80_FR_35455 80 FR 35337 - N.E.W. Hydro, Inc.; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions

80 FR 35337 - N.E.W. Hydro, Inc.; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 118 (June 19, 2015)

Page Range35337-35339
FR Document2015-15097

Federal Register, Volume 80 Issue 118 (Friday, June 19, 2015)
[Federal Register Volume 80, Number 118 (Friday, June 19, 2015)]
[Notices]
[Pages 35337-35339]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-15097]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2744-043]


N.E.W. Hydro, Inc.; Notice of Application Accepted for Filing, 
Soliciting Motions To Intervene and Protests, Ready for Environmental 
Analysis, and Soliciting Comments, Recommendations, Terms and 
Conditions, and Prescriptions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: 2744-043.
    c. Date filed: February 28, 2013.

[[Page 35338]]

    d. Applicant: N.E.W. Hydro, Inc.
    e. Name of Project: Menominee/Park Mill Hydroelectric Project.
    f. Location: The existing project is located on the Menominee 
River, in the city of Menominee, Menominee County, Michigan, and in the 
city of Marinette, Marinette County, Wisconsin. The project does not 
affect federal lands.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Scott Klabunde, North American Hydro 
Holdings, LLC, P.O. Box 167, Neshkoro, WI 54960-0167; Telephone (920) 
293-4628 Ext. 314.
    i. FERC Contact: Chelsea Hudock, Telephone (202) 502-8448, and 
email at [email protected].
    j. Deadline for filing motions to intervene, protests, comments, 
recommendations, terms and conditions, and prescriptions: 60 days from 
the issuance date of this notice; reply comments are due 105 days from 
the issuance date of this notice.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene, protests, comments, recommendations, terms and 
conditions, and prescriptions using the Commission's eFiling system at 
http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. The first page of any filing should 
include docket number P-2744-043.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted for filing and is now is 
ready for environmental analysis.
    l. The Menominee-Park Mill Project consists of two developments: 
The Menominee Development and the Park Mill Development. The applicant 
proposes no new changes to project operation at either development as 
part of relicensing the project. The centerline of the Menominee River 
constitutes the common border between Michigan and Wisconsin. The 
Menominee powerhouse is located on the Michigan side of the Menominee 
River whereas the powerhouse for the Park Mill development is located 
on the Wisconsin side of the Menominee River. The project is estimated 
to generate an average of 28 million kilowatt-hours annually.

Park Mill Development

    The Park Mill Development consists of the following existing 
features: (1) A 538.58-foot-long, 22-foot-high, concrete gravity dam 
that includes, a 48.5-foot-long overflow spillway with a crest 
elevation of 607.93 feet National Geodetic Vertical Datum (NGVD), 
topped with flashboards providing a crest elevation of 610.93 feet 
NGVD; a 168.58-foot-long spillway with seven 20-foot-wide by 13-foot-
high Tainter gates with a sill elevation of 597.23 feet NGVD and a top 
of gate elevation 610.93 feet NGVD; an 18-foot-long abandoned fishway 
having a crest elevation of 610.93 feet NGVD; and a 303.5-foot-long 
overflow spillway with a crest elevation of 607.93 feet NGVD, topped 
with flashboards providing a crest elevation of 610.93 feet NGVD; (2) a 
reservoir with a normal operating elevation of 610.43 feet NGVD, a 
surface area of about 539 acres, a gross storage of 3,788 acre-feet, 
and a hydraulic height of 16 feet; (3) inlet works that consist of a 
100-foot-wide concrete gravity section with five 16-foot-wide by 16-
foot-high Tainter gates having a sill elevation of 595.23 feet NGVD and 
a top of gate elevation of 611.23 feet NGVD; and a 77.84-foot-long side 
overflow spillway with a crest elevation of 610.13 NGVD, topped with 
flashboards providing a crest elevation of 611.13 feet NGVD; (4) a 
2,400-foot-long power canal that is created by an earthen embankment 
with a 16-foot top width and a crest elevation of 613 feet NGVD; (5) 
angled trashracks that are 80 feet long by 20 feet high with 1.75 inch 
clear bar spacing; (6) a 169-foot-long, 62-foot-wide stone and brick 
powerhouse at the downstream end of the headrace canal with a total 
installed capacity of 2.375 megawatts (MW), consisting of one 300-
horsepower (HP) Kaplan turbine connected to a 0.225-MW generator, two 
800-HP Francis turbines each connected to a 0.420-MW generator, two 
700-HP Kaplan turbines each connected to a 0.430-MW generator, one 465-
HP Kaplan turbine connected to a 0.450-MW generator; (7) a 3-phase 
3,000-kilovolt ampere (kVA), 0.48/24.9-kilovolt (kV) step-up 
transformer; (8) a 4,630-foot-long, 24.9-kV transmission line from the 
Park Mill transformer to its interconnection with Wisconsin Public 
Service Corporation (WPSC); and (9) appurtenant facilities. As part of 
a Commission-approved amendment of its current license, the applicant 
is currently modifying the Park Mill development by installing fish 
passage facilities.

Menominee Development

    The Menominee Development consists of the following existing 
features: (1) A 466.5-foot-long, 24-foot-high, concrete gravity dam 
that includes, an 8-foot-long abandoned fishway having a crest 
elevation of 593.93 feet NGVD; a 150.5-foot-long overflow spillway with 
a crest elevation of 593.93 feet NGVD; a 293-foot-long spillway with 12 
20-foot-wide by 12-foot-high Tainter gates with a sill elevation of 
582.43 feet and a top of gate elevation 594.43 feet NGVD; and a 15-
foot-long dam with a crest elevation of 598.43 feet NGVD; (2) a 20-
foot-long earthen embankment with a concrete core wall connected to the 
concrete dam at the south end of the dam; (3) a reservoir with a normal 
operating elevation of 593.53 feet NGVD, a surface area of about 143 
acres, a normal operating head of 12 feet, and a gross storage of 350 
acre-feet; (4) a set of angled trashracks in front of generating units 
#4 and #5 that are each 15\1/2\ foot-high by 28-foot-wide and are 
comprised of 7 panels with 3.5 inch clear bar spacing; a set of angled 
trashracks in front of generating units #8 and #9 that are each 15\1/2\ 
foot-high by 24 and \1/4\ feet-wide and comprised of 6 panels with 3.5-
inch clear bar spacing; (5) a 54-foot-long, 29-foot-wide concrete 
powerhouse containing two turbine/generator units, and a 67-foot-long, 
31-foot-wide concrete powerhouse containing two turbine/generator 
units, with powerhouses integral with the north side of the dam with a 
total installed capacity of 2.240 MW and a total combined maximum 
hydraulic capacity of 2,622 cfs, consisting of two 500-HP Kaplan 
turbines each connected to a 0.458 MW generator, and two 1,130-HP 
Kaplan turbines each connected to a 0.662 MW generator; (6) a 3-phase 
3,000-kVA 4.16/24.9-kV step-up transformer; (7) a 558-foot-long, 24.9-
kV transmission line; and (8) appurtenant facilities. As part of a 
Commission-approved amendment of its current license, the applicant is 
currently modifying the Menominee development by installing fish 
passage facilities.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be

[[Page 35339]]

viewed on the Commission's Web site at http://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, contact FERC Online Support at FERCOnlineSupport. A copy of 
the application is also available for inspection and reproduction at 
the address in item h above.
    Register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Anyone may submit comments, a protest, or a motion to intervene 
in accordance with the requirements of Rules of Practice and Procedure, 
18 CFR 385.210, .211, and .214. In determining the appropriate action 
to take, the Commission will consider all protests or other comments 
filed, but only those who file a motion to intervene in accordance with 
the Commission's Rules may become a party to the proceeding. Any 
comments, protests, or motions to intervene must be received on or 
before the specified comment date for the particular application.
    All filings must (1) bear in all capital letters the title 
``PROTEST'', ``MOTION TO INTERVENE'', ``COMMENTS,'' ``REPLY COMMENTS,'' 
``RECOMMENDATIONS,'' ``TERMS AND CONDITIONS,'' or ``PRESCRIPTIONS;'' 
(2) set forth in the heading the name of the applicant and the project 
number of the application to which the filing responds; (3) furnish the 
name, address, and telephone number of the person protesting or 
intervening; and (4) otherwise comply with the requirements of 18 CFR 
385.2001 through 385.2005. All comments, recommendations, terms and 
conditions or prescriptions must set forth their evidentiary basis and 
otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may 
obtain copies of the application directly from the applicant. A copy of 
any protest or motion to intervene must be served upon each 
representative of the applicant specified in the particular 
application. A copy of all other filings in reference to this 
application must be accompanied by proof of service on all persons 
listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    o. Procedural Schedule:
    The application will be processed according to the following 
revised Hydro Licensing Schedule. Revisions to the schedule may be made 
as appropriate.

------------------------------------------------------------------------
                 Milestone                           Target Date
------------------------------------------------------------------------
Filing of recommendations terms and         August 2015.
 conditions, and prescriptions.
Commission issues Environmental Assessment  February 2016.
------------------------------------------------------------------------

    p. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of this notice.
    q. A license applicant must file no later than 60 days following 
the date of issuance of the notice of acceptance and ready for 
environmental analysis provided for in 5.22: (1) A copy of the water 
quality certification; (2) a copy of the request for certification, 
including proof of the date on which the certifying agency received the 
request; or (3) evidence of waiver of water quality certification.

    Dated: June 12, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-15097 Filed 6-18-15; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                    Federal Register / Vol. 80, No. 118 / Friday, June 19, 2015 / Notices                                                  35337

                                                    Reference Room or may be viewed on                      will be required. Nevertheless, this                     Directions: From the junction of
                                                    the Commission’s Web site (http://                      meeting will satisfy the NEPA scoping                  Highway 20 and Lindsay Boulevard in
                                                    www.ferc.gov), using the ‘‘eLibrary’’                   requirements, irrespective of whether an               Idaho Falls, go north on Lindsay
                                                    link. Enter the docket number,                          EA or EIS is issued by the Commission.                 Boulevard for 2 miles, continue onto
                                                    excluding the last three digits in the                                                                         North River Road for 3.5 miles to the
                                                                                                            Scoping Meetings
                                                    docket number field, to access the                                                                             public boat launch and picnic area on
                                                    document. For assistance, contact FERC                    Commission staff will hold two                       the west side of the Snake River.
                                                    Online Support at                                       scoping meetings in the vicinity of the
                                                                                                                                                                   Meeting Objectives
                                                    FERCONlineSupport@ferc.gov, (866)                       project at the time and place noted
                                                    208–3676 (toll free), or (202) 502–8659                 below. The daytime meeting will focus                     At the scoping meetings, staff will: (1)
                                                    (TTY).                                                  on resource agency, Indian tribes, and                 Initiate scoping of the issues; (2) review
                                                       Register online at http://                           non-governmental organization                          and discuss existing conditions and
                                                    www.ferc.gov/docs-filing/                               concerns, while the evening meeting is                 resource management objectives; (3)
                                                    esubscription.asp to be notified via                    primarily for receiving input from the                 review and discuss existing information
                                                    email of new filing and issuances                       public. We invite all interested                       and identify preliminary information
                                                    related to this or other pending projects.              individuals, organizations, and agencies               and study needs; (4) review and discuss
                                                    For assistance, contact FERC Online                     to attend one or both of the meetings,                 the process plan and schedule for pre-
                                                    Support.                                                and to assist staff in identifying                     filing activity that incorporates the time
                                                       n. With this notice, we are soliciting               particular study needs, as well as the                 frames provided for in Part 5 of the
                                                    comments on the PAD and                                 scope of environmental issues to be                    Commission’s regulations and, to the
                                                    Commission’s staff Scoping Document 1                   addressed in the environmental                         extent possible, maximizes coordination
                                                    (SD1), as well as study requests. All                   document. The times and locations of                   of federal, state, and tribal permitting
                                                    comments on the PAD and SD1, and                        these meetings are as follows:                         and certification processes; and (5)
                                                    study requests should be sent to the                                                                           discuss the appropriateness of any
                                                    address above in paragraph h. In                        Evening Scoping Meeting                                federal or state agency or Indian tribe
                                                    addition, all comments on the PAD and                     Date and Time: Wednesday, July 8,                    acting as a cooperating agency for
                                                    SD1, study requests, requests for                       2015, 7:00 p.m. (MDT).                                 development of an environmental
                                                    cooperating agency status, and all                        Location: Shilo Inn Suites Hotel, 780                document.
                                                    communications to and from                              Lindsay Blvd., Idaho Falls, ID.                           Meeting participants should come
                                                    Commission staff related to the merits of                                                                      prepared to discuss their issues and/or
                                                                                                              Phone Number: (208) 523–0088.
                                                    the potential application must be filed                                                                        concerns. Please review the PAD in
                                                    with the Commission.                                    Daytime Scoping Meeting                                preparation for the scoping meetings.
                                                       The Commission strongly encourages                                                                          Directions on how to obtain a copy of
                                                    electronic filing. Please file all                         Date and Time: Thursday, July 9,
                                                                                                            2015, 9:30 a.m. (MDT).                                 the PAD and SD1 are included in item
                                                    documents using the Commission’s                                                                               m. of this document.
                                                    eFiling system at http://www.ferc.gov/                     Location: Shilo Inn Suites Hotel, 780
                                                    docs-filing/efiling.asp. Commenters can                 Lindsay Blvd., Idaho Falls, ID.                        Meeting Procedures
                                                    submit brief comments up to 6,000                          Phone Number: (208) 523–0088.                         The meetings will be recorded by a
                                                    characters, without prior registration,                    Scoping Document 1 (SD1), which                     stenographer and will be placed in the
                                                    using the eComment system at http://                    outlines the subject areas to be                       public records of the project.
                                                    www.ferc.gov/docs-filing/                               addressed in the environmental
                                                                                                                                                                     Dated: June 12, 2015.
                                                    ecomment.asp. You must include your                     document, was mailed to the
                                                                                                            individuals and entities on the                        Kimberly D. Bose,
                                                    name and contact information at the end
                                                                                                            Commission’s mailing list. Copies of                   Secretary.
                                                    of your comments. For assistance,
                                                    please contact FERC Online Support at                   SD1 will be available at the scoping                   [FR Doc. 2015–15109 Filed 6–18–15; 8:45 am]
                                                    FERCOnlineSupport@ferc.gov. In lieu of                  meetings, or may be viewed on the web                  BILLING CODE 6717–01–P

                                                    electronic filing, please send a paper                  at http://www.ferc.gov, using the
                                                    copy to: Secretary, Federal Energy                      ‘‘eLibrary’’ link. Follow the directions
                                                    Regulatory Commission, 888 First Street                 for accessing information in paragraph                 DEPARTMENT OF ENERGY
                                                    NE., Washington, DC 20426. The first                    n. Based on all oral and written
                                                                                                                                                                   Federal Energy Regulatory
                                                    page of any filing should include docket                comments, a Scoping Document 2 (SD2)
                                                                                                                                                                   Commission
                                                    number P–14513–001.                                     may be issued. SD2 may include a
                                                       All filings with the Commission must                 revised process plan and schedule, as                  [Project No. 2744–043]
                                                    bear the appropriate heading:                           well as a list of issues, identified
                                                    ‘‘Comments on Pre-Application                           through the scoping process.                           N.E.W. Hydro, Inc.; Notice of
                                                    Document,’’ ‘‘Study Requests,’’                                                                                Application Accepted for Filing,
                                                                                                            Environmental Site Review                              Soliciting Motions To Intervene and
                                                    ‘‘Comments on Scoping Document 1,’’
                                                    ‘‘Request for Cooperating Agency                          The Districts and Commission staff                   Protests, Ready for Environmental
                                                    Status,’’ or ‘‘Communications to and                    will conduct an Environmental Site                     Analysis, and Soliciting Comments,
                                                    from Commission Staff.’’ Any                            Review of the project on Wednesday,                    Recommendations, Terms and
                                                    individual or entity interested in                      July 8, starting at 1:00 p.m. (MDT). All               Conditions, and Prescriptions
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    submitting study requests, commenting                   participants should meet at the West                     Take notice that the following
                                                    on the PAD or SD1, and any agency                       River Road Boat Ramp, located at 9924                  hydroelectric application has been filed
                                                    requesting cooperating status must do so                North River Road, Idaho Falls, Idaho                   with the Commission and is available
                                                    by August 18, 2015.                                     83402. All participants are responsible                for public inspection.
                                                       o. Although our current intent is to                 for their own transportation. Please                     a. Type of Application: New Major
                                                    prepare an environmental assessment                     contact Mr. Nick Josten at gsense@                     License.
                                                    (EA), there is the possibility that an                  cableone.net by July 2, 2015, if you plan                b. Project No.: 2744–043.
                                                    Environmental Impact Statement (EIS)                    to attend the environmental site review.                 c. Date filed: February 28, 2013.


                                               VerDate Sep<11>2014   19:33 Jun 18, 2015   Jkt 235001   PO 00000   Frm 00039   Fmt 4703   Sfmt 4703   E:\FR\FM\19JNN1.SGM   19JNN1


                                                    35338                           Federal Register / Vol. 80, No. 118 / Friday, June 19, 2015 / Notices

                                                       d. Applicant: N.E.W. Hydro, Inc.                     operation at either development as part                transformer; (8) a 4,630-foot-long, 24.9-
                                                       e. Name of Project: Menominee/Park                   of relicensing the project. The centerline             kV transmission line from the Park Mill
                                                    Mill Hydroelectric Project.                             of the Menominee River constitutes the                 transformer to its interconnection with
                                                       f. Location: The existing project is                 common border between Michigan and                     Wisconsin Public Service Corporation
                                                    located on the Menominee River, in the                  Wisconsin. The Menominee                               (WPSC); and (9) appurtenant facilities.
                                                    city of Menominee, Menominee County,                    powerhouse is located on the Michigan                  As part of a Commission-approved
                                                    Michigan, and in the city of Marinette,                 side of the Menominee River whereas                    amendment of its current license, the
                                                    Marinette County, Wisconsin. The                        the powerhouse for the Park Mill                       applicant is currently modifying the
                                                    project does not affect federal lands.                  development is located on the                          Park Mill development by installing fish
                                                       g. Filed Pursuant to: Federal Power                  Wisconsin side of the Menominee River.                 passage facilities.
                                                    Act 16 U.S.C. 791(a)–825(r).                            The project is estimated to generate an
                                                       h. Applicant Contact: Scott Klabunde,                                                                       Menominee Development
                                                                                                            average of 28 million kilowatt-hours
                                                    North American Hydro Holdings, LLC,                     annually.                                                 The Menominee Development
                                                    P.O. Box 167, Neshkoro, WI 54960–                                                                              consists of the following existing
                                                    0167; Telephone (920) 293–4628 Ext.                     Park Mill Development                                  features: (1) A 466.5-foot-long, 24-foot-
                                                    314.                                                       The Park Mill Development consists                  high, concrete gravity dam that
                                                       i. FERC Contact: Chelsea Hudock,                     of the following existing features: (1) A              includes, an 8-foot-long abandoned
                                                    Telephone (202) 502–8448, and email at                  538.58-foot-long, 22-foot-high, concrete               fishway having a crest elevation of
                                                    chelsea.hudock@ferc.gov.                                gravity dam that includes, a 48.5-foot-                593.93 feet NGVD; a 150.5-foot-long
                                                       j. Deadline for filing motions to                    long overflow spillway with a crest                    overflow spillway with a crest elevation
                                                    intervene, protests, comments,                          elevation of 607.93 feet National                      of 593.93 feet NGVD; a 293-foot-long
                                                    recommendations, terms and                              Geodetic Vertical Datum (NGVD),                        spillway with 12 20-foot-wide by 12-
                                                    conditions, and prescriptions: 60 days                  topped with flashboards providing a                    foot-high Tainter gates with a sill
                                                    from the issuance date of this notice;                  crest elevation of 610.93 feet NGVD; a                 elevation of 582.43 feet and a top of gate
                                                    reply comments are due 105 days from                    168.58-foot-long spillway with seven                   elevation 594.43 feet NGVD; and a 15-
                                                    the issuance date of this notice.                       20-foot-wide by 13-foot-high Tainter                   foot-long dam with a crest elevation of
                                                       The Commission strongly encourages                   gates with a sill elevation of 597.23 feet             598.43 feet NGVD; (2) a 20-foot-long
                                                    electronic filing. Please file motions to               NGVD and a top of gate elevation 610.93                earthen embankment with a concrete
                                                    intervene, protests, comments,                          feet NGVD; an 18-foot-long abandoned                   core wall connected to the concrete dam
                                                    recommendations, terms and                              fishway having a crest elevation of                    at the south end of the dam; (3) a
                                                    conditions, and prescriptions using the                 610.93 feet NGVD; and a 303.5-foot-long                reservoir with a normal operating
                                                    Commission’s eFiling system at http://                  overflow spillway with a crest elevation               elevation of 593.53 feet NGVD, a surface
                                                    www.ferc.gov/docs-filing/efiling.asp.                   of 607.93 feet NGVD, topped with                       area of about 143 acres, a normal
                                                    Commenters can submit brief comments                    flashboards providing a crest elevation                operating head of 12 feet, and a gross
                                                    up to 6,000 characters, without prior                   of 610.93 feet NGVD; (2) a reservoir with              storage of 350 acre-feet; (4) a set of
                                                    registration, using the eComment system                 a normal operating elevation of 610.43                 angled trashracks in front of generating
                                                    at http://www.ferc.gov/docs-filing/                     feet NGVD, a surface area of about 539                 units #4 and #5 that are each 151⁄2 foot-
                                                    ecomment.asp. You must include your                     acres, a gross storage of 3,788 acre-feet,             high by 28-foot-wide and are comprised
                                                    name and contact information at the end                 and a hydraulic height of 16 feet; (3)                 of 7 panels with 3.5 inch clear bar
                                                    of your comments. For assistance,                       inlet works that consist of a 100-foot-                spacing; a set of angled trashracks in
                                                    please contact FERC Online Support at                   wide concrete gravity section with five                front of generating units #8 and #9 that
                                                    FERCOnlineSupport@ferc.gov, (866)                       16-foot-wide by 16-foot-high Tainter                   are each 151⁄2 foot-high by 24 and 1⁄4
                                                    208–3676 (toll free), or (202) 502–8659                 gates having a sill elevation of 595.23                feet-wide and comprised of 6 panels
                                                    (TTY). In lieu of electronic filing, please             feet NGVD and a top of gate elevation                  with 3.5-inch clear bar spacing; (5) a 54-
                                                    send a paper copy to: Secretary, Federal                of 611.23 feet NGVD; and a 77.84-foot-                 foot-long, 29-foot-wide concrete
                                                    Energy Regulatory Commission, 888                       long side overflow spillway with a crest               powerhouse containing two turbine/
                                                    First Street NE., Washington, DC 20426.                 elevation of 610.13 NGVD, topped with                  generator units, and a 67-foot-long, 31-
                                                    The first page of any filing should                     flashboards providing a crest elevation                foot-wide concrete powerhouse
                                                    include docket number P–2744–043.                       of 611.13 feet NGVD; (4) a 2,400-foot-                 containing two turbine/generator units,
                                                       The Commission’s Rules of Practice                   long power canal that is created by an                 with powerhouses integral with the
                                                    require all intervenors filing documents                earthen embankment with a 16-foot top                  north side of the dam with a total
                                                    with the Commission to serve a copy of                  width and a crest elevation of 613 feet                installed capacity of 2.240 MW and a
                                                    that document on each person on the                     NGVD; (5) angled trashracks that are 80                total combined maximum hydraulic
                                                    official service list for the project.                  feet long by 20 feet high with 1.75 inch               capacity of 2,622 cfs, consisting of two
                                                    Further, if an intervenor files comments                clear bar spacing; (6) a 169-foot-long, 62-            500-HP Kaplan turbines each connected
                                                    or documents with the Commission                        foot-wide stone and brick powerhouse                   to a 0.458 MW generator, and two 1,130-
                                                    relating to the merits of an issue that                 at the downstream end of the headrace                  HP Kaplan turbines each connected to a
                                                    may affect the responsibilities of a                    canal with a total installed capacity of               0.662 MW generator; (6) a 3-phase
                                                    particular resource agency, they must                   2.375 megawatts (MW), consisting of                    3,000-kVA 4.16/24.9-kV step-up
                                                    also serve a copy of the document on                    one 300-horsepower (HP) Kaplan                         transformer; (7) a 558-foot-long, 24.9-kV
                                                                                                            turbine connected to a 0.225-MW                        transmission line; and (8) appurtenant
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    that resource agency.
                                                       k. This application has been accepted                generator, two 800-HP Francis turbines                 facilities. As part of a Commission-
                                                    for filing and is now is ready for                      each connected to a 0.420-MW                           approved amendment of its current
                                                    environmental analysis.                                 generator, two 700-HP Kaplan turbines                  license, the applicant is currently
                                                       l. The Menominee-Park Mill Project                   each connected to a 0.430-MW                           modifying the Menominee development
                                                    consists of two developments: The                       generator, one 465-HP Kaplan turbine                   by installing fish passage facilities.
                                                    Menominee Development and the Park                      connected to a 0.450-MW generator; (7)                    m. A copy of the application is
                                                    Mill Development. The applicant                         a 3-phase 3,000-kilovolt ampere (kVA),                 available for review at the Commission
                                                    proposes no new changes to project                      0.48/24.9-kilovolt (kV) step-up                        in the Public Reference Room or may be


                                               VerDate Sep<11>2014   19:33 Jun 18, 2015   Jkt 235001   PO 00000   Frm 00040   Fmt 4703   Sfmt 4703   E:\FR\FM\19JNN1.SGM   19JNN1


                                                                                    Federal Register / Vol. 80, No. 118 / Friday, June 19, 2015 / Notices                                           35339

                                                    viewed on the Commission’s Web site at                  upon each representative of the                        DEPARTMENT OF ENERGY
                                                    http://www.ferc.gov using the                           applicant specified in the particular
                                                    ‘‘eLibrary’’ link. Enter the docket                     application. A copy of all other filings               Federal Energy Regulatory
                                                    number excluding the last three digits in               in reference to this application must be               Commission
                                                    the docket number field to access the                   accompanied by proof of service on all                 [Docket No. CD15–26–000]
                                                    document. For assistance, contact FERC                  persons listed in the service list
                                                    Online Support at FERCOnlineSupport.                    prepared by the Commission in this                     Mountain Village, CO; Notice of
                                                    A copy of the application is also                       proceeding, in accordance with 18 CFR                  Preliminary Determination of a
                                                    available for inspection and                            4.34(b) and 385.2010.                                  Qualifying Conduit Hydropower
                                                    reproduction at the address in item h                                                                          Facility and Soliciting Comments and
                                                    above.                                                    o. Procedural Schedule:
                                                                                                                                                                   Motions To Intervene
                                                       Register online at http://                             The application will be processed
                                                    www.ferc.gov/docs-filing/                               according to the following revised                       On June 3, 2015, the town of
                                                    esubscription.asp to be notified via                    Hydro Licensing Schedule. Revisions to                 Mountain Village, CO filed a notice of
                                                    email of new filings and issuances                      the schedule may be made as                            intent to construct a qualifying conduit
                                                    related to this or other pending projects.              appropriate.                                           hydropower facility, pursuant to section
                                                    For assistance, contact FERC Online                                                                            30 of the Federal Power Act (FPA), as
                                                    Support.                                                        Milestone                 Target Date          amended by section 4 of the
                                                       n. Anyone may submit comments, a                                                                            Hydropower Regulatory Efficiency Act
                                                    protest, or a motion to intervene in                    Filing of recommenda-        August 2015.              of 2013 (HREA). The proposed San
                                                    accordance with the requirements of                        tions terms and                                     Joaquin PRV Hydro Project would have
                                                    Rules of Practice and Procedure, 18 CFR                    conditions, and pre-                                an installed capacity of 15 kilowatts
                                                    385.210, .211, and .214. In determining                    scriptions.                                         (kW) and would be located on the
                                                    the appropriate action to take, the                     Commission issues            February 2016.            existing water supply pipeline for
                                                                                                               Environmental As-
                                                    Commission will consider all protests or                                                                       Mountain Village, which transports
                                                                                                               sessment.
                                                    other comments filed, but only those                                                                           water for municipal consumption. The
                                                    who file a motion to intervene in                                                                              project would be located near Mountain
                                                    accordance with the Commission’s                           p. Final amendments to the                          Village in San Miguel County, Colorado.
                                                    Rules may become a party to the                         application must be filed with the                       Applicant Contact: Finn Kjome,
                                                    proceeding. Any comments, protests, or                  Commission no later than 30 days from                  Director of Public Works, 455 Mountain
                                                    motions to intervene must be received                   the issuance date of this notice.                      Village Blvd., Suite A, Mountain
                                                    on or before the specified comment date                    q. A license applicant must file no                 Village, CO 81435, Phone No. (970)
                                                    for the particular application.                         later than 60 days following the date of               369–8206.
                                                       All filings must (1) bear in all capital             issuance of the notice of acceptance and                 FERC Contact: Robert Bell, Phone No.
                                                    letters the title ‘‘PROTEST’’, ‘‘MOTION                 ready for environmental analysis                       (202) 502–6062, email: robert.bell@
                                                    TO INTERVENE’’, ‘‘COMMENTS,’’                           provided for in 5.22: (1) A copy of the                ferc.gov.
                                                    ‘‘REPLY COMMENTS,’’                                     water quality certification; (2) a copy of               Qualifying Conduit Hydropower
                                                    ‘‘RECOMMENDATIONS,’’ ‘‘TERMS                            the request for certification, including               Facility Description: The proposed
                                                    AND CONDITIONS,’’ or                                                                                           project would consist of: (1) A proposed
                                                                                                            proof of the date on which the certifying
                                                    ‘‘PRESCRIPTIONS;’’ (2) set forth in the                                                                        short, 2-inch-diameter intake pipe that
                                                                                                            agency received the request; or (3)
                                                    heading the name of the applicant and                                                                          connects to a 10-inch-diameter main
                                                                                                            evidence of waiver of water quality
                                                    the project number of the application to                                                                       water supply pipe; (2) a proposed
                                                    which the filing responds; (3) furnish                  certification.                                         powerhouse that contains one turbine-
                                                    the name, address, and telephone                          Dated: June 12, 2015.                                generator unit with an installed capacity
                                                    number of the person protesting or                      Kimberly D. Bose,                                      of 15 kW; (3) a proposed short 2-inch-
                                                    intervening; and (4) otherwise comply                   Secretary.                                             diamter exit pipe returning flow to the
                                                    with the requirements of 18 CFR                         [FR Doc. 2015–15097 Filed 6–18–15; 8:45 am]
                                                                                                                                                                   main water supply pipe, making the
                                                    385.2001 through 385.2005. All                                                                                 total bypass approximately 10-feet; and
                                                                                                            BILLING CODE 6717–01–P
                                                    comments, recommendations, terms and                                                                           (5) appurtenant facilities. The proposed
                                                    conditions or prescriptions must set                                                                           project would have an estimated annual
                                                    forth their evidentiary basis and                                                                              generating capacity of 15 megawatt-
                                                    otherwise comply with the requirements                                                                         hours.
                                                    of 18 CFR 4.34(b). Agencies may obtain                                                                           A qualifying conduit hydropower
                                                    copies of the application directly from                                                                        facility is one that is determined or
                                                    the applicant. A copy of any protest or                                                                        deemed to meet all of the criteria shown
                                                    motion to intervene must be served                                                                             in the table below.

                                                                                      TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                  Satisfies
                                                                 Statutory provision                                                             Description
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                                                                                                                                                                   (Y/N)

                                                    FPA 30(a)(3)(A), as amended by HREA ...             The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or        Y
                                                                                                          similar manmade water conveyance that is operated for the distribution of water for
                                                                                                          agricultural, municipal, or industrial consumption and not primarily for the genera-
                                                                                                          tion of electricity.
                                                    FPA 30(a)(3)(C)(i), as amended by HREA              The facility is constructed, operated, or maintained for the generation of electric           Y
                                                                                                          power and uses for such generation only the hydroelectric potential of a non-feder-
                                                                                                          ally owned conduit.



                                               VerDate Sep<11>2014   19:33 Jun 18, 2015   Jkt 235001   PO 00000   Frm 00041   Fmt 4703   Sfmt 4703   E:\FR\FM\19JNN1.SGM   19JNN1



Document Created: 2018-02-22 11:10:36
Document Modified: 2018-02-22 11:10:36
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 35337 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR