Elan Energy Services, LLC (Applicant) has applied for authority to transmit electric energy from the United States to Mexico pursuant to section 202(e) of the Federal Power Act.

Federal Register, Volume 80 Issue 134 (Tuesday, July 14, 2015)
[Federal Register Volume 80, Number 134 (Tuesday, July 14, 2015)]
[Notices]
[Pages 41029-41030]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-17082]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

[OE Docket No. EA-413]


Application to Export Electric Energy; Elan Energy Services, LLC

AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.

ACTION: Notice of application.

-----------------------------------------------------------------------

SUMMARY: Elan Energy Services, LLC (Applicant) has applied for 
authority to transmit electric energy from the United States to Mexico 
pursuant to section 202(e) of the Federal Power Act.

DATES: Comments, protests, or motions to intervene must be submitted on 
or before August 13, 2015.

ADDRESSES: Comments, protests, motions to intervene, or requests for 
more information should be addressed to: Office of Electricity Delivery 
and Energy Reliability, Mail Code: OE-20, U.S. Department of Energy, 
1000 Independence Avenue SW., Washington, DC 20585-0350. Because of 
delays in handling conventional mail, it is recommended that documents 
be transmitted by overnight mail, by electronic mail to 
Electricity.Exports@hq.doe.gov, or by facsimile to 202-586-8008.

SUPPLEMENTARY INFORMATION: Exports of electricity from the United 
States to a foreign country are regulated by the Department of Energy 
(DOE) pursuant to sections 301(b) and 402(f) of the Department of 
Energy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require 
authorization under section 202(e) of the Federal Power Act (16 U.S.C. 
824a(e)).
    On June 5, 2015, DOE received an application from the Applicant for 
authority to transmit electric energy from the United States to Mexico 
as a power marketer for a five-year term using existing international 
transmission facilities. The Applicant will register as a Power 
Marketer with the Texas Public Utilities Commission (PUCT.) The 
Applicant will also register as a Purchasing Selling Entity with the 
Texas Reliability Entity (TRE) and the North American Electric 
Reliability Corporation (NERC).
    In its application, the Applicant states that it does not own or 
control any electric generation or transmission facilities, and it does 
not have a franchised service area. The electric energy that the 
Applicant proposes to export to Mexico would be surplus energy 
purchased from third parties such as electric utilities and Federal 
power marketing agencies pursuant to voluntary agreements. The existing 
international transmission facilities to be utilized by the Applicant 
have previously been authorized by Presidential permits issued pursuant 
to Executive Order 10485, as amended, and are appropriate for open 
access transmission by third parties.
    Procedural Matters: Any person desiring to be heard in this 
proceeding should file a comment or protest to the application at the 
address provided above. Protests should be filed in accordance with 
Rule 211 of the Federal Energy Regulatory Commission's (FERC) Rules of 
Practice and Procedures (18 CFR 385.211). Any person desiring to become 
a party to these proceedings should file a motion to intervene at the 
above address in accordance with FERC Rule 214 (18 CFR 385.214). Five 
copies of such comments, protests, or motions to intervene should be 
sent to the address provided above on or before the date listed above.
    Comments and other filings concerning the Applicant's application 
to export electric energy to Mexico should be clearly marked with OE 
Docket No. EA-413. An additional copy is to be provided directly to 
Andrew B.

[[Page 41030]]

Young, Mayer Brown LLP, 1999 K Street NW., Washington, DC 20006.
    A final decision will be made on this application after the 
environmental impacts have been evaluated pursuant to DOE's National 
Environmental Policy Act Implementing Procedures (10 CFR part 1021) and 
after a determination is made by DOE that the proposed action will not 
have an adverse impact on the sufficiency of supply or reliability of 
the U.S. electric power supply system.
    Copies of this application will be made available, upon request, 
for public inspection and copying at the address provided above, by 
accessing the program Web site at http://energy.gov/node/11845, or by 
emailing Angela Troy at Angela.Troy@hq.doe.gov.

    Issued in Washington, DC, on July 7, 2015.
Christopher Lawrence,
Electricity Policy Analyst, Office of Electricity Delivery and Energy 
Reliability.
[FR Doc. 2015-17082 Filed 7-13-15; 8:45 am]
 BILLING CODE 6450-01-P



                                                                                    Federal Register / Vol. 80, No. 134 / Tuesday, July 14, 2015 / Notices                                  41029

                                                    outside of the Scenic Area as is the case                Mitigation                                  electronic mail to Electricity.Exports@
                                                    with the Wind Project—warrants                              All the mitigation measures described hq.doe.gov, or by facsimile to 202–586–
                                                    thoughtful and careful consideration of                  in the Draft EIS and updated in the Final 8008.
                                                    its potential to impact scenic resources.                EIS have been adopted. A complete list      SUPPLEMENTARY INFORMATION: Exports of
                                                    BPA believes that such consideration                     of these measures can be found in the       electricity from the United States to a
                                                    has been amply demonstrated in this                      Mitigation Action Plan. WRE will be         foreign country are regulated by the
                                                    case, and that definite and effective                    responsible for executing mitigation        Department of Energy (DOE) pursuant to
                                                    action has been taken by the State of                    measures identified for the Wind            sections 301(b) and 402(f) of the
                                                    Washington to reasonably help protect                    Project, while BPA will be responsible      Department of Energy Organization Act
                                                    views as a result of this consideration.                 for executing the mitigation measures       (42 U.S.C. 7151(b), 7172(f)) and require
                                                    Furthermore, BPA agrees with the                         associated with the BPA                     authorization under section 202(e) of
                                                    Governor that the state-approved Wind                    interconnection facilities.                 the Federal Power Act (16 U.S.C.
                                                    Project strikes an effective balance                        In addition to identifying mitigation    824a(e)).
                                                    between minimizing visual impacts                        measures in the EIS, the State of              On June 5, 2015, DOE received an
                                                    while still carrying out the public                      Washington has included numerous            application from the Applicant for
                                                    interest of the State of Washington in                   conditions in the Final SCA for the         authority to transmit electric energy
                                                    approving sites for alternative energy                   Wind Project that are intended to ensure from the United States to Mexico as a
                                                    facilities.                                              that the Wind Project is built and          power marketer for a five-year term
                                                                                                             operated in a way that preserves and        using existing international
                                                       The total cost of the BPA
                                                                                                             protects the quality of the environment. transmission facilities. The Applicant
                                                    interconnection facilities is estimated at                                                           will register as a Power Marketer with
                                                                                                             As environmental mitigation,
                                                    $12.6 million. All costs associated with
                                                                                                             Washington EFSEC has found that these the Texas Public Utilities Commission
                                                    these facilities will be advance funded                                                              (PUCT.) The Applicant will also register
                                                                                                             conditions will ensure that the Project
                                                    by WRE and administration of contracts                   will produce minimal adverse                as a Purchasing Selling Entity with the
                                                    with WRE will follow normal,                             environmental effects. WRE will be          Texas Reliability Entity (TRE) and the
                                                    established procedures. In accordance                    required to comply with these Final         North American Electric Reliability
                                                    with BPA’s open access transmission                      SCA conditions. As discussed above,         Corporation (NERC).
                                                    tariff, WRE will be eligible to receive                  the Final SCA is available at http://          In its application, the Applicant states
                                                    transmission credits for any portion of                  www.efsec.wa.gov/whistling                  that it does not own or control any
                                                    the interconnection facilities that                      %20ridge.shtml.                             electric generation or transmission
                                                    constitute network upgrades. BPA                                                                     facilities, and it does not have a
                                                                                                                Issued in Portland, Oregon.
                                                    believes that this approach provides for                                                             franchised service area. The electric
                                                                                                                Dated: June 24, 2015.                    energy that the Applicant proposes to
                                                    both cost and administrative
                                                    efficiencies.                                            Elliot E. Mainzer,                          export to Mexico would be surplus
                                                                                                             Administrator and Chief Executive Officer.  energy purchased from third parties
                                                       Finally, in deciding to grant the
                                                    requested interconnection, BPA believes
                                                                                                             [FR Doc. 2015–17087 Filed 7–13–15; 8:45 am] such as electric utilities and Federal
                                                    it is being appropriately respectful of                  BILLING CODE 6450–01–P                      power marketing agencies pursuant to
                                                    state authorities concerning the siting of                                                           voluntary agreements. The existing
                                                    non-federal generation projects. As has                                                              international transmission facilities to
                                                                                                             DEPARTMENT OF ENERGY                        be utilized by the Applicant have
                                                    been mentioned previously in this
                                                                                                             [OE Docket No. EA–413]                      previously been authorized by
                                                    Record of Decision, BPA does not have
                                                                                                                                                         Presidential permits issued pursuant to
                                                    siting authority or regulatory
                                                                                                             Application to Export Electric Energy;      Executive Order 10485, as amended,
                                                    jurisdiction over these facilities. That is
                                                                                                             Elan Energy Services, LLC                   and are appropriate for open access
                                                    the purview of appropriate state and
                                                                                                                                                         transmission by third parties.
                                                    local entities, in this case Washington                  AGENCY: Office of Electricity Delivery         Procedural Matters: Any person
                                                    EFSEC and, ultimately, the Washington                    and Energy Reliability, DOE.                desiring to be heard in this proceeding
                                                    Governor. BPA notes that the siting                      ACTION: Notice of application.              should file a comment or protest to the
                                                    process conducted by the State of                                                                    application at the address provided
                                                    Washington for the Wind Project was                      SUMMARY: Elan Energy Services, LLC
                                                                                                                                                         above. Protests should be filed in
                                                    both lengthy and extremely thorough,                     (Applicant) has applied for authority to    accordance with Rule 211 of the Federal
                                                    and addressed many of the same                           transmit electric energy from the United Energy Regulatory Commission’s (FERC)
                                                    environmental issues also considered in                  States to Mexico pursuant to section        Rules of Practice and Procedures (18
                                                    the Final EIS for the Project. BPA also                  202(e) of the Federal Power Act.            CFR 385.211). Any person desiring to
                                                    notes that the State of Washington                       DATES: Comments, protests, or motions       become a party to these proceedings
                                                    decided to approve construction and                      to intervene must be submitted on or        should file a motion to intervene at the
                                                    operation of the Wind Project on the                     before August 13, 2015.                     above address in accordance with FERC
                                                    basis of the siting process and Final EIS.               ADDRESSES: Comments, protests,              Rule 214 (18 CFR 385.214). Five copies
                                                    Finally, BPA notes that this approval                    motions to intervene, or requests for       of such comments, protests, or motions
                                                    was upheld by the Washington Supreme                     more information should be addressed        to intervene should be sent to the
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    Court in a legal challenge of the siting                 to: Office of Electricity Delivery and      address provided above on or before the
                                                    process brought against the State of                     Energy Reliability, Mail Code: OE–20,       date listed above.
                                                    Washington. In light of this, granting the               U.S. Department of Energy, 1000                Comments and other filings
                                                    requested interconnection provides the                   Independence Avenue SW.,                    concerning the Applicant’s application
                                                    appropriate comity to the State of                       Washington, DC 20585–0350. Because          to export electric energy to Mexico
                                                    Washington’s legally executed overall                    of delays in handling conventional mail, should be clearly marked with OE
                                                    authorities concerning the siting of the                 it is recommended that documents be         Docket No. EA–413. An additional copy
                                                    Wind Project.                                            transmitted by overnight mail, by           is to be provided directly to Andrew B.


                                               VerDate Sep<11>2014   19:09 Jul 13, 2015   Jkt 235001   PO 00000   Frm 00039   Fmt 4703   Sfmt 4703   E:\FR\FM\14JYN1.SGM   14JYN1


                                                    41030                           Federal Register / Vol. 80, No. 134 / Tuesday, July 14, 2015 / Notices

                                                    Young, Mayer Brown LLP, 1999 K Street                    after the minor or minor part license                 Docket No. CP82–553–000 [21 FERC
                                                    NW., Washington, DC 20006.                               expires, until the Commission acts on                 ¶ 62,235 (1982)], all as more fully set
                                                       A final decision will be made on this                 its application. If the licensee of such a            forth in the application which is on file
                                                    application after the environmental                      project has not filed an application for              with the Commission and open to
                                                    impacts have been evaluated pursuant                     a subsequent license, then it may be                  public inspection.
                                                    to DOE’s National Environmental Policy                   required, pursuant to 18 CFR 16.21(b),                   The filing may be viewed on the web
                                                    Act Implementing Procedures (10 CFR                      to continue project operations until the              at http://www.ferc.gov using the
                                                    part 1021) and after a determination is                  Commission issues someone else a                      ‘‘eLibrary’’ link. Enter the docket
                                                    made by DOE that the proposed action                     license for the project or otherwise                  number excluding the last three digits in
                                                    will not have an adverse impact on the                   orders disposition of the project.                    the docket number field to access the
                                                    sufficiency of supply or reliability of the                 If the project is subject to section 15            document. For assistance, contact FERC
                                                    U.S. electric power supply system.                       of the FPA, notice is hereby given that               at FERCOnlineSupport@ferc.gov or call
                                                       Copies of this application will be                    an annual license for Project No. 2464                toll-free, (886) 208–3676 or TYY, (202)
                                                    made available, upon request, for public                 is issued to the licensee for a period                502–8659.
                                                    inspection and copying at the address                    effective July 1, 2015 through June 30,                  Any questions regarding this
                                                    provided above, by accessing the                         2016 or until the issuance of a new                   application should be directed to
                                                    program Web site at http://energy.gov/                   license for the project or other                      Stephen Veatch, Senior Director of
                                                    node/11845, or by emailing Angela Troy                   disposition under the FPA, whichever                  Certificates, Florida Gas Transmission
                                                    at Angela.Troy@hq.doe.gov.                               comes first. If issuance of a new license             Company, LLC, 1300 Main St., Houston,
                                                                                                             (or other disposition) does not take                  Texas, 77002, or by calling (713) 989–
                                                      Issued in Washington, DC, on July 7, 2015.                                                                   2024 (telephone) or (713) 989–1205 (fax)
                                                    Christopher Lawrence,
                                                                                                             place on or before June 30, 2016, notice
                                                                                                             is hereby given that, pursuant to 18 CFR              stephen.veatch@energytransfer.com.
                                                    Electricity Policy Analyst, Office of Electricity
                                                                                                             16.18(c), an annual license under                        Any person or the Commission’s Staff
                                                    Delivery and Energy Reliability.                                                                               may, within 60 days after the issuance
                                                                                                             section 15(a)(1) of the FPA is renewed
                                                    [FR Doc. 2015–17082 Filed 7–13–15; 8:45 am]
                                                                                                             automatically without further order or                of the instant notice by the Commission,
                                                    BILLING CODE 6450–01–P                                                                                         file pursuant to Rule 214 of the
                                                                                                             notice by the Commission, unless the
                                                                                                                                                                   Commission’s Procedural Rules (18 CFR
                                                                                                             Commission orders otherwise.
                                                                                                                                                                   385.214) a motion to intervene or notice
                                                    DEPARTMENT OF ENERGY                                        If the project is not subject to section
                                                                                                                                                                   of intervention and, pursuant to section
                                                                                                             15 of the FPA, notice is hereby given
                                                                                                                                                                   157.205 of the Commission’s
                                                    Federal Energy Regulatory                                that the licensee, Gresham Municipal
                                                                                                                                                                   Regulations under the NGA (18 CFR
                                                    Commission                                               Utilities, is authorized to continue
                                                                                                                                                                   157.205) a protest to the request. If no
                                                                                                             operation of the Weed Dam
                                                    [Project No. 2464–000]                                                                                         protest is filed within the time allowed
                                                                                                             Hydroelectric Project, until such time as
                                                                                                                                                                   therefore, the proposed activity shall be
                                                                                                             the Commission acts on its application
                                                    Gresham Municipal Utilities; Notice Of                                                                         deemed to be authorized effective the
                                                                                                             for a subsequent license.                             day after the time allowed for protest. If
                                                    Authorization for Continued Project
                                                    Operation                                                  Dated: July 8, 2015.                                a protest is filed and not withdrawn
                                                                                                             Kimberly D. Bose,                                     within 30 days after the time allowed
                                                       On June 10, 2013 Gresham Municipal                    Secretary.                                            for filing a protest, the instant request
                                                    Utilities, licensee for the Weed Dam                     [FR Doc. 2015–17223 Filed 7–13–15; 8:45 am]           shall be treated as an application for
                                                    Hydroelectric Project, filed an                                                                                authorization pursuant to section 7 of
                                                                                                             BILLING CODE 6717–01–P
                                                    Application for a New License pursuant                                                                         the NGA.
                                                    to the Federal Power Act (FPA) and the                                                                            Pursuant to section 157.9 of the
                                                    Commission’s regulations thereunder.                     DEPARTMENT OF ENERGY                                  Commission’s rules, 18 CFR 157.9,
                                                    The Weed Dam Hydroelectric Project is                                                                          within 90 days of this Notice the
                                                    located on Red River, in Shawano                         Federal Energy Regulatory                             Commission staff will either: Complete
                                                    County, Wisconsin.                                       Commission                                            its environmental assessment (EA) and
                                                       The license for Project No. 2464 was                                                                        place it into the Commission’s public
                                                    issued for a period ending June 30,                      [Docket No. CP15–524–000]
                                                                                                                                                                   record (eLibrary) for this proceeding, or
                                                    2015. Section 15(a)(1) of the FPA, 16                    Florida Gas Transmission Company,                     issue a Notice of Schedule for
                                                    U.S.C. 808(a)(1), requires the                           LLC; Notice of Request Under Blanket                  Environmental Review. If a Notice of
                                                    Commission, at the expiration of a                       Authorization                                         Schedule for Environmental Review is
                                                    license term, to issue from year-to-year                                                                       issued, it will indicate, among other
                                                    an annual license to the then licensee                     Take notice that on June 29, 2015,                  milestones, the anticipated date for the
                                                    under the terms and conditions of the                    Florida Gas Transmission Company,                     Commission staff’s issuance of the final
                                                    prior license until a new license is                     LLC (FGT), 1300 Main St., Houston,                    environmental impact statement (FEIS)
                                                    issued, or the project is otherwise                      Texas 77002, filed in Docket No. CP15–                or EA for this proposal. The filing of the
                                                    disposed of as provided in section 15 or                 524–000, a prior notice request pursuant              EA in the Commission’s public record
                                                    any other applicable section of the FPA.                 to sections 157.205, 157.208(b)/(c), and              for this proceeding or the issuance of a
                                                    If the project’s prior license waived the                157.211(b) of the Commission’s                        Notice of Schedule for Environmental
                                                    applicability of section 15 of the FPA,                  regulations under the Natural Gas Act                 Review will serve to notify federal and
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    then, based on section 9(b) of the                       (NGA). FGT seeks authorization to                     state agencies of the timing for the
                                                    Administrative Procedure Act, 5 U.S.C.                   construct, own and operate a new bi-                  completion of all necessary reviews, and
                                                    558(c), and as set forth at 18 CFR                       directional measurement and regulation                the subsequent need to complete all
                                                    16.21(a), if the licensee of such project                station and an interconnection with                   federal authorizations within 90 days of
                                                    has filed an application for a subsequent                Gulfstream Natural Gas System, LLC,                   the date of issuance of the Commission
                                                    license, the licensee may continue to                    located in Martin County, Florida. FGT                staff’s FEIS or EA.
                                                    operate the project in accordance with                   proposes to perform these activities                     Persons who wish to comment only
                                                    the terms and conditions of the license                  under its blanket certificate issued in               on the environmental review of this


                                               VerDate Sep<11>2014   19:09 Jul 13, 2015   Jkt 235001   PO 00000   Frm 00040   Fmt 4703   Sfmt 4703   E:\FR\FM\14JYN1.SGM   14JYN1



Document Created: 2018-02-23 09:19:39
Document Modified: 2018-02-23 09:19:39
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of application.
DatesComments, protests, or motions to intervene must be submitted on or before August 13, 2015.
FR Citation80 FR 41029 