: (1) 
Approximately 150 feet of 2-inch diameter pipe from its Line 1804 and 
Line 10240 in Somerset County, Pennsylvania, to the right-of-way of 
Line 138; and (2) an additional 3,300 feet of 2-inch diameter pipe 
along the right-of-way of Line 138 to the Columbia of Pennsylvania 
measuring station in Somerset County, Pennsylvania, all as more fully 
described in the application which is on file with the Commission and 
open to public inspection. The filing may also be viewed on the web at 
http://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC at 
[email protected] or call toll-free, (866) 208-3676 or TTY, 
(202) 502-8659.
    Any questions regarding this application should be directed to 
Tyler Brown, Senior Counsel, Columbia Gas Transmission, LLC, 5151 San 
Felipe Suite 2500, Houston, TX 77056, or call (713) 386-3797.
    To ensure continued firm transportation for an existing customer, 
Columbia must construct the proposed 3,450 feet of pipeline extending 
from Columbia's Line 1804 and Line 10240 to replace the 33 miles of 
Line 138 to be abandoned. Columbia states that no other firm 
transportation customers exist on the Line 138 section proposed to be 
abandoned.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below file with the Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 7 copies of filings made in the proceeding with the Commission 
and must mail a copy to the applicant and to every other party. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at http://www.ferc.gov. Persons unable to file electronically should 
submit an original and 5 copies of the protest or intervention to the 
Federal Energy regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    Comment Date: 5:00 p.m. Eastern Time on June 25, 2015


[[Page 35335]]


    Dated: June 4, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-15111 Filed 6-18-15; 8:45 am]
 BILLING CODE 6717-01-P



                                                    35334                           Federal Register / Vol. 80, No. 118 / Friday, June 19, 2015 / Notices

                                                      • August 6, 2015, 6:00 p.m. to 9:00                   Pennsylvania, to the right-of-way of                   with the requirements of the
                                                    p.m., La Quinta Inn, Twin Falls, Idaho                  Line 138; and (2) an additional 3,300                  Commission’s Rules of Practice and
                                                    NNPP will provide additional                            feet of 2-inch diameter pipe along the                 Procedure (18 CFR 385.214 or 385.211)
                                                    notification of the hearing times and                   right-of-way of Line 138 to the Columbia               and the Regulations under the NGA (18
                                                    locations through newspaper                             of Pennsylvania measuring station in                   CFR 157.10). A person obtaining party
                                                    advertisements and other appropriate                    Somerset County, Pennsylvania, all as                  status will be placed on the service list
                                                    media.                                                  more fully described in the application                maintained by the Secretary of the
                                                      At each hearing, NNPP will hold an                    which is on file with the Commission                   Commission and will receive copies of
                                                    open house for the first hour prior to                  and open to public inspection. The                     all documents filed by the applicant and
                                                    beginning the formal portion of the                     filing may also be viewed on the web at                by all other parties. A party must submit
                                                    hearing to allow participants to view                   http://www.ferc.gov using the                          7 copies of filings made in the
                                                    informational materials, ask questions of               ‘‘eLibrary’’ link. Enter the docket                    proceeding with the Commission and
                                                    NNPP representatives, and register to                   number excluding the last three digits in              must mail a copy to the applicant and
                                                    provide oral comments. The registration                 the docket number field to access the                  to every other party. Only parties to the
                                                    table will have a registration form to                  document. For assistance, contact FERC                 proceeding can ask for court review of
                                                    indicate mailing list preferences for                   at FERCOnlineSupport@ferc.gov or call                  Commission orders in the proceeding.
                                                    future communications about the                         toll-free, (866) 208–3676 or TTY, (202)                   However, a person does not have to
                                                    project and whether oral comments will                  502–8659.                                              intervene in order to have comments
                                                    be given. The public may provide                           Any questions regarding this                        considered. The second way to
                                                    written and/or oral comments at the                     application should be directed to Tyler                participate is by filing with the
                                                    hearings. Speakers may be asked to limit                Brown, Senior Counsel, Columbia Gas                    Secretary of the Commission, as soon as
                                                    their oral comments to a certain time                   Transmission, LLC, 5151 San Felipe                     possible, an original and two copies of
                                                    limit to be decided at the beginning of                 Suite 2500, Houston, TX 77056, or call                 comments in support of or in opposition
                                                    each of the public hearings so as to                    (713) 386–3797.                                        to this project. The Commission will
                                                    ensure that as many people as possible                     To ensure continued firm                            consider these comments in
                                                    have the opportunity to speak.                          transportation for an existing customer,               determining the appropriate action to be
                                                      Persons unable to attend these                        Columbia must construct the proposed                   taken, but the filing of a comment alone
                                                    hearings may view informational                         3,450 feet of pipeline extending from                  will not serve to make the filer a party
                                                    materials by visiting the NNPP Web site                 Columbia’s Line 1804 and Line 10240 to                 to the proceeding. The Commission’s
                                                    www.ecfrecapitalization.us.                             replace the 33 miles of Line 138 to be                 rules require that persons filing
                                                      Written comments on the Draft EIS                     abandoned. Columbia states that no                     comments in opposition to the project
                                                    also may be submitted to the addresses                  other firm transportation customers                    provide copies of their protests only to
                                                    shown above under ADDRESSES.                            exist on the Line 138 section proposed                 the party or parties directly involved in
                                                                                                            to be abandoned.                                       the protest.
                                                      Issued in Washington, DC on 15 June 2015.                Pursuant to section 157.9 of the                       Persons who wish to comment only
                                                    John M. McKenzie,                                       Commission’s rules, 18 CFR 157.9,                      on the environmental review of this
                                                    Director, Regulatory Affairs, Naval Nuclear             within 90 days of this Notice the                      project should submit an original and
                                                    Propulsion Program.                                     Commission staff will either: complete                 two copies of their comments to the
                                                    [FR Doc. 2015–15140 Filed 6–18–15; 8:45 am]             its environmental assessment (EA) and                  Secretary of the Commission.
                                                    BILLING CODE 6450–01–P                                  place it into the Commission’s public                  Environmental commentors will be
                                                                                                            record (eLibrary) for this proceeding; or              placed on the Commission’s
                                                                                                            issue a Notice of Schedule for                         environmental mailing list, will receive
                                                    DEPARTMENT OF ENERGY                                    Environmental Review. If a Notice of                   copies of the environmental documents,
                                                                                                            Schedule for Environmental Review is                   and will be notified of meetings
                                                    Federal Energy Regulatory                               issued, it will indicate, among other                  associated with the Commission’s
                                                    Commission                                              milestones, the anticipated date for the               environmental review process.
                                                    [Docket No. CP15–495–000]                               Commission staff’s issuance of the final               Environmental commentors will not be
                                                                                                            environmental impact statement (FEIS)                  required to serve copies of filed
                                                    Columbia Gas Transmission, LLC;                         or EA for this proposal. The filing of the             documents on all other parties.
                                                    Notice of Application                                   EA in the Commission’s public record                   However, the non-party commentors
                                                                                                            for this proceeding or the issuance of a               will not receive copies of all documents
                                                      Take notice that on May 20, 2015,                     Notice of Schedule for Environmental                   filed by other parties or issued by the
                                                    Columbia Gas Transmission, LLC                          Review will serve to notify federal and                Commission (except for the mailing of
                                                    (Columbia) 5151 San Felipe, Suite 2500,                 state agencies of the timing for the                   environmental documents issued by the
                                                    Houston, Texas 77056, filed an                          completion of all necessary reviews, and               Commission) and will not have the right
                                                    application pursuant to sections 7(b)                   the subsequent need to complete all                    to seek court review of the
                                                    and 7(c) of the Natural Gas Act (NGA)                   federal authorizations within 90 days of               Commission’s final order.
                                                    and the Federal Energy Regulatory                       the date of issuance of the Commission                    The Commission strongly encourages
                                                    Commission’s (Commission) regulations                   staff’s FEIS or EA.                                    electronic filings of comments, protests
                                                    seeking authorization to abandon                           There are two ways to become                        and interventions in lieu of paper using
                                                    approximately 33 miles of Line 138, an                  involved in the Commission’s review of                 the ‘‘eFiling’’ link at http://
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    existing multi-diameter pipeline located                this project. First, any person wishing to             www.ferc.gov. Persons unable to file
                                                    in Fayette and Somerset Counties,                       obtain legal status by becoming a party                electronically should submit an original
                                                    Pennsylvania, Preston County, West                      to the proceedings for this project                    and 5 copies of the protest or
                                                    Virginia, and Garrett County, Maryland.                 should, on or before the comment date                  intervention to the Federal Energy
                                                    Columbia also proposes to construct: (1)                stated below file with the Federal                     regulatory Commission, 888 First Street
                                                    Approximately 150 feet of 2-inch                        Energy Regulatory Commission, 888                      NE., Washington, DC 20426.
                                                    diameter pipe from its Line 1804 and                    First Street, NE., Washington, DC 20426,                  Comment Date: 5:00 p.m. Eastern
                                                    Line 10240 in Somerset County,                          a motion to intervene in accordance                    Time on June 25, 2015


                                               VerDate Sep<11>2014   19:33 Jun 18, 2015   Jkt 235001   PO 00000   Frm 00036   Fmt 4703   Sfmt 4703   E:\FR\FM\19JNN1.SGM   19JNN1


                                                                                    Federal Register / Vol. 80, No. 118 / Friday, June 19, 2015 / Notices                                                  35335

                                                      Dated: June 4, 2015.                                     Filed Date: 6/12/15.                                  Dated: June 15, 2015.
                                                    Kimberly D. Bose,                                          Accession Number: 20150612–5228.                    Kimberly D. Bose,
                                                    Secretary.                                                 Comments Due: 5 p.m. ET 7/6/15.                     Secretary.
                                                    [FR Doc. 2015–15111 Filed 6–18–15; 8:45 am]                Docket Numbers: ER15–1914–000.                      [FR Doc. 2015–15103 Filed 6–18–15; 8:45 am]
                                                    BILLING CODE 6717–01–P                                     Applicants: 87RL 8me LLC.                           BILLING CODE 6717–01–P

                                                                                                               Description: Baseline eTariff Filing:
                                                                                                            87RL 8me LLC MBR Tariff to be
                                                    DEPARTMENT OF ENERGY                                    effective 8/1/2015.                                    DEPARTMENT OF ENERGY

                                                    Federal Energy Regulatory                                  Filed Date: 6/12/15.                                Federal Energy Regulatory
                                                    Commission                                                 Accession Number: 20150612–5229.                    Commission
                                                                                                               Comments Due: 5 p.m. ET 7/6/15.
                                                    Combined Notice of Filings #1                              Docket Numbers: ER15–1915–000.                      [Docket No. CD15–28–000]

                                                       Take notice that the Commission                         Applicants: Clean Energy Future—                    SPS of Oregon; Notice of Preliminary
                                                    received the following electric corporate               Lordstown, LLC.                                        Determination of a Qualifying Conduit
                                                    filings:                                                   Description: Request for Limited                    Hydropower Facility and Soliciting
                                                       Docket Numbers: EC15–156–000.                        Waiver of Clean Energy Future—                         Comments and Motions To Intervene
                                                       Applicants: American Transmission                    Lordstown, LLC.
                                                    Company LLC.                                               Filed Date: 6/12/15.                                   On June 4, 2015, SPS of Oregon filed
                                                       Description: Application of American                    Accession Number: 20150612–5252.                    a notice of intent to construct a
                                                    Transmission Company LLC for                               Comments Due: 5 p.m. ET 7/6/15.                     qualifying conduit hydropower facility,
                                                    Authority to Acquire Certain Facilities                                                                        pursuant to section 30 of the Federal
                                                                                                               Take notice that the Commission
                                                    under Section 203 of the Federal Power                                                                         Power Act (FPA), as amended by section
                                                                                                            received the following electric securities
                                                    Act.                                                                                                           4 of the Hydropower Regulatory
                                                                                                            filings:
                                                       Filed Date: 6/12/15.                                                                                        Efficiency Act of 2013 (HREA). The
                                                                                                               Docket Numbers: ES15–34–000.                        proposed SPS2 Hydro project would
                                                       Accession Number: 20150612–5253.
                                                       Comments Due: 5 p.m. ET 7/6/15.                         Applicants: Central Maine Power                     have an installed capacity of 13
                                                                                                            Company.                                               kilowatts (kW) and would be located on
                                                       Take notice that the Commission
                                                                                                               Description: Application for                        the existing Westside Ditch, used for
                                                    received the following exempt
                                                                                                            Authorization to Issue Short-term Debt                 irrigation, and will be enclosed with a
                                                    wholesale generator filings:
                                                                                                            Instruments of Central Maine Power                     10-inch-diameter pipe. The project
                                                       Docket Numbers: EG15–95–000.
                                                       Applicants: Blue Sky West, LLC.                      Company.                                               would be located near Wallowa in
                                                       Description: Notice of Self-                            Filed Date: 6/12/15.                                Wallowa County, Oregon.
                                                    Certification of Exempt Wholesale                          Accession Number: 20150612–5255.                       Applicant Contact: Kyle Petrocine,
                                                    Generator Status of Blue Sky West, LLC.                    Comments Due: 5 p.m. ET 7/6/15.                     SPS of Oregon, 401 NE First St., Suite
                                                       Filed Date: 6/11/15.                                    The filings are accessible in the                   A, Enterprise, OR 97828, Phone No.
                                                       Accession Number: 20150611–5238.                     Commission’s eLibrary system by                        (541) 398–0018.
                                                       Comments Due: 5 p.m. ET 7/2/15.                      clicking on the links or querying the                     FERC Contact: Robert Bell, Phone No.
                                                       Take notice that the Commission                      docket number.                                         (202) 502–6062, email: robert.bell@
                                                    received the following electric rate                       Any person desiring to intervene or                 ferc.gov.
                                                    filings:                                                protest in any of the above proceedings                   Qualifying Conduit Hydropower
                                                       Docket Numbers: ER11–3576–011;                       must file in accordance with Rules 211                 Facility Description: The proposed
                                                    ER11–3401–010.                                          and 214 of the Commission’s                            project would consist of: (1) 2,500 feet
                                                       Applicants: Golden Spread Electric                   Regulations (18 CFR 385.211 and                        of 10-inch PVC pipe located on the
                                                    Cooperative, Inc., Golden Spread                        385.214) on or before 5:00 p.m. Eastern                existing Westside Ditch; (2) a proposed
                                                    Panhandle Wind Ranch, LLC.                              time on the specified comment date.                    5′x8′ powerhouse containing one
                                                       Description: Notice of Non-material                  Protests may be considered, but                        generating unit with an installed
                                                    Change in Status of Golden Spread                       intervention is necessary to become a                  capacity of 13 kW; (3) a short tailrace
                                                    Electric Cooperative, Inc.                              party to the proceeding.                               exhausting flow back into the irrigation
                                                       Filed Date: 6/12/15.                                    eFiling is encouraged. More detailed                ditch; and (4) appurtenant facilities. The
                                                       Accession Number: 20150612–5254.                     information relating to filing                         proposed project would have an
                                                       Comments Due: 5 p.m. ET 7/6/15.                      requirements, interventions, protests,                 estimated annual generating capacity of
                                                       Docket Numbers: ER15–1913–000..                      service, and qualifying facilities filings             81.895 megawatt-hours.
                                                       Applicants: Ameren Illinois Company                  can be found at: http://www.ferc.gov/                     A qualifying conduit hydropower
                                                       Description: Section 205(d) Rate                     docs-filing/efiling/filing-req.pdf. For                facility is one that is determined or
                                                    Filing: Cancellation of Rate Schedule                   other information, call (866) 208–3676                 deemed to meet all of the criteria shown
                                                    106 to be effective 3/30/2015.                          (toll free). For TTY, call (202) 502–8659.             in the table below.

                                                                                      TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                                                                                                                                                                        Satisfies
                                                                 Statutory provision                                                             Description                                             (Y/N)

                                                    FPA 30(a)(3)(A), as amended by HREA ...             The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or              Y
                                                                                                          similar manmade water conveyance that is operated for the distribution of water for
                                                                                                          agricultural, municipal, or industrial consumption and not primarily for the genera-
                                                                                                          tion of electricity.




                                               VerDate Sep<11>2014   19:33 Jun 18, 2015   Jkt 235001   PO 00000   Frm 00037   Fmt 4703   Sfmt 4703   E:\FR\FM\19JNN1.SGM   19JNN1



Document Created: 2018-02-22 11:10:04
Document Modified: 2018-02-22 11:10:04
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates5:00 p.m. Eastern Time on June 25, 2015
FR Citation80 FR 35334 