80_FR_44235 80 FR 44093 - Magnolia LNG, LLC; Kinder Morgan Louisiana Pipeline LLC; Notice of Availability of the Draft Environmental Impact Statement for the Proposed Magnolia LNG and Lake Charles Expansion Projects

80 FR 44093 - Magnolia LNG, LLC; Kinder Morgan Louisiana Pipeline LLC; Notice of Availability of the Draft Environmental Impact Statement for the Proposed Magnolia LNG and Lake Charles Expansion Projects

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 142 (July 24, 2015)

Page Range44093-44094
FR Document2015-18105

Federal Register, Volume 80 Issue 142 (Friday, July 24, 2015)
[Federal Register Volume 80, Number 142 (Friday, July 24, 2015)]
[Notices]
[Pages 44093-44094]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-18105]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. CP14-347-000; CP14-511-000]


Magnolia LNG, LLC; Kinder Morgan Louisiana Pipeline LLC; Notice 
of Availability of the Draft Environmental Impact Statement for the 
Proposed Magnolia LNG and Lake Charles Expansion Projects

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) has prepared a draft environmental impact statement (EIS) 
for the Magnolia LNG Project proposed by Magnolia LNG, LLC (Magnolia) 
and the Lake Charles Expansion Project proposed by Kinder Morgan 
Louisiana Pipeline LLC (Kinder Morgan) in the above-referenced dockets. 
The Magnolia LNG Project would include construction and operation of a 
liquefied natural gas (LNG) terminal that would include various 
liquefaction, LNG distribution, and appurtenant facilities. The Lake 
Charles Expansion Project would include reconfiguration of Kinder 
Morgan's existing pipeline system in order to accommodate Magnolia's 
request for natural gas service at the LNG terminal site. The projects 
would provide an LNG export capacity of 1.08 billion cubic feet per day 
of natural gas.
    The draft EIS assesses the potential environmental effects of 
construction and operation of the Magnolia LNG and Lake Charles 
Expansion Projects in accordance with the requirements of the National 
Environmental Policy Act (NEPA). The FERC staff concludes that approval 
of the proposed projects would result in limited adverse environmental 
impacts; however, these impacts would be reduced to less-than-
significant levels with the implementation of Magnolia's and Kinder 
Morgan's proposed mitigation and the additional measures recommended in 
the draft EIS.
    The U.S. Army Corps of Engineers, U.S. Coast Guard, U.S. Department 
of Energy, U.S. Department of Transportation, and U.S. Environmental 
Protection Agency participated as cooperating agencies in the 
preparation of the draft EIS. Cooperating agencies have jurisdiction by 
law or special expertise with respect to resources potentially affected 
by a proposal and participate in the NEPA analysis. Although the 
cooperating agencies provided input on the conclusions and 
recommendations presented in the draft EIS, the agencies will present 
their own conclusions and recommendations in their respective records 
of decision or determinations for the projects.
    The draft EIS addresses the potential environmental effects of the 
construction, modification, and operation of the following facilities 
associated with the two projects:
     A new LNG terminal that includes three liquefaction 
trains, two LNG storage tanks, liquefaction and refrigerant units, 
safety and control systems, and associated infrastructure;
     LNG truck loading facilities;
     LNG carrier and barge loading facilities;
     one new meter station;
     one new 32,000 horsepower compressor station;
     approximately 40 feet of 36-inch-diameter feed gas line to 
supply natural gas to the LNG terminal from Kinder Morgan's existing 
natural gas transmission pipeline;
     a new 1.2-mile-long, 36-inch-diameter low pressure natural 
gas header pipeline;
     a new 700-foot-long, 24-inch-diameter high pressure 
natural gas header pipeline;
     modifications at six existing meter stations; and
     construction of miscellaneous auxiliary and appurtenant 
facilities.
    The FERC staff mailed copies of the draft EIS to federal, state, 
and local government representatives and agencies; elected officials; 
environmental and public interest groups; Native American tribes; 
potentially affected landowners; other interested individuals and non-
governmental organizations; newspapers and libraries in the project 
area; and parties to these proceedings. Paper copy versions of this EIS 
were mailed to those specifically requesting them; all others received 
a compact disk version. In addition, the draft EIS is available for 
public viewing on the FERC's Web site (www.ferc.gov) using the eLibrary 
link. A limited number of hardcopies are available for distribution and 
public inspection at: Federal Energy Regulatory Commission, Public 
Reference Room, 888 First Street NE., Room 2A, Washington, DC 20426, 
(202) 502-8371.
    Any person wishing to comment on the draft EIS may do so. To ensure 
consideration of your comments on the proposal in the final EIS, it is 
important that the Commission receive your comments on or before 
September 8, 2015.
    For your convenience, there are four methods you can use to submit 
your comments to the Commission. In all instances, please reference the 
project docket number(s) (CP14-347-000 and

[[Page 44094]]

CP14-511-000) with your submission. The Commission encourages 
electronic filing of comments and has expert staff available to assist 
you at (202) 502-8258 or [email protected].
    (1) You can file your comments electronically using the eComment 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for submitting brief, 
text-only comments on a project.
    (2) You can file your comments electronically by using the eFiling 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file with your submission. 
New eFiling users must first create an account by clicking on 
``eRegister.'' If you are filing a comment on a particular project, 
please select ``Comment on a Filing'' as the filing type.
    (3) You can file a paper copy of your comments by mailing them to 
the following address: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC 
20426.
    (4) In lieu of sending written or electronic comments, the 
Commission invites you to attend a public comment meeting its staff 
will conduct in the project area to receive comments on the draft EIS. 
We encourage interested groups and individuals to attend and present 
oral comments on the draft EIS. A transcript of the meeting will be 
available for review in eLibrary under the project docket numbers. The 
meeting will begin at 7:00 p.m. and is scheduled as follows:

------------------------------------------------------------------------
               Date                               Location
------------------------------------------------------------------------
September 3, 2015.................  Historic Cash and Carry Building,
                                     801 Enterprise Boulevard, Lake
                                     Charles, Louisiana 70601, (337) 310-
                                     0405.
------------------------------------------------------------------------

    Any person seeking to become a party to the proceeding must file a 
motion to intervene pursuant to Rule 214 of the Commission's Rules of 
Practice and Procedures (Title 18 Code of Federal Regulations Part 
385.214).\1\ Only intervenors have the right to seek rehearing of the 
Commission's decision. The Commission grants affected landowners and 
others with environmental concerns intervenor status upon showing good 
cause by stating that they have a clear and direct interest in this 
proceeding that no other party can adequately represent. Simply filing 
environmental comments will not give you intervenor status, but you do 
not need intervenor status to have your comments considered.
---------------------------------------------------------------------------

    \1\ See the previous discussion on the methods for filing 
comments.
---------------------------------------------------------------------------

Questions?

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site (www.ferc.gov) using the eLibrary link. Click on the 
eLibrary link, click on ``General Search,'' and enter the docket 
number(s) excluding the last three digits in the Docket Number field 
(i.e., CP14-347 and CP14-511). Be sure you have selected an appropriate 
date range. For assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676; for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription that allows you to keep track of all formal issuances and 
submittals in specific dockets. This can reduce the amount of time you 
spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.

    Dated: July 17, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-18105 Filed 7-23-15; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                     Federal Register / Vol. 80, No. 142 / Friday, July 24, 2015 / Notices                                           44093

                                                    Commission staff will either: Complete                   DEPARTMENT OF ENERGY                                  their respective records of decision or
                                                    its environmental assessment (EA) and                                                                          determinations for the projects.
                                                    place it into the Commission’s public                    Federal Energy Regulatory                                The draft EIS addresses the potential
                                                    record (eLibrary) for this proceeding; or                Commission                                            environmental effects of the
                                                    issue a Notice of Schedule for                                                                                 construction, modification, and
                                                    Environmental Review. If a Notice of                     [Docket Nos. CP14–347–000; CP14–511–                  operation of the following facilities
                                                                                                             000]                                                  associated with the two projects:
                                                    Schedule for Environmental Review is
                                                    issued, it will indicate, among other                                                                             • A new LNG terminal that includes
                                                                                                             Magnolia LNG, LLC; Kinder Morgan                      three liquefaction trains, two LNG
                                                    milestones, the anticipated date for the                 Louisiana Pipeline LLC; Notice of                     storage tanks, liquefaction and
                                                    Commission staff’s issuance of the final                 Availability of the Draft Environmental               refrigerant units, safety and control
                                                    environmental impact statement (FEIS)                    Impact Statement for the Proposed                     systems, and associated infrastructure;
                                                    or EA for this proposal. The filing of the               Magnolia LNG and Lake Charles                            • LNG truck loading facilities;
                                                    EA in the Commission’s public record                     Expansion Projects                                       • LNG carrier and barge loading
                                                    for this proceeding or the issuance of a                                                                       facilities;
                                                                                                               The staff of the Federal Energy
                                                    Notice of Schedule for Environmental                                                                              • one new meter station;
                                                    Review will serve to notify federal and                  Regulatory Commission (FERC or                           • one new 32,000 horsepower
                                                    state agencies of the timing for the                     Commission) has prepared a draft                      compressor station;
                                                                                                             environmental impact statement (EIS)                     • approximately 40 feet of 36-inch-
                                                    completion of all necessary reviews, and
                                                                                                             for the Magnolia LNG Project proposed                 diameter feed gas line to supply natural
                                                    the subsequent need to complete all
                                                                                                             by Magnolia LNG, LLC (Magnolia) and                   gas to the LNG terminal from Kinder
                                                    federal authorizations within 90 days of                 the Lake Charles Expansion Project
                                                    the date of issuance of the Commission                                                                         Morgan’s existing natural gas
                                                                                                             proposed by Kinder Morgan Louisiana                   transmission pipeline;
                                                    staff’s FEIS or EA.                                      Pipeline LLC (Kinder Morgan) in the                      • a new 1.2-mile-long, 36-inch-
                                                       Persons who wish to comment only                      above-referenced dockets. The Magnolia                diameter low pressure natural gas
                                                    on the environmental review of this                      LNG Project would include construction                header pipeline;
                                                    project should submit an original and                    and operation of a liquefied natural gas                 • a new 700-foot-long, 24-inch-
                                                    two copies of their comments to the                      (LNG) terminal that would include                     diameter high pressure natural gas
                                                    Secretary of the Commission.                             various liquefaction, LNG distribution,               header pipeline;
                                                    Environmental commenters will be                         and appurtenant facilities. The Lake                     • modifications at six existing meter
                                                    placed on the Commission’s                               Charles Expansion Project would                       stations; and
                                                    environmental mailing list, will receive                 include reconfiguration of Kinder                        • construction of miscellaneous
                                                    copies of the environmental documents,                   Morgan’s existing pipeline system in                  auxiliary and appurtenant facilities.
                                                    and will be notified of meetings                         order to accommodate Magnolia’s                          The FERC staff mailed copies of the
                                                    associated with the Commission’s                         request for natural gas service at the                draft EIS to federal, state, and local
                                                    environmental review process.                            LNG terminal site. The projects would                 government representatives and
                                                                                                             provide an LNG export capacity of 1.08                agencies; elected officials;
                                                    Environmental commenters will not be
                                                                                                             billion cubic feet per day of natural gas.            environmental and public interest
                                                    required to serve copies of filed
                                                                                                               The draft EIS assesses the potential                groups; Native American tribes;
                                                    documents on all other parties.
                                                                                                             environmental effects of construction                 potentially affected landowners; other
                                                    However, the non-party commenters                        and operation of the Magnolia LNG and                 interested individuals and non-
                                                    will not receive copies of all documents                 Lake Charles Expansion Projects in                    governmental organizations;
                                                    filed by other parties or issued by the                  accordance with the requirements of the               newspapers and libraries in the project
                                                    Commission (except for the mailing of                    National Environmental Policy Act                     area; and parties to these proceedings.
                                                    environmental documents issued by the                    (NEPA). The FERC staff concludes that                 Paper copy versions of this EIS were
                                                    Commission) and will not have the right                  approval of the proposed projects would               mailed to those specifically requesting
                                                    to seek court review of the                              result in limited adverse environmental               them; all others received a compact disk
                                                    Commission’s final order.                                impacts; however, these impacts would                 version. In addition, the draft EIS is
                                                       The Commission strongly encourages                    be reduced to less-than-significant                   available for public viewing on the
                                                    electronic filings of comments, protests,                levels with the implementation of                     FERC’s Web site (www.ferc.gov) using
                                                    and interventions via the internet in lieu               Magnolia’s and Kinder Morgan’s                        the eLibrary link. A limited number of
                                                    of paper. See 18 CFR 385.2001(a)(1)(iii)                 proposed mitigation and the additional                hardcopies are available for distribution
                                                    and the instructions on the                              measures recommended in the draft EIS.                and public inspection at: Federal Energy
                                                    Commission’s Web site (www.ferc.gov)                       The U.S. Army Corps of Engineers,                   Regulatory Commission, Public
                                                    under the ‘‘e-Filing’’ link. Persons                     U.S. Coast Guard, U.S. Department of                  Reference Room, 888 First Street NE.,
                                                                                                             Energy, U.S. Department of                            Room 2A, Washington, DC 20426, (202)
                                                    unable to file electronically should
                                                                                                             Transportation, and U.S. Environmental                502–8371.
                                                    submit an original and 5 copies of the
                                                                                                             Protection Agency participated as                        Any person wishing to comment on
                                                    protest or intervention to the Federal
                                                                                                             cooperating agencies in the preparation               the draft EIS may do so. To ensure
                                                    Energy Regulatory Commission, 888                        of the draft EIS. Cooperating agencies                consideration of your comments on the
                                                    First Street NE., Washington, DC 20426.                  have jurisdiction by law or special                   proposal in the final EIS, it is important
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                      Dated: July 17, 2015.                                  expertise with respect to resources                   that the Commission receive your
                                                    Kimberly D. Bose,                                        potentially affected by a proposal and                comments on or before September 8,
                                                    Secretary.                                               participate in the NEPA analysis.                     2015.
                                                                                                             Although the cooperating agencies                        For your convenience, there are four
                                                    [FR Doc. 2015–18107 Filed 7–23–15; 8:45 am]
                                                                                                             provided input on the conclusions and                 methods you can use to submit your
                                                    BILLING CODE 6717–01–P
                                                                                                             recommendations presented in the draft                comments to the Commission. In all
                                                                                                             EIS, the agencies will present their own              instances, please reference the project
                                                                                                             conclusions and recommendations in                    docket number(s) (CP14–347–000 and


                                               VerDate Sep<11>2014   19:59 Jul 23, 2015   Jkt 235001   PO 00000   Frm 00075   Fmt 4703   Sfmt 4703   E:\FR\FM\24JYN1.SGM   24JYN1


                                                    44094                             Federal Register / Vol. 80, No. 142 / Friday, July 24, 2015 / Notices

                                                    CP14–511–000) with your submission.                       (www.ferc.gov) under the link to                      Commission, 888 First Street NE., Room
                                                    The Commission encourages electronic                      Documents and Filings. With eFiling,                  1A, Washington, DC 20426.
                                                    filing of comments and has expert staff                   you can provide comments in a variety                   (4) In lieu of sending written or
                                                    available to assist you at (202) 502–8258                 of formats by attaching them as a file                electronic comments, the Commission
                                                    or efiling@ferc.gov.                                      with your submission. New eFiling                     invites you to attend a public comment
                                                       (1) You can file your comments                         users must first create an account by                 meeting its staff will conduct in the
                                                    electronically using the eComment                         clicking on ‘‘eRegister.’’ If you are filing          project area to receive comments on the
                                                    feature on the Commission’s Web site                      a comment on a particular project,                    draft EIS. We encourage interested
                                                    (www.ferc.gov) under the link to                          please select ‘‘Comment on a Filing’’ as              groups and individuals to attend and
                                                    Documents and Filings. This is an easy                    the filing type.                                      present oral comments on the draft EIS.
                                                    method for submitting brief, text-only                                                                          A transcript of the meeting will be
                                                    comments on a project.                                       (3) You can file a paper copy of your              available for review in eLibrary under
                                                       (2) You can file your comments                         comments by mailing them to the                       the project docket numbers. The
                                                    electronically by using the eFiling                       following address: Kimberly D. Bose,                  meeting will begin at 7:00 p.m. and is
                                                    feature on the Commission’s Web site                      Secretary, Federal Energy Regulatory                  scheduled as follows:

                                                                     Date                                                                              Location

                                                    September 3, 2015 .................     Historic Cash and Carry Building, 801 Enterprise Boulevard, Lake Charles, Louisiana 70601, (337) 310–0405.



                                                       Any person seeking to become a party                   time you spend researching proceedings                   • Mail/Hand Delivery/Courier:
                                                    to the proceeding must file a motion to                   by automatically providing you with                   Federal Energy Regulatory Commission,
                                                    intervene pursuant to Rule 214 of the                     notification of these filings, document               Secretary of the Commission, 888 First
                                                    Commission’s Rules of Practice and                        summaries, and direct links to the                    Street NE., Washington, DC 20426.
                                                    Procedures (Title 18 Code of Federal                      documents. Go to www.ferc.gov/docs-                      Instructions: All submissions must be
                                                    Regulations Part 385.214).1 Only                          filing/esubscription.asp.                             formatted and filed in accordance with
                                                    intervenors have the right to seek                          Dated: July 17, 2015.                               submission guidelines at: http://
                                                    rehearing of the Commission’s decision.                                                                         www.ferc.gov/help/submission-
                                                                                                              Kimberly D. Bose,
                                                    The Commission grants affected                                                                                  guide.asp. For user assistance contact
                                                                                                              Secretary.
                                                    landowners and others with                                                                                      FERC Online Support by email at
                                                    environmental concerns intervenor                         [FR Doc. 2015–18105 Filed 7–23–15; 8:45 am]
                                                                                                                                                                    ferconlinesupport@ferc.gov, or by phone
                                                    status upon showing good cause by                         BILLING CODE 6717–01–P
                                                                                                                                                                    at: (866) 208–3676 (toll-free), or (202)
                                                    stating that they have a clear and direct                                                                       502–8659 for TTY.
                                                    interest in this proceeding that no other                                                                          Docket: Users interested in receiving
                                                    party can adequately represent. Simply                    DEPARTMENT OF ENERGY
                                                                                                                                                                    automatic notification of activity in this
                                                    filing environmental comments will not                                                                          docket or in viewing/downloading
                                                                                                              Federal Energy Regulatory
                                                    give you intervenor status, but you do                                                                          comments and issuances in this docket
                                                                                                              Commission
                                                    not need intervenor status to have your                                                                         may do so at http://www.ferc.gov/docs-
                                                    comments considered.                                                                                            filing/docs-filing.asp.
                                                                                                              [Docket No. IC15–9–000]
                                                    Questions?                                                                                                      FOR FURTHER INFORMATION CONTACT:
                                                                                                              Commission Information Collection                     Ellen Brown may be reached by email
                                                       Additional information about the
                                                                                                              Activities (FERC–546); Comment                        at DataClearance@FERC.gov, telephone
                                                    project is available from the
                                                                                                              Request; Extension                                    at (202) 502–8663, and fax at (202) 273–
                                                    Commission’s Office of External Affairs,
                                                    at (866) 208–FERC, or on the FERC Web                     AGENCY: Federal Energy Regulatory                     0873.
                                                    site (www.ferc.gov) using the eLibrary                    Commission, Energy.                                   SUPPLEMENTARY INFORMATION:
                                                    link. Click on the eLibrary link, click on                ACTION: Notice of information collection                 Title: FERC–546 (Certificated Rate
                                                    ‘‘General Search,’’ and enter the docket                  and request for comments.                             Filings).
                                                    number(s) excluding the last three digits                                                                          OMB Control No.: 1902–0155.
                                                    in the Docket Number field (i.e., CP14–                   SUMMARY:   In compliance with the                        Type of Request: Three-year extension
                                                    347 and CP14–511). Be sure you have                       requirements of the Paperwork                         of the FERC–546 information collection
                                                    selected an appropriate date range. For                   Reduction Act of 1995, 44 U.S.C.                      requirements with no changes to the
                                                    assistance, please contact FERC Online                    3506(c)(2)(A), the Federal Energy                     current reporting requirements.
                                                    Support at FercOnlineSupport@ferc.gov                     Regulatory Commission (Commission or                     Abstract: The Commission reviews
                                                    or toll free at (866) 208–3676; for TTY,                  FERC) is soliciting public comment on                 the FERC–546 materials to decide
                                                    contact (202) 502–8659. The eLibrary                      the currently approved information                    whether to determine an initial rate
                                                    link also provides access to the texts of                 collection, FERC–546 (Certificated Rate               associated with an application for a
                                                    formal documents issued by the                            Filings).                                             certificate under NGA section 7(c).
                                                    Commission, such as orders, notices,                      DATES: Comments on the collection of                  FERC reviews FERC–546 materials in
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    and rulemakings.                                          information are due September 22,
                                                       In addition, the Commission offers a                                                                         4(f) storage applications to evaluate
                                                                                                              2015.                                                 market power and decide whether to
                                                    free service called eSubscription that
                                                    allows you to keep track of all formal                    ADDRESSES:   You may submit comments                  grant, deny, or condition market based
                                                    issuances and submittals in specific                      (identified by Docket No. IC15–9–000)                 rate authority for the applicant. The
                                                    dockets. This can reduce the amount of                    by either of the following methods:                   Commission uses the FERC–546
                                                                                                                 • eFiling at Commission’s Web site:                information to monitor jurisdictional
                                                       1 See the previous discussion on the methods for       http://www.ferc.gov/docs-filing/                      transportation, natural gas storage, and
                                                    filing comments.                                          efiling.asp                                           unbundled sales activities of interstate


                                               VerDate Sep<11>2014    19:59 Jul 23, 2015   Jkt 235001   PO 00000   Frm 00076   Fmt 4703   Sfmt 4703   E:\FR\FM\24JYN1.SGM   24JYN1



Document Created: 2018-02-23 09:24:50
Document Modified: 2018-02-23 09:24:50
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 44093 