In compliance with the requirements of the Paperwork Reduction Act of 1995, 44 U.S.C. 3506(c)(2)(A), the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC-914 (Cogeneration and Small Power Production--Tariff Filings).

Federal Register, Volume 80 Issue 149 (Tuesday, August 4, 2015)
[Federal Register Volume 80, Number 149 (Tuesday, August 4, 2015)]
[Notices]
[Pages 46256-46257]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-19056]



[[Page 46256]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. IC15-11-000]


Commission Information Collection Activities (Ferc-914); Comment 
Request; Extension

AGENCY: Federal Energy Regulatory Commission. DOE.

ACTION: Notice of information collection and request for comments.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, 44 U.S.C. 3506(c)(2)(A), the Federal Energy Regulatory 
Commission (Commission or FERC) is soliciting public comment on the 
currently approved information collection, FERC-914 (Cogeneration and 
Small Power Production--Tariff Filings).

DATES: Comments on the collection of information are due October 5, 
2015.

ADDRESSES: You may submit comments (identified by Docket No. IC15-11-
000) by either of the following methods:
     eFiling at Commission's Web site: http://www.ferc.gov/docs-filing/efiling.asp.
     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE., 
Washington, DC 20426.
    Instructions: All submissions must be formatted and filed in 
accordance with submission guidelines at: http://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support 
by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208-3676 
(toll-free), or (202) 502-8659 for TTY.
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at http://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at 
DataClearance@FERC.gov, telephone at (202) 502-8663, and fax at (202) 
273-0873.

SUPPLEMENTARY INFORMATION: 
    Title: FERC-914, Cogeneration and Small Power Production--Tariff 
Filings.
    OMB Control No.: 1902-0231.
    Type of Request: Three-year extension of the FERC-914 information 
collection requirements with no changes to the current reporting 
requirements.
    Abstract: Section 205(c) of the Federal Power Act (FPA) requires 
that every public utility have all of its jurisdictional rates and 
tariffs on file with the Commission and make them available for public 
inspection, within such time and in such form as the Commission may 
designate. Section 205(d) of the FPA requires that every public utility 
must provide notice to the Commission and the public of any changes to 
its jurisdictional rates and tariffs, file such changes with the 
Commission, and make them available for public inspection, in such 
manner as directed by the Commission. In addition, FPA section 206 
requires the Commission, upon complaint or its own motion, to modify 
existing rates or services that are found to be unjust, unreasonable, 
unduly discriminatory or preferential. FPA section 207 requires the 
Commission upon complaint by a state commission and a finding of 
insufficient interstate service, to order the rendering of adequate 
interstate service by public utilities, the rates for which would be 
filed in accordance with FPA sections 205 and 206.
    In Orders Nos. 671 and 671-A,\1\ the Commission revised its 
regulations that govern qualifying small power production and 
cogeneration facilities. Among other things, the Commission eliminated 
certain exemptions from rate regulation that were previously available 
to qualifying facilities (QFs). New qualifying facilities may need to 
make tariff filings if they do not meet the new exemption requirements.
---------------------------------------------------------------------------

    \1\ Revised Regulations Governing Small Power Production and 
Cogeneration Facilities, Order No. 671, 71 FR 7852 (2/15/2006), FERC 
Stats. & Regs. ] 31,203 (2006); and Revised Regulations Governing 
Small Power Production and Cogeneration Facilities, Order 671-A, 71 
FR 30585 (5/30/2006), in Docket No. RM05-36.
---------------------------------------------------------------------------

    FERC implemented the Congressional mandate of the Energy Policy Act 
of 2005 (EPAct 2005) to establish criteria for new qualifying 
cogeneration facilities by: (1) Amending the exemptions available to 
qualifying facilities from the FPA and from PUHCA [resulting in the 
burden imposed by FERC-914, the subject of this statement]; (2) 
ensuring that these facilities are using their thermal output in a 
productive and beneficial manner; that the electrical, thermal, 
chemical and mechanical output of new qualifying cogeneration 
facilities is used fundamentally for industrial, commercial, 
residential or industrial purposes; and there is continuing progress in 
the development of efficient electric energy generating technology; (3) 
amending the FERC Form 556 \2\ to reflect the criteria for new 
qualifying cogeneration facilities; and (4) eliminating ownership 
limitations for qualifying cogeneration and small power production 
facilities. The Commission satisfied the statutory mandate and its 
continuing obligation to review its policies encouraging cogeneration 
and small power production, energy conservation, efficient use of 
facilities and resources by electric utilities, and equitable rates for 
energy customers.
---------------------------------------------------------------------------

    \2\ The FERC-556 is cleared separately as OMB Control No. 1902-
0075 and is not a subject of this notice.
---------------------------------------------------------------------------

    Type of Respondents: New qualifying facilities and small power 
producers that do not meet Commission exemption criteria.
    Estimate of Annual Burden: \3\ The Commission estimates the annual 
public reporting burden for the information collection as:
---------------------------------------------------------------------------

    \3\ The Commission defines burden as the total time, effort, or 
financial resources expended by persons to generate, maintain, 
retain, or disclose or provide information to or for a Federal 
agency. For further explanation of what is included in the 
information collection burden, reference 5 Code of Federal 
Regulations 1320.3.

                                            FERC-914: Cogeneration and Small Power Production--Tariff Filings
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                           Total annual
                                                             Number of     Annual number   Total number   Average burden  burden hours &     Cost per
                                                            respondents    of responses    of responses    and cost per    total annual   respondent ($)
                                                                          per respondent                   response \4\        cost
                                                                     (1)             (2)     (1) * (2) =             (4)     (3) * (4) =       (5) / (1)
                                                                                                     (3)                             (5)
--------------------------------------------------------------------------------------------------------------------------------------------------------
FPA Section 205 Filings.................................              35               1              35             183           6,405         $13,176
                                                                                                                 $13,176        $461,160
Electric Quarterly Reports (initial)....................               0               0               0             230               0               0
                                                                                                                 $16,560              $0

[[Page 46257]]

 
Electric Quarterly Reports (later)......................              35               4             140               6             840           1,728
                                                                                                                    $432         $60,480
Change of Status........................................              10               1              10               3              30             216
                                                                                                                    $216          $2,160
                                                         -----------------------------------------------------------------------------------------------
    Total...............................................  ..............  ..............             185  ..............           7,725         $15,120
                                                                                                                                $523,800
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Comments: Comments are invited on: (1) Whether the collection of 
information is necessary for the proper performance of the functions of 
the Commission, including whether the information will have practical 
utility; (2) the accuracy of the agency's estimate of the burden and 
cost of the collection of information, including the validity of the 
methodology and assumptions used; (3) ways to enhance the quality, 
utility and clarity of the information collection; and (4) ways to 
minimize the burden of the collection of information on those who are 
to respond, including the use of automated collection techniques or 
other forms of information technology.
---------------------------------------------------------------------------

    \4\ The estimates for cost per response are derived using the 
following formula: Average Burden Hours per Response.
    * $72.00 per Hour = Average Cost per Response. The hourly cost 
figure comes from the FERC average salary of $149,489/year.

    Dated: July 24, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-19056 Filed 8-3-15; 8:45 am]
BILLING CODE 6717-01-P



                                              46256                           Federal Register / Vol. 80, No. 149 / Tuesday, August 4, 2015 / Notices

                                              DEPARTMENT OF ENERGY                                      comments and issuances in this docket                     Among other things, the Commission
                                                                                                        may do so at http://www.ferc.gov/docs-                    eliminated certain exemptions from rate
                                              Federal Energy Regulatory                                 filing/docs-filing.asp.                                   regulation that were previously
                                              Commission                                                FOR FURTHER INFORMATION CONTACT:                          available to qualifying facilities (QFs).
                                              [Docket No. IC15–11–000]                                  Ellen Brown may be reached by email                       New qualifying facilities may need to
                                                                                                        at DataClearance@FERC.gov, telephone                      make tariff filings if they do not meet
                                              Commission Information Collection                         at (202) 502–8663, and fax at (202) 273–                  the new exemption requirements.
                                              Activities (Ferc–914); Comment                            0873.                                                        FERC implemented the Congressional
                                              Request; Extension                                        SUPPLEMENTARY INFORMATION:                                mandate of the Energy Policy Act of
                                                                                                           Title: FERC–914, Cogeneration and                      2005 (EPAct 2005) to establish criteria
                                              AGENCY: Federal Energy Regulatory                                                                                   for new qualifying cogeneration
                                              Commission. DOE.                                          Small Power Production—Tariff Filings.
                                                                                                           OMB Control No.: 1902–0231.                            facilities by: (1) Amending the
                                              ACTION: Notice of information collection                     Type of Request: Three-year extension                  exemptions available to qualifying
                                              and request for comments.                                 of the FERC–914 information collection                    facilities from the FPA and from
                                                                                                        requirements with no changes to the                       PUHCA [resulting in the burden
                                              SUMMARY:   In compliance with the                                                                                   imposed by FERC–914, the subject of
                                              requirements of the Paperwork                             current reporting requirements.
                                                                                                           Abstract: Section 205(c) of the Federal                this statement]; (2) ensuring that these
                                              Reduction Act of 1995, 44 U.S.C.                                                                                    facilities are using their thermal output
                                              3506(c)(2)(A), the Federal Energy                         Power Act (FPA) requires that every
                                                                                                        public utility have all of its                            in a productive and beneficial manner;
                                              Regulatory Commission (Commission or                                                                                that the electrical, thermal, chemical
                                              FERC) is soliciting public comment on                     jurisdictional rates and tariffs on file
                                                                                                        with the Commission and make them                         and mechanical output of new
                                              the currently approved information                                                                                  qualifying cogeneration facilities is used
                                              collection, FERC–914 (Cogeneration and                    available for public inspection, within
                                                                                                        such time and in such form as the                         fundamentally for industrial,
                                              Small Power Production—Tariff                                                                                       commercial, residential or industrial
                                              Filings).                                                 Commission may designate. Section
                                                                                                        205(d) of the FPA requires that every                     purposes; and there is continuing
                                              DATES:  Comments on the collection of                     public utility must provide notice to the                 progress in the development of efficient
                                              information are due October 5, 2015.                      Commission and the public of any                          electric energy generating technology;
                                              ADDRESSES: You may submit comments                        changes to its jurisdictional rates and                   (3) amending the FERC Form 556 2 to
                                              (identified by Docket No. IC15–11–000)                    tariffs, file such changes with the                       reflect the criteria for new qualifying
                                              by either of the following methods:                       Commission, and make them available                       cogeneration facilities; and (4)
                                                 • eFiling at Commission’s Web site:                    for public inspection, in such manner as                  eliminating ownership limitations for
                                              http://www.ferc.gov/docs-filing/                          directed by the Commission. In                            qualifying cogeneration and small
                                              efiling.asp.                                              addition, FPA section 206 requires the                    power production facilities. The
                                                 • Mail/Hand Delivery/Courier:                          Commission, upon complaint or its own                     Commission satisfied the statutory
                                              Federal Energy Regulatory Commission,                     motion, to modify existing rates or                       mandate and its continuing obligation to
                                              Secretary of the Commission, 888 First                    services that are found to be unjust,                     review its policies encouraging
                                              Street NE., Washington, DC 20426.                         unreasonable, unduly discriminatory or                    cogeneration and small power
                                                 Instructions: All submissions must be                  preferential. FPA section 207 requires                    production, energy conservation,
                                              formatted and filed in accordance with                    the Commission upon complaint by a                        efficient use of facilities and resources
                                              submission guidelines at: http://                         state commission and a finding of                         by electric utilities, and equitable rates
                                              www.ferc.gov/help/submission-                             insufficient interstate service, to order                 for energy customers.
                                              guide.asp. For user assistance contact                    the rendering of adequate interstate                         Type of Respondents: New qualifying
                                              FERC Online Support by email at                           service by public utilities, the rates for                facilities and small power producers
                                              ferconlinesupport@ferc.gov, or by phone                   which would be filed in accordance                        that do not meet Commission exemption
                                              at: (866) 208–3676 (toll-free), or (202)                  with FPA sections 205 and 206.                            criteria.
                                              502–8659 for TTY.                                            In Orders Nos. 671 and 671–A,1 the                        Estimate of Annual Burden: 3 The
                                                 Docket: Users interested in receiving                  Commission revised its regulations that                   Commission estimates the annual public
                                              automatic notification of activity in this                govern qualifying small power                             reporting burden for the information
                                              docket or in viewing/downloading                          production and cogeneration facilities.                   collection as:

                                                                            FERC–914: COGENERATION AND SMALL POWER PRODUCTION—TARIFF FILINGS
                                                                                                                          Annual                                                    Total annual
                                                                                                                                               Total             Average bur-                           Cost per
                                                                                                     Number of        number of re-                                                 burden hours
                                                                                                                                            number of            den and cost                          respondent
                                                                                                    respondents        sponses per                                                  & total annual
                                                                                                                                            responses           per response 4                             ($)
                                                                                                                        respondent                                                       cost

                                                                                                        (1)                 (2)           (1) * (2) = (3)            (4)            (3) * (4) = (5)      (5) ÷ (1)

                                              FPA Section 205 Filings ..........................                35                   1                  35                183               6,405            $13,176
                                                                                                                                                                      $13,176            $461,160
                                              Electric Quarterly Reports (initial) ............                   0                  0                   0                230                   0                       0
                                                                                                                                                                      $16,560                  $0
tkelley on DSK3SPTVN1PROD with NOTICES




                                                1 Revised Regulations Governing Small Power               2 The FERC–556 is cleared separately as OMB             provide information to or for a Federal agency. For
                                              Production and Cogeneration Facilities, Order No.         Control No. 1902–0075 and is not a subject of this        further explanation of what is included in the
                                              671, 71 FR 7852 (2/15/2006), FERC Stats. & Regs.          notice.                                                   information collection burden, reference 5 Code of
                                              ¶ 31,203 (2006); and Revised Regulations Governing          3 The Commission defines burden as the total            Federal Regulations 1320.3.
                                              Small Power Production and Cogeneration
                                              Facilities, Order 671–A, 71 FR 30585 (5/30/2006),         time, effort, or financial resources expended by
                                              in Docket No. RM05–36.                                    persons to generate, maintain, retain, or disclose or



                                         VerDate Sep<11>2014    18:45 Aug 03, 2015   Jkt 235001    PO 00000   Frm 00023   Fmt 4703   Sfmt 4703   E:\FR\FM\04AUN1.SGM       04AUN1


                                                                                    Federal Register / Vol. 80, No. 149 / Tuesday, August 4, 2015 / Notices                                                                            46257

                                                                      FERC–914: COGENERATION AND SMALL POWER PRODUCTION—TARIFF FILINGS—Continued
                                                                                                                                             Annual                                                              Total annual
                                                                                                                                                                        Total          Average bur-                                 Cost per
                                                                                                                Number of                number of re-                                                           burden hours
                                                                                                                                                                     number of         den and cost                                respondent
                                                                                                               respondents                sponses per                                                            & total annual
                                                                                                                                                                     responses        per response 4                                   ($)
                                                                                                                                           respondent                                                                 cost

                                                                                                                       (1)                        (2)               (1) * (2) = (3)            (4)               (3) * (4) = (5)    (5) ÷ (1)

                                              Electric Quarterly Reports (later) .............                                    35                           4               140                       6                 840            1,728
                                                                                                                                                                                                      $432             $60,480
                                              Change of Status .....................................                              10                          1                  10                      3                  30              216
                                                                                                                                                                                                      $216              $2,160

                                                   Total ..................................................   ........................   ........................              185    ........................           7,725         $15,120
                                                                                                                                                                                                                      $523,800



                                                Comments: Comments are invited on:                                       d. Applicant: L.S. Starrett Company                              Fisheries and Wildlife (MDFW) and by
                                              (1) Whether the collection of                                           (exemptee).                                                         the U.S. Department of the Interior
                                              information is necessary for the proper                                    e. Name of Project: Crescent Street                              (Interior). The MDFW and the Interior
                                              performance of the functions of the                                     Hydroelectric Project.                                              issued modifications to condition 5 of
                                              Commission, including whether the                                          f. Location: Millers River in the Town                           their terms and conditions and as such,
                                              information will have practical utility;                                of Athol, Worcester County,                                         the exemptee is requesting that the
                                              (2) the accuracy of the agency’s estimate                               Massachusetts.                                                      Commission amend the exemption
                                              of the burden and cost of the collection                                   g. Filed Pursuant to: Federal Power                              order by incorporating the modified
                                              of information, including the validity of                               Act, 16 U.S.C. 791a–825r.                                           terms and conditions. The modification
                                              the methodology and assumptions used;                                      h. Applicant Contact: Mr. Steve                                  of condition 5 allows the exemptee to
                                              (3) ways to enhance the quality, utility                                Walsh, L.S. Starrett Company, 121                                   operate the project with an approach
                                              and clarity of the information collection;                              Crescent Street, Athol, Massachusetts                               velocity at the left-side trash rack greater
                                              and (4) ways to minimize the burden of                                  01331; phone 978–249–3551.                                          than the 2.0 cubic feet per second as
                                              the collection of information on those                                     i. FERC Contact: Mr. Robert                                      required by the original condition 5,
                                              who are to respond, including the use                                   Ballantine at 202–502–6289,                                         until such time that the MDFW
                                              of automated collection techniques or                                   robert.ballantine@ferc.gov.                                         determines that protection for atlantic
                                              other forms of information technology.                                     j. Deadline for filing comments,                                 salmon is necessary. The Interior
                                                                                                                      motions to intervene, and protests is 30                            revision requires additional American
                                                Dated: July 24, 2015.                                                 days from the issuance of this notice by                            eel monitoring during the period of time
                                              Kimberly D. Bose,                                                       the Commission. All documents may be                                that the exceedance of the 2.0 cfs
                                              Secretary.                                                              filed electronically via the Internet. See,                         approach velocity is allowed.
                                              [FR Doc. 2015–19056 Filed 8–3–15; 8:45 am]                              18 CFR 385.2001(a)(1)(iii) and the                                     l. Locations of the Application: A
                                              BILLING CODE 6717–01–P                                                  instructions on the Commission’s Web                                copy of the application is available for
                                                                                                                      site at http://www.ferc.gov/docs-filing/                            inspection and reproduction at the
                                                                                                                      efiling.asp. If unable to be filed                                  Commission’s Public Reference Room,
                                              DEPARTMENT OF ENERGY                                                    electronically, documents may be paper-                             located at 888 First Street NE., Room
                                                                                                                      filed. To paper-file, an original and                               2A, Washington, DC 20426, or by calling
                                              Federal Energy Regulatory                                               seven copies should be mailed to:                                   202–502–8371. This filing may also be
                                              Commission                                                              Secretary, Federal Energy Regulatory                                viewed on the Commission’s Web site at
                                              [Project No. 14447–004]                                                 Commission, 888 First Street NE.,                                   http://www.ferc.gov using the
                                                                                                                      Washington, DC 20426. Commenters                                    ‘‘eLibrary’’ link. Enter the docket
                                              L.S. Starrett Company; Notice of                                        can submit brief comments up to 6,000                               number excluding the last three digits in
                                              Application Accepted For Filing,                                        characters, without prior registration,                             the docket number field to access the
                                              Soliciting Comments, Motions To                                         using the eComment system at http://                                document. You may also register online
                                              Intervene, And Protests                                                 www.ferc.gov/docs-filing/                                           at http://www.ferc.gov/docs-filing/
                                                                                                                      ecomment.asp. You must include your                                 esubscription.asp to be notified via
                                                Take notice that the following                                        name and contact information at the end                             email of new filings and issuances
                                              hydroelectric application has been filed                                of your comments.                                                   related to this or other pending projects.
                                              with the Commission and is available                                       Please include the project number                                For assistance, call 866–208–3676 or
                                              for public inspection:                                                  (P–14447–004) on any comments,                                      email FERCOnlineSupport@ferc.gov, for
                                                a. Type of Application: Incorporation                                 motions, or recommendations filed.                                  TTY, call 202–502–8659. A copy is also
                                              of modified 30(c) condition 5 into                                         k. Description of Request: Pursuant to                           available for inspection and
                                              Appendix A and B of the project                                         exemption Article 16(d), the exemptee                               reproduction at the address in item (h)
                                              exemption order.                                                        is requesting to amend Appendix A and                               above.
                                                b. Project No: 14447–004.                                             Appendix B of the Commission’s March                                   m. Individuals desiring to be included
                                                c. Date Filed: May 28, 2015.
tkelley on DSK3SPTVN1PROD with NOTICES




                                                                                                                      1, 2013, Order Granting Exemption                                   on the Commission’s mailing list should
                                                                                                                      From Licensing (5MW or Less) to                                     so indicate by writing to the Secretary
                                                4 The estimates for cost per response are derived
                                                                                                                      incorporate a modified condition 5. The                             of the Commission.
                                              using the following formula: Average Burden Hours                       appendices contain the mandatory                                       n. Comments, Protests, or Motions to
                                              per Response.
                                                * $72.00 per Hour = Average Cost per Response.
                                                                                                                      terms and conditions submitted under                                Intervene: Anyone may submit
                                              The hourly cost figure comes from the FERC                              section 30(c) of the Federal Power Act                              comments, a protest, or a motion to
                                              average salary of $149,489/year.                                        by the Massachusetts Division of                                    intervene in accordance with the


                                         VerDate Sep<11>2014       18:45 Aug 03, 2015         Jkt 235001      PO 00000        Frm 00024       Fmt 4703        Sfmt 4703   E:\FR\FM\04AUN1.SGM         04AUN1



Document Created: 2015-12-18 14:50:57
Document Modified: 2015-12-18 14:50:57
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of information collection and request for comments.
DatesComments on the collection of information are due October 5, 2015.
ContactEllen Brown may be reached by email at [email protected], telephone at (202) 502-8663, and fax at (202) 273-0873.