80_FR_37733 80 FR 37607 - Application to Export Electric Energy; Targray Americas Inc.

80 FR 37607 - Application to Export Electric Energy; Targray Americas Inc.

DEPARTMENT OF ENERGY

Federal Register Volume 80, Issue 126 (July 1, 2015)

Page Range37607-37608
FR Document2015-16187

Targray Americas Inc. (Targray) has applied for authority to transmit electric energy from the United States to Canada pursuant to section 202(e) of the Federal Power Act.

Federal Register, Volume 80 Issue 126 (Wednesday, July 1, 2015)
[Federal Register Volume 80, Number 126 (Wednesday, July 1, 2015)]
[Notices]
[Pages 37607-37608]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-16187]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

[OE Docket No. EA-411]


Application to Export Electric Energy; Targray Americas Inc.

AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.

ACTION: Notice of application.

-----------------------------------------------------------------------

SUMMARY: Targray Americas Inc. (Targray) has applied for authority to 
transmit electric energy from the United States to Canada pursuant to 
section 202(e) of the Federal Power Act.

DATES: Comments, protests, or motions to intervene must be submitted on 
or before July 31, 2015.

ADDRESSES: Comments, protests, motions to intervene, or requests for 
more information should be addressed to: Office of Electricity Delivery 
and Energy Reliability, Mail Code: OE-20, U.S. Department of Energy, 
1000 Independence Avenue SW, Washington, DC 20585-0350. Because of 
delays in handling conventional mail, it is recommended that documents 
be transmitted by overnight mail, by electronic mail to 
[email protected], or by facsimile to 202-586-8008.

SUPPLEMENTARY INFORMATION: Exports of electricity from the United 
States to a foreign country are regulated by the Department of Energy 
(DOE) pursuant to sections 301(b) and 402(f) of the Department of 
Energy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require 
authorization under section 202(e) of the Federal Power Act (16 U.S.C. 
824a(e)).
    On May 29, 2015, DOE received an application from Targray for 
authority to transmit electric energy from the United States to Canada 
as a power marketer for five years using existing international 
transmission facilities.
    In its application, Targray states that it does not own or control 
any electric generation or transmission facilities, and it does not 
have a franchised service area. Targray states that it has applied for 
market-based rate authority from the Federal Energy Regulatory 
Commission (FERC) to engage in the sale and purchase of electric energy 
to and from Independent System Operators and Regional Transmission 
Organizations. As such, the electric energy that Targray proposes to 
export to Canada would be surplus energy purchased from third parties 
such as power marketers, independent power producers, electric 
utilities, and Federal power marketing agencies pursuant to voluntary 
agreements. The existing international transmission facilities to be 
utilized by Targray have previously been authorized by Presidential 
permits issued pursuant to Executive Order 10485, as amended, and are 
appropriate for open access transmission by third parties.
    Procedural Matters: Any person desiring to be heard in this 
proceeding should file a comment or protest to the application at the 
address provided above. Protests should be filed in accordance with 
Rule 211 of the Federal Energy Regulatory Commission's (FERC)

[[Page 37608]]

Rules of Practice and Procedures (18 CFR 385.211). Any person desiring 
to become a party to these proceedings should file a motion to 
intervene at the above address in accordance with FERC Rule 214 (18 CFR 
385.214). Five copies of such comments, protests, or motions to 
intervene should be sent to the address provided above on or before the 
date listed above.
    Comments and other filings concerning the Targray application to 
export electric energy to Canada should be clearly marked with OE 
Docket No. EA-411. An additional copy is to be provided directly to 
Ruta Kalvaitis Skucas, Pierce Atwood LLC, 900 17th St., NW., Suite 350, 
Washington, DC 20006 and to Karen Roberge, Targray Technology 
International Inc., 18105 Transcanadienne, Kirkland QC, H9J 3Z4 Canada.
    A final decision will be made on this application after the 
environmental impacts have been evaluated pursuant to DOE's National 
Environmental Policy Act Implementing Procedures (10 CFR part 1021) and 
after a determination is made by DOE that the proposed action will not 
have an adverse impact on the sufficiency of supply or reliability of 
the U.S. electric power supply system.
    Copies of this application will be made available, upon request, 
for public inspection and copying at the address provided above, by 
accessing the program Web site at http://energy.gov/node/11845, or by 
emailing Angela Troy at [email protected].

    Issued in Washington, DC, on June 25, 2015.
Brian Mills,
Director, Permitting and Siting, Office of Electricity Delivery and 
Energy Reliability.
[FR Doc. 2015-16187 Filed 6-30-15; 8:45 am]
BILLING CODE 6450-01-P



                                                                            Federal Register / Vol. 80, No. 126 / Wednesday, July 1, 2015 / Notices                                            37607

                                                Underneath all four domains lie                         c. Response Capabilities: Internal                   States to Canada pursuant to section
                                              questions that contains specific                        Capabilities and External Capabilities.                202(e) of the Federal Power Act.
                                              information for each of the domains.                      d. Recovery Mechanisms: Resource                     DATES: Comments, protests, or motions
                                              Examples of questions that can be asked                 Restoration Agreements and Utility                     to intervene must be submitted on or
                                              with specific reference to resilience are:              Service Restoration.                                   before July 31, 2015.
                                              —What procedures are included in your                     (3) Do these components and                          ADDRESSES: Comments, protests,
                                                emergency action plan?                                subcomponents make sense as                            motions to intervene, or requests for
                                                [Preparedness]                                        contributors to electric distribution                  more information should be addressed
                                              —To date, what smart grid technologies                  system resilience?                                     to: Office of Electricity Delivery and
                                                have you incorporated into your                         (4) What is missing, or should be
                                                                                                                                                             Energy Reliability, Mail Code: OE–20,
                                                distribution system? [Mitigation                      taken away?
                                                                                                                                                             U.S. Department of Energy, 1000
                                                Measures]                                             C. Data Protection                                     Independence Avenue SW, Washington,
                                              —Does the control and dispatch center                                                                          DC 20585–0350. Because of delays in
                                                use a distribution management                           (5) What are your concerns about data
                                                                                                      protection if asked to submit                          handling conventional mail, it is
                                                system? [Response Capabilities]                                                                              recommended that documents be
                                              —What service restoration method(s)                     anonymous aggregate data for a national
                                                                                                      average for electric distribution                      transmitted by overnight mail, by
                                                does the utility use? [Recovery                                                                              electronic mail to Electricity.Exports@
                                                Mechanisms]                                           resilience?
                                                                                                        (6) Data protection is recognized as an              hq.doe.gov, or by facsimile to 202–586–
                                                For each of these questions there will                                                                       8008.
                                              be a set of distinct answers. This                      important consideration for utility
                                                                                                      participation in such an assessment                    SUPPLEMENTARY INFORMATION: Exports of
                                              method of construction allows
                                                                                                      model. What are your opinions and                      electricity from the United States to a
                                              consistent, objective information
                                                                                                      recommendations on data protection?                    foreign country are regulated by the
                                              collection for all entities interested in
                                                                                                                                                             Department of Energy (DOE) pursuant to
                                              using the model. In cooperation with                    D. Working Group Participation                         sections 301(b) and 402(f) of the
                                              the utility industry, a working group
                                                                                                        (7) Would your utility be willing to                 Department of Energy Organization Act
                                              will be created to assist in determining
                                                                                                      participate in a working group intent on               (42 U.S.C. 7151(b), 7172(f)) and require
                                              the direction of the program.
                                                                                                      constructing the relative importance of                authorization under section 202(e) of
                                              II. Request for Information                             the different components and                           the Federal Power Act (16 U.S.C.
                                                 In order to develop this pilot project,              subcomponents to the overall resilience                824a(e)).
                                              DOE would like input from resilience                    of the system? Who would be the                           On May 29, 2015, DOE received an
                                              experts in the electric distribution                    appropriate person within your utility                 application from Targray for authority to
                                              industry to gauge the interest and                      to participate in such a working group?                transmit electric energy from the United
                                              usefulness of the proposed decision                       (8) Are there others who you would                   States to Canada as a power marketer for
                                              support tool. This RFI provides the                     suggest to provide early feedback on                   five years using existing international
                                              public and industry stakeholders with                   tool development?                                      transmission facilities.
                                                                                                        (9) Is your utility interested in being                 In its application, Targray states that
                                              the opportunity to provide their view on
                                                                                                      part of a demonstration or pilot during                it does not own or control any electric
                                              the development of a resilience tool.
                                                                                                      early testing?                                         generation or transmission facilities,
                                              The intent of this RFI is to solicit
                                              information pertinent to the need and                                                                          and it does not have a franchised service
                                                                                                      E. Other Feedback
                                              viability of the resilience assessment                                                                         area. Targray states that it has applied
                                                                                                        Additional comments that may not be                  for market-based rate authority from the
                                              tool. The information obtained is meant                 captured in replies these questions, but
                                              to be used by DOE for tool design and                                                                          Federal Energy Regulatory Commission
                                                                                                      are considered relevant by respondents                 (FERC) to engage in the sale and
                                              strategy development purposes. In your                  are highly encouraged.
                                              comments, please reference the                                                                                 purchase of electric energy to and from
                                              question(s) to which you are                              Authority: Presidential Policy Directive-21.         Independent System Operators and
                                              responding, as well as provide other                      Issued at Washington, DC, on June 25,
                                                                                                                                                             Regional Transmission Organizations.
                                              pertinent information.                                  2015.                                                  As such, the electric energy that Targray
                                                                                                      Patricia A. Hoffman,
                                                                                                                                                             proposes to export to Canada would be
                                              A. Resilience Assessment Tool Need                                                                             surplus energy purchased from third
                                                                                                      Assistant Secretary, Department of Energy,
                                                (1) Would a resilience assessment tool                Office of Electricity Delivery and Energy
                                                                                                                                                             parties such as power marketers,
                                              be of interest for electric distribution                Reliability.                                           independent power producers, electric
                                              utilities?                                              [FR Doc. 2015–16186 Filed 6–30–15; 8:45 am]
                                                                                                                                                             utilities, and Federal power marketing
                                                (2) What would you like to see in                                                                            agencies pursuant to voluntary
                                                                                                      BILLING CODE 6450–01–P
                                              such a model should it exist (i.e.,                                                                            agreements. The existing international
                                              functionality, presentation,                                                                                   transmission facilities to be utilized by
                                              accessibility?)                                         DEPARTMENT OF ENERGY                                   Targray have previously been
                                                                                                                                                             authorized by Presidential permits
                                              B. Resilience Tool Criteria/Domains                     [OE Docket No. EA–411]                                 issued pursuant to Executive Order
                                                There are four key domains proposed                                                                          10485, as amended, and are appropriate
                                                                                                      Application to Export Electric Energy;                 for open access transmission by third
                                              for resilience: preparedness, mitigation
                                                                                                      Targray Americas Inc.                                  parties.
                                              measures, response and recovery. Each
tkelley on DSK3SPTVN1PROD with NOTICES




                                              of these components has                                 AGENCY: Office of Electricity Delivery                    Procedural Matters: Any person
                                              subcomponents as detailed below:                        and Energy Reliability, DOE.                           desiring to be heard in this proceeding
                                                a. Preparedness: Awareness and                        ACTION: Notice of application.                         should file a comment or protest to the
                                              Planning.                                                                                                      application at the address provided
                                                b. Mitigation Measures: Extreme                       SUMMARY:  Targray Americas Inc.                        above. Protests should be filed in
                                              Weather Mitigation, Utility Mitigation,                 (Targray) has applied for authority to                 accordance with Rule 211 of the Federal
                                              and Dependencies Mitigation.                            transmit electric energy from the United               Energy Regulatory Commission’s (FERC)


                                         VerDate Sep<11>2014   18:30 Jun 30, 2015   Jkt 235001   PO 00000   Frm 00028   Fmt 4703   Sfmt 4703   E:\FR\FM\01JYN1.SGM   01JYN1


                                              37608                         Federal Register / Vol. 80, No. 126 / Wednesday, July 1, 2015 / Notices

                                              Rules of Practice and Procedures (18                    ADDRESSES:    Comments, protests,                      to intervene should be sent to the
                                              CFR 385.211). Any person desiring to                    motions to intervene, or requests for                  address provided above on or before the
                                              become a party to these proceedings                     more information should be addressed                   date listed above.
                                              should file a motion to intervene at the                to: Office of Electricity Delivery and                    Comments and other filings
                                              above address in accordance with FERC                   Energy Reliability, Mail Code: OE–20,                  concerning Powerex’s application to
                                              Rule 214 (18 CFR 385.214). Five copies                  U.S. Department of Energy, 1000                        export electric energy to Canada should
                                              of such comments, protests, or motions                  Independence Avenue SW.,                               be clearly marked with OE Docket No.
                                              to intervene should be sent to the                      Washington, DC 20585–0350. Because                     EA–171–D. An additional copy is to be
                                              address provided above on or before the                 of delays in handling conventional mail,               provided directly to both Mike
                                              date listed above.                                      it is recommended that documents be                    MacDougall and Karen McDonald,
                                                 Comments and other filings                           transmitted by overnight mail, by                      Powerex Corp., 666 Burrard Street, Suite
                                              concerning the Targray application to                   electronic mail to Electricity.Exports@                1300, Vancouver, British Columbia
                                              export electric energy to Canada should                 hq.doe.gov, or by facsimile to 202–586–                Canada V6C 2X8 and to both Deanna
                                              be clearly marked with OE Docket No.                    8008.                                                  King and Tracey Bradley, Bracewell and
                                              EA–411. An additional copy is to be                     SUPPLEMENTARY INFORMATION: Exports of                  Giuliani LLP, 2000 K Street NW., Suite
                                              provided directly to Ruta Kalvaitis                     electricity from the United States to a                500, Washington, DC 20006.
                                              Skucas, Pierce Atwood LLC, 900 17th                     foreign country are regulated by the                      A final decision will be made on this
                                              St., NW., Suite 350, Washington, DC                     Department of Energy (DOE) pursuant to                 application after the environmental
                                              20006 and to Karen Roberge, Targray                     sections 301(b) and 402(f) of the                      impacts have been evaluated pursuant
                                              Technology International Inc., 18105                    Department of Energy Organization Act                  to DOE’s National Environmental Policy
                                              Transcanadienne, Kirkland QC, H9J 3Z4                   (42 U.S.C. 7151(b), 7172(f)) and require               Act Implementing Procedures (10 CFR
                                              Canada.                                                 authorization under section 202(e) of                  part 1021) and after a determination is
                                                 A final decision will be made on this                the Federal Power Act (16 U.S.C.                       made by DOE that the proposed action
                                              application after the environmental                     824a(e)).                                              will not have an adverse impact on the
                                              impacts have been evaluated pursuant                       On November 17, 2010, DOE issued                    sufficiency of supply or reliability of the
                                              to DOE’s National Environmental Policy                  Order No. EA–171–C to Powerex Corp.,                   U.S. electric power supply system.
                                              Act Implementing Procedures (10 CFR                     which authorized the Applicant to                         Copies of this application will be
                                              part 1021) and after a determination is                 transmit electric energy from the United               made available, upon request, for public
                                              made by DOE that the proposed action                    States to Canada as a power marketer for               inspection and copying at the address
                                              will not have an adverse impact on the                  a five-year term using existing                        provided above, by accessing the
                                              sufficiency of supply or reliability of the             international transmission facilities.                 program Web site at http://energy.gov/
                                              U.S. electric power supply system.                      That authority expires on November 17,                 node/11845, or by emailing Angela Troy
                                                 Copies of this application will be                   2015. On May 19, 2015, Powerex filed                   at Angela.Troy@hq.doe.gov.
                                              made available, upon request, for public                an application with DOE for renewal of                   Issued in Washington, DC, on June 25,
                                              inspection and copying at the address                   the export authority contained in Order                2015.
                                              provided above, by accessing the                        No. EA–171–C for an additional five-                   Brian Mills,
                                              program Web site at http://energy.gov/                  year term.                                             Director, Permitting and Siting Office of
                                              node/11845, or by emailing Angela Troy                     In its application, Powerex states that             Electricity Delivery and Energy Reliability.
                                              at Angela.Troy@hq.doe.gov.                              it does not own or operate any electric                [FR Doc. 2015–16233 Filed 6–30–15; 8:45 am]
                                                Issued in Washington, DC, on June 25,                 generation or transmission facilities,                 BILLING CODE 6450–01–P
                                              2015.                                                   and it does not have a franchised service
                                              Brian Mills,                                            area. The electric energy that Powerex
                                              Director, Permitting and Siting, Office of              proposes to export to Canada would be
                                              Electricity Delivery and Energy Reliability.            surplus energy purchased from third                    ENVIRONMENTAL PROTECTION
                                                                                                      parties such as electric utilities and                 AGENCY
                                              [FR Doc. 2015–16187 Filed 6–30–15; 8:45 am]
                                              BILLING CODE 6450–01–P
                                                                                                      Federal power marketing agencies
                                                                                                      pursuant to voluntary agreements. The                  [EPA–HQ–OPPT–2003–0004; FRL–9929–17]
                                                                                                      existing international transmission
                                                                                                                                                             Access to Confidential Business
                                              DEPARTMENT OF ENERGY                                    facilities to be utilized by Powerex have
                                                                                                                                                             Information by Science Applications
                                                                                                      previously been authorized by
                                                                                                                                                             International Corporation and Its
                                                                                                      Presidential permits issued pursuant to
                                              [OE Docket No. EA–171–D]                                                                                       Identified Subcontractor, Solutions by
                                                                                                      Executive Order 10485, as amended,
                                                                                                                                                             Design II, LLC
                                              Application To Export Electric Energy;                  and are appropriate for open access
                                              Powerex Corp.                                           transmission by third parties.                         AGENCY: Environmental Protection
                                                                                                         Procedural Matters: Any person                      Agency (EPA).
                                              AGENCY: Office of Electricity Delivery                  desiring to be heard in this proceeding                ACTION: Notice.
                                              and Energy Reliability, DOE.                            should file a comment or protest to the
                                              ACTION: Notice of Application.                          application at the address provided                    SUMMARY:   EPA has authorized its
                                                                                                      above. Protests should be filed in                     contractor, Science Applications
                                              SUMMARY:   Powerex Corp. (Applicant or                  accordance with Rule 211 of the Federal                International Corporation of McLean,
                                              Powerex) has applied to renew its                       Energy Regulatory Commission’s (FERC)                  VA, and its identified subcontractor,
                                              authority to transmit electric energy
tkelley on DSK3SPTVN1PROD with NOTICES




                                                                                                      Rules of Practice and Procedures (18                   Solutions by Design II, LLC of Vienna,
                                              from the United States to Canada                        CFR 385.211). Any person desiring to                   VA, to access information which has
                                              pursuant to section 202(e) of the Federal               become a party to these proceedings                    been submitted to EPA under all
                                              Power Act.                                              should file a motion to intervene at the               sections of the Toxic Substances Control
                                              DATES: Comments, protests, or motions                   above address in accordance with FERC                  Act (TSCA). Some of the information
                                              to intervene must be submitted on or                    Rule 214 (18 CFR 385.214). Five copies                 may be claimed or determined to be
                                              before July 31, 2015.                                   of such comments, protests, or motions                 Confidential Business Information (CBI).


                                         VerDate Sep<11>2014   18:30 Jun 30, 2015   Jkt 235001   PO 00000   Frm 00029   Fmt 4703   Sfmt 4703   E:\FR\FM\01JYN1.SGM   01JYN1



Document Created: 2015-12-15 13:19:26
Document Modified: 2015-12-15 13:19:26
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of application.
DatesComments, protests, or motions to intervene must be submitted on or before July 31, 2015.
FR Citation80 FR 37607 