80_FR_38366 80 FR 38239 - Comprehensive Vibration Assessment Program for Reactor Internals During Preoperational and Startup Testing

80 FR 38239 - Comprehensive Vibration Assessment Program for Reactor Internals During Preoperational and Startup Testing

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 80, Issue 127 (July 2, 2015)

Page Range38239-38241
FR Document2015-16284

The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment draft regulatory guide (DG), DG-1323, ``Comprehensive Vibration Assessment Program for Reactor Internals During Preoperational and Startup Testing.'' This guide describes methods and procedures that the staff of the NRC considers acceptable when a developing a comprehensive vibration assessment program (CVAP) for power reactor internals during preoperational and startup testing.

Federal Register, Volume 80 Issue 127 (Thursday, July 2, 2015)
[Federal Register Volume 80, Number 127 (Thursday, July 2, 2015)]
[Notices]
[Pages 38239-38241]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-16284]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2015-0161]


Comprehensive Vibration Assessment Program for Reactor Internals 
During Preoperational and Startup Testing

AGENCY: Nuclear Regulatory Commission.

ACTION: Draft regulatory guide; request for comment.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing for 
public comment draft regulatory guide (DG), DG-1323, ``Comprehensive 
Vibration Assessment Program for Reactor Internals During 
Preoperational and Startup Testing.'' This guide describes methods and 
procedures that the staff of the NRC considers acceptable when a 
developing a comprehensive vibration assessment program (CVAP) for 
power reactor internals during preoperational and startup testing.

DATES: Submit comments by August 31, 2015. Comments received after this 
date will be considered if it is practical to do so, but the NRC is 
able to ensure consideration only for comments received on or before 
this date. Although a time limit is given, comments and suggestions in 
connection with items for inclusion in guides currently being developed 
or improvements in all published guides are encouraged at any time.

ADDRESSES: You may submit comments by any of the following methods 
(unless this document describes a different method for submitting 
comments on a specified subject):
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2015-0161. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individual(s) listed in the FOR FURTHER INFORMATION CONTACT section 
of this document.
     Mail comments to: Cindy Bladey, Office of Administration, 
Mail Stop:

[[Page 38240]]

OWFN-12H08, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Thomas Scarbrough, Office of New 
Reactors, telephone: 301-415-2794, email: [email protected] or 
Yuken Wong, Office of New Reactors, telephone: 301-415-0500, email: 
[email protected]; and Stephen Burton, Office of Nuclear Regulatory 
Research, telephone: 301-415-7000, email: [email protected]. All 
are staff of the U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001.

SUPPLEMENTARY INFORMATION:

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2015-0161 when contacting the NRC 
about the availability of information regarding this document. You may 
obtain publically-available information related to this document, by 
any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2015-0161. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individual(s) listed in the FOR FURTHER INFORMATION CONTACT section 
of this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
DG is electronically available in ADAMS under Accession No. 
ML15083A390.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

B. Submitting Comments

    Please include Docket ID NRC-2015-0161 in your comment submission 
in order to ensure that the NRC is able to make your comment submission 
available to the public in this docket.
    The NRC cautions you not to include identifying or contact 
information in comment submissions that you do not want to be publicly 
disclosed in your comment submission. The NRC posts all comment 
submissions at http://www.regulations.gov as well as entering the 
comment submissions into ADAMS. The NRC does not routinely edit comment 
submissions to remove identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information in their comment submissions 
that they do not want to be publicly disclosed in their comment 
submission. Your request should state that the NRC does not routinely 
edit comment submissions to remove such information before making the 
comment submissions available to the public or entering the comment 
submissions into ADAMS.

II. Additional Information

    The NRC is issuing for public comment a DG in the NRC's 
``Regulatory Guide'' series. This series was developed to describe and 
make available to the public information regarding methods that are 
acceptable to the NRC staff for implementing specific parts of the 
NRC's regulations, techniques that the staff uses in evaluating 
specific issues or postulated events, and data that the staff needs in 
its review of applications for permits and licenses.
    The DG, entitled, ``Comprehensive Vibration Assessment Program for 
Reactor Internals During Preoperational and Startup Testing'' is a 
proposed revision temporarily identified by its task number, DG-1323. 
This DG-1323 is proposed Revision 4 of Regulatory Guide 1.20, 
``Comprehensive Vibration Assessment Program for Reactor Internals 
During Preoperational and Startup Testing.'' This regulatory guide 
describes methods and procedures that the staff of the NRC considers 
acceptable when developing a comprehensive vibration assessment program 
(CVAP) for power reactor internals during preoperational and startup 
testing. The DG describes methodology the NRC staff considers 
acceptable to support its review of applications for (1) nuclear 
reactor construction permits or operating licenses under part 50 of 
Title 10 of the Code of Federal Regulations (10 CFR); (2) design 
certifications and combined licenses under 10 CFR part 52, ``Licenses, 
Certifications, and Approvals for Nuclear Power Plants;'' and (3) 
license amendment requests for extended power uprates at operating 
reactors. The DG also describes methodology the staff considers 
acceptable for use by licensees of operating plants planning 
significant plant modifications that might induce potential adverse 
flow effects on structures, systems, and components within the scope of 
the DG.
    This proposed regulatory guide has been revised to expand the 
guidance related to flow-induced vibration, acoustic resonance, 
acoustic-induced vibration, and mechanical-induced vibration for 
boiling water reactors, pressurized water reactors, and small modular 
reactors. For small modular reactors, this includes guidance for the 
control rod drive system and mechanisms which might be contained in an 
integral reactor vessel. The additional guidance in this proposed 
revision is based in part on lessons learned from the review of recent 
applications, including both new plant applications and extended power 
uprate applications. In addition, the proposed revision re-defines and 
clarifies the prototype, limited prototype, and non-prototype 
classifications of reactor internal configurations. Also, the proposed 
revision aligns the format and content of the guide with the current 
program guidance for regulatory guides since Revision 3 of RG 1.20 was 
issued.

III. Backfitting and Issue Finality

    Issuance of this regulatory guide, if finalized, does not 
constitute backfitting as defined in 10 CFR 50.109 (the Backfit Rule) 
and is not otherwise inconsistent with the issue finality provisions in 
10 CFR part 52. This regulatory guide would not apply to any nuclear 
reactor construction permits or operating licenses under 10 CFR part 
50, design certifications and combined licenses under 10 CFR part 52, 
or license amendment requests for extended power uprates at operating 
reactors already issued by the NRC prior to issuance of the regulatory 
guide. The NRC has already completed its review of CVAPs for power 
reactor internals for these construction permits, operating licenses, 
design certifications, combined operating licenses, and license 
amendments for extended power uprates. Therefore, no further NRC 
regulatory action with respect to CVAPs will occur for those licenses, 
permits, certifications, and authorizations for

[[Page 38241]]

which the guidance in the regulatory guide would be relevant, absent 
voluntary action by the licensees to use the guidance to demonstrate 
compliance with the underlying NRC regulations.
    The regulatory guide, if finalized, may be applied to applications 
for construction permits, operating licenses, design certifications, 
combined licenses, and license amendments for extended power uprates, 
any of which are docketed and under review by the NRC as of the date of 
issuance of the final regulatory guide. If finalized, the regulatory 
guide may also be applied to applications for construction permits, 
operating licenses, design certifications, combined licenses, and 
license amendments for extended power uprates, any of which are 
submitted after the issuance of the final regulatory guide. Such action 
would not constitute backfitting as defined in 10 CFR 50.109(a)(1) and 
is not otherwise inconsistent with the applicable issue finality 
provisions in 10 CFR part 52 because such applicants and potential 
applicants are not, with certain exceptions, protected by either the 
Backfit Rule or any issue finality provisions under part 52. This is 
because neither the Backfit Rule nor the issue finality provisions 
under part 52--with certain exclusions discussed below--was intended to 
apply to every NRC action that substantially changes the expectations 
of current and future applicants. The exceptions to the general 
principle are applicable whenever an applicant references a 10 CFR part 
52 license (e.g., an early site permit), NRC regulatory approval (e.g., 
a design certification rule), or both, with specified issue finality 
provisions. The NRC does not, at this time, intend to impose the 
positions represented in the regulatory guide, if finalized, in a 
manner that is inconsistent with any issue finality provisions. If, in 
the future, the staff seeks to impose a position in the regulatory 
guide, if finalized, in a manner that does not provide issue finality 
as described in the applicable issue finality provision, then the staff 
must address the criteria for avoiding issue finality as described in 
the applicable issue finality provision.

    Dated at Rockville, Maryland, this 26th day of June, 2015.

    For the Nuclear Regulatory Commission.
Thomas H. Boyce,
Chief, Regulatory Guidance and Generic Issues Branch, Division of 
Engineering, Office of Nuclear Regulatory Research.
[FR Doc. 2015-16284 Filed 7-1-15; 8:45 am]
 BILLING CODE 7590-01-P



                                                                                    Federal Register / Vol. 80, No. 127 / Thursday, July 2, 2015 / Notices                                                 38239

                                                    SUMMARY:   The U.S. Nuclear Regulatory                   redundancies, and assure that statutory,              2 supersedes the last official revision
                                                    Commission (NRC) is issuing NUREG–                       regulatory, and guidance document                     published on May 2010.
                                                    1520, Revision 2, ‘‘Standard Review                      references are accurate and up to date.                  Dated at Rockville, Maryland, this 26th day
                                                    Plan for Fuel Cycle Facilities License                   Additionally, the SRP was revised to                  of June, 2015.
                                                    Applications,’’ dated June 2015.                         clarify the existing SRP discussion in                   For the Nuclear Regulatory Commission.
                                                    ADDRESSES: Please refer to Docket ID                     several technical areas such as nuclear
                                                                                                                                                                   Marissa G. Bailey,
                                                    NRC–2012–0220 when contacting the                        criticality safety and management
                                                                                                                                                                   Director, Division of Fuel Cycle Safety,
                                                    NRC about the availability of                            measures, as summarized below.
                                                                                                                                                                   Safeguards, and Environmental Review Office
                                                    information regarding this document.                     Chapter 5, ‘‘Nuclear Criticality Safety,’’            of Nuclear Material Safety and Safeguards.
                                                    You may obtain publicly-available                        contains an expanded discussion of the
                                                                                                                                                                   [FR Doc. 2015–16363 Filed 7–1–15; 8:45 am]
                                                    information related to this document                     double contingency principle and
                                                                                                                                                                   BILLING CODE 7590–01–P
                                                    using any of the following methods:                      double contingency protection,
                                                       • Federal Rulemaking Web site: Go to                  including a description of what
                                                    http://www.regulations.gov and search                    constitutes a loss of double contingency.
                                                                                                                                                                   NUCLEAR REGULATORY
                                                    for Docket ID NRC–2012–0220. Address                     Chapter 11, ‘‘Management Measures,’’
                                                                                                                                                                   COMMISSION
                                                    questions about NRC dockets to Carol                     includes a discussion of graded
                                                    Gallagher; telephone: 301–415–3463;                      management measures and the selection                 [NRC–2015–0161]
                                                    email: Carol.Gallagher@nrc.gov. For                      of items relied on for safety that relates
                                                                                                             to the application of graded                          Comprehensive Vibration Assessment
                                                    technical questions, contact the
                                                                                                             management measures. Additionally,                    Program for Reactor Internals During
                                                    individual listed in the FOR FURTHER
                                                                                                             the SRP contains two new chapters,                    Preoperational and Startup Testing
                                                    INFORMATION CONTACT section of this
                                                    document.                                                Chapter 12, ‘‘Material Control and                    AGENCY: Nuclear Regulatory
                                                       • NRC’s Agencywide Documents                          Accounting,’’ which includes guidance                 Commission.
                                                    Access and Management System                             associated with 10 CFR part 74
                                                                                                                                                                   ACTION: Draft regulatory guide; request
                                                    (ADAMS): You may obtain publicly                         requirements; and Chapter 13, ‘‘Physical
                                                                                                                                                                   for comment.
                                                    available documents online in the                        Protection,’’ which includes guidance
                                                    ADAMS Public Documents collection at                     associated with 10 CFR part 73                        SUMMARY:   The U.S. Nuclear Regulatory
                                                    http://www.nrc.gov/reading-rm/                           requirements. These new chapters were                 Commission (NRC) is issuing for public
                                                    adams.html. To begin the search, select                  added to address the requirements in 10               comment draft regulatory guide (DG),
                                                    ‘‘ADAMS Public Documents’’ and then                      CFR paragraphs 70.22(b), (g), (h), (j), and           DG–1323, ‘‘Comprehensive Vibration
                                                    select ‘‘Begin Web-based ADAMS                           (k). The title of the SRP was revised                 Assessment Program for Reactor
                                                    Search.’’ For problems with ADAMS,                       from ‘‘Standard Review Plan for the                   Internals During Preoperational and
                                                    please contact the NRC’s Public                          Review of a License Application for a                 Startup Testing.’’ This guide describes
                                                    Document Room (PDR) reference staff at                   Fuel Cycle Facility’’ to ‘‘Standard                   methods and procedures that the staff of
                                                    1–800–397–4209, 301–415–4737, or by                      Review Plan for License Applications                  the NRC considers acceptable when a
                                                    email to pdr.resource@nrc.gov. NUREG–                    for Fuel Cycle Facilities.’’                          developing a comprehensive vibration
                                                                                                               On June 5, 2014 (79 FR 32579), the                  assessment program (CVAP) for power
                                                    1520, Revision 2, ‘‘Standard Review
                                                                                                             NRC announced the availability of draft               reactor internals during preoperational
                                                    Plan for Fuel Cycle Facilities License
                                                                                                             NUREG–1520, Revision 2, and                           and startup testing.
                                                    Applications,’’ is available in ADAMS
                                                                                                             requested comments on it. The
                                                    under accession number ML15176A258.                                                                            DATES: Submit comments by August 31,
                                                                                                             comment period originally closed on
                                                       • NRC’s PDR: You may examine and                                                                            2015. Comments received after this date
                                                                                                             September 3, 2014. In a second notice,
                                                    purchase copies of public documents at                                                                         will be considered if it is practical to do
                                                                                                             dated August 6, 2014 (79 FR 45849), the
                                                    the NRC’s PDR, Room O1–F21, One                                                                                so, but the NRC is able to ensure
                                                                                                             NRC extended the comment period to
                                                    White Flint North, 11555 Rockville                                                                             consideration only for comments
                                                                                                             November 3, 2014. A public meeting
                                                    Pike, Rockville, Maryland 20852.                         with the industry was held on                         received on or before this date.
                                                    FOR FURTHER INFORMATION CONTACT: Soly                    September 23, 2014, to discuss the                    Although a time limit is given,
                                                    I. Soto, Office of Nuclear Material Safety               proposed changes to the SRP. A                        comments and suggestions in
                                                    and Safeguards, U.S. Nuclear Regulatory                  comment resolution table listing all                  connection with items for inclusion in
                                                    Commission, Washington DC 20555–                         comments and the NRC staff’s responses                guides currently being developed or
                                                    0001; telephone: 301–415–7528; email:                    was made publicly available in ADAMS                  improvements in all published guides
                                                    Soly.Soto@nrc.gov.                                       on March 23, 2015 (ML15065A286).                      are encouraged at any time.
                                                    SUPPLEMENTARY INFORMATION:                               Suggestions to improve the SRP were                   ADDRESSES: You may submit comments
                                                                                                             considered by the NRC staff in the                    by any of the following methods (unless
                                                    I. Discussion                                                                                                  this document describes a different
                                                                                                             preparation of the final NUREG report.
                                                      Licenses to possess and use special                    After further consideration, the NRC                  method for submitting comments on a
                                                    nuclear material (SNM) are governed by                   staff revised the title of NUREG–1520,                specified subject):
                                                    Part 70 of Title 10 of the Code of Federal               Revision 2, for final issuance. This                    • Federal Rulemaking Web site: Go to
                                                    Regulations (10 CFR). The revised                        change was performed after publication                http://www.regulations.gov and search
                                                    Standard Review Plan (SRP) now being                     of the comments resolution. The title                 for Docket ID NRC–2015–0161. Address
                                                    made available provides NRC staff                                                                              questions about NRC dockets to Carol
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                                                                             was revised from ‘‘Standard Review
                                                    guidance for reviewing and evaluating                    Plan for License Applications for Fuel                Gallagher; telephone: 301–415–3463;
                                                    the safety, health, security, and                        Cycle Facilities’’ to ‘‘Standard Review               email: Carol.Gallagher@nrc.gov. For
                                                    environmental protection aspects of                      Plan for Fuel Cycle Facilities License                technical questions, contact the
                                                    applications for licenses to possess and                 Applications.’’                                       individual(s) listed in the FOR FURTHER
                                                    use SNM at fuel cycle facilities.                          The final version of NUREG–1520,                    INFORMATION CONTACT section of this
                                                      The SRP has been revised to ensure                     Revision 2, is now available for use by               document.
                                                    consistency among the chapters,                          applicants, licensees, NRC license                      • Mail comments to: Cindy Bladey,
                                                    improve clarity of the text, reduce                      reviewers, and other NRC staff. Revision              Office of Administration, Mail Stop:


                                               VerDate Sep<11>2014   21:16 Jul 01, 2015   Jkt 235001   PO 00000   Frm 00068   Fmt 4703   Sfmt 4703   E:\FR\FM\02JYN1.SGM   02JYN1


                                                    38240                           Federal Register / Vol. 80, No. 127 / Thursday, July 2, 2015 / Notices

                                                    OWFN–12H08, U.S. Nuclear Regulatory                      B. Submitting Comments                                licenses under part 50 of Title 10 of the
                                                    Commission, Washington, DC 20555–                          Please include Docket ID NRC–2015–                  Code of Federal Regulations (10 CFR);
                                                    0001.                                                    0161 in your comment submission in                    (2) design certifications and combined
                                                      For additional direction on obtaining                  order to ensure that the NRC is able to               licenses under 10 CFR part 52,
                                                    information and submitting comments,                     make your comment submission                          ‘‘Licenses, Certifications, and Approvals
                                                    see ‘‘Obtaining Information and                          available to the public in this docket.               for Nuclear Power Plants;’’ and (3)
                                                    Submitting Comments’’ in the                               The NRC cautions you not to include                 license amendment requests for
                                                    SUPPLEMENTARY INFORMATION section of                     identifying or contact information in                 extended power uprates at operating
                                                    this document.                                           comment submissions that you do not                   reactors. The DG also describes
                                                                                                                                                                   methodology the staff considers
                                                                                                             want to be publicly disclosed in your
                                                    FOR FURTHER INFORMATION CONTACT:                                                                               acceptable for use by licensees of
                                                                                                             comment submission. The NRC posts all
                                                    Thomas Scarbrough, Office of New                                                                               operating plants planning significant
                                                                                                             comment submissions at http://
                                                    Reactors, telephone: 301–415–2794,                                                                             plant modifications that might induce
                                                                                                             www.regulations.gov as well as entering
                                                    email: Thomas.Scarbrough@nec.gov or                                                                            potential adverse flow effects on
                                                                                                             the comment submissions into ADAMS.
                                                    Yuken Wong, Office of New Reactors,                                                                            structures, systems, and components
                                                                                                             The NRC does not routinely edit
                                                    telephone: 301–415–0500, email:                                                                                within the scope of the DG.
                                                                                                             comment submissions to remove                            This proposed regulatory guide has
                                                    Yuken.Wong@nrc.gov; and Stephen
                                                                                                             identifying or contact information.                   been revised to expand the guidance
                                                    Burton, Office of Nuclear Regulatory
                                                                                                               If you are requesting or aggregating                related to flow-induced vibration,
                                                    Research, telephone: 301–415–7000,
                                                                                                             comments from other persons for                       acoustic resonance, acoustic-induced
                                                    email: Stephen.Burton@nrc.gov. All are
                                                                                                             submission to the NRC, then you should                vibration, and mechanical-induced
                                                    staff of the U.S. Nuclear Regulatory
                                                                                                             inform those persons not to include                   vibration for boiling water reactors,
                                                    Commission, Washington, DC 20555–
                                                                                                             identifying or contact information in                 pressurized water reactors, and small
                                                    0001.
                                                                                                             their comment submissions that they do                modular reactors. For small modular
                                                    SUPPLEMENTARY INFORMATION:                               not want to be publicly disclosed in                  reactors, this includes guidance for the
                                                                                                             their comment submission. Your request                control rod drive system and
                                                    I. Obtaining Information and                             should state that the NRC does not
                                                    Submitting Comments                                                                                            mechanisms which might be contained
                                                                                                             routinely edit comment submissions to                 in an integral reactor vessel. The
                                                    A. Obtaining Information                                 remove such information before making                 additional guidance in this proposed
                                                                                                             the comment submissions available to                  revision is based in part on lessons
                                                       Please refer to Docket ID NRC–2015–                   the public or entering the comment                    learned from the review of recent
                                                    0161 when contacting the NRC about                       submissions into ADAMS.                               applications, including both new plant
                                                    the availability of information regarding                                                                      applications and extended power uprate
                                                    this document. You may obtain                            II. Additional Information
                                                                                                                                                                   applications. In addition, the proposed
                                                    publically-available information related                    The NRC is issuing for public                      revision re-defines and clarifies the
                                                    to this document, by any of the                          comment a DG in the NRC’s ‘‘Regulatory                prototype, limited prototype, and non-
                                                    following methods:                                       Guide’’ series. This series was                       prototype classifications of reactor
                                                       • Federal Rulemaking Web site: Go to                  developed to describe and make                        internal configurations. Also, the
                                                    http://www.regulations.gov and search                    available to the public information                   proposed revision aligns the format and
                                                    for Docket ID NRC–2015–0161. Address                     regarding methods that are acceptable to              content of the guide with the current
                                                    questions about NRC dockets to Carol                     the NRC staff for implementing specific               program guidance for regulatory guides
                                                    Gallagher; telephone: 301–415–3463;                      parts of the NRC’s regulations,                       since Revision 3 of RG 1.20 was issued.
                                                    email: Carol.Gallagher@nrc.gov. For                      techniques that the staff uses in
                                                                                                             evaluating specific issues or postulated              III. Backfitting and Issue Finality
                                                    technical questions, contact the
                                                    individual(s) listed in the FOR FURTHER                  events, and data that the staff needs in                 Issuance of this regulatory guide, if
                                                    INFORMATION CONTACT section of this                      its review of applications for permits                finalized, does not constitute backfitting
                                                    document.                                                and licenses.                                         as defined in 10 CFR 50.109 (the Backfit
                                                                                                                The DG, entitled, ‘‘Comprehensive                  Rule) and is not otherwise inconsistent
                                                       • NRC’s Agencywide Documents                          Vibration Assessment Program for                      with the issue finality provisions in 10
                                                    Access and Management System                             Reactor Internals During Preoperational               CFR part 52. This regulatory guide
                                                    (ADAMS): You may obtain publicly-                        and Startup Testing’’ is a proposed                   would not apply to any nuclear reactor
                                                    available documents online in the                        revision temporarily identified by its                construction permits or operating
                                                    ADAMS Public Documents collection at                     task number, DG–1323. This DG–1323 is                 licenses under 10 CFR part 50, design
                                                    http://www.nrc.gov/reading-rm/                           proposed Revision 4 of Regulatory                     certifications and combined licenses
                                                    adams.html. To begin the search, select                  Guide 1.20, ‘‘Comprehensive Vibration                 under 10 CFR part 52, or license
                                                    ‘‘ADAMS Public Documents’’ and then                      Assessment Program for Reactor                        amendment requests for extended
                                                    select ‘‘Begin Web-based ADAMS                           Internals During Preoperational and                   power uprates at operating reactors
                                                    Search.’’ For problems with ADAMS,                       Startup Testing.’’ This regulatory guide              already issued by the NRC prior to
                                                    please contact the NRC’s Public                          describes methods and procedures that                 issuance of the regulatory guide. The
                                                    Document Room (PDR) reference staff at                   the staff of the NRC considers                        NRC has already completed its review of
                                                    1–800–397–4209, 301–415–4737, or by                      acceptable when developing a                          CVAPs for power reactor internals for
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    email to pdr.resource@nrc.gov. The DG                    comprehensive vibration assessment                    these construction permits, operating
                                                    is electronically available in ADAMS                     program (CVAP) for power reactor                      licenses, design certifications, combined
                                                    under Accession No. ML15083A390.                         internals during preoperational and                   operating licenses, and license
                                                       • NRC’s PDR: You may examine and                      startup testing. The DG describes                     amendments for extended power
                                                    purchase copies of public documents at                   methodology the NRC staff considers                   uprates. Therefore, no further NRC
                                                    the NRC’s PDR, Room O1–F21, One                          acceptable to support its review of                   regulatory action with respect to CVAPs
                                                    White Flint North, 11555 Rockville                       applications for (1) nuclear reactor                  will occur for those licenses, permits,
                                                    Pike, Rockville, Maryland 20852.                         construction permits or operating                     certifications, and authorizations for


                                               VerDate Sep<11>2014   21:16 Jul 01, 2015   Jkt 235001   PO 00000   Frm 00069   Fmt 4703   Sfmt 4703   E:\FR\FM\02JYN1.SGM   02JYN1


                                                                                    Federal Register / Vol. 80, No. 127 / Thursday, July 2, 2015 / Notices                                                 38241

                                                    which the guidance in the regulatory                     OVERSEAS PRIVATE INVESTMENT                           subject form should include form
                                                    guide would be relevant, absent                          CORPORATION                                           number [OPIC–248] on both the
                                                    voluntary action by the licensees to use                                                                       envelope and in the subject line of the
                                                    the guidance to demonstrate compliance                   Submission for OMB Review;                            letter. Electronic comments and requests
                                                    with the underlying NRC regulations.                     Comments Request                                      for copies of the subject form may be
                                                       The regulatory guide, if finalized, may                                                                     sent to James.Bobbitt@opic.gov, subject
                                                                                                             AGENCY: Overseas Private Investment
                                                    be applied to applications for                                                                                 line [OPIC–248].
                                                                                                             Corporation (OPIC).
                                                    construction permits, operating licenses,                ACTION: Notice and request for                        Summary Form Under Review
                                                    design certifications, combined licenses,                comments.                                               Type of Request: Revision of a
                                                    and license amendments for extended                                                                            currently approved information
                                                    power uprates, any of which are                          SUMMARY:    Under the provisions of the
                                                                                                                                                                   collection.
                                                    docketed and under review by the NRC                     Paperwork Reduction Act (44 U.S.C.
                                                                                                                                                                     Title: Office of Investment Policy
                                                    as of the date of issuance of the final                  chapter 35), agencies are required to
                                                                                                                                                                   Questionnaire.
                                                    regulatory guide. If finalized, the                      publish a Notice in the Federal Register                Form Number: OPIC–248.
                                                    regulatory guide may also be applied to                  notifying the public that the agency is                 Frequency of Use: One per investor
                                                    applications for construction permits,                   modifying an existing information                     per project.
                                                    operating licenses, design certifications,               collection for OMB review and approval                  Type of Respondents: Business or
                                                    combined licenses, and license                           and requests public review and                        other institution (except farms);
                                                    amendments for extended power                            comment on the submission. Comments                   individuals.
                                                    uprates, any of which are submitted                      are being solicited on the need for the                 Standard Industrial Classification
                                                    after the issuance of the final regulatory               information; the accuracy of OPIC’s                   Codes: All.
                                                    guide. Such action would not constitute                  burden estimate; the quality, practical                 Description of Affected Public: U.S.
                                                    backfitting as defined in 10 CFR                         utility, and clarity of the information to            companies or citizens investing
                                                    50.109(a)(1) and is not otherwise                        be collected; and ways to minimize                    overseas.
                                                    inconsistent with the applicable issue                   reporting the burden, including                         Reporting Hours: 644 (2.8 hours per
                                                                                                             automated collected techniques and                    form).
                                                    finality provisions in 10 CFR part 52
                                                                                                             uses of other forms of technology.                      Number of Responses: 230 per year.
                                                    because such applicants and potential
                                                                                                                The proposed changes to OPIC–248                     Federal Cost: $28,389.
                                                    applicants are not, with certain
                                                                                                             clarifies existing questions, incorporates              Authority for Information Collection:
                                                    exceptions, protected by either the
                                                                                                             sector-specific development impact                    Sections [231, 231A, 239(d), and 240A]
                                                    Backfit Rule or any issue finality                       questions, and eliminates ineffective                 of the Foreign Assistance Act of 1961,
                                                    provisions under part 52. This is                        questions in an effort to harmonize                   as amended.
                                                    because neither the Backfit Rule nor the                 development impact indicators with                      Abstract (Needs and Uses): The Office
                                                    issue finality provisions under part 52—                 other Development Finance Institutions                of Investment Policy Questionnaire is
                                                    with certain exclusions discussed                        (‘‘DFIs’’). OPIC is a signatory to a                  the principal document used by OPIC to
                                                    below—was intended to apply to every                     ‘‘Memorandum of Understanding’’ with                  prepare a developmental impact profile
                                                    NRC action that substantially changes                    25 partnering DFIs to harmonize                       and determine the projected impact on
                                                    the expectations of current and future                   developmental impact metrics where                    the United States, as well as to
                                                    applicants. The exceptions to the                        possible. The goal of this effort is to               determine the project’s compliance with
                                                    general principle are applicable                         reduce the burden on clients that seek                environmental and labor policies, as
                                                    whenever an applicant references a 10                    financing from multiple DFIs and to                   consistent with OPIC’s authorizing
                                                    CFR part 52 license (e.g., an early site                 instill best practices in the collection              legislation.
                                                    permit), NRC regulatory approval (e.g., a                and the reporting on OPIC’s                             Dated: June 26, 2015.
                                                    design certification rule), or both, with                developmental impacts. In order to
                                                    specified issue finality provisions. The                                                                       Nichole Skoyles,
                                                                                                             minimize the reporting burden on
                                                    NRC does not, at this time, intend to                                                                          Administrative Counsel, Department of Legal
                                                                                                             respondents, OPIC has designed OPIC–                  Affairs.
                                                    impose the positions represented in the                  248 as an electronic form that has
                                                    regulatory guide, if finalized, in a                                                                           [FR Doc. 2015–16263 Filed 7–1–15; 8:45 am]
                                                                                                             multiple drop-down options, in which
                                                    manner that is inconsistent with any                     the respondent only responds to                       BILLING CODE 3210–01–P

                                                    issue finality provisions. If, in the                    questions that are applicable to their
                                                    future, the staff seeks to impose a                      investment.
                                                    position in the regulatory guide, if                                                                           PEACE CORPS
                                                                                                             DATES:  Comments must be received
                                                    finalized, in a manner that does not
                                                                                                             within sixty (60) calendar days of                    Privacy Act of 1974: New System of
                                                    provide issue finality as described in the
                                                                                                             publication of this Notice.                           Records
                                                    applicable issue finality provision, then
                                                    the staff must address the criteria for                  ADDRESSES: Mail all comments and
                                                                                                                                                                   AGENCY:    Peace Corps.
                                                    avoiding issue finality as described in                  requests for copies of the subject form
                                                                                                             to OPIC’s Agency Submitting Officer:                  ACTION:    Notice of a new system of
                                                    the applicable issue finality provision.                                                                       records.
                                                                                                             James Bobbitt, Overseas Private
                                                       Dated at Rockville, Maryland, this 26th day           Investment Corporation, 1100 New York                 SUMMARY:   Peace Corps proposes to add
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    of June, 2015.                                           Avenue NW., Washington, DC 20527.                     a new system of records to its inventory
                                                       For the Nuclear Regulatory Commission.                See SUPPLEMENTARY INFORMATION for                     of records systems subject to the Privacy
                                                    Thomas H. Boyce,                                         other information about filing.                       Act of 1974 (5 U.S.C. 552a), as amended.
                                                    Chief, Regulatory Guidance and Generic                   FOR FURTHER INFORMATION CONTACT:                      This action is necessary to meet the
                                                    Issues Branch, Division of Engineering, Office           OPIC Agency Submitting Officer: James                 requirements of the Privacy Act to
                                                    of Nuclear Regulatory Research.                          Bobbitt, (202) 336–8558.                              publish in the Federal Register notice of
                                                    [FR Doc. 2015–16284 Filed 7–1–15; 8:45 am]               SUPPLEMENTARY INFORMATION: All mailed                 the existence and the requirements of
                                                    BILLING CODE 7590–01–P                                   comments and requests for copies of the               the Privacy Act to publish in the


                                               VerDate Sep<11>2014   21:16 Jul 01, 2015   Jkt 235001   PO 00000   Frm 00070   Fmt 4703   Sfmt 4703   E:\FR\FM\02JYN1.SGM   02JYN1



Document Created: 2015-12-15 13:15:59
Document Modified: 2015-12-15 13:15:59
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionDraft regulatory guide; request for comment.
DatesSubmit comments by August 31, 2015. Comments received after this date will be considered if it is practical to do so, but the NRC is able to ensure consideration only for comments received on or before this date. Although a time limit is given, comments and suggestions in connection with items for inclusion in guides currently being developed or improvements in all published guides are encouraged at any time.
ContactThomas Scarbrough, Office of New Reactors, telephone: 301-415-2794, email: [email protected] or Yuken Wong, Office of New Reactors, telephone: 301-415-0500, email: [email protected]; and Stephen Burton, Office of Nuclear Regulatory Research, telephone: 301-415-7000, email: [email protected] All are staff of the U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
FR Citation80 FR 38239 