80_FR_45708 80 FR 45562 - Open Phase Conditions in Electric Power System

80 FR 45562 - Open Phase Conditions in Electric Power System

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 80, Issue 146 (July 30, 2015)

Page Range45562-45563
FR Document2015-18634

The U.S. Nuclear Regulatory Commission (NRC) is issuing a final version of Branch Technical Position (BTP) 8-9, ``Open Phase Conditions in Electric Power System,'' of NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition.''

Federal Register, Volume 80 Issue 146 (Thursday, July 30, 2015)
[Federal Register Volume 80, Number 146 (Thursday, July 30, 2015)]
[Notices]
[Pages 45562-45563]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-18634]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2014-0131]


Open Phase Conditions in Electric Power System

AGENCY: Nuclear Regulatory Commission.

ACTION: Branch technical position-final; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing a 
final version of Branch Technical Position (BTP) 8-9, ``Open Phase 
Conditions in Electric Power System,'' of NUREG-0800, ``Standard Review 
Plan for the Review of Safety Analysis Reports for Nuclear Power 
Plants: LWR Edition.''

DATES: The effective date of this Branch Technical Position is August 
31, 2015.

ADDRESSES: Please refer to Docket ID NRC-2014-0131 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2014-0131. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced in this notice (if 
that document is available in ADAMS) is provided the first time that a 
document is referenced. The final version for BTP 8-9, ``Open Phase 
Conditions in Electric Power System,'' is available under ADAMS 
Accession No. ML15057A085. A redline strikeout comparing the proposed 
and final revision of the document can be found in ADAMS under 
Accession No. ML15056A316.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.
     The NRC posts its issued staff guidance on the NRC's 
external Web page (http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr0800/).

FOR FURTHER INFORMATION CONTACT: Mark D. Notich, Office of New 
Reactors,

[[Page 45563]]

U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, 
telephone: 301-415-6992, email: [email protected].

SUPPLEMENTARY INFORMATION:

I. Background

    On June 5, 2014 (79 FR 32580), the NRC published for public comment 
the proposed version of BTP 8-9, ``Open Phase Conditions in Electric 
Power System,'' in Chapter 8, ``Electrical Power,'' of NUREG-0800. The 
staff received many comments on the draft BTP. A summary of the 
comments and the staff's disposition of the comments are available in a 
separate document, ``Response to Public Comments on Draft Standard 
Review Plan, BTP 8-9, Open Phase Conditions in Electric Power System'' 
(ADAMS Accession No. ML15056A521). The BTP is guidance to the NRC Staff 
for reviewing applications for licenses for nuclear power reactors 
under 10 CFR parts 50 and 52 and amendments to licenses issued under 
parts 50 and 52. The NRC Staff intends to reference the BTP in NUREG-
0800 for the same purpose.

II. Backfitting and Issue Finality

    Branch Technical Position 8-9 provides guidance to the staff for 
reviewing applications for a construction permit and an operating 
license under part 50 of Title 10 of the Code of Federal Regulations 
(10 CFR), ``Domestic Licensing of Production and Utilization 
Facilities,'' with respect to compliance with General Design Criteria 
17, ``Electric Power Systems,'' of Appendix A, ``General Design 
Criteria for Nuclear Power Plants.'' BTP 8-9 also provides guidance for 
reviewing an application for a standard design approval, a standard 
design certification, a combined license, and a manufacturing license 
under 10 CFR part 52, ``Licenses, Certifications, and Approvals for 
Nuclear Power Plants,'' with respect to those same subject matters.
    Issuance of BTP 8-9 does not constitute backfitting as defined in 
10 CFR 50.109 (the Backfit Rule) nor is it inconsistent with the issue 
finality provisions in 10 CFR part 52. The NRC's position is based upon 
the following considerations.

1. The BTP 8-9 Positions Would Not Constitute Backfitting, Inasmuch as 
the SRP Is Internal Guidance to NRC Staff

    The BTP provides internal guidance to the NRC staff on how to 
review an application for NRC regulatory approval in the form of 
licensing. Changes in internal staff guidance are not matters for which 
either nuclear power plant applicants or licensees are protected under 
either the Backfit Rule or the issue finality provisions of 10 CFR part 
52.

2. Application of BTP 8-9 to Existing Licensees

    The NRC staff may consider imposing the positions described in the 
BTP on existing licenses, the NRC staff will address backfit 
considerations in any plant-specific action it takes. If, in the 
future, the NRC staff seeks to impose a position in the BTP on holders 
of already issued licenses in a manner that does not provide issue 
finality as described in the applicable issue finality provision, then 
the staff must make the showing as set forth in the Backfit Rule or 
address the criteria for avoiding issue finality as described in the 
applicable issue finality provision.

3. Backfitting and Issue Finality Do Not--With Limited Exceptions Not 
Applicable Here--Protect Current or Future Applicants

    Applicants and potential applicants are not, with certain 
exceptions, protected by either the Backfit Rule or any issue finality 
provisions under 10 CFR part 52. Neither the Backfit Rule nor the issue 
finality provisions under 10 CFR part 52--with certain exclusions--were 
intended to apply to every NRC action that substantially changes the 
expectations of current and future applicants.
    The exceptions to the general principle are applicable whenever an 
applicant references a 10 CFR part 52 license (e.g., an early site 
permit) or NRC regulatory approval (e.g., a design certification rule) 
with specified issue finality provisions. The NRC staff does not, at 
this time, intend to impose the positions represented in the SRP in a 
manner that is inconsistent with any issue finality provisions. If, in 
the future, the staff seeks to impose a position in the BTP section in 
a manner that does not provide issue finality as described in the 
applicable issue finality provision, then the staff must address the 
criteria for avoiding issue finality as described in the applicable 
issue finality provision.

III. Congressional Review Act

    This action is a rule as defined in the Congressional Review Act (5 
U.S.C. 801-808). However, the Office of Management and Budget has not 
found it to be a major rule as defined in the Congressional Review Act.

    Dated at Rockville, Maryland, this 22nd day of July 2015.

    For the Nuclear Regulatory Commission.
Lawrence Burkhart,
Acting Chief, New Reactor Rulemaking and Guidance Branch, Division of 
Advanced Reactors and Rulemaking, Office of New Reactors.
[FR Doc. 2015-18634 Filed 7-29-15; 8:45 am]
 BILLING CODE 7590-01-P



                                             45562                          Federal Register / Vol. 80, No. 146 / Thursday, July 30, 2015 / Notices

                                             available on the NRC’s public Web site                   delivery service upon depositing the                  ACTION:Branch technical position-final;
                                             at http://www.nrc.gov/site-help/e-                       document with the provider of the                     issuance.
                                             submittals.html. A filing is considered                  service. A presiding officer, having
                                             complete at the time the documents are                   granted an exemption request from                     SUMMARY:   The U.S. Nuclear Regulatory
                                             submitted through the NRC’s E-Filing                     using E-Filing, may require a participant             Commission (NRC) is issuing a final
                                             system. To be timely, an electronic                      or party to use E-Filing if the presiding             version of Branch Technical Position
                                             filing must be submitted to the E-Filing                 officer subsequently determines that the              (BTP) 8–9, ‘‘Open Phase Conditions in
                                             system no later than 11:59 p.m. Eastern                  reason for granting the exemption from                Electric Power System,’’ of NUREG–
                                             Time on the due date. Upon receipt of                    use of E-Filing no longer exists.                     0800, ‘‘Standard Review Plan for the
                                             a transmission, the E-Filing system                         Documents submitted in adjudicatory                Review of Safety Analysis Reports for
                                             time-stamps the document and sends                       proceedings will appear in the NRC’s                  Nuclear Power Plants: LWR Edition.’’
                                             the submitter an email notice                            electronic hearing docket which is                    DATES: The effective date of this Branch
                                             confirming receipt of the document. The                  available to the public at http://                    Technical Position is August 31, 2015.
                                             E-Filing system also distributes an email                ehd1.nrc.gov/ehd/, unless excluded                    ADDRESSES: Please refer to Docket ID
                                             notice that provides access to the                       pursuant to an order of the Commission,               NRC–2014–0131 when contacting the
                                             document to the NRC’s Office of the                      or the presiding officer. Participants are            NRC about the availability of
                                             General Counsel and any others who                       requested not to include personal                     information regarding this document.
                                             have advised the Office of the Secretary                 privacy information, such as social                   You may obtain publicly-available
                                             that they wish to participate in the                     security numbers, home addresses, or                  information related to this document
                                             proceeding, so that the filer need not                   home phone numbers in their filings,                  using any of the following methods:
                                             serve the documents on those                             unless an NRC regulation or other law                    • Federal Rulemaking Web site: Go to
                                             participants separately. Therefore,                      requires submission of such                           http://www.regulations.gov and search
                                             applicants and other participants (or                    information. However, in some                         for Docket ID NRC–2014–0131. Address
                                             their counsel or representative) must                    instances, a request to intervene will                questions about NRC dockets to Carol
                                             apply for and receive a digital ID                       require including information on local                Gallagher; telephone: 301–415–3463;
                                             certificate before a hearing request/                    residence in order to demonstrate a                   email: Carol.Gallagher@nrc.gov. For
                                             petition to intervene is filed so that they              proximity assertion of interest in the                technical questions, contact the
                                             can obtain access to the document via                    proceeding. With respect to copyrighted               individual listed in the FOR FURTHER
                                             the E-Filing system.                                     works, except for limited excerpts that               INFORMATION CONTACT section of this
                                                A person filing electronically using                  serve the purpose of the adjudicatory                 document.
                                             the NRC’s adjudicatory E-Filing system                   filings and would constitute a Fair Use                  • NRC’s Agencywide Documents
                                             may seek assistance by contacting the                    application, participants are requested               Access and Management System
                                             NRC Meta System Help Desk through                        not to include copyrighted materials in               (ADAMS): You may obtain publicly
                                             the ‘‘Contact Us’’ link located on the                   their submission.                                     available documents online in the
                                             NRC’s public Web site at http://                            For further details with respect to this           ADAMS Public Documents collection at
                                             www.nrc.gov/site-help/e-                                 action, see the application for license               http://www.nrc.gov/reading-rm/
                                             submittals.html, by email to                             amendment dated August 11, 2014                       adams.html. To begin the search, select
                                             MSHD.Resource@nrc.gov, or by a toll-                     (ADAMS Accession No. ML14223A780),                    ‘‘ADAMS Public Documents’’ and then
                                             free call at 1–866–672–7640. The NRC                     as supplemented by letters dated April                select ‘‘Begin Web-based ADAMS
                                             Meta System Help Desk is available
                                                                                                      6, 2015 (ADAMS Accession No.                          Search.’’ For problems with ADAMS,
                                             between 8 a.m. and 8 p.m., Eastern
                                                                                                      ML15097A386), and July 16, 2015                       please contact the NRC’s Public
                                             Time, Monday through Friday,
                                                                                                      (ADAMS Accession No. ML15197A256).                    Document Room (PDR) reference staff at
                                             excluding government holidays.
                                                Participants who believe that they                       Attorney for licensee: Damon D. Obie,              1–800–397–4209, 301–415–4737, or by
                                             have a good cause for not submitting                     Associate General Counsel, Talen                      email to pdr.resource@nrc.gov. The
                                             documents electronically must file an                    Energy Supply, LLC, 835 Hamilton St.,                 ADAMS accession number for each
                                             exemption request, in accordance with                    Suite 150, Allentown, PA 18101.                       document referenced in this notice (if
                                             10 CFR 2.302(g), with their initial paper                   NRC Branch Chief: Douglas A.                       that document is available in ADAMS)
                                             filing requesting authorization to                       Broaddus.                                             is provided the first time that a
                                             continue to submit documents in paper                       Dated at Rockville, Maryland, this 23rd day        document is referenced. The final
                                             format. Such filings must be submitted                   of July 2015.                                         version for BTP 8–9, ‘‘Open Phase
                                             by: (1) First class mail addressed to the                   For the Nuclear Regulatory Commission.             Conditions in Electric Power System,’’
                                             Office of the Secretary of the                           Jeffrey A. Whited,                                    is available under ADAMS Accession
                                             Commission, U.S. Nuclear Regulatory                                                                            No. ML15057A085. A redline strikeout
                                                                                                      Project Manager, Plant Licensing Branch I–
                                             Commission, Washington, DC 20555–                        2, Division of Operating Reactor Licensing,           comparing the proposed and final
                                             0001, Attention: Rulemaking and                          Office of Nuclear Reactor Regulation.                 revision of the document can be found
                                             Adjudications Staff; or (2) courier,                     [FR Doc. 2015–18733 Filed 7–29–15; 8:45 am]
                                                                                                                                                            in ADAMS under Accession No.
                                             express mail, or expedited delivery                                                                            ML15056A316.
                                                                                                      BILLING CODE 7590–01–P
                                             service to the Office of the Secretary,                                                                           • NRC’s PDR: You may examine and
                                             Sixteenth Floor, One White Flint North,                                                                        purchase copies of public documents at
                                             11555 Rockville Pike, Rockville,                         NUCLEAR REGULATORY                                    the NRC’s PDR, Room O1–F21, One
                                             Maryland 20852, Attention: Rulemaking                    COMMISSION                                            White Flint North, 11555 Rockville
Lhorne on DSK7TPTVN1PROD with NOTICES




                                             and Adjudications Staff. Participants                                                                          Pike, Rockville, Maryland 20852.
                                             filing a document in this manner are                     [NRC–2014–0131]                                          • The NRC posts its issued staff
                                             responsible for serving the document on                                                                        guidance on the NRC’s external Web
                                                                                                      Open Phase Conditions in Electric                     page (http://www.nrc.gov/reading-rm/
                                             all other participants. Filing is                        Power System
                                             considered complete by first-class mail                                                                        doc-collections/nuregs/staff/sr0800/).
                                             as of the time of deposit in the mail, or                AGENCY:Nuclear Regulatory                             FOR FURTHER INFORMATION CONTACT:
                                             by courier, express mail, or expedited                   Commission.                                           Mark D. Notich, Office of New Reactors,


                                        VerDate Sep<11>2014   14:54 Jul 29, 2015   Jkt 235001   PO 00000   Frm 00062   Fmt 4703   Sfmt 4703   E:\FR\FM\30JYN1.SGM   30JYN1


                                                                            Federal Register / Vol. 80, No. 146 / Thursday, July 30, 2015 / Notices                                                 45563

                                             U.S. Nuclear Regulatory Commission,                      applicants or licensees are protected                   For the Nuclear Regulatory Commission.
                                             Washington, DC 20555–0001, telephone:                    under either the Backfit Rule or the                  Lawrence Burkhart,
                                             301–415–6992, email: Mark.Notich@                        issue finality provisions of 10 CFR part              Acting Chief, New Reactor Rulemaking and
                                             nrc.gov.                                                 52.                                                   Guidance Branch, Division of Advanced
                                                                                                                                                            Reactors and Rulemaking, Office of New
                                             SUPPLEMENTARY INFORMATION:                               2. Application of BTP 8–9 to Existing                 Reactors.
                                             I. Background                                            Licensees                                             [FR Doc. 2015–18634 Filed 7–29–15; 8:45 am]
                                                On June 5, 2014 (79 FR 32580), the                       The NRC staff may consider imposing                BILLING CODE 7590–01–P
                                             NRC published for public comment the                     the positions described in the BTP on
                                             proposed version of BTP 8–9, ‘‘Open                      existing licenses, the NRC staff will
                                             Phase Conditions in Electric Power                                                                             NUCLEAR REGULATORY
                                                                                                      address backfit considerations in any
                                             System,’’ in Chapter 8, ‘‘Electrical                                                                           COMMISSION
                                                                                                      plant-specific action it takes. If, in the
                                             Power,’’ of NUREG–0800. The staff                        future, the NRC staff seeks to impose a               [Docket No. 50–286; NRC–2012–0236]
                                             received many comments on the draft                      position in the BTP on holders of
                                             BTP. A summary of the comments and                       already issued licenses in a manner that              Entergy Nuclear Operations, Inc.;
                                             the staff’s disposition of the comments                  does not provide issue finality as                    Indian Point Nuclear Generating, Unit
                                             are available in a separate document,                    described in the applicable issue finality            No. 3
                                             ‘‘Response to Public Comments on Draft                   provision, then the staff must make the               AGENCY:  Nuclear Regulatory
                                             Standard Review Plan, BTP 8–9, Open                      showing as set forth in the Backfit Rule              Commission.
                                             Phase Conditions in Electric Power                       or address the criteria for avoiding issue
                                             System’’ (ADAMS Accession No.                                                                                  ACTION: License amendment application;
                                                                                                      finality as described in the applicable               withdrawal by applicant.
                                             ML15056A521). The BTP is guidance to                     issue finality provision.
                                             the NRC Staff for reviewing applications                                                                       SUMMARY:   The Nuclear Regulatory
                                             for licenses for nuclear power reactors                  3. Backfitting and Issue Finality Do
                                                                                                                                                            Commission (NRC) has granted the
                                             under 10 CFR parts 50 and 52 and                         Not—With Limited Exceptions Not
                                                                                                                                                            request of Entergy Nuclear Operations,
                                             amendments to licenses issued under                      Applicable Here—Protect Current or
                                                                                                                                                            Inc., to withdraw its application dated
                                             parts 50 and 52. The NRC Staff intends                   Future Applicants
                                                                                                                                                            August 14, 2012, for a proposed
                                             to reference the BTP in NUREG–0800                                                                             amendment to Facility Operating
                                             for the same purpose.                                       Applicants and potential applicants
                                                                                                      are not, with certain exceptions,                     License No. DPR–64 for Indian Point
                                             II. Backfitting and Issue Finality                       protected by either the Backfit Rule or               Nuclear Generating, Unit No. 3. The
                                                Branch Technical Position 8–9                         any issue finality provisions under 10                proposed change would have changed
                                             provides guidance to the staff for                       CFR part 52. Neither the Backfit Rule                 the licensing basis for the emergency
                                             reviewing applications for a                             nor the issue finality provisions under               diesel generator fuel oil storage tank
                                             construction permit and an operating                     10 CFR part 52—with certain                           requirements, revised Technical
                                             license under part 50 of Title 10 of the                 exclusions—were intended to apply to                  Specification (TS) 3.8.3, ‘‘Diesel Fuel
                                             Code of Federal Regulations (10 CFR),                    every NRC action that substantially                   Oil, and Starting Air,’’ and relocated the
                                             ‘‘Domestic Licensing of Production and                   changes the expectations of current and               specific numerical values for fuel oil
                                             Utilization Facilities,’’ with respect to                future applicants.                                    storage requirements from the TSs to the
                                             compliance with General Design Criteria                                                                        TS Bases in accordance with Technical
                                                                                                         The exceptions to the general
                                             17, ‘‘Electric Power Systems,’’ of                                                                             Specification Task Force (TSTF)
                                                                                                      principle are applicable whenever an
                                             Appendix A, ‘‘General Design Criteria                                                                          Traveler TSTF–501, Revision 1,
                                                                                                      applicant references a 10 CFR part 52
                                             for Nuclear Power Plants.’’ BTP 8–9 also                                                                       ‘‘Relocate Stored Fuel Oil and Lube Oil
                                                                                                      license (e.g., an early site permit) or
                                             provides guidance for reviewing an                                                                             Volume Values to Licensee Control.’’
                                                                                                      NRC regulatory approval (e.g., a design
                                             application for a standard design                                                                              ADDRESSES: Please refer to Docket ID
                                                                                                      certification rule) with specified issue
                                             approval, a standard design                              finality provisions. The NRC staff does               NRC–2012–0236 when contacting the
                                             certification, a combined license, and a                 not, at this time, intend to impose the               NRC about the availability of
                                             manufacturing license under 10 CFR                       positions represented in the SRP in a                 information regarding this document.
                                             part 52, ‘‘Licenses, Certifications, and                 manner that is inconsistent with any                  You may obtain publicly-available
                                             Approvals for Nuclear Power Plants,’’                    issue finality provisions. If, in the                 information related to this document
                                             with respect to those same subject                       future, the staff seeks to impose a                   using any of the following methods:
                                             matters.                                                                                                          • Federal Rulemaking Web site: Go to
                                                                                                      position in the BTP section in a manner
                                                Issuance of BTP 8–9 does not                                                                                http://www.regulations.gov and search
                                                                                                      that does not provide issue finality as
                                             constitute backfitting as defined in 10                                                                        for Docket ID NRC–2012–0236. Address
                                                                                                      described in the applicable issue finality
                                             CFR 50.109 (the Backfit Rule) nor is it                                                                        questions about NRC dockets to Carol
                                                                                                      provision, then the staff must address
                                             inconsistent with the issue finality                                                                           Gallagher; telephone: 301–415–3463;
                                                                                                      the criteria for avoiding issue finality as
                                             provisions in 10 CFR part 52. The NRC’s                                                                        email: Carol.Gallagher@nrc.gov. For
                                                                                                      described in the applicable issue finality
                                             position is based upon the following                                                                           technical questions, contact the
                                                                                                      provision.
                                             considerations.                                                                                                individual listed in the FOR FURTHER
                                                                                                      III. Congressional Review Act                         INFORMATION CONTACT section of this
                                             1. The BTP 8–9 Positions Would Not                                                                             document.
                                             Constitute Backfitting, Inasmuch as the                     This action is a rule as defined in the               • NRC’s Agencywide Documents
                                             SRP Is Internal Guidance to NRC Staff
Lhorne on DSK7TPTVN1PROD with NOTICES




                                                                                                      Congressional Review Act (5 U.S.C.                    Access and Management System
                                                The BTP provides internal guidance                    801–808). However, the Office of                      (ADAMS): You may obtain publicly
                                             to the NRC staff on how to review an                     Management and Budget has not found                   available documents online in the
                                             application for NRC regulatory approval                  it to be a major rule as defined in the               ADAMS Public Documents collection at
                                             in the form of licensing. Changes in                     Congressional Review Act.                             http://www.nrc.gov/reading-rm/
                                             internal staff guidance are not matters                    Dated at Rockville, Maryland, this 22nd             adams.html. To begin the search, select
                                             for which either nuclear power plant                     day of July 2015.                                     ‘‘ADAMS Public Documents’’ and then


                                        VerDate Sep<11>2014   14:54 Jul 29, 2015   Jkt 235001   PO 00000   Frm 00063   Fmt 4703   Sfmt 4703   E:\FR\FM\30JYN1.SGM   30JYN1



Document Created: 2018-02-23 09:30:11
Document Modified: 2018-02-23 09:30:11
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionBranch technical position-final; issuance.
DatesThe effective date of this Branch Technical Position is August 31, 2015.
ContactMark D. Notich, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, telephone: 301-415-6992, email: [email protected]
FR Citation80 FR 45562 