[Federal Register Volume 80, Number 145 (Wednesday, July 29, 2015)]
[Notices]
[Pages 45208-45209]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-18479]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD15-29-000]


Dan Sullivan; Notice of Preliminary Determination of a Qualifying 
Conduit Hydropower Facility and Soliciting Comments and Motions To 
Intervene

    On June 30, 2015, Dan Sullivan filed a notice of intent to 
construct a qualifying conduit hydropower facility, pursuant to section 
30 of the Federal Power Act (FPA), as amended by section 4 of the 
Hydropower Regulatory Efficiency Act of 2013 (HREA). The proposed Drake 
Cottonwood Hydropower Project would have an installed capacity of 14 
kilowatts (kW) and would be located on the existing irrigation canal 
off Cottonwood Creek; 1.5 miles of the canal will be enclosed with a 
15-inch-diameter pipe. The project would be located near Hotchkiss in 
Delta County, Colorado.
    Applicant Contact: Dan Sullivan, 8301 Crawford Road, Hotchkiss, CO 
81419, Phone No. (970) 216-6925.
    FERC Contact: Robert Bell, Phone No. (202) 502-6062, email: 
[email protected].
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) 1.5 miles of 15-inch PVC pipe located on 
the existing irrigation canal off Cottonwood Creek; (2) a proposed 10-
foot-long by 12-foot-wide by 8-foot-high powerhouse containing four 
generating units with a total installed capacity of 14 kW; (3) a 4-
foot-long by 10-foot-wide tailrace returning flow back into the 
irrigation canal; and (4) appurtenant facilities. The proposed project 
would have an estimated annual generating capacity of 95 megawatt-
hours.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all of the criteria shown in the table below.

      Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
                                                          Satisfies  (Y/
      Statutory provision              Description              N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by   The conduit the                      Y
 HREA.                            facility uses a
                                  tunnel, canal,
                                  pipeline, aqueduct,
                                  flume, ditch, or
                                  similar manmade water
                                  conveyance that is
                                  operated for the
                                  distribution of water
                                  for agricultural,
                                  municipal, or
                                  industrial
                                  consumption and not
                                  primarily for the
                                  generation of
                                  electricity.
FPA 30(a)(3)(C)(i), as amended   The facility is                      Y
 by HREA.                         constructed,
                                  operated, or
                                  maintained for the
                                  generation of
                                  electric power and
                                  uses for such
                                  generation only the
                                  hydroelectric
                                  potential of a non-
                                  federally owned
                                  conduit.
FPA 30(a)(3)(C)(ii), as amended  The facility has an                  Y
 by HREA.                         installed capacity
                                  that does not exceed
                                  5 megawatts.
FPA 30(a)(3)(C)(iii), as         On or before August 9,               Y
 amended by HREA.                 2013, the facility is
                                  not licensed, or
                                  exempted from the
                                  licensing
                                  requirements of Part
                                  I of the FPA.
------------------------------------------------------------------------

    Preliminary Determination: Based upon the above criteria, 
Commission staff preliminarily determines that the proposal satisfies 
the requirements for a qualifying conduit hydropower facility, which is 
not required to be licensed or exempted from licensing.
    Comments and Motions to Intervene: Deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 45 
days from the issuance date of this notice.
    Deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2014).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/

[[Page 45209]]

ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. A copy of all other filings in 
reference to this application must be accompanied by proof of service 
on all persons listed in the service list prepared by the Commission in 
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at the Commission in its Public Reference Room, Room 2A, 
888 First Street NE., Washington, DC 20426. The filing may also be 
viewed on the web at http://www.ferc.gov/docs-filing/elibrary.asp using 
the ``eLibrary'' link. Enter the docket number (e.g., CD15-29-000) in 
the docket number field to access the document. For assistance, call 
toll-free 1-866-208-3676 or email [email protected]. For TTY, 
call (202) 502-8659.

    Dated: July 22, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-18479 Filed 7-28-15; 8:45 am]
BILLING CODE 6717-01-P



                                              45208                        Federal Register / Vol. 80, No. 145 / Wednesday, July 29, 2015 / Notices

                                              information collection should be sent to                  be sent to Mr. Licari at: Publication                 installed capacity of 14 kilowatts (kW)
                                              Ms. Seehra at the Office of Management                    Collections Program, WHS/ESD                          and would be located on the existing
                                              and Budget, Desk Officer for DoD, Room                    Information Management Division, 4800                 irrigation canal off Cottonwood Creek;
                                              10236, New Executive Office Building,                     Mark Center Drive, 2nd Floor, East                    1.5 miles of the canal will be enclosed
                                              Washington, DC 20503.                                     Tower, Suite 02G09, Alexandria, VA                    with a 15-inch-diameter pipe. The
                                                 You may also submit comments,                          22350–3100.                                           project would be located near Hotchkiss
                                              identified by docket number and title,                    Amy G. Williams,
                                                                                                                                                              in Delta County, Colorado.
                                              by the following method:                                                                                           Applicant Contact: Dan Sullivan,
                                                                                                        Editor, Defense Acquisition Regulations
                                                 Federal eRulemaking Portal: http://                    System.                                               8301 Crawford Road, Hotchkiss, CO
                                              www.regulations.gov. Follow the                                                                                 81419, Phone No. (970) 216–6925.
                                                                                                        [FR Doc. 2015–18590 Filed 7–28–15; 8:45 am]
                                              instructions for submitting comments.
                                                                                                        BILLING CODE 5001–06–P                                   FERC Contact: Robert Bell, Phone No.
                                                 Instructions: All submissions received
                                                                                                                                                              (202) 502–6062, email: robert.bell@
                                              must include the agency name, docket
                                                                                                                                                              ferc.gov.
                                              number, and title for the Federal
                                              Register document. The general policy                     DEPARTMENT OF ENERGY                                     Qualifying Conduit Hydropower
                                              for comments and other public                                                                                   Facility Description: The proposed
                                                                                                        Federal Energy Regulatory                             project would consist of: (1) 1.5 miles of
                                              submissions from members of the public                    Commission
                                              is to make these submissions available                                                                          15-inch PVC pipe located on the
                                              for public viewing on the Internet at                     [Docket No. CD15–29–000]                              existing irrigation canal off Cottonwood
                                              http://www.regulations.gov as they are                                                                          Creek; (2) a proposed 10-foot-long by 12-
                                              received without change, including any                    Dan Sullivan; Notice of Preliminary                   foot-wide by 8-foot-high powerhouse
                                              personal identifiers or contact                           Determination of a Qualifying Conduit                 containing four generating units with a
                                              information provided. To confirm                          Hydropower Facility and Soliciting                    total installed capacity of 14 kW; (3) a
                                              receipt of your comment(s), please                        Comments and Motions To Intervene                     4-foot-long by 10-foot-wide tailrace
                                              check http://www.regulations.gov                            On June 30, 2015, Dan Sullivan filed                returning flow back into the irrigation
                                              approximately two to three days after                     a notice of intent to construct a                     canal; and (4) appurtenant facilities. The
                                              submission to verify posting (except                      qualifying conduit hydropower facility,               proposed project would have an
                                              allow 30 days for posting of comments                     pursuant to section 30 of the Federal                 estimated annual generating capacity of
                                              submitted by mail).                                       Power Act (FPA), as amended by section                95 megawatt-hours.
                                                 DoD Public Collections Clearance                       4 of the Hydropower Regulatory                           A qualifying conduit hydropower
                                              Officer: Mr. Frederick C. Licari.                         Efficiency Act of 2013 (HREA). The                    facility is one that is determined or
                                                 Written requests for copies of the                     proposed Drake Cottonwood                             deemed to meet all of the criteria shown
                                              information collection proposal should                    Hydropower Project would have an                      in the table below.

                                                                                    TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                   Satisfies
                                                          Statutory provision                                                              Description                                              (Y/N)

                                              FPA 30(a)(3)(A), as amended by HREA ..               The conduit the facility uses a tunnel, canal, pipeline, aqueduct, flume, ditch, or                Y
                                                                                                     similar manmade water conveyance that is operated for the distribution of water
                                                                                                     for agricultural, municipal, or industrial consumption and not primarily for the gen-
                                                                                                     eration of electricity.
                                              FPA 30(a)(3)(C)(i), as amended by HREA               The facility is constructed, operated, or maintained for the generation of electric                Y
                                                                                                     power and uses for such generation only the hydroelectric potential of a non-fed-
                                                                                                     erally owned conduit.
                                              FPA 30(a)(3)(C)(ii), as amended                by    The facility has an installed capacity that does not exceed 5 megawatts.                           Y
                                                HREA.
                                              FPA 30(a)(3)(C)(iii), as amended               by    On or before August 9, 2013, the facility is not licensed, or exempted from the li-                Y
                                                HREA.                                               censing requirements of Part I of the FPA.



                                                Preliminary Determination: Based                        and Procedure, 18 CFR 385.210 and                     with the requirements of sections
                                              upon the above criteria, Commission                       385.214. Any motions to intervene must                385.2001 through 385.2005 of the
                                              staff preliminarily determines that the                   be received on or before the specified                Commission’s regulations.1 All
                                              proposal satisfies the requirements for a                 deadline date for the particular                      comments contesting Commission staff’s
                                              qualifying conduit hydropower facility,                   proceeding.                                           preliminary determination that the
                                              which is not required to be licensed or                                                                         facility meets the qualifying criteria
                                                                                                           Filing and Service of Responsive
                                              exempted from licensing.                                                                                        must set forth their evidentiary basis.
                                                Comments and Motions to Intervene:                      Documents: All filings must (1) bear in                  The Commission strongly encourages
                                              Deadline for filing comments contesting                   all capital letters the ‘‘COMMENTS                    electronic filing. Please file motions to
                                              whether the facility meets the qualifying                 CONTESTING QUALIFICATION FOR A                        intervene and comments using the
                                              criteria is 45 days from the issuance                     CONDUIT HYDROPOWER FACILITY’’                         Commission’s eFiling system at http://
tkelley on DSK3SPTVN1PROD with NOTICES




                                              date of this notice.                                      or ‘‘MOTION TO INTERVENE,’’ as                        www.ferc.gov/docs-filing/efiling.asp.
                                                Deadline for filing motions to                          applicable; (2) state in the heading the              Commenters can submit brief comments
                                              intervene is 30 days from the issuance                    name of the applicant and the project                 up to 6,000 characters, without prior
                                              date of this notice.                                      number of the application to which the                registration, using the eComment system
                                                Anyone may submit comments or a                         filing responds; (3) state the name,                  at http://www.ferc.gov/docs-filing/
                                              motion to intervene in accordance with                    address, and telephone number of the
                                              the requirements of Rules of Practice                     person filing; and (4) otherwise comply                 1 18   CFR 385.2001–2005 (2014).



                                         VerDate Sep<11>2014   17:33 Jul 28, 2015    Jkt 235001   PO 00000   Frm 00028   Fmt 4703   Sfmt 4703   E:\FR\FM\29JYN1.SGM    29JYN1


                                                                           Federal Register / Vol. 80, No. 145 / Wednesday, July 29, 2015 / Notices                                                  45209

                                              ecomment.asp. You must include your                         Description: § 205(d) Rate Filing:                   Dated: July 22, 2015.
                                              name and contact information at the end                  Eligibility for Start-Up Offer                        Nathaniel J. Davis,
                                              of your comments. For assistance,                        Cancellation Costs to be effective 10/1/              Deputy Secretary.
                                              please contact FERC Online Support at                    2015.                                                 [FR Doc. 2015–18566 Filed 7–28–15; 8:45 am]
                                              FERCOnlineSupport@ferc.gov, (866)                           Filed Date: 7/21/15.                               BILLING CODE 6717–01–P
                                              208–3676 (toll free), or (202) 502–8659                     Accession Number: 20150721–5149.
                                              (TTY). In lieu of electronic filing, please                 Comments Due: 5 p.m. ET 8/11/15.
                                              send a paper copy to: Secretary, Federal                    Docket Numbers: ER15–2236–000.                     DEPARTMENT OF ENERGY
                                              Energy Regulatory Commission, 888                           Applicants: Midwest Power
                                              First Street NE., Washington, DC 20426.                  Transmission Arkansas, LLC.                           Federal Energy Regulatory
                                              A copy of all other filings in reference                    Description: Baseline eTariff Filing:              Commission
                                              to this application must be accompanied                  Midwest Power Transmission Arkansas,
                                              by proof of service on all persons listed                LLC to be effective 9/21/2015.                        [Docket No. CD15–30–000]
                                              in the service list prepared by the                         Filed Date: 7/22/15.
                                              Commission in this proceeding, in                           Accession Number: 20150722–5001.                   Sweetwater Authority; Notice of
                                              accordance with 18 CFR 4.34(b) and                          Comments Due: 5 p.m. ET 8/12/15.                   Preliminary Determination of a
                                              385.2010.                                                                                                      Qualifying Conduit Hydropower
                                                Locations of Notice of Intent: Copies                     Docket Numbers: ER15–2237–000.                     Facility and Soliciting Comments and
                                              of the notice of intent can be obtained                     Applicants: Kanstar Transmission,                  Motions To Intervene
                                              directly from the applicant or such                      LLC.
                                              copies can be viewed and reproduced at                      Description: Baseline eTariff Filing:                 On July 14, 2015, Sweetwater
                                              the Commission in its Public Reference                   Kanstar Transmission, LLC to be                       Authority filed a notice of intent to
                                              Room, Room 2A, 888 First Street NE.,                     effective 9/21/2015.                                  construct a qualifying conduit
                                              Washington, DC 20426. The filing may                        Filed Date: 7/22/15.                               hydropower facility, pursuant to section
                                              also be viewed on the web at http://                        Accession Number: 20150722–5025.                   30 of the Federal Power Act (FPA), as
                                              www.ferc.gov/docs-filing/elibrary.asp                       Comments Due: 5 p.m. ET 8/12/15.                   amended by section 4 of the
                                              using the ‘‘eLibrary’’ link. Enter the                      Docket Numbers: ER15–2238–000.                     Hydropower Regulatory Efficiency Act
                                              docket number (e.g., CD15–29–000) in                        Applicants: PJM Interconnection,                   of 2013 (HREA). The proposed Perdue
                                              the docket number field to access the                    L.L.C.                                                Water Treatment Plant Hydroelectric
                                              document. For assistance, call toll-free                    Description: Tariff Cancellation:                  Project would have an installed capacity
                                              1–866–208–3676 or email                                  Notice of Cancellation of WMPA SA No.                 of 700 kilowatts (kW) and would be
                                              FERCOnlineSupport@ferc.gov. For TTY,                     3412, Queue No. X3–011 to be effective                located on San Diego County Water
                                              call (202) 502–8659.                                     6/20/2015.                                            Authority’s existing raw water Pipeline
                                                                                                          Filed Date: 7/22/15.                               3, which carries raw water to a 24-inch
                                                Dated: July 22, 2015.                                                                                        diameter turnout pipe which in turn
                                                                                                          Accession Number: 20150722–5042.
                                              Kimberly D. Bose,                                                                                              transports water into the Perdue Water
                                                                                                          Comments Due: 5 p.m. ET 8/12/15.
                                              Secretary.                                                                                                     Treatment Plant. The project would be
                                                                                                          Docket Numbers: ER15–2239–000.
                                              [FR Doc. 2015–18479 Filed 7–28–15; 8:45 am]                                                                    located near Spring Valley in San Diego
                                                                                                          Applicants: NextEra Energy
                                              BILLING CODE 6717–01–P                                                                                         County, California.
                                                                                                       Transmission West, LLC.
                                                                                                                                                                Applicant Contact: Scott McClelland,
                                                                                                          Description: Baseline eTariff Filing:
                                                                                                                                                             Sweetwater Authority, 100 Lakeview
                                              DEPARTMENT OF ENERGY                                     NextEra Energy Transmission West, LLC
                                                                                                                                                             Avenue, Spring Valley, CA 91977,
                                                                                                       Transmission Owner Tariff to be
                                                                                                                                                             Phone No. (619) 409–1413.
                                              Federal Energy Regulatory                                effective 10/20/2015.
                                                                                                                                                                FERC Contact: Robert Bell, Phone No.
                                              Commission                                                  Filed Date: 7/22/15.
                                                                                                                                                             (202) 502–6062, email: robert.bell@
                                                                                                          Accession Number: 20150722–5051.                   ferc.gov.
                                              Combined Notice of Filings #1                               Comments Due: 5 p.m. ET 8/12/15.                      Qualifying Conduit Hydropower
                                                 Take notice that the Commission                          The filings are accessible in the                  Facility Description: The proposed
                                              received the following electric rate                     Commission’s eLibrary system by                       project would consist of: (1) A proposed
                                              filings:                                                 clicking on the links or querying the                 32-foot-long, 16-inch diameter pipe to
                                                 Docket Numbers: ER15–2191–000.                        docket number.                                        generating unit one and a proposed 23-
                                                 Applicants: Grant Wind, LLC.                             Any person desiring to intervene or                foot-long, 14-inch-diameter pipe to
                                                 Description: Supplement to July 13,                   protest in any of the above proceedings               generating unit two; (2) a proposed
                                              2015 Grant Wind, LLC tariff filing.                      must file in accordance with Rules 211                powerhouse containing two generating
                                                 Filed Date: 7/21/15.                                  and 214 of the Commission’s                           units with a total installed capacity of
                                                 Accession Number: 20150721–5154.                      Regulations (18 CFR 385.211 and                       700 kW; (3) a proposed 10-foot-long, 16-
                                                 Comments Due: 5 p.m. ET 8/3/15.                       385.214) on or before 5:00 p.m. Eastern               inch diameter pipe from unit one and a
                                                 Docket Numbers: ER15–2234–000.                        time on the specified comment date.                   proposed 23-foot-long, 16-inch-diameter
                                                 Applicants: Rochester Gas and                         Protests may be considered, but                       pipe which merge into a proposed 11-
                                              Electric Corporation.                                    intervention is necessary to become a                 foot-long, 24-inch-diameter discharge
                                                 Description: § 205(d) Rate Filing:                    party to the proceeding.                              pipe into the treatment plant; and (4)
                                              RGE–RED Borderline Service Agreement                        eFiling is encouraged. More detailed               appurtenant facilities. The proposed
tkelley on DSK3SPTVN1PROD with NOTICES




                                              to be effective 7/22/2015.                               information relating to filing                        project would have an estimated annual
                                                 Filed Date: 7/21/15.                                  requirements, interventions, protests,                generating capacity of 3,784 megawatt-
                                                 Accession Number: 20150721–5148.                      service, and qualifying facilities filings            hours.
                                                 Comments Due: 5 p.m. ET 8/11/15.                      can be found at: http://www.ferc.gov/                    A qualifying conduit hydropower
                                                 Docket Numbers: ER15–2235–000.                        docs-filing/efiling/filing-req.pdf. For               facility is one that is determined or
                                                 Applicants: Southwest Power Pool,                     other information, call (866) 208–3676                deemed to meet all of the criteria shown
                                              Inc.                                                     (toll free). For TTY, call (202) 502–8659.            in the table below.


                                         VerDate Sep<11>2014   17:33 Jul 28, 2015   Jkt 235001   PO 00000   Frm 00029   Fmt 4703   Sfmt 4703   E:\FR\FM\29JYN1.SGM   29JYN1



Document Created: 2015-12-15 13:05:43
Document Modified: 2015-12-15 13:05:43
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 45208 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR