DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 151 (August 6, 2015)

Page Range46981-46982
FR Document2015-19322

Federal Register, Volume 80 Issue 151 (Thursday, August 6, 2015)
[Federal Register Volume 80, Number 151 (Thursday, August 6, 2015)]
[Notices]
[Pages 46981-46982]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-19322]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

    Take notice that the Commission has received the following Natural 
Gas Pipeline Rate and Refund Report filings:

Filings Instituting Proceedings

    Docket Numbers: RP15-1138-000.
    Applicants: Algonquin Gas Transmission, LLC.
    Description: Section 4(d) Rate Filing: BUG 2015-08-01 Ramapo 
Release to be effective 8/1/2015.
    Filed Date: 7/29/15.
    Accession Number: 20150729-5025.
    Comments Due: 5 p.m. ET 8/10/15.

    Docket Numbers: RP15-1139-000.
    Applicants: Algonquin Gas Transmission, LLC.
    Description: Section 4(d) Rate Filing: KeySpan 2015-08-01 Ramapo 
Release to be effective 8/1/2015.
    Filed Date: 7/29/15.
    Accession Number: 20150729-5027.
    Comments Due: 5 p.m. ET 8/10/15.

    Docket Numbers: RP15-1140-000.
    Applicants: Algonquin Gas Transmission, LLC.
    Description: Section 4(d) Rate Filing: BBPC 2015-08-01 Releases to 
EDF Trading to be effective 8/1/2015.
    Filed Date: 7/29/15.
    Accession Number: 20150729-5028.
    Comments Due: 5 p.m. ET 8/10/15.

    Docket Numbers: RP15-1141-000.
    Applicants: Algonquin Gas Transmission, LLC.
    Description: Section 4(d) Rate Filing: ConEdison 2015-08-01 Ramapo 
Release to Spark Energy to be effective 8/1/2015.
    Filed Date: 7/29/15.
    Accession Number: 20150729-5029.
    Comments Due: 5 p.m. ET 8/10/15.

    Docket Numbers: RP15-1142-000.
    Applicants: Questar Pipeline Company.
    Description: Section 4(d) Rate Filing: ? 31, Capacity Reserved for 
Future Expansion, Version 1.0.0 to be effective 9/1/2015.
    Filed Date: 7/29/15.
    Accession Number: 20150729-5062.
    Comments Due: 5 p.m. ET 8/10/15.

    Docket Numbers: RP15-1143-000.
    Applicants: Alliance Pipeline L.P.
    Description: Section 4(d) Rate Filing: August 1-14 2015 Auction to 
be effective 8/1/2015.

[[Page 46982]]

    Filed Date: 7/29/15.
    Accession Number: 20150729-5071.
    Comments Due: 5 p.m. ET 8/10/15.

    Docket Numbers: RP15-1144-000.
    Applicants: Florida Gas Transmission Company, LLC.
    Description: Section 4(d) Rate Filing: Negotiated Rates Filing on 
7-30-15 to be effective 8/1/2015.
    Filed Date: 7/30/15.
    Accession Number: 20150730-5031.
    Comments Due: 5 p.m. ET 8/11/15.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: http://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: July 30, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-19322 Filed 8-5-15; 8:45 am]
BILLING CODE 6717-01-P



                                                                           Federal Register / Vol. 80, No. 151 / Thursday, August 6, 2015 / Notices                                                   46981

                                              capacity under a transaction’s existing                 No. 809 and should be subject to notice                   Issued: July 31, 2015.
                                              provisions if it wishes to terminate the                and comment to establish that the                       Kimberly D. Bose,
                                              transaction, even if the releasing shipper              default interpretation is reasonable. In                Secretary.
                                              and the replacement shipper are unable                  particular, the Commission seeks                        [FR Doc. 2015–19292 Filed 8–5–15; 8:45 am]
                                              to reach agreement on a non-default                     comment on a number of aspects of the                   BILLING CODE 6717–01–P
                                              recall transition.                                      proposal. Commenters should address
                                              III. Commission Determination                           the merits of establishing a default
                                                                                                      approach or propose an alternative                      DEPARTMENT OF ENERGY
                                              A. Implementation Date                                  approach. Commenters should address
                                                 10. As requested, the Commission                     whether the default should apply to all                 Federal Energy Regulatory
                                              finds the timing proposed by the                                                                                Commission
                                                                                                      agreements into which the parties have
                                              Associations to effectuate a reasonable                 entered before April 1, 2016 (as                        Combined Notice of Filings
                                              implementation of Order No. 809. We                     proposed by the Associations), or
                                              agree that having all pipelines follow                  should only apply to releases entered                     Take notice that the Commission has
                                              the same schedule will provide for a                    into by an earlier date, such as the date               received the following Natural Gas
                                              smoother transition and help shippers                   of issuance of Order No. 809, which put                 Pipeline Rate and Refund Report filings:
                                              by ensuring that they can conduct                       the parties on notice that the                          Filings Instituting Proceedings
                                              transactions on all pipelines under the                 nomination schedule would change as
                                              same timetable.                                                                                                    Docket Numbers: RP15–1138–000.
                                                                                                      of April 1, 2016, and therefore permitted                  Applicants: Algonquin Gas
                                                 11. We accept the schedules proposed
                                                                                                      negotiations as to the applicability of                 Transmission, LLC.
                                              by the Associations as described in full
                                                                                                      recall conditions for releases that are                    Description: Section 4(d) Rate Filing:
                                              in Appendices A and B to their request
                                                                                                      still in effect on April 1, 2016 or                     BUG 2015–08–01 Ramapo Release to be
                                              for clarification. In general, the new
                                              day-ahead nomination timelines will                     thereafter. They also should address                    effective 8/1/2015.
                                              apply as of March 31, 2016 for those                    whether the default that should apply                      Filed Date: 7/29/15.
                                              nominations that will become effective                  when the transaction specifies that                        Accession Number: 20150729–5025.
                                              April 1, 2016. Specifically, the Timely                 recalls are permitted only at the                          Comments Due: 5 p.m. ET 8/10/15.
                                              and Evening Nomination Cycle                            Intraday 2 Nomination Cycle is to                          Docket Numbers: RP15–1139–000.
                                              deadlines on March 31, 2016 for the                     permit recalls at Intraday 2 and 3 (as                     Applicants: Algonquin Gas
                                              April 1, 2016 Gas Day will be 1:00 p.m.                 proposed by the Associations) or only                   Transmission, LLC.
                                              CCT and 6:00 p.m. CCT, respectively.                    Intraday 3. Finally, commenters should                     Description: Section 4(d) Rate Filing:
                                              Otherwise, the intraday nomination                      address the proposal that ‘‘the releasing               KeySpan 2015–08–01 Ramapo Release
                                              timelines on March 31, 2016 will follow                 shipper should have the ability to recall               to be effective 8/1/2015.
                                              the existing timeline.                                  capacity under a transaction’s existing                    Filed Date: 7/29/15.
                                                 12. With respect to capacity releases,               provisions if it wishes to terminate the                   Accession Number: 20150729–5027.
                                                                                                                                                                 Comments Due: 5 p.m. ET 8/10/15.
                                              the new biddable release schedule will                  transaction, even if the releasing shipper
                                              start at 9:00 a.m. CCT on March 31,                     and the replacement shipper are unable                     Docket Numbers: RP15–1140–000.
                                              2016, for all releases with contracts to                to reach agreement on a non-default                        Applicants: Algonquin Gas
                                              be effective on March 31, 2016, April 1,                                                                        Transmission, LLC.
                                                                                                      recall transition.’’ 7 Comments should
                                                                                                                                                                 Description: Section 4(d) Rate Filing:
                                              2016, or thereafter. Non-biddable                       address how this provision would                        BBPC 2015–08–01 Releases to EDF
                                              releases effective on March 31, 2016                    operate and why the general default                     Trading to be effective 8/1/2015.
                                              will follow the existing posting                        provisions should not apply to a                           Filed Date: 7/29/15.
                                              schedule for the Intraday 1 and Intraday                contract in dispute if the parties are                     Accession Number: 20150729–5028.
                                              2 Nomination Cycles, and will follow                    unable to reach agreement (and have not                    Comments Due: 5 p.m. ET 8/10/15.
                                              the new day-ahead nomination schedule                   sought Commission resolution of the                        Docket Numbers: RP15–1141–000.
                                              for the Timely and Evening Nomination                   dispute).                                                  Applicants: Algonquin Gas
                                              Cycles.6                                                                                                        Transmission, LLC.
                                                                                                         15. Initial comments will be due 20
                                              B. Default Capacity Release Recall                      days from the date of this order and                       Description: Section 4(d) Rate Filing:
                                              Rights                                                  reply comments will be due 30 days                      ConEdison 2015–08–01 Ramapo Release
                                                 13. The Commission sees value in                     from the date of this order.                            to Spark Energy to be effective 8/1/2015.
                                                                                                                                                                 Filed Date: 7/29/15.
                                              establishing a default interpretation of
                                                                                                      The Commission orders:                                     Accession Number: 20150729–5029.
                                              capacity release contractual recall                                                                                Comments Due: 5 p.m. ET 8/10/15.
                                              provisions to assist parties in                            (A) The Commission grants the                           Docket Numbers: RP15–1142–000.
                                              effectuating the transition between the                 Associations’ requested clarification as                   Applicants: Questar Pipeline
                                              two intraday and three intraday                         to the implementation date of Order No.                 Company.
                                              nomination schedules. While parties                     809, as discussed in the body of this                      Description: Section 4(d) Rate Filing:
                                              may vary such a default interpretation                  order.                                                  ? 31, Capacity Reserved for Future
                                              by agreement, a default may reduce the                                                                          Expansion, Version 1.0.0 to be effective
                                              burden of negotiation on those parties                     (B) Initial comments on the
                                                                                                      Associations’ proposed default recall                   9/1/2015.
                                              satisfied with the default interpretation.                                                                         Filed Date: 7/29/15.
                                                 14. Such a request, however, goes                    rights for capacity release transactions
tkelley on DSK3SPTVN1PROD with NOTICES




                                                                                                      are due 20 days from the date of this                      Accession Number: 20150729–5062.
                                              beyond merely clarifying the                                                                                       Comments Due: 5 p.m. ET 8/10/15.
                                              implementation date adopted in Order                    order with reply comments due 10 days
                                                                                                      thereafter.                                                Docket Numbers: RP15–1143–000.
                                                6 For example, a non-biddable release for the
                                                                                                                                                                 Applicants: Alliance Pipeline L.P.
                                                                                                        By the Commission.                                       Description: Section 4(d) Rate Filing:
                                              Timely Nomination Cycle on March 31, 2016 (to
                                              become effective April 1, 2016) must submit its                                                                 August 1–14 2015 Auction to be
                                              notice by 12 a.m. CCT.                                    7 Associations’   Supplemental Filing at 3.           effective 8/1/2015.


                                         VerDate Sep<11>2014   17:50 Aug 05, 2015   Jkt 235001   PO 00000   Frm 00035     Fmt 4703   Sfmt 4703   E:\FR\FM\06AUN1.SGM   06AUN1


                                              46982                        Federal Register / Vol. 80, No. 151 / Thursday, August 6, 2015 / Notices

                                                 Filed Date: 7/29/15.                                 www.ferc.gov using the ‘‘eLibrary’’ link.             with the requirements of the
                                                 Accession Number: 20150729–5071.                     Enter the docket number excluding the                 Commission’s Rules of Practice and
                                                 Comments Due: 5 p.m. ET 8/10/15.                     last three digits in the docket number                Procedure (18 CFR 385.214 or 385.211)
                                                 Docket Numbers: RP15–1144–000.                       field to access the document. For                     and the Regulations under the NGA (18
                                                 Applicants: Florida Gas Transmission                 assistance, contact FERC at                           CFR 157.10). A person obtaining party
                                              Company, LLC.                                           FERCOnlineSupport@ferc.gov or call                    status will be placed on the service list
                                                 Description: Section 4(d) Rate Filing:               toll-free, (866) 208–3676 or TTY, (202)               maintained by the Secretary of the
                                              Negotiated Rates Filing on 7–30–15 to                   502–8659.                                             Commission and will receive copies of
                                              be effective 8/1/2015.                                     Any questions concerning this                      all documents filed by the applicant and
                                                 Filed Date: 7/30/15.                                 application may be directed to: Mr.                   by all other parties. A party must submit
                                                 Accession Number: 20150730–5031.                     Peter Trombley, Associate General                     7 copies of filings made with the
                                                 Comments Due: 5 p.m. ET 8/11/15.                     Counsel, Kinder Morgan Inc., 1001                     Commission and must mail a copy to
                                                 The filings are accessible in the                    Louisiana Street, Suite 1000, Houston,                the applicant and to every other party in
                                              Commission’s eLibrary system by                         Texas, 77002, by phone at (713) 420–                  the proceeding. Only parties to the
                                              clicking on the links or querying the                   3348, or email at peter_trombley@                     proceeding can ask for court review of
                                              docket number.                                          kindermorgan.com.                                     Commission orders in the proceeding.
                                                 Any person desiring to intervene or                     Specifically, Hiland requests (i)                     However, a person does not have to
                                              protest in any of the above proceedings                 certificate authorization of Norse                    intervene in order to have comments
                                              must file in accordance with Rules 211                  Residue Line for the limited purpose of               considered. The second way to
                                              and 214 of the Commission’s                             transporting its own natural gas from                 participate is by filing with the
                                              Regulations (18 CFR 385.211 and                         the Hiland owned Norse processing                     Secretary of the Commission, as soon as
                                              385.214) on or before 5:00 p.m. Eastern                 plant to an interconnect with WBI                     possible, an original and two copies of
                                                                                                      interstate gas pipeline system; (ii) a Part           comments in support of or in opposition
                                              time on the specified comment date.
                                                                                                      157, Subpart F blanket certificate                    to this project. The Commission will
                                              Protests may be considered, but
                                                                                                      authorizing certain routine construction,             consider these comments in
                                              intervention is necessary to become a
                                                                                                      operation, and abandonment activities;                determining the appropriate action to be
                                              party to the proceeding.
                                                                                                      (iii) waivers of certain regulatory                   taken, but the filing of a comment alone
                                                 eFiling is encouraged. More detailed
                                                                                                      requirements; and (iv) confirmation that              will not serve to make the filer a party
                                              information relating to filing
                                                                                                      the Commission’s assertion of                         to the proceeding. The Commission’s
                                              requirements, interventions, protests,
                                                                                                      jurisdiction over the Norse Residue Line              rules require that persons filing
                                              service, and qualifying facilities filings
                                                                                                      will not jeopardize the non-                          comments in opposition to the project
                                              can be found at: http://www.ferc.gov/
                                                                                                      jurisdictional status of Hiland’s                     provide copies of their protests only to
                                              docs-filing/efiling/filing-req.pdf. For
                                                                                                      otherwise non-jurisdictional gathering                the party or parties directly involved in
                                              other information, call (866) 208–3676
                                                                                                      and processing facilities and operations.             the protest.
                                              (toll free). For TTY, call (202) 502–8659.                 Pursuant to section 157.9 of the                      Persons who wish to comment only
                                                Dated: July 30, 2015.                                 Commission’s rules, 18 CFR 157.9,                     on the environmental review of this
                                              Nathaniel J. Davis, Sr.,                                within 90 days of this Notice the                     project should submit an original and
                                              Deputy Secretary.                                       Commission staff will either: Complete                two copies of their comments to the
                                              [FR Doc. 2015–19322 Filed 8–5–15; 8:45 am]              its environmental assessment (EA) and                 Secretary of the Commission.
                                              BILLING CODE 6717–01–P
                                                                                                      place it into the Commission’s public                 Environmental commenters will be
                                                                                                      record (eLibrary) for this proceeding; or             placed on the Commission’s
                                                                                                      issue a Notice of Schedule for                        environmental mailing list, will receive
                                              DEPARTMENT OF ENERGY                                    Environmental Review. If a Notice of                  copies of the environmental documents,
                                                                                                      Schedule for Environmental Review is                  and will be notified of meetings
                                              Federal Energy Regulatory                               issued, it will indicate, among other                 associated with the Commission’s
                                              Commission                                              milestones, the anticipated date for the              environmental review process.
                                                                                                      Commission staff’s issuance of the final              Environmental commenters will not be
                                              [Docket No. CP15–534–000]
                                                                                                      environmental impact statement (FEIS)                 required to serve copies of filed
                                              Hiland Partner Holdings, LLC; Notice                    or EA for this proposal. The filing of the            documents on all other parties.
                                              of Application                                          EA in the Commission’s public record                  However, the non-party commenters
                                                                                                      for this proceeding or the issuance of a              will not receive copies of all documents
                                                 Take notice that on July 17, 2015,                   Notice of Schedule for Environmental                  filed by other parties or issued by the
                                              Hiland Partner Holdings LLC (Hiland),                   Review will serve to notify federal and               Commission (except for the mailing of
                                              pursuant to section 7(c) of the Federal                 state agencies of the timing for the                  environmental documents issued by the
                                              Energy Regulatory Commission’s (FERC)                   completion of all necessary reviews, and              Commission) and will not have the right
                                              regulations under the Natural Gas Act                   the subsequent need to complete all                   to seek court review of the
                                              (NGA), filed in Docket No. CP15–534–                    federal authorizations within 90 days of              Commission’s final order.
                                              000, application for a certificate of                   the date of issuance of the Commission                   The Commission strongly encourages
                                              public convenience and necessity                        staff’s FEIS or EA.                                   electronic filings of comments, protests
                                              (Application) and all authorizations                       There are two ways to become                       and interventions in lieu of paper using
                                              necessary for it to own, operate, and                   involved in the Commission’s review of                the ‘‘eFiling’’ link at http://
                                              maintain an existing 6.65 miles long and                this project. First, any person wishing to            www.ferc.gov. Persons unable to file
tkelley on DSK3SPTVN1PROD with NOTICES




                                              6-inch in diameter natural gas pipeline                 obtain legal status by becoming a party               electronically should submit an original
                                              (Norse Residue Line) located in Divide                  to the proceedings for this project                   and 5 copies of the protest or
                                              County, North Dakota, all as more fully                 should, on or before the comment date                 intervention to the Federal Energy
                                              set forth in the Application which is on                stated below, file with the Federal                   regulatory Commission, 888 First Street
                                              file with the Commission and open for                   Energy Regulatory Commission, 888                     NE., Washington, DC 20426.
                                              public inspection. The filing may also                  First Street NE., Washington, DC 20426,                  Comment Date: 5:00 p.m. Eastern
                                              be viewed on the web at http://                         a motion to intervene in accordance                   Time on August 21, 2015.


                                         VerDate Sep<11>2014   17:50 Aug 05, 2015   Jkt 235001   PO 00000   Frm 00036   Fmt 4703   Sfmt 4703   E:\FR\FM\06AUN1.SGM   06AUN1



Document Created: 2018-02-23 10:55:35
Document Modified: 2018-02-23 10:55:35
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates7/29/15.
FR Citation80 FR 46981 