The U.S. Nuclear Regulatory Commission (NRC) has issued a director's decision with regard to a petition dated March 12, 2011, filed by Thomas Saporito (the petitioner), requesting that the NRC take action with regard to all operating reactor licensees. The petitioner's requests and the director's decision are included in the SUPPLEMENTARY INFORMATION section of this document.

Federal Register, Volume 80 Issue 121 (Wednesday, June 24, 2015)
[Federal Register Volume 80, Number 121 (Wednesday, June 24, 2015)]
[Notices]
[Pages 36365-36366]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-15518]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2011-0147]


Thomas Saporito on Behalf of Saprodani Associates

AGENCY: Nuclear Regulatory Commission.

ACTION: Director's decision under 10 CFR 2.206; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) has issued a 
director's decision with regard to a petition dated March 12, 2011, 
filed by Thomas Saporito (the petitioner), requesting that the NRC take 
action with regard to all operating reactor licensees. The petitioner's 
requests and the director's decision are included in the SUPPLEMENTARY 
INFORMATION section of this document.

DATES: June 24, 2015.

ADDRESSES: Please refer to Docket ID NRC-2011-0147 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2011-0147. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected].
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced (if that document 
is available in ADAMS) is provided the first time that a document is 
referenced.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

SUPPLEMENTARY INFORMATION: 
    Notice is hereby given that the Director, Office of Nuclear Reactor 
Regulation, has issued a director's decision (ADAMS Accession No. 
ML15114A411) on a petition filed by the petitioner on March 12, 2011 
(ADAMS Accession No. ML110740026). The petition was supplemented by 
documents dated April 14, April 16, and May 25, 2011 (ADAMS Accession 
Nos. ML11110A026, ML11110A027, ML11110A028, ML11119A024, and 
ML111450897, respectively.)
    The petitioner requested that the NRC:
    1. Order the immediate shutdown of all nuclear power reactors 
located on or near an earthquake fault line in the United States.
    2. Order the immediate shutdown of all power reactors employing GE 
Mark I containment design in the United States, characterizing such 
design as flawed from the nuclear safety standpoint.
    3. Advise other countries employing the GE Mark I nuclear power 
reactors about the serious nuclear safety design flaws associated with 
that design, which is likely to result in a serious nuclear accident 
comparable to the Japanese nuclear disaster.
    4. Immediately revoke all 20-year license extensions issued to NRC 
licensees, because the NRC ``has improperly and illegally granted 20-
year license extensions to the 40-year license that was initially 
granted by the agency for the 104 nuclear reactors throughout the 
United States.''
    As the basis for these requests, the petitioner cited the events in 
Japan at the Fukushima Dai-ichi Nuclear Power Plant.
    On April 14, 2011, and May 25, 2011, the petitioner met with the 
NRC's Petition Review Board. The meetings provided the petitioner an 
opportunity to provide additional information and to clarify issues 
cited in the petition. The transcripts for those meetings are available 
in ADAMS under Accession Nos. ML11109A014 and ML11146A010, 
respectively.
    The NRC sent a copy of the proposed director's decision to the 
petitioner and the licensees for comment on April 8, 2015 (ADAMS 
Package Accession No. ML13018A145). The petitioner and the licensees 
were asked to provide comments within 2 weeks on any part of the 
proposed director's decision that was considered to be erroneous or any 
issues in the petition that were not addressed. Comments were received 
from two licensees and are addressed in an attachment to the final 
director's decision. The staff did not receive any comments from the 
petitioner.
    The Director of the Office of Nuclear Reactor Regulation has 
determined that the following requests are denied: (1) To require that 
the NRC Order the immediate shutdown of all nuclear power reactors 
located on or near an earthquake fault line in the United States, and 
(2) to require that the NRC Order the immediate shutdown of all power 
reactors employing GE Mark I containment design in the United States. 
The NRC rejected Request 3 on the basis that the NRC was already 
implementing the actions requested. The NRC rejected Request 4 on the 
basis that the petitioner's claim was general and insufficient to 
warrant further inquiry, and that the NRC staff had already reviewed, 
evaluated, and resolved the issue.
    The reasons for this decision are explained in the director's 
decision (DD-15-06) under Section 2.206 of Title 10 of the Code of 
Federal Regulations (10 CFR) of the Commission's regulations.
    The NRC will file a copy of the director's decision with the 
Secretary of the Commission for the Commission's review in accordance 
with 10 CFR

[[Page 36366]]

2.206. As provided by this regulation, the director's decision will 
constitute the final action of the Commission 25 days after the date of 
the decision, unless the Commission, on its own motion, institutes a 
review of the director's decision in that time.

    Dated at Rockville, Maryland, this 17th day of June, 2015.
    For the Nuclear Regulatory Commission.
William M. Dean,
Director, Office of Nuclear Reactor Regulation.
[FR Doc. 2015-15518 Filed 6-23-15; 8:45 am]
 BILLING CODE 7590-01-P



                                                                           Federal Register / Vol. 80, No. 121 / Wednesday, June 24, 2015 / Notices                                           36365

                                              FOR FURTHER INFORMATION CONTACT:     Li                 DATES:   June 24, 2015.                                accident comparable to the Japanese
                                              Ling Hamady, ACA Permit Officer, at                     ADDRESSES:    Please refer to Docket ID                nuclear disaster.
                                              the above address or ACApermits@                        NRC–2011–0147 when contacting the                         4. Immediately revoke all 20-year
                                              nsf.gov or (703) 292–7149.                              NRC about the availability of                          license extensions issued to NRC
                                              SUPPLEMENTARY INFORMATION: The                          information regarding this document.                   licensees, because the NRC ‘‘has
                                              National Science Foundation, as                         You may obtain publicly-available                      improperly and illegally granted 20-year
                                              directed by the Antarctic Conservation                  information related to this document                   license extensions to the 40-year license
                                              Act of 1978 (Pub. L. 95–541), as                        using any of the following methods:                    that was initially granted by the agency
                                              amended by the Antarctic Science,                          • Federal Rulemaking Web site: Go to                for the 104 nuclear reactors throughout
                                              Tourism and Conservation Act of 1996,                   http://www.regulations.gov and search                  the United States.’’
                                              has developed regulations for the                       for Docket ID NRC–2011–0147. Address                      As the basis for these requests, the
                                              establishment of a permit system for                    questions about NRC dockets to Carol                   petitioner cited the events in Japan at
                                              various activities in Antarctica and                    Gallagher; telephone: 301–415–3463;                    the Fukushima Dai-ichi Nuclear Power
                                              designation of certain animals and                      email: Carol.Gallagher@nrc.gov.                        Plant.
                                                                                                                                                                On April 14, 2011, and May 25, 2011,
                                              certain geographic areas a requiring                       • NRC’s Agencywide Documents
                                                                                                                                                             the petitioner met with the NRC’s
                                              special protection. The regulations                     Access and Management System
                                                                                                                                                             Petition Review Board. The meetings
                                              establish such a permit system to                       (ADAMS): You may obtain publicly
                                                                                                                                                             provided the petitioner an opportunity
                                              designate Antarctic Specially Protected                 available documents online in the
                                                                                                                                                             to provide additional information and to
                                              Areas.                                                  ADAMS Public Documents collection at
                                                                                                                                                             clarify issues cited in the petition. The
                                                                                                      http://www.nrc.gov/reading-rm/                         transcripts for those meetings are
                                              Application Details                                     adams.html. To begin the search, select                available in ADAMS under Accession
                                                1. Applicant: Helen Glazer, 3413                      ‘‘ADAMS Public Documents’’ and then                    Nos. ML11109A014 and ML11146A010,
                                              Nancy Ellen Way, Owings Mills, MD                       select ‘‘Begin Web-based ADAMS                         respectively.
                                              2117.                                                   Search.’’ For problems with ADAMS,                        The NRC sent a copy of the proposed
                                                Permit Application: 2016–002.                         please contact the NRC’s Public                        director’s decision to the petitioner and
                                                Activity for Which Permit is                          Document Room (PDR) reference staff at                 the licensees for comment on April 8,
                                              Requested: ASPA entry, Applicant, as                    1–800–397–4209, 301–415–4737, or by                    2015 (ADAMS Package Accession No.
                                              an NSF artist, desires to enter several                 email to pdr.resource@nrc.gov. The                     ML13018A145). The petitioner and the
                                              ASPAs in order to take photos for use                   ADAMS accession number for each                        licensees were asked to provide
                                              in hand painted photographs and 3D                      document referenced (if that document                  comments within 2 weeks on any part
                                              sculpture creation.                                     is available in ADAMS) is provided the                 of the proposed director’s decision that
                                                Location: ASPA 121 Cape Royds;                        first time that a document is referenced.              was considered to be erroneous or any
                                              ASPA 122 Arrival Heights; ASPA 131                         • NRC’s PDR: You may examine and                    issues in the petition that were not
                                              Canada Glacier; ASPA 157 Backdoor                       purchase copies of public documents at                 addressed. Comments were received
                                              Bay; ASPA 158 Hut Point; ASPA 172                       the NRC’s PDR, Room O1–F21, One                        from two licensees and are addressed in
                                              Lower Taylor Glacier and Blood Falls.                   White Flint North, 11555 Rockville
                                                Dates: October 25, 2015 to January 4,                                                                        an attachment to the final director’s
                                                                                                      Pike, Rockville, Maryland 20852.                       decision. The staff did not receive any
                                              2016.
                                                                                                      SUPPLEMENTARY INFORMATION:                             comments from the petitioner.
                                              Nadene G. Kennedy,                                         Notice is hereby given that the                        The Director of the Office of Nuclear
                                              Polar Coordination Specialist, Division of              Director, Office of Nuclear Reactor                    Reactor Regulation has determined that
                                              Polar Programs.                                         Regulation, has issued a director’s                    the following requests are denied: (1) To
                                              [FR Doc. 2015–15501 Filed 6–23–15; 8:45 am]             decision (ADAMS Accession No.                          require that the NRC Order the
                                              BILLING CODE 7555–01–P                                  ML15114A411) on a petition filed by                    immediate shutdown of all nuclear
                                                                                                      the petitioner on March 12, 2011                       power reactors located on or near an
                                                                                                      (ADAMS Accession No. ML110740026).                     earthquake fault line in the United
                                              NUCLEAR REGULATORY                                      The petition was supplemented by                       States, and (2) to require that the NRC
                                              COMMISSION                                              documents dated April 14, April 16, and                Order the immediate shutdown of all
                                                                                                      May 25, 2011 (ADAMS Accession Nos.                     power reactors employing GE Mark I
                                              [NRC–2011–0147]                                         ML11110A026, ML11110A027,                              containment design in the United
                                                                                                      ML11110A028, ML11119A024, and                          States. The NRC rejected Request 3 on
                                              Thomas Saporito on Behalf of                            ML111450897, respectively.)                            the basis that the NRC was already
                                              Saprodani Associates                                       The petitioner requested that the                   implementing the actions requested.
                                              AGENCY: Nuclear Regulatory                              NRC:                                                   The NRC rejected Request 4 on the basis
                                              Commission.                                                1. Order the immediate shutdown of                  that the petitioner’s claim was general
                                              ACTION: Director’s decision under 10                    all nuclear power reactors located on or               and insufficient to warrant further
                                              CFR 2.206; issuance.                                    near an earthquake fault line in the                   inquiry, and that the NRC staff had
                                                                                                      United States.                                         already reviewed, evaluated, and
                                              SUMMARY:   The U.S. Nuclear Regulatory                     2. Order the immediate shutdown of                  resolved the issue.
                                              Commission (NRC) has issued a                           all power reactors employing GE Mark                      The reasons for this decision are
                                              director’s decision with regard to a                    I containment design in the United                     explained in the director’s decision
                                              petition dated March 12, 2011, filed by                 States, characterizing such design as                  (DD–15–06) under Section 2.206 of Title
tkelley on DSK3SPTVN1PROD with NOTICES




                                              Thomas Saporito (the petitioner),                       flawed from the nuclear safety                         10 of the Code of Federal Regulations
                                              requesting that the NRC take action with                standpoint.                                            (10 CFR) of the Commission’s
                                              regard to all operating reactor licensees.                 3. Advise other countries employing                 regulations.
                                              The petitioner’s requests and the                       the GE Mark I nuclear power reactors                      The NRC will file a copy of the
                                              director’s decision are included in the                 about the serious nuclear safety design                director’s decision with the Secretary of
                                              SUPPLEMENTARY INFORMATION section of                    flaws associated with that design, which               the Commission for the Commission’s
                                              this document.                                          is likely to result in a serious nuclear               review in accordance with 10 CFR


                                         VerDate Sep<11>2014   16:43 Jun 23, 2015   Jkt 235001   PO 00000   Frm 00050   Fmt 4703   Sfmt 4703   E:\FR\FM\24JNN1.SGM   24JNN1


                                              36366                        Federal Register / Vol. 80, No. 121 / Wednesday, June 24, 2015 / Notices

                                              2.206. As provided by this regulation,                  site instructions for submitting                       shall be secondarily liable for the
                                              the director’s decision will constitute                 comments.                                              liability it (the seller) would have had
                                              the final action of the Commission 25                      • Email: reg.comments@pbgc.gov.                     but for section 4204.
                                              days after the date of the decision,                       • Fax: 202–326–4224.                                   The bond or escrow described above
                                              unless the Commission, on its own                          • Mail or Hand Delivery: Regulatory                 would be paid to the plan if the
                                              motion, institutes a review of the                      Affairs Group, Office of the General                   purchaser withdraws from the plan or
                                              director’s decision in that time.                       Counsel, Pension Benefit Guaranty                      fails to make any required contributions
                                                Dated at Rockville, Maryland, this 17th day           Corporation, 1200 K Street NW.,                        to the plan within the first five plan
                                              of June, 2015.                                          Washington, DC 20005–4026.                             years beginning after the sale.
                                                For the Nuclear Regulatory Commission.                   Comments received, including                           Additionally, section 4204(b)(1)
                                              William M. Dean,                                        personal information provided, will be                 provides that if a sale of assets is
                                              Director, Office of Nuclear Reactor                     posted to www.pbgc.gov. Copies of                      covered by section 4204, the purchaser
                                              Regulation.                                             comments and non-confidential                          assumes by operation of law the
                                              [FR Doc. 2015–15518 Filed 6–23–15; 8:45 am]             portions of the request may be obtained                contribution record of the seller for the
                                              BILLING CODE 7590–01–P
                                                                                                      by writing to Disclosure Division, Office              plan year in which the sale occurred
                                                                                                      of the General Counsel, Pension Benefit                and the preceding four plan years.
                                                                                                      Guaranty Corporation, 1200 K Street                       Section 4204(c) of ERISA authorizes
                                                                                                      NW., Washington, DC 20005–4026 or                      PBGC to grant individual or class
                                              PENSION BENEFIT GUARANTY
                                                                                                      calling 202–326–4040 during normal                     variances or exemptions from the
                                              CORPORATION
                                                                                                      business hours. (TTY and TDD users                     purchaser’s bond/escrow requirement of
                                              Pendency of Request for Exemption                       may call the Federal relay service toll-               section 4204(a)(1)(B) when warranted.
                                              From the Bond/Escrow Requirement                        free at 1–800–877–8339 and ask to be                   The legislative history of section 4204
                                              Relating to the Sale of Assets by an                    connected to 202–326–4040.)                            indicates a Congressional intent that the
                                              Employer Who Contributes to a                           FOR FURTHER INFORMATION CONTACT:                       sales rules be administered in a manner
                                              Multiemployer Plan; Harrington Air                      Bruce Perlin (Perlin.Bruce@PBGC.gov),                  that assures protection of the plan with
                                              Systems, LLC and J.C. Cannistraro,                      202–326–4020, ext. 6818 or Jon                         the least practicable intrusion into
                                              LLC                                                     Chatalian (Chatalian.Jon@PBGC.gov),                    normal business transactions. Senate
                                                                                                      ext. 6757, Office of the Chief Counsel,                Committee on Labor and Human
                                              AGENCY: Pension Benefit Guaranty                        Suite 340, 1200 K Street NW.,                          Resources, 96th Cong., 2nd Sess.,
                                              Corporation.                                            Washington, DC 20005–4026; (TTY/                       S.1076, The Multiemployer Pension
                                              ACTION: Notice of pendency of request.                  TDD users may call the Federal relay                   Plan Amendments Act of 1980:
                                                                                                      service toll-free at 1–800–877–8339 and                Summary and Analysis of
                                              SUMMARY:   This notice advises interested               ask to be connected to 202–326–4020.)                  Considerations 16 (Comm. Print, April
                                              persons that the Pension Benefit                                                                               1980); 128 Cong. Rec. S10117 (July 29,
                                                                                                      SUPPLEMENTARY INFORMATION:
                                              Guaranty Corporation (‘‘PBGC’’) has                                                                            1980). The granting of an exemption or
                                              received a request from Harrington Air                  Background                                             variance from the bond/escrow
                                              Systems, LLC, and its sister company                       Section 4204 of the Employee                        requirement does not constitute a
                                              J.C. Cannistraro, LLC, for an exemption                 Retirement Income Security Act of 1974,                finding by PBGC that a particular
                                              from the bond/escrow requirement of                     as amended by the Multiemployer                        transaction satisfies the other
                                              section 4204(a)(1) of the Employee                      Pension Plan Amendments Act of 1980                    requirements of section 4204(a)(1).
                                              Retirement Income Security Act of 1974,                 (‘‘ERISA’’ or ‘‘the Act’’), provides that a               Under the PBGC’s regulation on
                                              as amended, with respect to the Sheet                   bona fide arm’s-length sale of assets of               variances for sales of assets (29 CFR part
                                              Metal Workers National Pension Fund.                    a contributing employer to an unrelated                4204), a request for a variance or waiver
                                              Section 4204(a)(1) provides that the sale               party will not be considered a                         of the bond/escrow requirement under
                                              of assets by an employer that                           withdrawal if three conditions are met.                any of the tests established in the
                                              contributes to a multiemployer pension                  These conditions, enumerated in section                regulation (§§ 4204.12–4204.13) is to be
                                              plan will not constitute a complete or                  4204(a)(1)(A)–(C), are that—                           made by the parties to the sale to the
                                              partial withdrawal from the plan if                        (A) The purchaser has an obligation to              plan in question. PBGC will consider a
                                              certain conditions are met. One of these                contribute to the plan with respect to                 waiver request by a purchaser or seller
                                              conditions is that the purchaser posts a                the operations for substantially the same              only if the transaction does not satisfy
                                              bond or deposits money in escrow for                    number of contributions base units for                 the regulatory tests or the parties
                                              the five-plan-year period beginning after               which the seller was obligated to                      decline to provide the plan financial
                                              the sale. PBGC is authorized to grant                   contribute;                                            information necessary to show
                                              individual and class exemptions from                       (B) The purchaser obtains a bond or                 satisfaction of one of the regulatory tests
                                              this requirement. Before granting an                    places an amount in escrow, for a period               because it is privileged or confidential
                                              exemption PBGC is required to give                      of five plan years after the sale, equal to            financial information within the
                                              interested persons an opportunity to                    the greater of the seller’s average                    meaning of 5 U.S.C. 552(b)(4) (the
                                              comment on the exemption request. The                   required annual contribution to the plan               Freedom of Information Act).
                                              purpose of this notice is to advise                     for the three plan years preceding the                    Under § 4204.22 of the regulation, the
                                              interested persons of the exemption                     year in which the sale occurred or the                 PBGC shall approve a request for a
                                              request and solicit their views on it.                  seller’s required annual contribution for              variance or exemption if it determines
                                              DATES: Comments must be received on
tkelley on DSK3SPTVN1PROD with NOTICES




                                                                                                      the plan year preceding the year in                    that approval of the request is
                                              or before August 10, 2015.                              which the sale occurred; and                           warranted, in that it—
                                              ADDRESSES: Comments may be                                 (C) The contract of sale provides that                 (1) Would more effectively or
                                              submitted by any of the following                       if the purchaser withdraws from the                    equitably carry out the purposes of Title
                                              methods:                                                plan within the first five plan years                  IV of the Act; and
                                                 • Federal eRulemaking Portal: http://                beginning after the sale and fails to pay                 (2) Would not significantly increase
                                              www.regulations.gov. Follow the Web                     any of its liability to the plan, the seller           the risk of financial loss to the plan.


                                         VerDate Sep<11>2014   16:43 Jun 23, 2015   Jkt 235001   PO 00000   Frm 00051   Fmt 4703   Sfmt 4703   E:\FR\FM\24JNN1.SGM   24JNN1



Document Created: 2015-12-15 14:09:29
Document Modified: 2015-12-15 14:09:29
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionDirector's decision under 10 CFR 2.206; issuance.
DatesJune 24, 2015.
FR Citation80 FR 36365 