80_FR_35461 80 FR 35343 - Natural Gas Pipeline Company of America LLC; Notice of Application

80 FR 35343 - Natural Gas Pipeline Company of America LLC; Notice of Application

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 118 (June 19, 2015)

Page Range35343-35344
FR Document2015-15105

Federal Register, Volume 80 Issue 118 (Friday, June 19, 2015)
[Federal Register Volume 80, Number 118 (Friday, June 19, 2015)]
[Notices]
[Pages 35343-35344]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-15105]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP15-505-000]


Natural Gas Pipeline Company of America LLC; Notice of 
Application

    Take notice that on June 1, 2015, Natural Gas Pipeline Company of 
America LLC (Natural) 3250 Lacey Road, Suite 700, Downers Grove, 
Illinois 60515-7918, filed an application pursuant to section 7(c) of 
the Natural Gas Act (NGA) and the Federal Energy Regulatory 
Commission's (Commission) regulations seeking authorization to 
construct and operate a new greenfield compressor station and related 
facilities located in Livingston County, Illinois (Chicago Market 
Expansion Project). The Chicago Market Expansion Project will add 
30,000 horsepower of new compression to Natural's system. The proposed 
project is in response to market demand and will support an

[[Page 35344]]

additional 238,000 dekatherms per day of firm transportation service to 
the Chicago market area, all as more fully described in the application 
which is on file with the Commission and open to public inspection. The 
filing may also be viewed on the web at http://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, contact FERC at [email protected] or call toll-
free, (866) 208-3676 or TTY, (202) 502-8659.
    Any questions regarding this application should be directed to 
Bruce H. Newsome, Vice President, Natural Gas Pipeline Company of 
America LLC, 3250 Lacey Road, Suite 700, Downers Grove, IL 60515 or 
call (630) 725-3070 or by email [email protected].
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 7 copies of filings made in the proceeding with the Commission 
and must mail a copy to the applicant and to every other party. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at http://www.ferc.gov. Persons unable to file electronically should 
submit an original and 5 copies of the protest or intervention to the 
Federal Energy regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    Comment Date: 5:00 p.m. Eastern Time on July 6, 2015.

    Dated: June 12, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-15105 Filed 6-18-15; 8:45 am]
BILLING CODE 6717-01-P



                                                                                    Federal Register / Vol. 80, No. 118 / Friday, June 19, 2015 / Notices                                                  35343

                                                    DEPARTMENT OF ENERGY                                    Online service, please email                              Accession Number: 20150612–5151.
                                                                                                            FERCOnlineSupport@ferc.gov or call                        Comments Due: 5 p.m. ET 7/6/15.
                                                    Federal Energy Regulatory                               (866) 208–3676 (toll free). For TTY, call                 Docket Numbers: ER15–1912–000.
                                                    Commission                                              (202) 502–8659.                                           Applicants: PJM Interconnection,
                                                    [Docket No. ER15–1908–000]                                Dated: June 12, 2015.                                L.L.C.
                                                                                                            Kimberly D. Bose,                                         Description: Section 205(d) rate filing
                                                    West Chicago Battery Storage LLC;                                                                              per 35.13(a)(2)(iii): Service Agreement
                                                                                                            Secretary.
                                                    Supplemental Notice That Initial                                                                               Nos. 2526, 2527, 2528, and 2529 to be
                                                                                                            [FR Doc. 2015–15095 Filed 6–18–15; 8:45 am]
                                                    Market-Based Rate Filing Includes                                                                              effective 5/13/2015.
                                                                                                            BILLING CODE 6717–01–P
                                                    Request for Blanket Section 204                                                                                   Filed Date: 6/12/15.
                                                    Authorization                                                                                                     Accession Number: 20150612–5207.
                                                                                                                                                                      Comments Due: 5 p.m. ET 7/6/15.
                                                       This is a supplemental notice in the                 DEPARTMENT OF ENERGY                                      The filings are accessible in the
                                                    above-referenced proceeding of West                                                                            Commission’s eLibrary system by
                                                    Chicago Battery Storage LLC’s                           Federal Energy Regulatory
                                                                                                            Commission                                             clicking on the links or querying the
                                                    application for market-based rate                                                                              docket number.
                                                    authority, with an accompanying rate                                                                              Any person desiring to intervene or
                                                                                                            Combined Notice of Filings #2
                                                    tariff, noting that such application                                                                           protest in any of the above proceedings
                                                    includes a request for blanket                             Take notice that the Commission                     must file in accordance with Rules 211
                                                    authorization, under 18 CFR part 34, of                 received the following electric rate                   and 214 of the Commission’s
                                                    future issuances of securities and                      filings:                                               Regulations (18 CFR 385.211 and
                                                    assumptions of liability.                                  Docket Numbers: ER14–2586–002.                      385.214) on or before 5:00 p.m. Eastern
                                                       Any person desiring to intervene or to                  Applicants: California Independent                  time on the specified comment date.
                                                    protest should file with the Federal                    System Operator Corporation.                           Protests may be considered, but
                                                    Energy Regulatory Commission, 888                          Description: Compliance filing per 35:              intervention is necessary to become a
                                                    First Street NE., Washington, DC 20426,                 20150612_IPE4–5_SecondCompliance                       party to the proceeding.
                                                    in accordance with Rules 211 and 214                    to be effective 2/2/2015.                                 eFiling is encouraged. More detailed
                                                    of the Commission’s Rules of Practice                      Filed Date: 6/12/15.                                information relating to filing
                                                    and Procedure (18 CFR 385.211 and                          Accession Number: 20150612–5130.                    requirements, interventions, protests,
                                                    385.214). Anyone filing a motion to                        Comments Due: 5 p.m. ET 7/6/15.                     service, and qualifying facilities filings
                                                    intervene or protest must serve a copy                     Docket Numbers: ER15–1430–001.                      can be found at: http://www.ferc.gov/
                                                    of that document on the Applicant.                         Applicants: Appalachian Power                       docs-filing/efiling/filing-req.pdf. For
                                                       Notice is hereby given that the                      Company.                                               other information, call (866) 208–3676
                                                    deadline for filing protests with regard                   Description: Tariff Amendment per                   (toll free). For TTY, call (202) 502–8659.
                                                    to the applicant’s request for blanket                  35.17(b): Reactive Supply and Voltage
                                                    authorization, under 18 CFR part 34, of                                                                          Dated: June 12, 2015.
                                                                                                            Control Amendment Amd to be effective
                                                    future issuances of securities and                                                                             Kimberly D. Bose,
                                                                                                            6/1/2015.
                                                    assumptions of liability, is July 2, 2015.                                                                     Secretary.
                                                                                                               Filed Date: 6/12/15.
                                                       The Commission encourages                               Accession Number: 20150612–5143.                    [FR Doc. 2015–15102 Filed 6–18–15; 8:45 am]
                                                    electronic submission of protests and                      Comments Due: 5 p.m. ET 7/6/15.                     BILLING CODE 6717–01–P
                                                    interventions in lieu of paper, using the
                                                    FERC Online links at http://                               Docket Numbers: ER15–1432–001.
                                                    www.ferc.gov. To facilitate electronic                     Applicants: AEP Generation
                                                                                                                                                                   DEPARTMENT OF ENERGY
                                                    service, persons with Internet access                   Resources Inc.
                                                    who will eFile a document and/or be                        Description: Tariff Amendment per                   Federal Energy Regulatory
                                                    listed as a contact for an intervenor                   35.17(b): Reactive Supply and Voltage                  Commission
                                                    must create and validate an                             Control Amendment Amd to be effective
                                                                                                            6/1/2015.                                              [Docket No. CP15–505–000]
                                                    eRegistration account using the
                                                    eRegistration link. Select the eFiling                     Filed Date: 6/12/15.
                                                                                                                                                                   Natural Gas Pipeline Company of
                                                    link to log on and submit the                              Accession Number: 20150612–5145.
                                                                                                                                                                   America LLC; Notice of Application
                                                                                                               Comments Due: 5 p.m. ET 7/6/15.
                                                    intervention or protests.
                                                       Persons unable to file electronically                   Docket Numbers: ER15–1444–001.                        Take notice that on June 1, 2015,
                                                    should submit an original and 5 copies                     Applicants: Wheeling Power                          Natural Gas Pipeline Company of
                                                    of the intervention or protest to the                   Company.                                               America LLC (Natural) 3250 Lacey
                                                    Federal Energy Regulatory Commission,                      Description: Compliance filing per 35:              Road, Suite 700, Downers Grove, Illinois
                                                    888 First Street NE., Washington, DC                    Power Coordination Agreement                           60515–7918, filed an application
                                                    20426.                                                  Concurrence Compliance to be effective                 pursuant to section 7(c) of the Natural
                                                       The filings in the above-referenced                  6/1/2015.                                              Gas Act (NGA) and the Federal Energy
                                                    proceeding are accessible in the                           Filed Date: 6/12/15.                                Regulatory Commission’s (Commission)
                                                    Commission’s eLibrary system by                            Accession Number: 20150612–5150.                    regulations seeking authorization to
                                                    clicking on the appropriate link in the                    Comments Due: 5 p.m. ET 7/6/15.                     construct and operate a new greenfield
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    above list. They are also available for                    Docket Numbers: ER15–1446–001.                      compressor station and related facilities
                                                    electronic review in the Commission’s                      Applicants: Wheeling Power                          located in Livingston County, Illinois
                                                    Public Reference Room in Washington,                    Company.                                               (Chicago Market Expansion Project).
                                                    DC. There is an eSubscription link on                      Description: Compliance filing per 35:              The Chicago Market Expansion Project
                                                    the Web site that enables subscribers to                System Integration Agreement                           will add 30,000 horsepower of new
                                                    receive email notification when a                       Concurrence Compliance to be effective                 compression to Natural’s system. The
                                                    document is added to a subscribed                       6/1/2015.                                              proposed project is in response to
                                                    docket(s). For assistance with any FERC                    Filed Date: 6/12/15.                                market demand and will support an


                                               VerDate Sep<11>2014   19:33 Jun 18, 2015   Jkt 235001   PO 00000   Frm 00045   Fmt 4703   Sfmt 4703   E:\FR\FM\19JNN1.SGM   19JNN1


                                                    35344                           Federal Register / Vol. 80, No. 118 / Friday, June 19, 2015 / Notices

                                                    additional 238,000 dekatherms per day                   proceeding with the Commission and                     DEPARTMENT OF ENERGY
                                                    of firm transportation service to the                   must mail a copy to the applicant and
                                                    Chicago market area, all as more fully                  to every other party. Only parties to the              Federal Energy Regulatory
                                                    described in the application which is on                proceeding can ask for court review of                 Commission
                                                    file with the Commission and open to                    Commission orders in the proceeding.                   [Docket No. ER15–1907–000]
                                                    public inspection. The filing may also
                                                                                                               However, a person does not have to
                                                    be viewed on the web at http://                                                                                Joliet Battery Storage LLC;
                                                    www.ferc.gov using the ‘‘eLibrary’’ link.               intervene in order to have comments
                                                                                                                                                                   Supplemental Notice That Initial
                                                    Enter the docket number excluding the                   considered. The second way to
                                                                                                                                                                   Market-Based Rate Filing Includes
                                                    last three digits in the docket number                  participate is by filing with the
                                                                                                                                                                   Request for Blanket Section 204
                                                    field to access the document. For                       Secretary of the Commission, as soon as                Authorization
                                                    assistance, contact FERC at                             possible, an original and two copies of
                                                    FERCOnlineSupport@ferc.gov or call                      comments in support of or in opposition                   This is a supplemental notice in the
                                                    toll-free, (866) 208–3676 or TTY, (202)                 to this project. The Commission will                   above-referenced proceeding of Joliet
                                                    502–8659.                                               consider these comments in                             Battery Storage LLC’s application for
                                                       Any questions regarding this                         determining the appropriate action to be               market-based rate authority, with an
                                                    application should be directed to Bruce                 taken, but the filing of a comment alone               accompanying rate tariff, noting that
                                                    H. Newsome, Vice President, Natural                     will not serve to make the filer a party               such application includes a request for
                                                    Gas Pipeline Company of America LLC,                    to the proceeding. The Commission’s                    blanket authorization, under 18 CFR
                                                    3250 Lacey Road, Suite 700, Downers                     rules require that persons filing                      part 34, of future issuances of securities
                                                    Grove, IL 60515 or call (630) 725–3070                  comments in opposition to the project                  and assumptions of liability.
                                                    or by email bruce_newsome@                                                                                        Any person desiring to intervene or to
                                                                                                            provide copies of their protests only to               protest should file with the Federal
                                                    kindermorgan.com.                                       the party or parties directly involved in
                                                       Pursuant to section 157.9 of the                                                                            Energy Regulatory Commission, 888
                                                                                                            the protest.                                           First Street NE., Washington, DC 20426,
                                                    Commission’s rules, 18 CFR 157.9,
                                                    within 90 days of this Notice the                          Persons who wish to comment only                    in accordance with Rules 211 and 214
                                                    Commission staff will either: Complete                  on the environmental review of this                    of the Commission’s Rules of Practice
                                                    its environmental assessment (EA) and                   project should submit an original and                  and Procedure (18 CFR 385.211 and
                                                    place it into the Commission’s public                   two copies of their comments to the                    385.214). Anyone filing a motion to
                                                    record (eLibrary) for this proceeding; or               Secretary of the Commission.                           intervene or protest must serve a copy
                                                    issue a Notice of Schedule for                          Environmental commentors will be                       of that document on the Applicant.
                                                    Environmental Review. If a Notice of                    placed on the Commission’s                                Notice is hereby given that the
                                                    Schedule for Environmental Review is                    environmental mailing list, will receive               deadline for filing protests with regard
                                                    issued, it will indicate, among other                   copies of the environmental documents,                 to the applicant’s request for blanket
                                                    milestones, the anticipated date for the                and will be notified of meetings                       authorization, under 18 CFR part 34, of
                                                    Commission staff’s issuance of the final                                                                       future issuances of securities and
                                                                                                            associated with the Commission’s
                                                    environmental impact statement (FEIS)                                                                          assumptions of liability, is July 2, 2015.
                                                                                                            environmental review process.                             The Commission encourages
                                                    or EA for this proposal. The filing of the
                                                                                                            Environmental commentors will not be                   electronic submission of protests and
                                                    EA in the Commission’s public record
                                                                                                            required to serve copies of filed                      interventions in lieu of paper, using the
                                                    for this proceeding or the issuance of a
                                                    Notice of Schedule for Environmental                    documents on all other parties.                        FERC Online links at http://
                                                    Review will serve to notify federal and                 However, the non-party commentors                      www.ferc.gov. To facilitate electronic
                                                    state agencies of the timing for the                    will not receive copies of all documents               service, persons with Internet access
                                                    completion of all necessary reviews, and                filed by other parties or issued by the                who will eFile a document and/or be
                                                    the subsequent need to complete all                     Commission (except for the mailing of                  listed as a contact for an intervenor
                                                    federal authorizations within 90 days of                environmental documents issued by the                  must create and validate an
                                                    the date of issuance of the Commission                  Commission) and will not have the right                eRegistration account using the
                                                    staff’s FEIS or EA.                                     to seek court review of the                            eRegistration link. Select the eFiling
                                                       There are two ways to become                         Commission’s final order.                              link to log on and submit the
                                                    involved in the Commission’s review of                     The Commission strongly encourages                  intervention or protests.
                                                    this project. First, any person wishing to                                                                        Persons unable to file electronically
                                                                                                            electronic filings of comments, protests
                                                    obtain legal status by becoming a party                                                                        should submit an original and 5 copies
                                                                                                            and interventions in lieu of paper using
                                                    to the proceedings for this project                                                                            of the intervention or protest to the
                                                    should, on or before the comment date                   the ‘‘eFiling’’ link at http://
                                                                                                                                                                   Federal Energy Regulatory Commission,
                                                    stated below file with the Federal                      www.ferc.gov. Persons unable to file                   888 First Street NE., Washington, DC
                                                    Energy Regulatory Commission, 888                       electronically should submit an original               20426.
                                                    First Street NE., Washington, DC 20426,                 and 5 copies of the protest or                            The filings in the above-referenced
                                                    a motion to intervene in accordance                     intervention to the Federal Energy                     proceeding are accessible in the
                                                    with the requirements of the                            regulatory Commission, 888 First Street                Commission’s eLibrary system by
                                                    Commission’s Rules of Practice and                      NE., Washington, DC 20426.                             clicking on the appropriate link in the
                                                    Procedure (18 CFR 385.214 or 385.211)                                                                          above list. They are also available for
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                                                                               Comment Date: 5:00 p.m. Eastern
                                                    and the Regulations under the NGA (18                   Time on July 6, 2015.                                  electronic review in the Commission’s
                                                    CFR 157.10). A person obtaining party                                                                          Public Reference Room in Washington,
                                                                                                              Dated: June 12, 2015.
                                                    status will be placed on the service list                                                                      DC. There is an eSubscription link on
                                                    maintained by the Secretary of the                      Kimberly D. Bose,                                      the Web site that enables subscribers to
                                                    Commission and will receive copies of                   Secretary.                                             receive email notification when a
                                                    all documents filed by the applicant and                [FR Doc. 2015–15105 Filed 6–18–15; 8:45 am]            document is added to a subscribed
                                                    by all other parties. A party must submit               BILLING CODE 6717–01–P                                 docket(s). For assistance with any FERC
                                                    7 copies of filings made in the                                                                                Online service, please email


                                               VerDate Sep<11>2014   19:33 Jun 18, 2015   Jkt 235001   PO 00000   Frm 00046   Fmt 4703   Sfmt 4703   E:\FR\FM\19JNN1.SGM   19JNN1



Document Created: 2018-02-22 11:10:16
Document Modified: 2018-02-22 11:10:16
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates5:00 p.m. Eastern Time on July 6, 2015.
FR Citation80 FR 35343 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR