The Coast Guard has issued a temporary deviation from the operating schedule that governs the operation of the Galveston Causeway Railroad Vertical Lift Bridge across the Gulf Intracoastal Waterway, mile 357.2 west of Harvey Locks, at Galveston, Galveston County, Texas. The deviation is necessary in order to conduct maintenance on the bridge. This deviation allows the bridge to remain temporarily closed to navigation for eight hours on consecutive days during day light hours and will operate normally at all other times.

Federal Register, Volume 80 Issue 152 (Friday, August 7, 2015)
[Federal Register Volume 80, Number 152 (Friday, August 7, 2015)]
[Rules and Regulations]
[Pages 47410-47411]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-19377]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2015-0741]


Drawbridge Operation Regulation; Gulf Intracoastal Waterway, 
Galveston, TX

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulations.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the operation of the Galveston Causeway 
Railroad Vertical Lift Bridge across the Gulf Intracoastal Waterway, 
mile 357.2 west of Harvey Locks, at Galveston, Galveston County, Texas. 
The deviation is necessary in order to conduct maintenance on the 
bridge. This deviation allows the bridge to remain temporarily closed 
to navigation for eight hours on consecutive days during day light 
hours and will operate normally at all other times.

DATES: This deviation is effective from August 31 through September 5, 
2015. This deviation will be enforced from 7:30 a.m. to 11:30 and then 
again from 1:30 p.m. to 5:30 p.m., daily, beginning August 31 through 
September 5, 2015.

ADDRESSES: The docket for this deviation, [USCG-2015-0741] is available 
at http://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH.'' Click on Open Docket Folder on the line 
associated with this deviation. You may also visit the Docket 
Management Facility in Room W12-140 on the ground floor of the 
Department of Transportation West Building, 1200 New Jersey Avenue SE., 
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, 
except Federal holidays.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email Jim Wetherington, Bridge 
Administration Branch, Coast Guard; telephone 504-671-2128, email 
[email protected]. If you have questions on viewing the 
docket, call Cheryl F. Collins, Program Manager, Docket Operations, 
telephone 202-366-9826.

SUPPLEMENTARY INFORMATION: The BNSF Railway Company requested a 
temporary deviation from the operating schedule of the Galveston 
Causeway Railroad Vertical Lift Bridge across the Gulf Intracoastal 
Waterway, mile 357.2 west of Harvey Locks, at Galveston, Galveston 
County, Texas.
    The bridge has a vertical clearance of 8.0 feet above mean high 
water, elevation 3.0 feet (NAVD88), in the closed-to-navigation 
position and 73 feet above mean high water in the open-to-navigation 
position. In accordance with 33 CFR 117.5, the draw shall open on 
signal for the passage of vessels.
    This temporary deviation allows the vertical lift bridge to remain 
closed to navigation from 7:30 a.m. to 11:30 and then again from 1:30 
p.m. to 5:30 p.m., daily, beginning August 31 through September 5, 
2015. During this time, the bridge owner will complete cable lubing, 
welding joints and replacing span guide bearings. If the vessel can 
safely pass without an opening, the vessel may pass at the slowest safe 
speed. The bridge can open in case of emergency.
    Navigation at the site of the bridge consists mainly of tows with 
barges and some recreational pleasure craft. Based on known waterway 
users, as well as coordination with those waterway users, it has been 
determined that this closure will not have a significant effect on 
these vessels. No alternate routes are available.
    In accordance with 33 CFR 117.35, the draw bridge must return to 
its regular operating schedule immediately

[[Page 47411]]

at the end of the effective period of this temporary deviation.
    This deviation from the operating regulations is authorized under 
33 CFR 117.35.

    Dated: August 3, 2015.
David M. Frank,
Bridge Administrator, Eighth Coast Guard District.
[FR Doc. 2015-19377 Filed 8-6-15; 8:45 am]
 BILLING CODE 9110-04-P



                                             47410               Federal Register / Vol. 80, No. 152 / Friday, August 7, 2015 / Rules and Regulations

                                             Miramonte’’ is a term of viticultural                   onto the Tucker Mountain map, to the                  1:30 p.m. to 5:30 p.m., daily, beginning
                                             significance.                                           southwest corner of section 34, T14S/                 August 31 through September 5, 2015.
                                                (b) Approved maps. The six United                    R26E; then                                            ADDRESSES: The docket for this
                                             States Geological Survey (USGS)                           (9) Proceed north along the western                 deviation, [USCG–2015–0741] is
                                             1:24,000 scale topographic maps used to                 boundary lines of sections 34, 27, 22,                available at http://www.regulations.gov.
                                             determine the boundary of the Squaw                     and 15, T14S/R26E, to the northwest                   Type the docket number in the
                                             Valley-Miramonte viticultural area are                  corner of section 15; then                            ‘‘SEARCH’’ box and click ‘‘SEARCH.’’
                                             titled:                                                   (10) Proceed west along the southern                Click on Open Docket Folder on the line
                                                (1) Orange Cove North, Calif., 1966;                 boundary lines of sections 9, 8, and 7,               associated with this deviation. You may
                                                (2) Pine Flat Dam, Calif., 1965;                     T14S/R26E, and sections 12 and 11,                    also visit the Docket Management
                                             photoinspected 1978;                                    T14S/R25E, to the southwest corner of                 Facility in Room W12–140 on the
                                                (3) Luckett Mtn., Calif., provisional                section 11; then                                      ground floor of the Department of
                                             edition 1987;                                             (11) Proceed south along the eastern
                                                (4) Verplank Ridge, Calif., provisional                                                                    Transportation West Building, 1200
                                                                                                     boundary lines of sections 15 and 22,                 New Jersey Avenue SE., Washington,
                                             edition 1987;
                                                (5) Miramonte, Calif., 1966; and                     T14S/R25E, to the southeast corner of                 DC 20590, between 9 a.m. and 5 p.m.,
                                                (6) Tucker Mtn., Calif., 1966.                       section 22; then (12) Proceed west along              Monday through Friday, except Federal
                                                (c) Boundary. The Squaw Valley-                      the southern boundary line of section                 holidays.
                                             Miramonte viticultural area is located in               22, T14S/R25E, and, crossing onto the                 FOR FURTHER INFORMATION CONTACT: If
                                             Fresno County, California. The                          Orange Cove North map, continue west                  you have questions on this temporary
                                             boundary of the Squaw Valley-                           along the southern boundary line of                   deviation, call or email Jim
                                             Miramonte viticultural area is as                       section 21, T14S/R25E, returning to the               Wetherington, Bridge Administration
                                             described below:                                        beginning point.                                      Branch, Coast Guard; telephone 504–
                                                (1) The beginning point is located on                  Signed: June 11, 2015.                              671–2128, email james.r.wetherington@
                                             the Orange Cove North map, at the                       John J. Manfreda,                                     uscg.mil. If you have questions on
                                             southwest corner of section 21, T14S/                   Administrator.                                        viewing the docket, call Cheryl F.
                                             R25E. From the beginning point,                                                                               Collins, Program Manager, Docket
                                                                                                       Approved: June 17, 2015.
                                             proceed north-northwesterly in a                                                                              Operations, telephone 202–366–9826.
                                             straight line to the marked 3,355-foot                  Timothy E. Skud,
                                                                                                                                                           SUPPLEMENTARY INFORMATION: The BNSF
                                             elevation point on Bear Mountain,                       Deputy Assistant Secretary (Tax, Trade, and
                                                                                                     Tariff Policy).                                       Railway Company requested a
                                             section 5, T14S/R25E; then                                                                                    temporary deviation from the operating
                                                (2) Proceed northeast in a straight                  [FR Doc. 2015–19454 Filed 8–6–15; 8:45 am]
                                                                                                                                                           schedule of the Galveston Causeway
                                             line, crossing onto the Pine Flat Dam                   BILLING CODE 4810–31–P
                                                                                                                                                           Railroad Vertical Lift Bridge across the
                                             map and over the marked 3,354-foot
                                                                                                                                                           Gulf Intracoastal Waterway, mile 357.2
                                             elevation point on Bear Mountain,
                                                                                                                                                           west of Harvey Locks, at Galveston,
                                             section 32, T13S/R25E, and then                         DEPARTMENT OF HOMELAND                                Galveston County, Texas.
                                             continuing northeasterly in a straight                  SECURITY                                                 The bridge has a vertical clearance of
                                             line and crossing onto the Luckett                                                                            8.0 feet above mean high water,
                                             Mountain map, proceed to the marked                     Coast Guard                                           elevation 3.0 feet (NAVD88), in the
                                             3,489-foot summit of Dalton Mountain,
                                                                                                                                                           closed-to-navigation position and 73
                                             section 22, T13S/R25E; then                             33 CFR Part 117                                       feet above mean high water in the open-
                                                (3) Proceed easterly in a straight line
                                             to the Sequoia National Forest boundary                 [Docket No. USCG–2015–0741]                           to-navigation position. In accordance
                                             line at the northwest corner of section                                                                       with 33 CFR 117.5, the draw shall open
                                             28, T13S/R26E; then                                     Drawbridge Operation Regulation; Gulf                 on signal for the passage of vessels.
                                                (4) Proceed east along the Sequoia                   Intracoastal Waterway, Galveston, TX                     This temporary deviation allows the
                                             National Forest boundary line, crossing                                                                       vertical lift bridge to remain closed to
                                                                                                     AGENCY: Coast Guard, DHS.                             navigation from 7:30 a.m. to 11:30 and
                                             onto the Verplank Ridge map, and
                                             continue south, then east, then south                   ACTION:Notice of deviation from                       then again from 1:30 p.m. to 5:30 p.m.,
                                             along the national forest boundary line,                drawbridge regulations.                               daily, beginning August 31 through
                                             crossing onto the Miramonte map, and                                                                          September 5, 2015. During this time, the
                                                                                                     SUMMARY:   The Coast Guard has issued a               bridge owner will complete cable
                                             then continue south, then east along the                temporary deviation from the operating
                                             national forest boundary line to the                                                                          lubing, welding joints and replacing
                                                                                                     schedule that governs the operation of                span guide bearings. If the vessel can
                                             northeast corner of section 5, T14S/                    the Galveston Causeway Railroad
                                             R27E; then                                                                                                    safely pass without an opening, the
                                                                                                     Vertical Lift Bridge across the Gulf                  vessel may pass at the slowest safe
                                                (5) Proceed south along the eastern
                                                                                                     Intracoastal Waterway, mile 357.2 west                speed. The bridge can open in case of
                                             boundary lines of sections 5, 8, and 17,
                                                                                                     of Harvey Locks, at Galveston,                        emergency.
                                             T14S/R27E, to the southeast corner of
                                                                                                     Galveston County, Texas. The deviation                   Navigation at the site of the bridge
                                             section 17; then
                                                (6) Proceed east along the northern                  is necessary in order to conduct                      consists mainly of tows with barges and
                                             boundary line of section 21, T14S/R27E,                 maintenance on the bridge. This                       some recreational pleasure craft. Based
                                             to the northeast corner of that section;                deviation allows the bridge to remain                 on known waterway users, as well as
                                             then                                                    temporarily closed to navigation for                  coordination with those waterway users,
                                                                                                     eight hours on consecutive days during
rmajette on DSK2TPTVN1PROD with RULES




                                                (7) Proceed south along the eastern                                                                        it has been determined that this closure
                                             boundary lines of sections 21, 28, and                  day light hours and will operate                      will not have a significant effect on
                                             33, T14S/R27E, to the Fresno-Tulare                     normally at all other times.                          these vessels. No alternate routes are
                                             County boundary line at the southeast                   DATES: This deviation is effective from               available.
                                             corner of section 33; then                              August 31 through September 5, 2015.                     In accordance with 33 CFR 117.35,
                                                (8) Proceed west along the Fresno-                   This deviation will be enforced from                  the draw bridge must return to its
                                             Tulare County boundary line, crossing                   7:30 a.m. to 11:30 and then again from                regular operating schedule immediately


                                        VerDate Sep<11>2014   15:21 Aug 06, 2015   Jkt 235001   PO 00000   Frm 00012   Fmt 4700   Sfmt 4700   E:\FR\FM\07AUR1.SGM   07AUR1


                                                                 Federal Register / Vol. 80, No. 152 / Friday, August 7, 2015 / Rules and Regulations                                              47411

                                             at the end of the effective period of this              questions on viewing the docket, call                    In accordance with 33 CFR 117.35(e),
                                             temporary deviation.                                    Cheryl Collins, Program Manager,                      the drawbridges must return to their
                                                This deviation from the operating                    Docket Operations, telephone 202–366–                 regular operating schedules
                                             regulations is authorized under 33 CFR                  9826.                                                 immediately at the end of the effective
                                             117.35.                                                                                                       period of this temporary deviation. This
                                                                                                     SUPPLEMENTARY INFORMATION:
                                               Dated: August 3, 2015.                                                                                      deviation from the operating regulations
                                                                                                     Multnomah County has requested a                      is authorized under 33 CFR 117.35.
                                             David M. Frank,                                         temporary deviation from the operating
                                             Bridge Administrator, Eighth Coast Guard                schedule for the Broadway Bridge, mile                  Dated: July 17, 2015.
                                             District.                                               11.7, Burnside Bridge, mile 12.4,                     Steven M. Fischer,
                                             [FR Doc. 2015–19377 Filed 8–6–15; 8:45 am]              Morrison Bridge, mile 12.8, and                       Bridge Administrator, Thirteenth Coast Guard
                                             BILLING CODE 9110–04–P                                  Hawthorne Bridge, mile 13.1, all                      District.
                                                                                                     crossing the Willamette River at                      [FR Doc. 2015–19373 Filed 8–6–15; 8:45 am]
                                                                                                     Portland, OR. The requested deviation is              BILLING CODE 9110–04–P
                                             DEPARTMENT OF HOMELAND                                  to accommodate the annual Providence
                                             SECURITY                                                Bridge Pedal event. To facilitate this
                                                                                                     event, the draws of the bridges will be               DEPARTMENT OF HEALTH AND
                                             Coast Guard                                                                                                   HUMAN SERVICES
                                                                                                     maintained in the closed-to-navigation
                                                                                                     positions as follows: The Broadway
                                             33 CFR Part 117                                                                                               42 CFR Part 110
                                                                                                     Bridge, mile 11.7, provides a vertical
                                             [Docket No. USCG–2015–0624]                             clearance of 90 feet in the closed                    RIN 0906–AA79
                                                                                                     position; Burnside Bridge, mile 12.4,
                                             Drawbridge Operation Regulation;                        provides a vertical clearance of 64 feet              Countermeasures Injury
                                             Willamette River at Portland, OR                        in the closed position; Morrison Bridge,              Compensation Program: Pandemic
                                             AGENCY: Coast Guard, DHS.                               mile 12.8, provides a vertical clearance              Influenza Countermeasures Injury
                                                                                                     of 69 feet in the closed position; and                Table
                                             ACTION:Notice of deviation from
                                             drawbridge regulation.                                  Hawthorne Bridge, mile 13.1, provides a               AGENCY:  Health Resources and Services
                                                                                                     vertical clearance of 49 feet in the                  Administration (HRSA), Department of
                                             SUMMARY:    The Coast Guard has issued a                closed position; all clearances are                   Health and Human Services (HHS).
                                             temporary deviation from the operating                  referenced to the vertical clearance                  ACTION: Final rule.
                                             schedule that governs four Multnomah                    above Columbia River Datum 0.0. The
                                             County bridges: the Broadway Bridge,                    normal operating schedule for all four                SUMMARY:   HHS is establishing the
                                             mile 11.7, Burnside Bridge, mile 12.4,                  bridges is set in 33 CFR 117.897, and                 Pandemic Influenza Countermeasures
                                             Morrison Bridge, mile 12.8, and                         states that the bridges need not open                 Injury Table as authorized by the Public
                                             Hawthorne Bridge, mile 13.1, all                        from 7 a.m. to 9 a.m., and from 4 p.m.                Readiness and Emergency Preparedness
                                             crossing the Willamette River at                        to 6 p.m. Monday through Friday. These                Act (PREP Act). Through this final rule,
                                             Portland, OR. This deviation is                         four bridges need not open for vessel                 the Secretary of the U.S. Department of
                                             necessary to accommodate the annual                     traffic from 6 a.m. on August 9, 2015, to             Health and Human Services (Secretary)
                                             Portland Providence Bridge Pedal event.                 12:30 p.m. on August 9, 2015. This                    adds regulations for the purpose of
                                             This deviation allows the bridges to                    deviation period is from 6 a.m. on                    creating Covered Countermeasures
                                             remain in the closed-to-navigation                      August 9, 2015, to 12:30 p.m. August 9,               Injury Tables. The pandemic influenza
                                             position to allow safe roadway                          2015. The deviation allows the                        countermeasures are identified in
                                             movement of event participants.                         Broadway Bridge, Burnside Bridge,                     Secretarial declarations relating to
                                             DATES: This deviation is effective from                 Morrison Bridge, and the Hawthorne                    pandemic influenza, including
                                             6 a.m. on August 9, 2015, to 12:30 p.m.                 Bridge all crossing the Willamette River,             influenza caused by the 2009 H1N1
                                             on August 9, 2015.                                      to remain in the closed-to-navigation                 pandemic influenza virus (hereafter
                                             ADDRESSES: The docket for this                          position and need not open for maritime               referred to as the 2009 H1N1 virus) and
                                             deviation, [USCG–2015–0624] is                          traffic from 6 a.m. to 12:30 p.m. on                  other potential pandemic strains, such
                                             available at http://www.regulations.gov.                August 9, 2015. The four bridges shall                as H5N1 avian influenza.
                                             Type the docket number in the                           operate in accordance to 33 CFR                       DATES: This rule is effective September
                                             ‘‘SEARCH’’ box and click ‘‘SEARCH.’’                    117.897 at all other times. Waterway                  8, 2015.
                                             Click on Open Docket Folder on the line                 usage on this part of the Willamette                  FOR FURTHER INFORMATION CONTACT: Dr.
                                             associated with this deviation. You may                 River includes vessels ranging from                   Avril M. Houston, Director, Division of
                                             also visit the Docket Management                        commercial tug and barge to small                     Injury Compensation Programs,
                                             Facility in Room W12–140 on the                         pleasure craft.                                       Healthcare Systems Bureau, HRSA,
                                             ground floor of the Department of                          Vessels able to pass through the                   Parklawn Building, Room 11C–26, 5600
                                             Transportation West Building, 1200                      bridge in the closed-to-navigation                    Fishers Lane, Rockville, MD 20857, or
                                             New Jersey Avenue SE., Washington,                      positions may do so at any time. The                  by telephone (855) 266–2427. This is a
                                             DC 20590, between 9 a.m. and 5 p.m.,                    bridges will be able to open for                      toll-free number.
                                             Monday through Friday, except Federal                   emergencies and there is no immediate                 SUPPLEMENTARY INFORMATION: On March
                                             holidays.                                               alternate route for vessels to pass. The              30, 2014, HHS published the Notice of
                                             FOR FURTHER INFORMATION CONTACT: If                     Coast Guard will also inform the users                Proposed Rulemaking (NPRM) in the
rmajette on DSK2TPTVN1PROD with RULES




                                             you have questions on this temporary                    of the waterways through our Local and                Federal Register to amend the
                                             deviation, call or email Mr. Steven                     Broadcast Notices to Mariners of the                  Countermeasures Injury Compensation
                                             Fischer, Bridge Administrator,                          change in operating schedule for the                  Program’s (CICP or Program)
                                             Thirteenth Coast Guard District;                        bridges so that vessels can arrange their             implementing regulation and establish a
                                             telephone 206–220–7282, email d13-pf-                   transits to minimize any impact caused                table of injuries resulting from the
                                             d13bridges@uscg.mil. If you have                        by the temporary deviation.                           administration or use of covered


                                        VerDate Sep<11>2014   15:21 Aug 06, 2015   Jkt 235001   PO 00000   Frm 00013   Fmt 4700   Sfmt 4700   E:\FR\FM\07AUR1.SGM   07AUR1



Document Created: 2015-12-15 10:56:22
Document Modified: 2015-12-15 10:56:22
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionNotice of deviation from drawbridge regulations.
DatesThis deviation is effective from August 31 through September 5, 2015. This deviation will be enforced from 7:30 a.m. to 11:30 and then again from 1:30 p.m. to 5:30 p.m., daily, beginning August 31 through September 5, 2015.
ContactIf you have questions on this temporary deviation, call or email Jim Wetherington, Bridge Administration Branch, Coast Guard; telephone 504-671-2128, email [email protected] If you have questions on viewing the docket, call Cheryl F. Collins, Program Manager, Docket Operations, telephone 202-366-9826.