80_FR_44239 80 FR 44097 - FirstLight Hydro Generating Company; Notice of Application Accepted for Filing, Soliciting Comments, Motions to Intervene, and Protests

80 FR 44097 - FirstLight Hydro Generating Company; Notice of Application Accepted for Filing, Soliciting Comments, Motions to Intervene, and Protests

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 142 (July 24, 2015)

Page Range44097-44098
FR Document2015-18108

Federal Register, Volume 80 Issue 142 (Friday, July 24, 2015)
[Federal Register Volume 80, Number 142 (Friday, July 24, 2015)]
[Notices]
[Pages 44097-44098]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-18108]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2662-026]


FirstLight Hydro Generating Company; Notice of Application 
Accepted for Filing, Soliciting Comments, Motions to Intervene, and 
Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Request for Temporary Variance.
    b. Project No.: 2662-026.
    c. Date Filed: June 30, 2015.
    d. Applicant: FirstLight Hydro Generating Company (licensee).
    e. Name of Project: Scotland Hydroelectric Project.
    f. Location: Windham County, Connecticut.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Richard Laudenat, Plant Manager, (860) 350-
3617, or [email protected].
    i. FERC Contact: Alicia Burtner, (202) 502-8038, or 
[email protected].
    j. Deadline for filing comments, motions to intervene, protests, 
and recommendations is 30 days from the issuance date of this notice by 
the Commission.
    All documents may be filed electronically via the Internet. See, 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site at http://www.ferc.gov/docs-filing/efiling.asp. If unable to be 
filed electronically, documents may be paper-filed. To paper-file, an 
original and seven copies should be mailed to: Secretary, Federal 
Energy Regulatory Commission, 888 First Street NE., Washington, DC 
20426. Commenters can submit brief comments up to 6,000 characters, 
without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and 
contact information at the end of your comments.
    Please include the project number (P-2662-026) on any comments, 
motions, or recommendations filed.
    k. Description of Request: The licensee requests a one-year 
temporary variance from the operating requirements of the Commission's 
November 21, 2013 Order Issuing New License and Denying Competing 
License Application. Specifically, the licensee requests to operate its 
turbine in cycling mode, lower the flashboards and the operating range 
of the reservoir elevation, continuously spill 10 cubic feet per 
second, and keep the existing flow valve closed unless otherwise 
authorized by the Connecticut Department of Energy and Environmental 
Protection. Due to economic shifts, the licensee indicates that it is 
no longer feasible to install a low-flow turbine that had been 
paramount to being able to comply with the license conditions. The 
licensee requests this variance in order to maintain compliance while 
determining an appropriate alternative operating scenario.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits 
in the docket number field to access the document. You may also 
register online at http://www.ferc.gov/docs-filing/esubscription.asp to 
be notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
[email protected], for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or 
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis and otherwise comply with the requirements of 18 CFR 
4.34(b). All comments, motions to intervene, or protests should relate 
to project operations, which are the subject of the variance. Agencies 
may obtain copies of the application directly from the applicant. A 
copy of any protest or motion to intervene must be served upon each 
representative of the applicant specified in the particular 
application. If an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they

[[Page 44098]]

must also serve a copy of the document on that resource agency. A copy 
of all other filings in reference to this application must be 
accompanied by proof of service on all persons listed in the service 
list prepared by the Commission in this proceeding, in accordance with 
18 CFR 4.34(b) and 385.2010.

    Dated: July 17, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-18108 Filed 7-23-15; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                     Federal Register / Vol. 80, No. 142 / Friday, July 24, 2015 / Notices                                           44097

                                                       Filed Date: 7/17/15.                                     f. Location: Windham County,                       viewed on the Commission’s Web site at
                                                       Accession Number: 20150717–5110.                      Connecticut.                                          http://www.ferc.gov/docs-filing/
                                                       Comments Due: 5 p.m. ET 8/7/15.                          g. Filed Pursuant to: Federal Power                elibrary.asp. Enter the docket number
                                                       Docket Numbers: ER15–2223–000.                        Act, 16 U.S.C. 791(a)–825(r).                         excluding the last three digits in the
                                                       Applicants: Midcontinent                                 h. Applicant Contact: Richard                      docket number field to access the
                                                    Independent System Operator, Inc.,                       Laudenat, Plant Manager, (860) 350–                   document. You may also register online
                                                    Michigan Electric Transmission                           3617, or richard.laudenat@                            at http://www.ferc.gov/docs-filing/
                                                    Company, LLC, Wolverine Power                            gdfsuezna.com.                                        esubscription.asp to be notified via
                                                    Supply Cooperative, Inc.                                    i. FERC Contact: Alicia Burtner, (202)             email of new filings and issuances
                                                       Description: Section 205(d) Rate                      502–8038, or alicia.burtner@ferc.gov.                 related to this or other pending projects.
                                                                                                                j. Deadline for filing comments,                   For assistance, call 1–866–208–3676 or
                                                    Filing: 2015–07–17_SA 2818 METC-
                                                                                                             motions to intervene, protests, and                   email FERCOnlineSupport@ferc.gov, for
                                                    Wolverine Power E&P (J392) to be
                                                                                                             recommendations is 30 days from the                   TTY, call (202) 502–8659. A copy is also
                                                    effective 7/18/2015.
                                                                                                             issuance date of this notice by the                   available for inspection and
                                                       Filed Date: 7/17/15.
                                                                                                             Commission.                                           reproduction at the address in item (h)
                                                       Accession Number: 20150717–5131.
                                                                                                                All documents may be filed                         above.
                                                       Comments Due: 5 p.m. ET 8/7/15.
                                                                                                             electronically via the Internet. See, 18                 m. Individuals desiring to be included
                                                       The filings are accessible in the                     CFR 385.2001(a)(1)(iii) and the
                                                    Commission’s eLibrary system by                                                                                on the Commission’s mailing list should
                                                                                                             instructions on the Commission’s Web                  so indicate by writing to the Secretary
                                                    clicking on the links or querying the                    site at http://www.ferc.gov/docs-filing/              of the Commission.
                                                    docket number.                                           efiling.asp. If unable to be filed                       n. Comments, Protests, or Motions to
                                                       Any person desiring to intervene or                   electronically, documents may be paper-               Intervene: Anyone may submit
                                                    protest in any of the above proceedings                  filed. To paper-file, an original and                 comments, a protest, or a motion to
                                                    must file in accordance with Rules 211                   seven copies should be mailed to:                     intervene in accordance with the
                                                    and 214 of the Commission’s                              Secretary, Federal Energy Regulatory                  requirements of Rules of Practice and
                                                    Regulations (18 CFR 385.211 and                          Commission, 888 First Street NE.,                     Procedure, 18 CFR 385.210, .211, .214.
                                                    385.214) on or before 5:00 p.m. Eastern                  Washington, DC 20426. Commenters                      In determining the appropriate action to
                                                    time on the specified comment date.                      can submit brief comments up to 6,000                 take, the Commission will consider all
                                                    Protests may be considered, but                          characters, without prior registration,               protests or other comments filed, but
                                                    intervention is necessary to become a                    using the eComment system at http://                  only those who file a motion to
                                                    party to the proceeding.                                 www.ferc.gov/docs-filing/                             intervene in accordance with the
                                                       eFiling is encouraged. More detailed                  ecomment.asp. You must include your                   Commission’s Rules may become a
                                                    information relating to filing                           name and contact information at the end               party to the proceeding. Any comments,
                                                    requirements, interventions, protests,                   of your comments.                                     protests, or motions to intervene must
                                                    service, and qualifying facilities filings                  Please include the project number (P–              be received on or before the specified
                                                    can be found at: http://www.ferc.gov/                    2662–026) on any comments, motions,                   comment date for the particular
                                                    docs-filing/efiling/filing-req.pdf. For                  or recommendations filed.                             application.
                                                    other information, call (866) 208–3676                      k. Description of Request: The                        o. Filing and Service of Responsive
                                                    (toll free). For TTY, call (202) 502–8659.               licensee requests a one-year temporary                Documents: Any filing must (1) bear in
                                                      Dated: July 17, 2015.                                  variance from the operating                           all capital letters the title
                                                    Kimberly D. Bose,                                        requirements of the Commission’s                      ‘‘COMMENTS’’, ‘‘PROTEST’’, or
                                                    Secretary.                                               November 21, 2013 Order Issuing New                   ‘‘MOTION TO INTERVENE’’ as
                                                                                                             License and Denying Competing License                 applicable; (2) set forth in the heading
                                                    [FR Doc. 2015–18106 Filed 7–23–15; 8:45 am]
                                                                                                             Application. Specifically, the licensee               the name of the applicant and the
                                                    BILLING CODE 6717–01–P
                                                                                                             requests to operate its turbine in cycling            project number of the application to
                                                                                                             mode, lower the flashboards and the                   which the filing responds; (3) furnish
                                                    DEPARTMENT OF ENERGY                                     operating range of the reservoir                      the name, address, and telephone
                                                                                                             elevation, continuously spill 10 cubic                number of the person protesting or
                                                    Federal Energy Regulatory                                feet per second, and keep the existing                intervening; and (4) otherwise comply
                                                    Commission                                               flow valve closed unless otherwise                    with the requirements of 18 CFR
                                                                                                             authorized by the Connecticut                         385.2001 through 385.2005. All
                                                    [Project No. 2662–026]                                   Department of Energy and                              comments, motions to intervene, or
                                                                                                             Environmental Protection. Due to                      protests must set forth their evidentiary
                                                    FirstLight Hydro Generating Company;
                                                                                                             economic shifts, the licensee indicates               basis and otherwise comply with the
                                                    Notice of Application Accepted for
                                                                                                             that it is no longer feasible to install a            requirements of 18 CFR 4.34(b). All
                                                    Filing, Soliciting Comments, Motions
                                                                                                             low-flow turbine that had been                        comments, motions to intervene, or
                                                    to Intervene, and Protests
                                                                                                             paramount to being able to comply with                protests should relate to project
                                                      Take notice that the following                         the license conditions. The licensee                  operations, which are the subject of the
                                                    hydroelectric application has been filed                 requests this variance in order to                    variance. Agencies may obtain copies of
                                                    with the Commission and is available                     maintain compliance while determining                 the application directly from the
                                                                                                             an appropriate alternative operating                  applicant. A copy of any protest or
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    for public inspection:
                                                      a. Type of Application: Request for                    scenario.                                             motion to intervene must be served
                                                    Temporary Variance.                                         l. Locations of the Application: A                 upon each representative of the
                                                      b. Project No.: 2662–026.                              copy of the application is available for              applicant specified in the particular
                                                      c. Date Filed: June 30, 2015.                          inspection and reproduction at the                    application. If an intervener files
                                                      d. Applicant: FirstLight Hydro                         Commission’s Public Reference Room,                   comments or documents with the
                                                    Generating Company (licensee).                           located at 888 First Street NE., Room                 Commission relating to the merits of an
                                                      e. Name of Project: Scotland                           2A, Washington, DC 20426, or by calling               issue that may affect the responsibilities
                                                    Hydroelectric Project.                                   (202) 502–8371. This filing may also be               of a particular resource agency, they


                                               VerDate Sep<11>2014   19:59 Jul 23, 2015   Jkt 235001   PO 00000   Frm 00079   Fmt 4703   Sfmt 4703   E:\FR\FM\24JYN1.SGM   24JYN1


                                                    44098                            Federal Register / Vol. 80, No. 142 / Friday, July 24, 2015 / Notices

                                                    must also serve a copy of the document                   approved for a five-year period                       Secretary of Energy the power marketing
                                                    on that resource agency. A copy of all                   beginning on October 1, 2010, and                     functions of the Secretary of the
                                                    other filings in reference to this                       ending September 30, 2015.                            Department of the Interior and the
                                                    application must be accompanied by                          Western proposed extending the                     Bureau of Reclamation (Reclamation)
                                                    proof of service on all persons listed in                existing rate-setting formula pursuant to             under the Reclamation Act of 1902 (ch.
                                                    the service list prepared by the                         10 CFR part 903.23(a), Formula Rate                   1093, 32 Stat. 388), as amended and
                                                    Commission in this proceeding, in                        Schedule BCP–F9 under Rate Order No.                  supplemented by subsequent laws,
                                                    accordance with 18 CFR 4.34(b) and                       WAPA–171. The notice of proposed                      particularly section 9(c) of the
                                                    385.2010.                                                extension was published in the Federal                Reclamation Project Act of 1939 (43
                                                      Dated: July 17, 2015.                                  Register on February 9, 2015 (80 FR                   U.S.C. 485h(c)), and other acts that
                                                    Kimberly D. Bose,                                        6955). As allowed by 10 CFR part                      specifically apply to the project
                                                                                                             903.23(a), Western held a public                      involved.
                                                    Secretary.
                                                                                                             information forum and public comment                     By Delegation Order No. 00–037.00A,
                                                    [FR Doc. 2015–18108 Filed 7–23–15; 8:45 am]                                                                    effective October 25, 2013, the Secretary
                                                                                                             forum. The consultation and comment
                                                    BILLING CODE 6717–01–P                                                                                         of Energy delegated: (1) The authority to
                                                                                                             period ended May 11, 2015. All
                                                                                                             comments received during the comment                  develop power and transmission rates to
                                                                                                             period were considered in the                         the Administrator of Western Area
                                                    DEPARTMENT OF ENERGY                                                                                           Power Administration (Western); (2) the
                                                                                                             development of the final rates.
                                                    Western Area Power Administration                           By Delegation Order No. 00–037.00A,                authority to confirm, approve, and place
                                                                                                             effective October 25, 2013, the Secretary             such rates into effect on an interim basis
                                                    Boulder Canyon Project-Rate Order                        of Energy delegated: (1) The authority to             to the Deputy Secretary of Energy; and
                                                    No. WAPA–171                                             develop power and transmission rates to               (3) the authority to confirm, approve,
                                                                                                             the Administrator of Western Area                     and place into effect on a final basis, to
                                                    AGENCY:  Western Area Power                              Power Administration (Western); (2) the               remand or to disapprove such rates to
                                                    Administration, DOE.                                     authority to confirm, approve, and place              the Federal Energy Regulatory
                                                    ACTION: Notice of Extension of Existing                  such rates into effect on an interim basis            Commission (FERC). This extension is
                                                    Rate-setting Formula and Approval of                     to the Deputy Secretary of Energy; and                issued pursuant to the Delegation Order
                                                    Fiscal Year (FY) 2016 Base Charge and                    (3) the authority to confirm, approve,                and DOE rate extension procedures at
                                                    Rates.                                                   and place into effect on a final basis, to            10 CFR part 903.23(a).
                                                    SUMMARY:    This action extends the                      remand or to disapprove such rates to                 BACKGROUND
                                                    existing Boulder Canyon Project (BCP)                    the Federal Energy Regulatory
                                                                                                             Commission (FERC).                                       On December 9, 2010, in Docket No.
                                                    rate-setting formula through September                                                                         EF10–7–000 at 133 FERC ¶ 62,229,
                                                    30, 2020, and approves the base charge                      Following review of Western’s
                                                                                                             proposal within the Department of                     FERC issued an order confirming,
                                                    and rates for FY 2016. The existing                                                                            approving and placing into effect on a
                                                    Electric Service Rate Schedule, BCP–F8,                  Energy, I hereby approve Rate Order No.
                                                                                                             WAPA–171, which extends the existing                  final basis Electric Service Rate
                                                    is set to expire on September 30, 2015.                                                                        Schedule BCP–F8 for the Boulder
                                                    The Electric Service Rate Schedule                       rate-setting formula through September
                                                                                                             30, 2020, and approves the proposed                   Canyon Project (BCP). Electric Service
                                                    contains a rate-setting formula that is                                                                        Rate Schedule BCP–F8, Rate Order No.
                                                    recalculated annually based on updated                   BCP electric service base charge and
                                                                                                             rates for FY 2016. Rate Order No.                     WAPA–150, was approved for five years
                                                    financial and sales data.                                                                                      beginning October 1, 2010 through
                                                    DATES: The first day of the first full
                                                                                                             WAPA–171 will be submitted to FERC
                                                                                                             for confirmation and approval on a final              September 30, 2015.
                                                    billing period beginning on or after                                                                              Western followed the Procedures for
                                                    October 1, 2015, and extending through                   basis.
                                                                                                                                                                   Public Participation in Power and
                                                    September 30, 2020, or until superseded                    Dated: July 17, 2015.                               Transmission Rate Adjustments and
                                                    by another rate schedule, whichever                      Elizabeth Sherwood-Randall,                           Extensions set forth in 10 CFR part
                                                    occurs earlier.                                          Deputy Secretary.                                     903.23(a) in extending the BCP rate-
                                                    FOR FURTHER INFORMATION CONTACT: Mr.                                                                           setting formula through September 30,
                                                                                                             DEPARTMENT OF ENERGY
                                                    Ronald E. Moulton, Regional Manager,                                                                           2020, and setting the new base charge
                                                    Desert Southwest Customer Service                        DEPUTY SECRETARY                                      and rates for Fiscal Year (FY) 2016. The
                                                    Region, Western Area Power                                 In the matter of:                                   steps Western took to involve interested
                                                    Administration, P.O. Box 6457,                           Western Area Power Administration,                    parties in the rate process were:
                                                    Phoenix, AZ 85005–6457, (602) 605–                           Rate Extension for the Boulder                       1. On February 9, 2015, Western
                                                    2453, email moulton@wapa.gov, or Mr.                         Canyon Project, Electric Service                  published a notice in the Federal
                                                    Jack Murray, Rates Manager, Desert                           Formula Rate Schedule                             Register (80 FR 6955) announcing the
                                                    Southwest Customer Service Region,                       Rate Order No. WAPA–171                               extension of the rate-setting formula and
                                                    Western Area Power Administration,                                                                             the proposed base charge and rates for
                                                    P.O. Box 6457, Phoenix, AZ 85005–                        ORDER CONFIRMING AND                                  BCP. Publication of this notice initiated
                                                    6457, (602) 605–2442, email jmurray@                     APPROVING AN EXTENSION OF THE                         the public consultation and comment
                                                    wapa.gov.                                                BOULDER CANYON PROJECT                                period, and announced the public
                                                                                                             ELECTRIC SERVICE RATE-SETTING                         information and public comment
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    SUPPLEMENTARY INFORMATION: The
                                                                                                             FORMULA AND FY 2016 BASE                              forums. Western also announced the
                                                    existing Rate Schedule BCP–F8 under
                                                                                                             CHARGE AND RATES FORMULA                              public forum dates and posted the BCP
                                                    Rate Order No. WAPA–1501 was
                                                                                                             RATE SCHEDULE                                         rate adjustment at http://
                                                      1 FERC confirmed and approved Rate Order No.             These rates were established in                     www.wapa.gov/dsw/pwrmkt/BCP/
                                                    WAPA–150 on December 9, 2010, in Docket No.              accordance with Section 302 of the                    RateAdjust.htm.
                                                    EF10–7–000, See United States Department of              Department of Energy (DOE)                               2. On March 11, 2015, Western hosted
                                                    Energy, Western Area Power Administration,
                                                    Boulder Canyon Project, 133 FERC ¶ 62,229                Organization Act (42 U.S.C. 7152). This               an informal customer meeting in
                                                    (December 9, 2010).                                      act transferred to and vested in the                  Phoenix, Arizona. At this informal


                                               VerDate Sep<11>2014   19:59 Jul 23, 2015   Jkt 235001   PO 00000   Frm 00080   Fmt 4703   Sfmt 4703   E:\FR\FM\24JYN1.SGM   24JYN1



Document Created: 2018-02-23 09:25:17
Document Modified: 2018-02-23 09:25:17
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 44097 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR