80_FR_36450 80 FR 36329 - Pershing County Water Conservation District, Nevada; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests

80 FR 36329 - Pershing County Water Conservation District, Nevada; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 121 (June 24, 2015)

Page Range36329-36330
FR Document2015-15493

Federal Register, Volume 80 Issue 121 (Wednesday, June 24, 2015)
[Federal Register Volume 80, Number 121 (Wednesday, June 24, 2015)]
[Notices]
[Pages 36329-36330]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-15493]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14327-004]


Pershing County Water Conservation District, Nevada; Notice of 
Application Accepted for Filing, Soliciting Comments, Motions To 
Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Proceeding: Surrender of License.
    b. Project No.: 14327-004.
    c. Date Filed: June 4, 2015.
    d. Licensee: Pershing County Water Conservation District, Nevada.
    e. Name of Project: Humboldt River Hydropower Project.
    f. Location: The unconstructed project would be located at the U.S. 
Department of the Interior, Bureau of Reclamation's Rye Patch Dam, on 
the Humboldt River in Pershing County, Nevada. The project would occupy 
0.25 acre of federal land.
    g. Filed Pursuant to: 18 CFR 6.2.
    h. Licensee Contact: Mr. Bennie Hodges, Manager, Pershing County 
Water Conservation District, P.O. Box 218, Lovelock, NV 89419, 
Telephone: (775) 273-2293, Email: pcwcd@irrigation.lovelock.nv.us.
    i. FERC Contact: Mr. Ashish Desai, (202) 502-8370, 
Ashish.Desai@ferc.gov.
    j. Deadline for filing comments, interventions and protests is 30 
days from the issuance date of this notice. The Commission strongly 
encourages electronic filing. Please file motions to intervene, 
protests and comments using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your

[[Page 36330]]

name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14327-004.
    k. Description of Project Facilities: The unconstructed project 
works would consist of (1) an 18-foot by 18-foot powerhouse to be 
located in an existing parking area immediately downstream of the dam 
on the west side of the spillway; (2) a new 750-kilowatt generator to 
be installed within the powerhouse and connected to a new Kaplan 
turbine via a driveshaft; (3) the Kaplan turbine which would be 
installed outside of the powerhouse and connected to an existing 48-
inch-diameter steel discharge pipe; (4) a second existing 48-inch-
diameter steel pipe that would be used to bypass flow past the turbine; 
(5) a new 24.9-kilovolt, 9,360-foot-long primary transmission line; and 
(6) appurtenant facilities.
    l. Description of Proceeding: On June 4, 2015, Pershing County 
Water Conservation District, Nevada filed a request to surrender their 
license for the unconstructed project stating that due to the current 
drought in the western United States, the project is not feasible at 
this time.
    m. This filing may be viewed on the Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and 
issuances related to this or other pending projects. For assistance, 
call 1-866-208-3676 or email FERCOnlineSupport@ferc.gov, for TTY, call 
(202) 502-8659. A copy is also available for inspection and 
reproduction in the Commission's Public Reference Room located at 888 
First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 
502-8371.
    n. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    o. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.212 and .214. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    p. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or 
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis and otherwise comply with the requirements of 18 CFR 
4.34(b). All comments, motions to intervene, or protests should relate 
to project works which are the subject of the license surrender. 
Agencies may obtain copies of the application directly from the 
applicant. A copy of any protest or motion to intervene must be served 
upon each representative of the applicant specified in the particular 
application. If an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.
    q. Agency Comments--Federal, state, and local agencies are invited 
to file comments on the described proceeding. If any agency does not 
file comments within the time specified for filing comments, it will be 
presumed to have no comments.

    Dated: June 18, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-15493 Filed 6-23-15; 8:45 am]
 BILLING CODE 6717-01-P



                                                                            Federal Register / Vol. 80, No. 121 / Wednesday, June 24, 2015 / Notices                                                 36329

                                                                                   TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                   Satisfies
                                                             Statutory provision                                                            Description                                             (Y/N)

                                              FPA 30(a)(3)(A), as amended by HREA ...              The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or             Y
                                                                                                     similar manmade water conveyance that is operated for the distribution of water for
                                                                                                     agricultural, municipal, or industrial consumption and not primarily for the genera-
                                                                                                     tion of electricity..
                                              FPA 30(a)(3)(C)(i), as amended by HREA               The facility is constructed, operated, or maintained for the generation of electric                Y
                                                                                                     power and uses for such generation only the hydroelectric potential of a non-feder-
                                                                                                     ally owned conduit..
                                              FPA 30(a)(3)(C)(ii), as amended by HREA              The facility has an installed capacity that does not exceed 5 megawatts. ....................      Y
                                              FPA 30(a)(3)(C)(iii), as amended by                  On or before August 9, 2013, the facility is not licensed, or exempted from the licens-            Y
                                                HREA.                                                ing requirements of Part I of the FPA..



                                                 Preliminary Determination: Based                      ecomment.asp. You must include your                    DEPARTMENT OF ENERGY
                                              upon the above criteria, Commission                      name and contact information at the end
                                              staff preliminarily determines that the                  of your comments. For assistance,                      Federal Energy Regulatory
                                              proposal satisfies the requirements for a                please contact FERC Online Support at                  Commission
                                              qualifying conduit hydropower facility,                  FERCOnlineSupport@ferc.gov, (866)                      [Project No. 14327–004]
                                              which is not required to be licensed or                  208–3676 (toll free), or (202) 502–8659
                                              exempted from licensing.                                 (TTY). In lieu of electronic filing, please            Pershing County Water Conservation
                                                 Comments and Motions to Intervene:                    send a paper copy to: Secretary, Federal               District, Nevada; Notice of Application
                                              Deadline for filing comments contesting                                                                         Accepted for Filing, Soliciting
                                                                                                       Energy Regulatory Commission, 888
                                              whether the facility meets the qualifying                                                                       Comments, Motions To Intervene, and
                                                                                                       First Street NE., Washington, DC 20426.
                                              criteria is 45 days from the issuance                                                                           Protests
                                              date of this notice.                                     A copy of all other filings in reference
                                                 Deadline for filing motions to                        to this application must be accompanied                   Take notice that the following
                                              intervene is 30 days from the issuance                   by proof of service on all persons listed              hydroelectric application has been filed
                                              date of this notice.                                     in the service list prepared by the                    with the Commission and is available
                                                 Anyone may submit comments or a                       Commission in this proceeding, in                      for public inspection:
                                              motion to intervene in accordance with                   accordance with 18 CFR 4.34(b) and                        a. Type of Proceeding: Surrender of
                                              the requirements of Rules of Practice                    385.2010.                                              License.
                                              and Procedure, 18 CFR 385.210 and                          Locations of Notice of Intent: Copies                   b. Project No.: 14327–004.
                                              385.214. Any motions to intervene must                   of the notice of intent can be obtained                   c. Date Filed: June 4, 2015.
                                              be received on or before the specified                                                                             d. Licensee: Pershing County Water
                                                                                                       directly from the applicant or such
                                              deadline date for the particular                                                                                Conservation District, Nevada.
                                                                                                       copies can be viewed and reproduced at                    e. Name of Project: Humboldt River
                                              proceeding.
                                                 Filing and Service of Responsive                      the Commission in its Public Reference                 Hydropower Project.
                                              Documents: All filings must (1) bear in                  Room, Room 2A, 888 First Street NE.,                      f. Location: The unconstructed project
                                              all capital letters the ‘‘COMMENTS                       Washington, DC 20426. The filing may                   would be located at the U.S. Department
                                              CONTESTING QUALIFICATION FOR A                           also be viewed on the web at http://                   of the Interior, Bureau of Reclamation’s
                                              CONDUIT HYDROPOWER FACILITY’’                            www.ferc.gov/docs-filing/elibrary.asp                  Rye Patch Dam, on the Humboldt River
                                              or ‘‘MOTION TO INTERVENE,’’ as                           using the ‘‘eLibrary’’ link. Enter the                 in Pershing County, Nevada. The project
                                              applicable; (2) state in the heading the                 docket number (e.g., CD15–18) in the                   would occupy 0.25 acre of federal land.
                                              name of the applicant and the project                    docket number field to access the                         g. Filed Pursuant to: 18 CFR 6.2.
                                              number of the application to which the                   document. For assistance, call toll-free                  h. Licensee Contact: Mr. Bennie
                                              filing responds; (3) state the name,                     1–866–208–3676 or email                                Hodges, Manager, Pershing County
                                              address, and telephone number of the                     FERCOnlineSupport@ferc.gov. For TTY,                   Water Conservation District, P.O. Box
                                              person filing; and (4) otherwise comply                  call (202) 502–8659.                                   218, Lovelock, NV 89419, Telephone:
                                              with the requirements of sections                                                                               (775) 273–2293, Email:
                                                                                                         Dated: June 18, 2015.
                                              385.2001 through 385.2005 of the                                                                                pcwcd@irrigation.lovelock.nv.us.
                                              Commission’s regulations.1 All                           Kimberly D. Bose,                                         i. FERC Contact: Mr. Ashish Desai,
                                              comments contesting Commission staff’s                   Secretary.                                             (202) 502–8370, Ashish.Desai@ferc.gov.
                                              preliminary determination that the                       [FR Doc. 2015–15491 Filed 6–23–15; 8:45 am]               j. Deadline for filing comments,
                                              facility meets the qualifying criteria                   BILLING CODE 6717–01–P                                 interventions and protests is 30 days
                                              must set forth their evidentiary basis.                                                                         from the issuance date of this notice.
                                                 The Commission strongly encourages                                                                           The Commission strongly encourages
                                              electronic filing. Please file motions to                                                                       electronic filing. Please file motions to
                                              intervene and comments using the                                                                                intervene, protests and comments using
                                              Commission’s eFiling system at http://                                                                          the Commission’s eFiling system at
tkelley on DSK3SPTVN1PROD with NOTICES




                                              www.ferc.gov/docs-filing/efiling.asp.                                                                           http://www.ferc.gov/docs-filing/
                                              Commenters can submit brief comments                                                                            efiling.asp. Commenters can submit
                                              up to 6,000 characters, without prior                                                                           brief comments up to 6,000 characters,
                                              registration, using the eComment system                                                                         without prior registration, using the
                                              at http://www.ferc.gov/docs-filing/                                                                             eComment system at http://
                                                                                                                                                              www.ferc.gov/docs-filing/
                                                1 18   CFR 385.2001–2005 (2014).                                                                              ecomment.asp. You must include your


                                         VerDate Sep<11>2014    16:43 Jun 23, 2015   Jkt 235001   PO 00000   Frm 00014   Fmt 4703   Sfmt 4703   E:\FR\FM\24JNN1.SGM   24JNN1


                                              36330                        Federal Register / Vol. 80, No. 121 / Wednesday, June 24, 2015 / Notices

                                              name and contact information at the end                 consider all protests or other comments                DEPARTMENT OF ENERGY
                                              of your comments. For assistance,                       filed, but only those who file a motion
                                              please contact FERC Online Support at                   to intervene in accordance with the                    Federal Energy Regulatory
                                              FERCOnlineSupport@ferc.gov, (866)                       Commission’s Rules may become a                        Commission
                                              208–3676 (toll free), or (202) 502–8659                 party to the proceeding. Any comments,
                                              (TTY). In lieu of electronic filing, please                                                                    Combined Notice Of Filings #1
                                                                                                      protests, or motions to intervene must
                                              send a paper copy to: Secretary, Federal                be received on or before the specified                    Take notice that the Commission
                                              Energy Regulatory Commission, 888                       comment date for the particular                        received the following exempt
                                              First Street NE., Washington, DC 20426.                 application.                                           wholesale generator filings:
                                              The first page of any filing should                                                                               Docket Numbers: EG15–97–000.
                                              include docket number P–14327–004.                         p. Filing and Service of Responsive
                                                                                                      Documents: Any filing must (1) bear in                    Applicants: Route 66 Wind Power,
                                                 k. Description of Project Facilities:
                                                                                                      all capital letters the title                          LLC.
                                              The unconstructed project works would
                                                                                                                                                                Description: Notice of Self-
                                              consist of (1) an 18-foot by 18-foot                    ‘‘COMMENTS’’, ‘‘PROTEST’’, or
                                                                                                                                                             Certification of Exempt Wholesale
                                              powerhouse to be located in an existing                 ‘‘MOTION TO INTERVENE’’ as
                                                                                                                                                             Generator Status of Route 66 Wind
                                              parking area immediately downstream                     applicable; (2) set forth in the heading               Power, LLC.
                                              of the dam on the west side of the                      the name of the applicant and the                         Filed Date: 6/17/15.
                                              spillway; (2) a new 750-kilowatt                        project number of the application to                      Accession Number: 20150617–5235.
                                              generator to be installed within the                    which the filing responds; (3) furnish                    Comments Due: 5 p.m. ET 7/8/15.
                                              powerhouse and connected to a new                       the name, address, and telephone
                                              Kaplan turbine via a driveshaft; (3) the                                                                          Take notice that the Commission
                                                                                                      number of the person protesting or                     received the following electric rate
                                              Kaplan turbine which would be                           intervening; and (4) otherwise comply
                                              installed outside of the powerhouse and                                                                        filings:
                                                                                                      with the requirements of 18 CFR                           Docket Numbers: ER15–1937–000.
                                              connected to an existing 48-inch-
                                                                                                      385.2001 through 385.2005. All                            Applicants: PJM Interconnection,
                                              diameter steel discharge pipe; (4) a
                                                                                                      comments, motions to intervene, or                     L.L.C., Old Dominion Electric
                                              second existing 48-inch-diameter steel
                                              pipe that would be used to bypass flow                  protests must set forth their evidentiary              Cooperative.
                                              past the turbine; (5) a new 24.9-kilovolt,              basis and otherwise comply with the                       Description: § 205(d) Rate Filing:
                                              9,360-foot-long primary transmission                    requirements of 18 CFR 4.34(b). All                    Second Revised Service Agreement No.
                                              line; and (6) appurtenant facilities.                   comments, motions to intervene, or                     3746—NITSA between PJM and ODEC
                                                 l. Description of Proceeding: On June                protests should relate to project works                to be effective 6/1/2015.
                                              4, 2015, Pershing County Water                          which are the subject of the license                      Filed Date: 6/17/15.
                                              Conservation District, Nevada filed a                   surrender. Agencies may obtain copies                     Accession Number: 20150617–5248.
                                              request to surrender their license for the              of the application directly from the                      Comments Due: 5 p.m. ET 7/8/15.
                                              unconstructed project stating that due to               applicant. A copy of any protest or                       Docket Numbers: ER15–1938–000.
                                              the current drought in the western                      motion to intervene must be served                        Applicants: PJM Interconnection,
                                              United States, the project is not feasible              upon each representative of the                        L.L.C.
                                              at this time.                                           applicant specified in the particular                     Description: § 205(d) Rate Filing:
                                                 m. This filing may be viewed on the                  application. If an intervener files                    Original WMPA Service Agreement No.
                                              Commission’s Web site at http://                        comments or documents with the                         4183; Queue No. Z2–105 to be effective
                                              www.ferc.gov/docs-filing/elibrary.asp.                  Commission relating to the merits of an                10/31/2014.
                                              Enter the docket number excluding the                   issue that may affect the responsibilities                Filed Date: 6/17/15.
                                              last three digits in the docket number                                                                            Accession Number: 20150617–5266.
                                                                                                      of a particular resource agency, they
                                              field to access the document. You may                                                                             Comments Due: 5 p.m. ET 7/8/15.
                                                                                                      must also serve a copy of the document
                                              also register online at http://                                                                                   Docket Numbers: ER15–1939–000.
                                              www.ferc.gov/docs-filing/                               on that resource agency. A copy of all
                                                                                                      other filings in reference to this                        Applicants: Southwest Power Pool,
                                              esubscription.asp to be notified via                                                                           Inc.
                                              email of new filings and issuances                      application must be accompanied by
                                                                                                      proof of service on all persons listed in                 Description: § 205(d) Rate Filing: 3050
                                              related to this or other pending projects.                                                                     Sunwind Energy Group GIA to be
                                              For assistance, call 1–866–208–3676 or                  the service list prepared by the
                                                                                                      Commission in this proceeding, in                      effective 6/3/2015.
                                              email FERCOnlineSupport@ferc.gov, for                                                                             Filed Date: 6/17/15.
                                              TTY, call (202) 502–8659. A copy is also                accordance with 18 CFR 4.34(b) and
                                                                                                      385.2010.                                                 Accession Number: 20150617–5267.
                                              available for inspection and                                                                                      Comments Due: 5 p.m. ET 7/8/15.
                                              reproduction in the Commission’s                           q. Agency Comments—Federal, state,
                                              Public Reference Room located at 888                                                                              Docket Numbers: ER15–1940–000.
                                                                                                      and local agencies are invited to file                    Applicants: PJM Interconnection,
                                              First Street NE., Room 2A, Washington,                  comments on the described proceeding.
                                              DC 20426, or by calling (202) 502–8371.                                                                        L.L.C.
                                                                                                      If any agency does not file comments                      Description: § 205(d) Rate Filing:
                                                 n. Individuals desiring to be included               within the time specified for filing
                                              on the Commission’s mailing list should                                                                        Service Agreement No. 4184; Queue No.
                                                                                                      comments, it will be presumed to have                  Z2–106 to be effective 10/31/2014.
                                              so indicate by writing to the Secretary
                                                                                                      no comments.                                              Filed Date: 6/17/15.
                                              of the Commission.
                                                 o. Comments, Protests, or Motions to                   Dated: June 18, 2015.                                   Accession Number: 20150617–5268.
                                                                                                                                                                Comments Due: 5 p.m. ET 7/8/15.
tkelley on DSK3SPTVN1PROD with NOTICES




                                              Intervene: Anyone may submit                            Kimberly D. Bose,
                                              comments, a protest, or a motion to                     Secretary.                                                Docket Numbers: ER15–1941–000.
                                              intervene in accordance with the                        [FR Doc. 2015–15493 Filed 6–23–15; 8:45 am]
                                                                                                                                                                Applicants: Barclays Bank PLC.
                                              requirements of Rules of Practice and                                                                             Description: Notice of Cancellation of
                                                                                                      BILLING CODE 6717–01–P
                                              Procedure, 18 CFR 385.210, .211, .212                                                                          Market Based Rate Tariff of Barclays
                                              and .214. In determining the appropriate                                                                       Bank PLC.
                                              action to take, the Commission will                                                                               Filed Date: 6/17/15.


                                         VerDate Sep<11>2014   16:43 Jun 23, 2015   Jkt 235001   PO 00000   Frm 00015   Fmt 4703   Sfmt 4703   E:\FR\FM\24JNN1.SGM   24JNN1



Document Created: 2015-12-15 14:09:20
Document Modified: 2015-12-15 14:09:20
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 36329 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR