DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 149 (August 4, 2015)

Page Range46264-46265
FR Document2015-19054

Federal Register, Volume 80 Issue 149 (Tuesday, August 4, 2015)
[Federal Register Volume 80, Number 149 (Tuesday, August 4, 2015)]
[Notices]
[Pages 46264-46265]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-19054]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD15-31-000]


Town of Grand Lake, Colorado; Notice of Preliminary Determination 
of a Qualifying Conduit Hydropower Facility and Soliciting Comments and 
Motions To Intervene

    On July 16, 2015, the Town of Grand Lake, Colorado, filed a notice 
of intent to construct a qualifying conduit hydropower facility, 
pursuant to section 30 of the Federal Power Act (FPA), as amended by 
section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA). 
The proposed Grand Lake WTP Hydro Project would have an installed 
capacity of 20 kilowatts (kW), and would be located along an existing 
12-inch-diameter raw water pipeline within the city's water treatment 
plant. The project would be located in the Town of Grand Lake, 
Colorado.
    Applicant Contact: Jim White, Town Manager, P.O. Box 99, Grand 
Lake, CO, Phone No. (970) 627-3435.
    FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, email: 
[email protected].
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) An approximately 360-square-foot 
powerhouse within the existing water treatment plant building; (2) a 
short intake receiving water from the existing 12-inch-diameter raw 
water pipeline; (3) one turbine/generator unit with an installed 
capacity of 20 kW; (4) a short discharge returning water to the 
existing 12-inch-diameter raw water pipeline; and (5) appurtenant 
facilities.
    The proposed project would have a total installed capacity of 20 
kW.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all of the criteria shown in the table below.

                          Table 1--Criteria for Qualifying Conduit Hydropower Facility
----------------------------------------------------------------------------------------------------------------
                                                                                                       Satisfies
            Statutory provision                                    Description                           (Y/N)
----------------------------------------------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by HREA.......         The conduit the facility uses is a tunnel, canal,          Y
                                                pipeline, aqueduct, flume, ditch, or similar manmade
                                              water conveyance that is operated for the distribution
                                                 of water for agricultural, municipal, or industrial
                                                 consumption and not primarily for the generation of
                                                                                         electricity
FPA 30(a)(3)(C)(i), as amended by HREA....  The facility is constructed, operated, or maintained for          Y
                                                  the generation of electric power and uses for such
                                               generation only the hydroelectric potential of a non-
                                                                             federally owned conduit
FPA 30(a)(3)(C)(ii), as amended by HREA...      The facility has an installed capacity that does not          Y
                                                                                  exceed 5 megawatts
FPA 30(a)(3)(C)(iii), as amended by HREA..          On or before August 9, 2013, the facility is not          Y
                                            licensed, or exempted from the licensing requirements of
                                                                                   Part I of the FPA
----------------------------------------------------------------------------------------------------------------

    Preliminary Determination: Based upon the above criteria, 
Commission staff preliminarily determines that the proposal satisfies 
the requirements for a qualifying conduit hydropower facility, which is 
not required to be licensed or exempted from licensing.
    Comments and Motions to Intervene: Deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 45 
days from the issuance date of this notice.
    Deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2014).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your

[[Page 46265]]

name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. A copy of all other filings in reference to this 
application must be accompanied by proof of service on all persons 
listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at the Commission in its Public Reference Room, Room 2A, 
888 First Street NE., Washington, DC 20426. The filing may also be 
viewed on the web at http://www.ferc.gov/docs-filing/elibrary.asp using 
the ``eLibrary'' link. Enter the docket number (i.e., CD15-31) in the 
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email [email protected]. For TTY, call 
(202) 502-8659.

    Dated: July 24, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-19054 Filed 8-3-15; 8:45 am]
BILLING CODE 6717-01-P



                                              46264                          Federal Register / Vol. 80, No. 149 / Tuesday, August 4, 2015 / Notices

                                              serve motions to intervene or protests                      Dated: July 28, 2015.                                12-inch-diameter raw water pipeline
                                              on persons other than the Applicant.                      Kimberly D. Bose,                                      within the city’s water treatment plant.
                                                 The Commission encourages                              Secretary.                                             The project would be located in the
                                              electronic submission of protests and                     [FR Doc. 2015–19062 Filed 8–3–15; 8:45 am]             Town of Grand Lake, Colorado.
                                              interventions in lieu of paper using the                  BILLING CODE 6717–01–P                                    Applicant Contact: Jim White, Town
                                              ‘‘eFiling’’ link at http://www.ferc.gov.                                                                         Manager, P.O. Box 99, Grand Lake, CO,
                                              Persons unable to file electronically                                                                            Phone No. (970) 627–3435.
                                              should submit an original and 14 copies                   DEPARTMENT OF ENERGY                                      FERC Contact: Christopher Chaney,
                                              of the protest or intervention to the                                                                            Phone No. (202) 502–6778, email:
                                                                                                        Federal Energy Regulatory                              christopher.chaney@ferc.gov.
                                              Federal Energy Regulatory Commission,                     Commission
                                              888 First Street NE., Washington, DC                                                                                Qualifying Conduit Hydropower
                                              20426.                                                    [Docket No. CD15–31–000]                               Facility Description: The proposed
                                                                                                                                                               project would consist of: (1) An
                                                 This filing is accessible on-line at                   Town of Grand Lake, Colorado; Notice                   approximately 360-square-foot
                                              http://www.ferc.gov, using the                            of Preliminary Determination of a                      powerhouse within the existing water
                                              ‘‘eLibrary’’ link and is available for                    Qualifying Conduit Hydropower                          treatment plant building; (2) a short
                                              review in the Commission’s Public                         Facility and Soliciting Comments and                   intake receiving water from the existing
                                              Reference Room in Washington, DC.                         Motions To Intervene                                   12-inch-diameter raw water pipeline; (3)
                                              There is an ‘‘eSubscription’’ link on the                                                                        one turbine/generator unit with an
                                              Web site that enables subscribers to                        On July 16, 2015, the Town of Grand
                                                                                                        Lake, Colorado, filed a notice of intent               installed capacity of 20 kW; (4) a short
                                              receive email notification when a                                                                                discharge returning water to the existing
                                                                                                        to construct a qualifying conduit
                                              document is added to a subscribed                                                                                12-inch-diameter raw water pipeline;
                                                                                                        hydropower facility, pursuant to section
                                              docket(s). For assistance with any FERC                                                                          and (5) appurtenant facilities.
                                                                                                        30 of the Federal Power Act (FPA), as
                                              Online service, please email                              amended by section 4 of the                               The proposed project would have a
                                              FERCOnlineSupport@ferc.gov, or call                       Hydropower Regulatory Efficiency Act                   total installed capacity of 20 kW.
                                              (866) 208–3676 (toll free). For TTY, call                 of 2013 (HREA). The proposed Grand                        A qualifying conduit hydropower
                                              (202) 502–8659.                                           Lake WTP Hydro Project would have an                   facility is one that is determined or
                                                 Comment Date: 5:00 p.m. Eastern                        installed capacity of 20 kilowatts (kW),               deemed to meet all of the criteria shown
                                              Time on August 18, 2015.                                  and would be located along an existing                 in the table below.

                                                                                  TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                        Satisfies
                                                                           Statutory provision                                                               Description                                 (Y/N)

                                              FPA 30(a)(3)(A), as amended by HREA .............................................         The conduit the facility uses is a tunnel, canal, pipeline,        Y
                                                                                                                                  aqueduct, flume, ditch, or similar manmade water conveyance
                                                                                                                                     that is operated for the distribution of water for agricultural,
                                                                                                                                   municipal, or industrial consumption and not primarily for the
                                                                                                                                                                           generation of electricity
                                              FPA 30(a)(3)(C)(i), as amended by HREA .........................................        The facility is constructed, operated, or maintained for the         Y
                                                                                                                                      generation of electric power and uses for such generation
                                                                                                                                        only the hydroelectric potential of a non-federally owned
                                                                                                                                                                                             conduit
                                              FPA 30(a)(3)(C)(ii), as amended by HREA .........................................     The facility has an installed capacity that does not exceed 5          Y
                                                                                                                                                                                         megawatts
                                              FPA 30(a)(3)(C)(iii), as amended by HREA ........................................      On or before August 9, 2013, the facility is not licensed, or         Y
                                                                                                                                       exempted from the licensing requirements of Part I of the
                                                                                                                                                                                                FPA



                                                Preliminary Determination: Based                        and Procedure, 18 CFR 385.210 and                      385.2001 through 385.2005 of the
                                              upon the above criteria, Commission                       385.214. Any motions to intervene must                 Commission’s regulations.1 All
                                              staff preliminarily determines that the                   be received on or before the specified                 comments contesting Commission staff’s
                                              proposal satisfies the requirements for a                 deadline date for the particular                       preliminary determination that the
                                              qualifying conduit hydropower facility,                   proceeding.                                            facility meets the qualifying criteria
                                              which is not required to be licensed or                      Filing and Service of Responsive                    must set forth their evidentiary basis.
                                              exempted from licensing.                                  Documents: All filings must (1) bear in                   The Commission strongly encourages
                                                Comments and Motions to Intervene:                      all capital letters the ‘‘COMMENTS                     electronic filing. Please file motions to
                                              Deadline for filing comments contesting                   CONTESTING QUALIFICATION FOR A                         intervene and comments using the
                                              whether the facility meets the qualifying                 CONDUIT HYDROPOWER FACILITY’’                          Commission’s eFiling system at http://
                                              criteria is 45 days from the issuance                     or ‘‘MOTION TO INTERVENE,’’ as                         www.ferc.gov/docs-filing/efiling.asp.
                                              date of this notice.
tkelley on DSK3SPTVN1PROD with NOTICES




                                                                                                        applicable; (2) state in the heading the               Commenters can submit brief comments
                                                Deadline for filing motions to                          name of the applicant and the project                  up to 6,000 characters, without prior
                                              intervene is 30 days from the issuance                    number of the application to which the                 registration, using the eComment system
                                              date of this notice.                                      filing responds; (3) state the name,                   at http://www.ferc.gov/docs-filing/
                                                Anyone may submit comments or a                         address, and telephone number of the                   ecomment.asp. You must include your
                                              motion to intervene in accordance with                    person filing; and (4) otherwise comply
                                              the requirements of Rules of Practice                     with the requirements of sections                        1 18   CFR 385.2001–2005 (2014).



                                         VerDate Sep<11>2014    18:45 Aug 03, 2015   Jkt 235001   PO 00000   Frm 00031    Fmt 4703   Sfmt 4703   E:\FR\FM\04AUN1.SGM     04AUN1


                                                                            Federal Register / Vol. 80, No. 149 / Tuesday, August 4, 2015 / Notices                                           46265

                                              name and contact information at the end                 appropriate. Such notices, motions, or                jurisdiction pursuant to Section 1(b) of
                                              of your comments. For assistance,                       protests must be filed on or before the               the NGA, all as more fully set forth in
                                              please contact FERC Online Support at                   comment date. On or before the                        the application, which is on file with
                                              FERCOnlineSupport@ferc.gov, (866)                       comment date, it is not necessary to                  the Commission and open to public
                                              208–3676 (toll free), or (202) 502–8659                 serve motions to intervene or protests                inspection. The filing may also be
                                              (TTY). In lieu of electronic filing, please             on persons other than the Applicant.                  viewed on the web at http://
                                              send a paper copy to: Secretary, Federal                   The Commission encourages                          www.ferc.gov using the ‘‘eLibrary’’ link.
                                              Energy Regulatory Commission, 888                       electronic submission of protests and                 Enter the docket number excluding the
                                              First Street NE., Washington, DC 20426.                 interventions in lieu of paper using the              last three digits in the docket number
                                              A copy of all other filings in reference                ‘‘eFiling’’ link at http://www.ferc.gov.              field to access the document. For
                                              to this application must be accompanied                 Persons unable to file electronically                 assistance, contact FERC at
                                              by proof of service on all persons listed               should submit an original and 14 copies               FERCOnlineSupport@ferc.gov or call
                                              in the service list prepared by the                     of the protest or intervention to the                 toll-free, (866) 208–3676 or TTY, (202)
                                              Commission in this proceeding, in                       Federal Energy Regulatory Commission,                 502–8659.
                                              accordance with 18 CFR 4.34(b) and                      888 First Street NE., Washington, DC                     Any questions regarding this
                                              385.2010.                                               20426.                                                application should be directed to Tyler
                                                Locations of Notice of Intent: Copies                    This filing is accessible on-line at               R. Brown, Senior Counsel, Columbia
                                              of the notice of intent can be obtained                 http://www.ferc.gov, using the                        Gas Transmission, LLC, 5151 San
                                              directly from the applicant or such                     ‘‘eLibrary’’ link and is available for                Felipe, Suite 2500, Houston, TX 77056,
                                              copies can be viewed and reproduced at                  review in the Commission’s Public                     phone: (713) 386–3797 or email:
                                              the Commission in its Public Reference                  Reference Room in Washington, DC.                     tbrown@cpg.com.
                                              Room, Room 2A, 888 First Street NE.,                    There is an ‘‘eSubscription’’ link on the                Pursuant to section 157.9 of the
                                              Washington, DC 20426. The filing may                    Web site that enables subscribers to                  Commission’s rules, 18 CFR 157.9,
                                              also be viewed on the web at http://                    receive email notification when a                     within 90 days of this Notice the
                                              www.ferc.gov/docs-filing/elibrary.asp                   document is added to a subscribed                     Commission staff will either: Complete
                                              using the ‘‘eLibrary’’ link. Enter the                  docket(s). For assistance with any FERC               its environmental assessment (EA) and
                                              docket number (i.e., CD15–31) in the                    Online service, please email                          place it into the Commission’s public
                                              docket number field to access the                       FERCOnlineSupport@ferc.gov, or call                   record (eLibrary) for this proceeding; or
                                              document. For assistance, call toll-free                (866) 208–3676 (toll free). For TTY, call             issue a Notice of Schedule for
                                              1–866–208–3676 or email                                 (202) 502–8659.                                       Environmental Review. If a Notice of
                                              FERCOnlineSupport@ferc.gov. For TTY,                       Comment Date: 5:00 p.m. Eastern                    Schedule for Environmental Review is
                                              call (202) 502–8659.                                    Time on August 18, 2015.                              issued, it will indicate, among other
                                                Dated: July 24, 2015.                                                                                       milestones, the anticipated date for the
                                                                                                        Dated: July 28, 2015.                               Commission staff’s issuance of the final
                                              Kimberly D. Bose,
                                                                                                      Kimberly D. Bose,                                     environmental impact statement (FEIS)
                                              Secretary.
                                                                                                      Secretary.                                            or EA for this proposal. The filing of the
                                              [FR Doc. 2015–19054 Filed 8–3–15; 8:45 am]                                                                    EA in the Commission’s public record
                                                                                                      [FR Doc. 2015–19064 Filed 8–3–15; 8:45 am]
                                              BILLING CODE 6717–01–P                                                                                        for this proceeding or the issuance of a
                                                                                                      BILLING CODE 6717–01–P
                                                                                                                                                            Notice of Schedule for Environmental
                                                                                                                                                            Review will serve to notify federal and
                                              DEPARTMENT OF ENERGY                                                                                          state agencies of the timing for the
                                                                                                      DEPARTMENT OF ENERGY
                                              Federal Energy Regulatory                                                                                     completion of all necessary reviews, and
                                                                                                      Federal Energy Regulatory                             the subsequent need to complete all
                                              Commission
                                                                                                      Commission                                            federal authorizations within 90 days of
                                              [Docket No. EL14–26–000]                                                                                      the date of issuance of the Commission
                                                                                                      [Docket No. CP15–531–000]
                                                                                                                                                            staff’s FEIS or EA.
                                              New York Independent System                                                                                      There are two ways to become
                                              Operator, Inc.; Notice of Filing                        Columbia Gas Transmission, LLC;
                                                                                                      Notice of Application                                 involved in the Commission’s review of
                                                Take notice that on July 23, 2015,                                                                          this project. First, any person wishing to
                                              New York Independent System                                Take notice that on July 14, 2015,                 obtain legal status by becoming a party
                                              Operator, Inc. filed a compliance filing                Columbia Gas Transmission, LLC                        to the proceedings for this project
                                              in response to the Federal Energy                       (Columbia), 5151 San Felipe, Suite                    should, on or before the comment date
                                              Regulatory Commission’s (Commission)                    2500, Houston, TX 77056, filed in                     stated below, file with the Federal
                                              March 20, 2014 Order to Show Cause.1                    Docket No. CP15–531–000, an                           Energy Regulatory Commission, 888
                                                Any person desiring to intervene or to                application pursuant to section 7(b) of               First Street NE., Washington, DC 20426,
                                              protest this filing must file in                        the Natural Gas Act and Part 157 of the               a motion to intervene in accordance
                                              accordance with Rules 211 and 214 of                    Commission’s regulations, seeking                     with the requirements of the
                                              the Commission’s Rules of Practice and                  authorization to abandon by sale certain              Commission’s Rules of Practice and
                                              Procedure (18 CFR 385.211, 385.214).                    natural gas facilities located in various             Procedure (18 CFR 385.214 or 385.211)
                                              Protests will be considered by the                      Counties in Ohio to Columbia Gas of                   and the Regulations under the NGA (18
                                              Commission in determining the                           Ohio. The facilities consist of 13.1 miles            CFR 157.10). A person obtaining party
                                              appropriate action to be taken, but will                of pipeline, 594 measuring stations, 35               status will be placed on the service list
tkelley on DSK3SPTVN1PROD with NOTICES




                                              not serve to make protestants parties to                mainline consumer taps and                            maintained by the Secretary of the
                                              the proceeding. Any person wishing to                   appurtenances. In addition, Columbia                  Commission and will receive copies of
                                              become a party must file a notice of                    further request that the Commission                   all documents filed by the applicant and
                                              intervention or motion to intervene, as                 find that following abandonment by                    by all other parties. A party must submit
                                                                                                      sale, the facilities will perform                     7 copies of filings made with the
                                                1 Posting of Offers to Purchase Capacity, Order to    distribution activities and thus be                   Commission and must mail a copy to
                                              Show Cause, 146 FERC ¶ 61,203 (2014).                   exempt from the Commission’s                          the applicant and to every other party in


                                         VerDate Sep<11>2014   18:45 Aug 03, 2015   Jkt 235001   PO 00000   Frm 00032   Fmt 4703   Sfmt 4703   E:\FR\FM\04AUN1.SGM   04AUN1



Document Created: 2015-12-18 14:51:46
Document Modified: 2015-12-18 14:51:46
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 46264 