DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 121 (June 24, 2015)

Page Range36328-36329
FR Document2015-15491

Federal Register, Volume 80 Issue 121 (Wednesday, June 24, 2015)
[Federal Register Volume 80, Number 121 (Wednesday, June 24, 2015)]
[Notices]
[Pages 36328-36329]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-15491]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD15-18-000]


Soldier Canyon Filter Plant; Notice of Preliminary Determination 
of a Qualifying Conduit Hydropower Facility and Soliciting Comments and 
Motions To Intervene

    On January 23, 2015, Soldier Canyon Filter Plant filed a notice of 
intent to construct a qualifying conduit hydropower facility, pursuant 
to section 30 of the Federal Power Act (FPA), as amended by section 4 
of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The 
proposed Soldier Canyon Micro Hydro Facility would have an installed 
capacity of 100 kilowatts (kW), and would be located along the existing 
36-inch-diameter Soldier Canyon Pipeline at the Soldier Canyon Filter 
Plant. The project would be located near Fort Collins in Larimer 
County, Colorado.
    Applicant Contact: Mr. Chris Harris, General Manager, 4424 Laporte 
Avenue, Fort Collins, CO 80521, Phone No. (970) 482-3143.
    FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, email: 
christopher.chaney@ferc.gov.
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) A proposed 140-square-foot buried 
powerhouse; (2) an approximately 30-foot-long, 16-inch-diameter intake 
pipe branching off the 36-inch-diameter Soldier Canyon Pipeline; (3) 
one 100-kilowatt turbine-generating unit; (4) an approximately 60-foot-
long, 16-inch-diameter discharge pipe returning water to the 36-inch-
diameter Soldier Canyon Pipeline; and (5) appurtenant facilities. The 
proposed project would have an estimated annual generating capacity of 
880 megawatt-hours.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all of the criteria shown in the table below.

[[Page 36329]]



      Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
                                                              Satisfies
       Statutory provision               Description            (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by    The conduit the facility            Y
 HREA.                             uses is a tunnel,
                                   canal, pipeline,
                                   aqueduct, flume, ditch,
                                   or similar manmade
                                   water conveyance that
                                   is operated for the
                                   distribution of water
                                   for agricultural,
                                   municipal, or
                                   industrial consumption
                                   and not primarily for
                                   the generation of
                                   electricity..
FPA 30(a)(3)(C)(i), as amended    The facility is                     Y
 by HREA.                          constructed, operated,
                                   or maintained for the
                                   generation of electric
                                   power and uses for such
                                   generation only the
                                   hydroelectric potential
                                   of a non-federally
                                   owned conduit..
FPA 30(a)(3)(C)(ii), as amended   The facility has an                 Y
 by HREA.                          installed capacity that
                                   does not exceed 5
                                   megawatts..
FPA 30(a)(3)(C)(iii), as amended  On or before August 9,              Y
 by HREA.                          2013, the facility is
                                   not licensed, or
                                   exempted from the
                                   licensing requirements
                                   of Part I of the FPA..
------------------------------------------------------------------------

    Preliminary Determination: Based upon the above criteria, 
Commission staff preliminarily determines that the proposal satisfies 
the requirements for a qualifying conduit hydropower facility, which is 
not required to be licensed or exempted from licensing.
    Comments and Motions to Intervene: Deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 45 
days from the issuance date of this notice.
    Deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2014).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. A copy of all other filings in 
reference to this application must be accompanied by proof of service 
on all persons listed in the service list prepared by the Commission in 
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at the Commission in its Public Reference Room, Room 2A, 
888 First Street NE., Washington, DC 20426. The filing may also be 
viewed on the web at http://www.ferc.gov/docs-filing/elibrary.asp using 
the ``eLibrary'' link. Enter the docket number (e.g., CD15-18) in the 
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email FERCOnlineSupport@ferc.gov. For TTY, call 
(202) 502-8659.

    Dated: June 18, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-15491 Filed 6-23-15; 8:45 am]
 BILLING CODE 6717-01-P



                                              36328                        Federal Register / Vol. 80, No. 121 / Wednesday, June 24, 2015 / Notices

                                                 Filed Date: 6/1/15.                                  for the continued operation of the 1.1-                DEPARTMENT OF ENERGY
                                                 Accession Number: 20150601–5402.                     megawatt Wallowa Falls Hydroelectric
                                                 Comments Due: 5 p.m. ET 6/19/15.                     Project (Wallowa Falls Project) No. 308.               Federal Energy Regulatory
                                                 Docket Numbers: RP15–1052–001.                       On February 10, 2015, PacifiCorp filed                 Commission
                                                 Applicants: Discovery Gas                            an updated application that included
                                              Transmission LLC.                                       modifications to its proposed action. On               [Docket No. CD15–18–000]
                                                 Description: Compliance filing per
                                                                                                      March 6, 2015, the Commission issued
                                              154.203: Substitute Order No. 801                                                                              Soldier Canyon Filter Plant; Notice of
                                                                                                      a Notice of Application Ready for
                                              Compliance filing (System Map                                                                                  Preliminary Determination of a
                                              Migration to Web site) to be effective 7/               Environmental Analysis, and Soliciting
                                                                                                      Comments, Recommendations,                             Qualifying Conduit Hydropower
                                              9/2015.
                                                 Filed Date: 6/15/15.                                 Preliminary Terms and Conditions, and                  Facility and Soliciting Comments and
                                                 Accession Number: 20150615–5128.                     Preliminary Fishway Prescriptions (REA                 Motions To Intervene
                                                 Comments Due: 5 p.m. ET 6/29/15.                     Notice). The REA notice included a
                                                 Docket Numbers: RP15–1053–001.                       procedural schedule that included                        On January 23, 2015, Soldier Canyon
                                                 Applicants: Black Marlin Pipeline                    preparation of a single Environmental                  Filter Plant filed a notice of intent to
                                              Company.                                                Assessment (EA).                                       construct a qualifying conduit
                                                 Description: Compliance filing per                                                                          hydropower facility, pursuant to section
                                                                                                         Based on the comments received in
                                              154.203: Substitute Order No. 801                                                                              30 of the Federal Power Act (FPA), as
                                                                                                      response to the REA notice, Commission
                                              Compliance Filing (System Map                                                                                  amended by section 4 of the
                                              Migration to Web site) to be effective 7/               staff has determined that its analysis of
                                                                                                                                                             Hydropower Regulatory Efficiency Act
                                              9/2015.                                                 the proposed relicensing action will
                                                                                                                                                             of 2013 (HREA). The proposed Soldier
                                                 Filed Date: 6/15/15.                                 require preparation of a Draft and Final               Canyon Micro Hydro Facility would
                                                 Accession Number: 20150615–5226.                     EA. A Draft EA will be issued and                      have an installed capacity of 100
                                                 Comments Due: 5 p.m. ET 6/29/15.                     circulated for review by all interested                kilowatts (kW), and would be located
                                                 Any person desiring to protest in any                parties. All comments filed on the Draft               along the existing 36-inch-diameter
                                              of the above proceedings must file in                   EA will be analyzed by staff and                       Soldier Canyon Pipeline at the Soldier
                                              accordance with Rule 211 of the                         considered in the Final EA. Staff’s                    Canyon Filter Plant. The project would
                                              Commission’s Regulations (18 CFR                        conclusions and recommendations will                   be located near Fort Collins in Larimer
                                              385.211) on or before 5:00 p.m. Eastern                 be available for the Commission’s
                                              time on the specified comment date.                                                                            County, Colorado.
                                                                                                      consideration in reaching its final
                                                 The filings are accessible in the                    licensing decision.                                      Applicant Contact: Mr. Chris Harris,
                                              Commission’s eLibrary system by                                                                                General Manager, 4424 Laporte Avenue,
                                              clicking on the links or querying the                      The application will be processed                   Fort Collins, CO 80521, Phone No. (970)
                                              docket number.                                          according to the following revised                     482–3143.
                                                 eFiling is encouraged. More detailed                 procedural schedule. Revisions to the
                                                                                                      schedule may be made as appropriate.                     FERC Contact: Christopher Chaney,
                                              information relating to filing
                                              requirements, interventions, protests,                                                                         Phone No. (202) 502–6778, email:
                                              service, and qualifying facilities filings                     Milestone                  Target date          christopher.chaney@ferc.gov.
                                              can be found at: http://www.ferc.gov/                                                                            Qualifying Conduit Hydropower
                                              docs-filing/efiling/filing-req.pdf. For                 Issue Draft EA ...........   November 2015.            Facility Description: The proposed
                                              other information, call (866) 208–3676                  Comments on Draft            December 2015.
                                                                                                                                                             project would consist of: (1) A proposed
                                                                                                        EA due.
                                              (toll free). For TTY, call (202) 502–8659.                                                                     140-square-foot buried powerhouse; (2)
                                                                                                      Modified terms and           January 2016.
                                                Dated: June 16, 2015.                                   conditions due.                                      an approximately 30-foot-long, 16-inch-
                                              Kimberly D. Bose,                                       Commission issues            April 2016.               diameter intake pipe branching off the
                                              Secretary.                                                Final EA.                                            36-inch-diameter Soldier Canyon
                                              [FR Doc. 2015–15486 Filed 6–23–15; 8:45 am]                                                                    Pipeline; (3) one 100-kilowatt turbine-
                                              BILLING CODE 6717–01–P                                    Any questions regarding this notice                  generating unit; (4) an approximately
                                                                                                      may be directed to Matt Cutlip at (503)                60-foot-long, 16-inch-diameter discharge
                                                                                                      552–2762, or by email at matt.cutlip@                  pipe returning water to the 36-inch-
                                              DEPARTMENT OF ENERGY                                    ferc.gov.                                              diameter Soldier Canyon Pipeline; and
                                                                                                                                                             (5) appurtenant facilities. The proposed
                                              Federal Energy Regulatory                                 Dated: June 18, 2015.
                                                                                                                                                             project would have an estimated annual
                                              Commission                                              Kimberly D. Bose,                                      generating capacity of 880 megawatt-
                                              [Project No. 308–007]                                   Secretary.                                             hours.
                                                                                                      [FR Doc. 2015–15490 Filed 6–23–15; 8:45 am]
                                                                                                                                                               A qualifying conduit hydropower
                                              PacifiCorp Energy; Notice of Intent To                  BILLING CODE 6717–01–P                                 facility is one that is determined or
                                              Prepare a Draft and Final
                                              Environmental Assessment and                                                                                   deemed to meet all of the criteria shown
                                              Revised Procedural Schedule                                                                                    in the table below.

                                                On February 28, 2014, PacifiCorp
                                              Energy (PacifiCorp) filed an application
tkelley on DSK3SPTVN1PROD with NOTICES




                                         VerDate Sep<11>2014   16:43 Jun 23, 2015   Jkt 235001   PO 00000   Frm 00013   Fmt 4703   Sfmt 4703   E:\FR\FM\24JNN1.SGM   24JNN1


                                                                            Federal Register / Vol. 80, No. 121 / Wednesday, June 24, 2015 / Notices                                                 36329

                                                                                   TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                   Satisfies
                                                             Statutory provision                                                            Description                                             (Y/N)

                                              FPA 30(a)(3)(A), as amended by HREA ...              The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or             Y
                                                                                                     similar manmade water conveyance that is operated for the distribution of water for
                                                                                                     agricultural, municipal, or industrial consumption and not primarily for the genera-
                                                                                                     tion of electricity..
                                              FPA 30(a)(3)(C)(i), as amended by HREA               The facility is constructed, operated, or maintained for the generation of electric                Y
                                                                                                     power and uses for such generation only the hydroelectric potential of a non-feder-
                                                                                                     ally owned conduit..
                                              FPA 30(a)(3)(C)(ii), as amended by HREA              The facility has an installed capacity that does not exceed 5 megawatts. ....................      Y
                                              FPA 30(a)(3)(C)(iii), as amended by                  On or before August 9, 2013, the facility is not licensed, or exempted from the licens-            Y
                                                HREA.                                                ing requirements of Part I of the FPA..



                                                 Preliminary Determination: Based                      ecomment.asp. You must include your                    DEPARTMENT OF ENERGY
                                              upon the above criteria, Commission                      name and contact information at the end
                                              staff preliminarily determines that the                  of your comments. For assistance,                      Federal Energy Regulatory
                                              proposal satisfies the requirements for a                please contact FERC Online Support at                  Commission
                                              qualifying conduit hydropower facility,                  FERCOnlineSupport@ferc.gov, (866)                      [Project No. 14327–004]
                                              which is not required to be licensed or                  208–3676 (toll free), or (202) 502–8659
                                              exempted from licensing.                                 (TTY). In lieu of electronic filing, please            Pershing County Water Conservation
                                                 Comments and Motions to Intervene:                    send a paper copy to: Secretary, Federal               District, Nevada; Notice of Application
                                              Deadline for filing comments contesting                                                                         Accepted for Filing, Soliciting
                                                                                                       Energy Regulatory Commission, 888
                                              whether the facility meets the qualifying                                                                       Comments, Motions To Intervene, and
                                                                                                       First Street NE., Washington, DC 20426.
                                              criteria is 45 days from the issuance                                                                           Protests
                                              date of this notice.                                     A copy of all other filings in reference
                                                 Deadline for filing motions to                        to this application must be accompanied                   Take notice that the following
                                              intervene is 30 days from the issuance                   by proof of service on all persons listed              hydroelectric application has been filed
                                              date of this notice.                                     in the service list prepared by the                    with the Commission and is available
                                                 Anyone may submit comments or a                       Commission in this proceeding, in                      for public inspection:
                                              motion to intervene in accordance with                   accordance with 18 CFR 4.34(b) and                        a. Type of Proceeding: Surrender of
                                              the requirements of Rules of Practice                    385.2010.                                              License.
                                              and Procedure, 18 CFR 385.210 and                          Locations of Notice of Intent: Copies                   b. Project No.: 14327–004.
                                              385.214. Any motions to intervene must                   of the notice of intent can be obtained                   c. Date Filed: June 4, 2015.
                                              be received on or before the specified                                                                             d. Licensee: Pershing County Water
                                                                                                       directly from the applicant or such
                                              deadline date for the particular                                                                                Conservation District, Nevada.
                                                                                                       copies can be viewed and reproduced at                    e. Name of Project: Humboldt River
                                              proceeding.
                                                 Filing and Service of Responsive                      the Commission in its Public Reference                 Hydropower Project.
                                              Documents: All filings must (1) bear in                  Room, Room 2A, 888 First Street NE.,                      f. Location: The unconstructed project
                                              all capital letters the ‘‘COMMENTS                       Washington, DC 20426. The filing may                   would be located at the U.S. Department
                                              CONTESTING QUALIFICATION FOR A                           also be viewed on the web at http://                   of the Interior, Bureau of Reclamation’s
                                              CONDUIT HYDROPOWER FACILITY’’                            www.ferc.gov/docs-filing/elibrary.asp                  Rye Patch Dam, on the Humboldt River
                                              or ‘‘MOTION TO INTERVENE,’’ as                           using the ‘‘eLibrary’’ link. Enter the                 in Pershing County, Nevada. The project
                                              applicable; (2) state in the heading the                 docket number (e.g., CD15–18) in the                   would occupy 0.25 acre of federal land.
                                              name of the applicant and the project                    docket number field to access the                         g. Filed Pursuant to: 18 CFR 6.2.
                                              number of the application to which the                   document. For assistance, call toll-free                  h. Licensee Contact: Mr. Bennie
                                              filing responds; (3) state the name,                     1–866–208–3676 or email                                Hodges, Manager, Pershing County
                                              address, and telephone number of the                     FERCOnlineSupport@ferc.gov. For TTY,                   Water Conservation District, P.O. Box
                                              person filing; and (4) otherwise comply                  call (202) 502–8659.                                   218, Lovelock, NV 89419, Telephone:
                                              with the requirements of sections                                                                               (775) 273–2293, Email:
                                                                                                         Dated: June 18, 2015.
                                              385.2001 through 385.2005 of the                                                                                pcwcd@irrigation.lovelock.nv.us.
                                              Commission’s regulations.1 All                           Kimberly D. Bose,                                         i. FERC Contact: Mr. Ashish Desai,
                                              comments contesting Commission staff’s                   Secretary.                                             (202) 502–8370, Ashish.Desai@ferc.gov.
                                              preliminary determination that the                       [FR Doc. 2015–15491 Filed 6–23–15; 8:45 am]               j. Deadline for filing comments,
                                              facility meets the qualifying criteria                   BILLING CODE 6717–01–P                                 interventions and protests is 30 days
                                              must set forth their evidentiary basis.                                                                         from the issuance date of this notice.
                                                 The Commission strongly encourages                                                                           The Commission strongly encourages
                                              electronic filing. Please file motions to                                                                       electronic filing. Please file motions to
                                              intervene and comments using the                                                                                intervene, protests and comments using
                                              Commission’s eFiling system at http://                                                                          the Commission’s eFiling system at
tkelley on DSK3SPTVN1PROD with NOTICES




                                              www.ferc.gov/docs-filing/efiling.asp.                                                                           http://www.ferc.gov/docs-filing/
                                              Commenters can submit brief comments                                                                            efiling.asp. Commenters can submit
                                              up to 6,000 characters, without prior                                                                           brief comments up to 6,000 characters,
                                              registration, using the eComment system                                                                         without prior registration, using the
                                              at http://www.ferc.gov/docs-filing/                                                                             eComment system at http://
                                                                                                                                                              www.ferc.gov/docs-filing/
                                                1 18   CFR 385.2001–2005 (2014).                                                                              ecomment.asp. You must include your


                                         VerDate Sep<11>2014    16:43 Jun 23, 2015   Jkt 235001   PO 00000   Frm 00014   Fmt 4703   Sfmt 4703   E:\FR\FM\24JNN1.SGM   24JNN1



Document Created: 2015-12-15 14:09:20
Document Modified: 2015-12-15 14:09:20
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 36328 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR