80_FR_41166 80 FR 41032 - Sunshine Act Meeting Notice

80 FR 41032 - Sunshine Act Meeting Notice

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 134 (July 14, 2015)

Page Range41032-41033
FR Document2015-17305

Federal Register, Volume 80 Issue 134 (Tuesday, July 14, 2015)
[Federal Register Volume 80, Number 134 (Tuesday, July 14, 2015)]
[Notices]
[Pages 41032-41033]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-17305]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Sunshine Act Meeting Notice

    The following notice of meeting is published pursuant to section 
3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C. 
552b:

AGENCY HOLDING MEETING: Federal Energy Regulatory Commission.

DATE AND TIME: July 16, 2015 10 a.m.

PLACE: Room 2C, 888 First Street NE., Washington, DC 20426.

STATUS: OPEN.

MATTERS TO BE CONSIDERED: Agenda.

    Note: Items listed on the agenda may be deleted without further 
notice.


CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, 
Telephone (202) 502-8400.
    For a recorded message listing items struck from or added to the 
meeting, call (202) 502-8627.

    This is a list of matters to be considered by the Commission. It 
does not include a listing of all documents relevant to the items on 
the agenda. All public documents, however, may be viewed on line at the 
Commission's Web site at http://www.ferc.gov using the eLibrary link, 
or may be examined in the Commission's Public Reference Room.


                             1018th--Meeting
              [Regular Meeting--July 16, 2015, 10:00 a.m.]
------------------------------------------------------------------------
       Item No.           Docket No.                 Company
------------------------------------------------------------------------
                             ADMINISTRATIVE
------------------------------------------------------------------------
A-1..................  AD02-7-000......  Customer Matters, Reliability,
                                          Security and Market
                                          Operations.
A-2..................  AD02-1-000......  Agency Business Matters.
------------------------------------------------------------------------
                                ELECTRIC
------------------------------------------------------------------------
E-1..................  RM15-14-000.....  Revised Critical Infrastructure
                                          Protection Reliability
                                          Standards.
E-2..................  ER15-1745-000...  Midcontinent Independent System
                                          Operator, Inc.
E-3..................  ER12-2170-000...  International Transmission
                                          Company.
E-4..................  ER12-2170-001...  International Transmission
                                          Company.
E-5..................  RM15-3-000......  Revisions to Public Utility
                                          Filing Requirements.
E-6..................  OA08-53-005.....  Midwest Independent
                                          Transmission System Operator,
                                          Inc.
                       ER15-133-000....  Midcontinent Independent System
                                          Operator, Inc.
E-7..................  ER05-1056-008...  Chehalis Power Generating, L.P.
E-8..................  ER14-2553-001,    Southwest Power Pool, Inc.
                        ER14-2553-002.
E-9..................  ER14-1469-002...  PJM Interconnection, L.L.C.
E-10.................  OMITTED.........
E-11.................  OMITTED.........
E-12.................  EC15-138-000....  DTE Electric Company and DTE
                                          East China, LLC.
E-13.................  EL15-59-000.....  Navopache Electric Cooperative,
                                          Inc.
E-14.................  EL15-57-000.....  GenOn Energy Management, LLC v.
                                          ISO New England Inc.
------------------------------------------------------------------------
                              MISCELLANEOUS
------------------------------------------------------------------------
M-1..................  RM13-17-002.....  Communication of Operational
                                          Information Between Natural
                                          Gas Pipelines and Electric
                                          Transmission Operators.
------------------------------------------------------------------------
                                   GAS
------------------------------------------------------------------------
G-1..................  RP14-380-001....  National Fuel Gas Supply
                                          Corporation and Empire
                                          Pipeline, Inc.
G-2..................  RM96-1-038......  Standards for Business
                                          Practices of Interstate
                                          Natural Gas Pipelines.
G-3..................  RP12-498-003....  Enable Gas Transmission, LLC
                                          formerly CenterPoint.
                       RP12-498-004....  Energy Gas Transmission
                                          Company, LLC.
G-4..................  RP12-816-001,     EL Paso Natural Gas Company,
                        RP12-816-002.     L.L.C.
G-5..................  RP08-426-017,     EL Paso Natural Gas Company,
                        RP12-806-000.     L.L.C.
G-6..................  PL15-1-001......  Cost Recovery Mechanisms for
                                          Modernization of Natural Gas
                                          Facilities.
G-7..................  IS12-236-001....  Enbridge Energy, Limited
                                          Partnership.
------------------------------------------------------------------------
                                  HYDRO
------------------------------------------------------------------------
H-1..................  P-14245-001.....  KC Hydro LLC of New Hampshire.
H-2..................  P-2197-107......  Alcoa Power Generating Inc.
------------------------------------------------------------------------
                              CERTIFICATES
------------------------------------------------------------------------
C-1..................  CP13-541-000....  Floridian Natural Gas Storage
                                          Company, LLC.
C-2..................  CP15-23-000.....  Southern Natural Gas Company,
                                          L.L.C.

[[Page 41033]]

 
C-3..................  RM12-11-003.....  Revisions to Auxiliary
                                          Installations, Replacement
                                          Facilities, and Siting and
                                          Maintenance Regulations.
------------------------------------------------------------------------


    Issued: July 9, 2015.
Kimberly D. Bose,
Secretary.
    A free webcast of this event is available through www.ferc.gov. 
Anyone with Internet access who desires to view this event can do so by 
navigating to www.ferc.gov's Calendar of Events and locating this event 
in the Calendar. The event will contain a link to its webcast. The 
Capitol Connection provides technical support for the free webcasts. It 
also offers access to this event via television in the DC area and via 
phone bridge for a fee. If you have any questions, visit 
www.CapitolConnection.org or contact Danelle Springer or David 
Reininger at 703-993-3100.
    Immediately following the conclusion of the Commission Meeting, a 
press briefing will be held in the Commission Meeting Room. Members of 
the public may view this briefing in the designated overflow room. This 
statement is intended to notify the public that the press briefings 
that follow Commission meetings may now be viewed remotely at 
Commission headquarters, but will not be telecast through the Capitol 
Connection service.

[FR Doc. 2015-17305 Filed 7-10-15; 11:15 am]
 BILLING CODE 6717-01-P



                                                    41032                                   Federal Register / Vol. 80, No. 134 / Tuesday, July 14, 2015 / Notices

                                                    docket(s). For assistance with any FERC                              DEPARTMENT OF ENERGY                                      Note: Items listed on the agenda may be
                                                    Online service, please email                                                                                                 deleted without further notice.
                                                    FERCOnlineSupport@ferc.gov. or call                                  Federal Energy Regulatory
                                                                                                                                                                                 CONTACT PERSON FOR MORE INFORMATION:
                                                    (866) 208–3676 (toll free). For TTY, call                            Commission
                                                                                                                                                                                 Kimberly D. Bose, Secretary, Telephone
                                                    (202) 502–8659.                                                                                                              (202) 502–8400.
                                                                                                                         Sunshine Act Meeting Notice
                                                      Dated: July 8, 2015.                                                                                                          For a recorded message listing items
                                                    Kimberly D. Bose,                                                      The following notice of meeting is                    struck from or added to the meeting, call
                                                                                                                         published pursuant to section 3(a) of the               (202) 502–8627.
                                                    Secretary.
                                                                                                                         government in the Sunshine Act (Pub.                       This is a list of matters to be
                                                    [FR Doc. 2015–17221 Filed 7–13–15; 8:45 am]                          L. 94–409), 5 U.S.C. 552b:                              considered by the Commission. It does
                                                    BILLING CODE 6717–01–P
                                                                                                                         AGENCY HOLDING MEETING: Federal                         not include a listing of all documents
                                                                                                                         Energy Regulatory Commission.                           relevant to the items on the agenda. All
                                                                                                                         DATE AND TIME: July 16, 2015 10 a.m.                    public documents, however, may be
                                                                                                                                                                                 viewed on line at the Commission’s
                                                                                                                         PLACE: Room 2C, 888 First Street NE.,
                                                                                                                                                                                 Web site at http://www.ferc.gov using
                                                                                                                         Washington, DC 20426.
                                                                                                                                                                                 the eLibrary link, or may be examined
                                                                                                                         STATUS: OPEN.                                           in the Commission’s Public Reference
                                                                                                                         MATTERS TO BE CONSIDERED: Agenda.                       Room.

                                                                                                                                    1018TH—MEETING
                                                                                                                          [Regular Meeting—July 16, 2015, 10:00 a.m.]

                                                          Item No.                                    Docket No.                                                                  Company

                                                                                                                                            ADMINISTRATIVE

                                                    A–1 ....................      AD02–7–000 ............................................   Customer Matters, Reliability, Security and Market Operations.
                                                    A–2 ....................      AD02–1–000 ............................................   Agency Business Matters.

                                                                                                                                               ELECTRIC

                                                    E–1    ....................   RM15–14–000 .........................................     Revised Critical Infrastructure Protection Reliability Standards.
                                                    E–2    ....................   ER15–1745–000 ......................................      Midcontinent Independent System Operator, Inc.
                                                    E–3    ....................   ER12–2170–000 ......................................      International Transmission Company.
                                                    E–4    ....................   ER12–2170–001 ......................................      International Transmission Company.
                                                    E–5    ....................   RM15–3–000 ...........................................    Revisions to Public Utility Filing Requirements.
                                                    E–6    ....................   OA08–53–005 .........................................     Midwest Independent Transmission System Operator, Inc.
                                                                                  ER15–133–000 ........................................     Midcontinent Independent System Operator, Inc.
                                                    E–7 ....................      ER05–1056–008 ......................................      Chehalis Power Generating, L.P.
                                                    E–8 ....................      ER14–2553–001, ER14–2553–002 ........                     Southwest Power Pool, Inc.
                                                    E–9 ....................      ER14–1469–002 ......................................      PJM Interconnection, L.L.C.
                                                    E–10 ..................       OMITTED.
                                                    E–11 ..................       OMITTED.
                                                    E–12 ..................       EC15–138–000 ........................................     DTE Electric Company and DTE East China, LLC.
                                                    E–13 ..................       EL15–59–000 ..........................................    Navopache Electric Cooperative, Inc.
                                                    E–14 ..................       EL15–57–000 ..........................................    GenOn Energy Management, LLC v. ISO New England Inc.

                                                                                                                                            MISCELLANEOUS

                                                    M–1 ....................      RM13–17–002 .........................................     Communication of Operational Information Between Natural Gas Pipelines and
                                                                                                                                              Electric Transmission Operators.

                                                                                                                                                   GAS

                                                    G–1 ....................      RP14–380–001 ........................................     National Fuel Gas Supply Corporation and Empire Pipeline, Inc.
                                                    G–2 ....................      RM96–1–038 ...........................................    Standards for Business Practices of Interstate Natural Gas Pipelines.
                                                    G–3 ....................      RP12–498–003 ........................................     Enable Gas Transmission, LLC formerly CenterPoint.
                                                                                  RP12–498–004 ........................................     Energy Gas Transmission Company, LLC.
                                                    G–4    ....................   RP12–816–001, RP12–816–002 ............                   EL Paso Natural Gas Company, L.L.C.
                                                    G–5    ....................   RP08–426–017, RP12–806–000 ............                   EL Paso Natural Gas Company, L.L.C.
                                                    G–6    ....................   PL15–1–001 ............................................   Cost Recovery Mechanisms for Modernization of Natural Gas Facilities.
                                                    G–7    ....................   IS12–236–001 .........................................    Enbridge Energy, Limited Partnership.
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                                                                                                                 HYDRO

                                                    H–1 ....................      P–14245–001 ..........................................    KC Hydro LLC of New Hampshire.
                                                    H–2 ....................      P–2197–107 ............................................   Alcoa Power Generating Inc.

                                                                                                                                             CERTIFICATES

                                                    C–1 ....................      CP13–541–000 ........................................     Floridian Natural Gas Storage Company, LLC.
                                                    C–2 ....................      CP15–23–000 ..........................................    Southern Natural Gas Company, L.L.C.



                                               VerDate Sep<11>2014         19:09 Jul 13, 2015     Jkt 235001    PO 00000      Frm 00042     Fmt 4703   Sfmt 4703   E:\FR\FM\14JYN1.SGM   14JYN1


                                                                                         Federal Register / Vol. 80, No. 134 / Tuesday, July 14, 2015 / Notices                                                   41033

                                                                                                                        1018TH—MEETING—Continued
                                                                                                                     [Regular Meeting—July 16, 2015, 10:00 a.m.]

                                                          Item No.                                Docket No.                                                                 Company

                                                    C–3 ....................   RM12–11–003 .........................................   Revisions to Auxiliary Installations, Replacement Facilities, and Siting and Mainte-
                                                                                                                                         nance Regulations.



                                                      Issued: July 9, 2015.                                         First Street NE., Washington, DC 20426,                 ENVIRONMENTAL PROTECTION
                                                    Kimberly D. Bose,                                               in accordance with Rules 211 and 214                    AGENCY
                                                    Secretary.                                                      of the Commission’s Rules of Practice
                                                                                                                                                                            [EPA–HQ–OAR–2015–0092; FRL–9930–50–
                                                       A free webcast of this event is                              and Procedure (18 CFR 385.211 and                       OAR]
                                                    available through www.ferc.gov. Anyone                          385.214). Anyone filing a motion to
                                                    with Internet access who desires to view                        intervene or protest must serve a copy                  Notice of Opportunity To Comment on
                                                    this event can do so by navigating to                           of that document on the Applicant.                      an Analysis of the Greenhouse Gas
                                                    www.ferc.gov’s Calendar of Events and                              Notice is hereby given that the                      Emissions Attributable to Production
                                                    locating this event in the Calendar. The                        deadline for filing protests with regard                and Transport of Cotton (Gossypium
                                                    event will contain a link to its webcast.                       to the applicant’s request for blanket                  spp.) Seed Oil for Use in Biofuel
                                                    The Capitol Connection provides                                                                                         Production
                                                                                                                    authorization, under 18 CFR part 34, of
                                                    technical support for the free webcasts.
                                                                                                                    future issuances of securities and                      AGENCY: Environmental Protection
                                                    It also offers access to this event via
                                                    television in the DC area and via phone                         assumptions of liability, is July 28,                   Agency (EPA).
                                                    bridge for a fee. If you have any                               2015.                                                   ACTION: Notice.
                                                    questions, visit                                                   The Commission encourages
                                                                                                                                                                            SUMMARY:    The Environmental Protection
                                                    www.CapitolConnection.org or contact                            electronic submission of protests and
                                                                                                                                                                            Agency (EPA) is inviting comment on
                                                    Danelle Springer or David Reininger at                          interventions in lieu of paper, using the
                                                                                                                                                                            its analysis of the greenhouse gas (GHG)
                                                    703–993–3100.                                                   FERC Online links at http://                            emissions attributable to the production
                                                       Immediately following the conclusion                         www.ferc.gov. To facilitate electronic                  and transport of Gossypium spp. seed
                                                    of the Commission Meeting, a press                              service, persons with Internet access                   oil (‘‘cottonseed oil’’) feedstock for use
                                                    briefing will be held in the Commission                         who will eFile a document and/or be                     in making biofuels such as biodiesel,
                                                    Meeting Room. Members of the public                             listed as a contact for an intervenor                   renewable diesel, and jet fuel. This
                                                    may view this briefing in the designated                        must create and validate an                             document explains EPA’s analysis of the
                                                    overflow room. This statement is                                eRegistration account using the                         feedstock production and transport-
                                                    intended to notify the public that the                          eRegistration link. Select the eFiling                  related components of the lifecycle GHG
                                                    press briefings that follow Commission                          link to log on and submit the                           emissions of biofuel made from
                                                    meetings may now be viewed remotely                             intervention or protests.                               cottonseed oil, including both direct
                                                    at Commission headquarters, but will
                                                                                                                       Persons unable to file electronically                and indirect agricultural and forestry
                                                    not be telecast through the Capitol
                                                                                                                    should submit an original and 5 copies                  sector emissions. This notice also
                                                    Connection service.
                                                                                                                    of the intervention or protest to the                   describes how EPA may apply this
                                                    [FR Doc. 2015–17305 Filed 7–10–15; 11:15 am]                                                                            analysis in the future to determine
                                                                                                                    Federal Energy Regulatory Commission,
                                                    BILLING CODE 6717–01–P
                                                                                                                    888 First Street NE., Washington, DC                    whether biofuels produced from
                                                                                                                                                                            cottonseed oil meet the necessary GHG
                                                                                                                    20426.
                                                                                                                                                                            reductions required for qualification as
                                                    DEPARTMENT OF ENERGY                                               The filings in the above-referenced                  renewable fuel under the Renewable
                                                                                                                    proceeding are accessible in the                        Fuel Standard program. Based on this
                                                    Federal Energy Regulatory                                       Commission’s eLibrary system by                         analysis, we anticipate that biofuels
                                                    Commission                                                      clicking on the appropriate link in the                 produced from cottonseed oil could
                                                    [Docket No. ER15–2129–000]                                      above list. They are also available for                 qualify as biomass-based diesel or
                                                                                                                    electronic review in the Commission’s                   advanced biofuel if typical fuel
                                                    Slate Creek Wind Project, LLC;                                  Public Reference Room in Washington,                    production process technologies are
                                                    Supplemental Notice That Initial                                DC. There is an eSubscription link on                   used.
                                                    Market-Based Rate Filing Includes                               the Web site that enables subscribers to
                                                    Request for Blanket Section 204                                                                                         DATES:  Comments must be received on
                                                                                                                    receive email notification when a                       or before August 13, 2015.
                                                    Authorization                                                   document is added to a subscribed                       ADDRESSES: Submit your comments,
                                                      This is a supplemental notice in the                          docket(s). For assistance with any FERC                 identified by Docket ID No. EPA–HQ–
                                                    above-referenced proceeding of Slate                            Online service, please email                            OAR–2015–0092, by one of the
                                                    Creek Wind Project, LLC’s application                           FERCOnlineSupport@ferc.gov, or call                     following methods:
                                                    for market-based rate authority, with an                        (866) 208–3676 (toll free). For TTY, call                 • http://www.regulations.gov. Follow
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    accompanying rate tariff, noting that                           (202) 502–8659.                                         the on-line instructions for submitting
                                                    such application includes a request for                           Dated: July 8, 2015.                                  comments.
                                                    blanket authorization, under 18 CFR                                                                                       • Email: a-and-r-docket@epa.gov,
                                                                                                                    Kimberly D. Bose,
                                                    part 34, of future issuances of securities                                                                              Attention Air and Radiation Docket ID
                                                    and assumptions of liability.                                   Secretary.                                              No. EPA–HQ–OAR–2015–0092.
                                                      Any person desiring to intervene or to                        [FR Doc. 2015–17222 Filed 7–13–15; 8:45 am]               • Mail: Air and Radiation Docket,
                                                    protest should file with the Federal                            BILLING CODE 6717–01–P                                  Docket No. EPA–HQ–OAR–2015–0092,
                                                    Energy Regulatory Commission, 888                                                                                       Environmental Protection Agency, Mail


                                               VerDate Sep<11>2014      19:09 Jul 13, 2015    Jkt 235001    PO 00000     Frm 00043     Fmt 4703   Sfmt 4703   E:\FR\FM\14JYN1.SGM   14JYN1



Document Created: 2018-02-23 09:19:08
Document Modified: 2018-02-23 09:19:08
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 41032 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR