NUCLEAR REGULATORY COMMISSION

Federal Register Volume 80, Issue 152 (August 7, 2015)

Page Range47534-47535
FR Document2015-19445

The U.S. Nuclear Regulatory Commission (NRC) is issuing a revised regulatory guide, (RG) 5.27, Revision 1, ``Special Nuclear Material Doorway Monitors.'' This guidance addresses NRC requirements that individuals must be searched as they leave a material access area (MAA) for facilities that contain special nuclear material (SNM) of a type and quantity that require an MAA.

Federal Register, Volume 80 Issue 152 (Friday, August 7, 2015)
[Federal Register Volume 80, Number 152 (Friday, August 7, 2015)]
[Notices]
[Pages 47534-47535]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-19445]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2014-0062]


Special Nuclear Material Doorway Monitors

AGENCY: Nuclear Regulatory Commission.

ACTION: Regulatory guide; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing a 
revised regulatory guide, (RG) 5.27, Revision 1, ``Special Nuclear 
Material Doorway Monitors.'' This guidance addresses NRC requirements 
that individuals must be searched as they leave a material access area 
(MAA) for facilities that contain special nuclear material (SNM) of a 
type and quantity that require an MAA.

ADDRESSES: Please refer to Docket ID NRC-2014-0062 when contacting the 
NRC about the availability of information regarding this document. You 
may access information related to this document, which the NRC 
possesses and is publicly available, using the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2014-0062. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-287-
3422; email: [email protected].
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may access publicly available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced in this notice (if 
that document is available in ADAMS) is provided the first time that a 
document is referenced. Revision 1 of Regulatory Guide 5.27 is 
available in ADAMS under Accession No. ML14290A268. The regulatory 
analysis may be found in ADAMS under Accession No. ML12237A124.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.
    Regulatory guides are not copyrighted, and NRC approval is not 
required to reproduce them.

FOR FURTHER INFORMATION CONTACT: Al Tardiff, Office of Nuclear Security 
and Incident Response, telephone: 301-415-7015, email: 
[email protected] or, Richard Jervey, Office of Nuclear Regulatory 
Research, telephone: telephone: 301-251-7404, email: 
[email protected]; U.S. Nuclear Regulatory Commission, Washington, 
DC 20555-0001.

SUPPLEMENTARY INFORMATION: 

I. Introduction

    The NRC is issuing a new guide in the NRC's ``Regulatory Guide'' 
series. This series was developed to describe and make available to the 
public information such as methods that are acceptable to the NRC staff 
for implementing specific parts of the agency's regulations, techniques 
that the staff uses in evaluating specific problems or postulated 
accidents, and data that the staff needs in its review of applications 
for permits and licenses.
    Regulatory Guide 5.27, Revision 1 was issued for comment as Draft 
Regulatory Guide (DG) 5038. The NRC developed this regulatory guide to 
describe a method that the NRC staff considers acceptable to implement 
the search requirement for concealed SNM applied to personnel exiting a 
material access area MAA. For holders of a reactor license under part 
50 of title 10 of the Code of Federal Regulations (10 CFR) (Ref. 1), 
``Domestic Licensing of Production and Utilization Facilities,'' a 
combined license under 10 CFR part 52, ``Licenses, Certifications, and 
Approvals for Nuclear Power Plants,'' or a fuel cycle facility license 
under 10 CFR part 76, ``Certification of Gaseous Diffusion Plants,'' 
having the need to possess or use SNM within their facility, the NRC 
typically has included in their license a condition granting a general 
license to use SNM under 10 CFR part 70, ``Domestic Licensing of 
Special Nuclear Material.'' The RG applies to facilities that contain 
SNM of a type and quantity to require an MAA. An MAA is any location 
which contains special nuclear material, within a vault or a building, 
the roof, walls, and floor of which each constitute a physical barrier.
    This RG is being revised because it was out-of-date with current, 
related

[[Page 47535]]

guidance and references in the CFR. Related specifications and 
standards for SNM monitors and metal detectors have been updated or 
developed since the previous revision was issued in 1974. This revision 
has been developed to provide detection practices and criteria that 
licensees may use to meet NRC regulations in 10 CFR part 73 and to 
augment programmatic information within the general reference, NUREG-
1964, ``Access Control Systems: Technical Information for NRC 
Licensees,'' issued in April of 2011. NUREG-1964 may be found in ADAMS 
under Accession No. ML1115A078.

II. Additional Information

    DG-5038 was published in the Federal Register on March 26, 2014, 
(79 FR 16832) for a 30 day public comment period. The public comment 
period closed on April 25, 2014. Public comments on DG-5038 and the 
staff responses to the public comments are available at ADAMS Accession 
Number ML14288A653.

III. Congressional Review Act

    This regulatory guide is a rule as defined in the Congressional 
Review Act (5 U.S.C. 801-808). However, the Office of Management and 
Budget has not found it to be a major rule as defined in the 
Congressional Review Act.

IV. Backfitting and Issue Finality

    This RG applies to applicants for, and current and future holders 
of special nuclear material licenses under 10 CFR part 70, and 
operating licenses under part 50, combined licenses under part 52, and 
certificates of compliance or approvals of a compliance plan for 
gaseous diffusion plants under part 76 if they are also applicants for, 
or holders of, special nuclear material licenses under part 70. 
Issuance of this RG does not constitute backfitting under 10 CFR parts 
50, 70, or 76, and is not otherwise inconsistent with the issue 
finality provisions in 10 CFR part 52. As discussed in the 
``Implementation'' section of the RG, the NRC has no current intention 
to impose this RG on holders of part 50 operating licenses, part 52 
combined licenses, part 70 licensees, or part 76 certificates of 
compliance. Moreover, the guidance in the RG addresses security issues, 
which are matters separate from the technical requirements to operate a 
facility covered by backfitting and issue finality provisions.
    The NRC has determined that the backfit provisions in Sec.  50.109 
do not apply to non-power reactor licensees because the rulemaking 
record for Sec.  50.109 indicates that the Commission likely intended 
to apply this provision to only power reactors, and NRC practice has 
been consistent with this rulemaking record. The part 52 issue finality 
provisions do not apply to non-power reactors because part 52 does not 
apply to non-power reactors.
    This RG could be applied to applications for part 50 operating 
licenses, part 52 combined licenses, part 70 licenses, and part 76 
certificates of compliance docketed by the NRC as of the date of 
issuance of the RG, as well as future such applications submitted after 
the issuance of the RG. Such action would not constitute backfitting as 
defined in 10 CFR 50.109, 70.76, or 76.76, or be otherwise inconsistent 
with the applicable issue finality provision in 10 CFR part 52, 
inasmuch as such applicants or potential applicants are not within the 
scope of entities protected by 10 CFR 50.109, 70.76, and 76.76, or the 
relevant issue finality provisions in part 52. Backfitting restrictions 
were not intended to apply to every NRC action that substantially 
changes settled expectations, and applicants have no reasonable 
expectation that future requirements may change, see 54 FR 15372 (April 
18, 1989), at 15385-86. Although the issue finality provisions in part 
52 are intended to provide regulatory stability and issue finality, the 
matters addressed in this RG (concerning certain security requirements 
in part 73) are not within the scope of issues that may be resolved for 
design certification, design approval or a manufacturing license, and 
therefore are not subject to issue finality protections in part 52.

    Dated at Rockville, Maryland, this 23rd day of July 2015.

    For the Nuclear Regulatory Commission.
Thomas H. Boyce,
Chief, Regulatory Guidance and Generic Issues Branch, Division of 
Engineering, Office of Nuclear Regulatory Research.
[FR Doc. 2015-19445 Filed 8-6-15; 8:45 am]
BILLING CODE 7590-01-P



                                              47534                          Federal Register / Vol. 80, No. 152 / Friday, August 7, 2015 / Notices

                                              ML15209A575 (Volume 1) and                                Dated at Rockville, Maryland, this 30th day         ML14290A268. The regulatory analysis
                                              ML15209A270 (Volume 2).                                 of July 2015.                                         may be found in ADAMS under
                                                • NRC’s PDR: You may examine and                        For the Nuclear Regulatory Commission.              Accession No. ML12237A124.
                                              purchase copies of public documents at                  James G. Danna,                                          • NRC’s PDR: You may examine and
                                              the NRC’s PDR, Room O1–F21, One                         Chief, Projects Branch 2, Division of License         purchase copies of public documents at
                                              White Flint North, 11555 Rockville                      Renewal, Office of Nuclear Reactor                    the NRC’s PDR, Room O1–F21, One
                                              Pike, Rockville, Maryland 20852.                        Regulation.                                           White Flint North, 11555 Rockville
                                              FOR FURTHER INFORMATION CONTACT: Lois                   [FR Doc. 2015–19408 Filed 8–6–15; 8:45 am]            Pike, Rockville, Maryland 20852.
                                              James, Office of Nuclear Reactor                        BILLING CODE 7590–01–P
                                                                                                                                                               Regulatory guides are not
                                              Regulation, U.S. Nuclear Regulatory                                                                           copyrighted, and NRC approval is not
                                              Commission, Washington, DC 20555–                                                                             required to reproduce them.
                                              0001; telephone: 301–415–3306; email:                   NUCLEAR REGULATORY                                    FOR FURTHER INFORMATION CONTACT: Al
                                              Lois.James@nrc.gov.                                     COMMISSION                                            Tardiff, Office of Nuclear Security and
                                                                                                                                                            Incident Response, telephone: 301–415–
                                              SUPPLEMENTARY INFORMATION:                              [NRC–2014–0062]                                       7015, email: Al.Tardiff@nrc.gov or,
                                              I. Background                                           Special Nuclear Material Doorway                      Richard Jervey, Office of Nuclear
                                                                                                      Monitors                                              Regulatory Research, telephone:
                                                In accordance with § 51.118 of Title
                                                                                                                                                            telephone: 301–251–7404, email:
                                              10 of the Code of Federal Regulations,
                                                                                                      AGENCY:  Nuclear Regulatory                           Richard.Jervey@nrc.gov; U.S. Nuclear
                                              the NRC is making available final
                                                                                                      Commission.                                           Regulatory Commission, Washington,
                                              Supplement 46 to the GEIS regarding
                                                                                                      ACTION: Regulatory guide; issuance.                   DC 20555–0001.
                                              the renewal of NextEra operating license
                                                                                                                                                            SUPPLEMENTARY INFORMATION:
                                              NPF–86 for an additional 20 years of
                                                                                                      SUMMARY:   The U.S. Nuclear Regulatory
                                              operation for Seabrook. Draft                                                                                 I. Introduction
                                                                                                      Commission (NRC) is issuing a revised
                                              Supplement 46 to the GEIS was noticed                                                                            The NRC is issuing a new guide in the
                                                                                                      regulatory guide, (RG) 5.27, Revision 1,
                                              by the NRC in the Federal Register on                                                                         NRC’s ‘‘Regulatory Guide’’ series. This
                                                                                                      ‘‘Special Nuclear Material Doorway
                                              August 5, 2011 (76 FR 47612), and                                                                             series was developed to describe and
                                                                                                      Monitors.’’ This guidance addresses
                                              noticed by the Environmental Protection                                                                       make available to the public information
                                                                                                      NRC requirements that individuals must
                                              Agency on August 12, 2011 (76 FR                                                                              such as methods that are acceptable to
                                                                                                      be searched as they leave a material
                                              50214). The public comment period on                                                                          the NRC staff for implementing specific
                                                                                                      access area (MAA) for facilities that
                                              draft Supplement 46 to the GEIS ended                                                                         parts of the agency’s regulations,
                                                                                                      contain special nuclear material (SNM)
                                              on October 26, 2011. In April 2013, a                                                                         techniques that the staff uses in
                                                                                                      of a type and quantity that require an
                                              supplement to draft Supplement 46 was                                                                         evaluating specific problems or
                                                                                                      MAA.
                                              published. The supplement to draft                                                                            postulated accidents, and data that the
                                              Supplement 46 was noticed by the                        ADDRESSES:   Please refer to Docket ID                staff needs in its review of applications
                                              Environmental Protection Agency on                      NRC–2014–0062 when contacting the                     for permits and licenses.
                                              May 3, 2013 (78 FR 26027). The end of                   NRC about the availability of                            Regulatory Guide 5.27, Revision 1 was
                                              the comment period for the supplement                   information regarding this document.                  issued for comment as Draft Regulatory
                                              to draft Supplement 46 was on June 30,                  You may access information related to                 Guide (DG) 5038. The NRC developed
                                              2013. The comments received on the                      this document, which the NRC                          this regulatory guide to describe a
                                              draft Supplement 46 published in 2011                   possesses and is publicly available,                  method that the NRC staff considers
                                              and supplement to the draft Supplement                  using the following methods:                          acceptable to implement the search
                                              in 2013 are addressed in final                             • Federal Rulemaking Web site: Go to               requirement for concealed SNM applied
                                              Supplement 46 to the GEIS. Final                        http://www.regulations.gov and search                 to personnel exiting a material access
                                              Supplement 46 to the GEIS is available                  for Docket ID NRC–2014–0062. Address                  area MAA. For holders of a reactor
                                              as indicated in the ADDRESSES section of                questions about NRC dockets to Carol                  license under part 50 of title 10 of the
                                              this document.                                          Gallagher; telephone: 301–287–3422;                   Code of Federal Regulations (10 CFR)
                                                                                                      email: Carol.Gallagher@nrc.gov.                       (Ref. 1), ‘‘Domestic Licensing of
                                              II. Discussion                                             • NRC’s Agencywide Documents                       Production and Utilization Facilities,’’ a
                                                 As discussed in Section 9.4 of the                   Access and Management System                          combined license under 10 CFR part 52,
                                              final Supplement 46 to the GEIS, the                    (ADAMS): You may access publicly                      ‘‘Licenses, Certifications, and Approvals
                                              NRC determined that the adverse                         available documents online in the                     for Nuclear Power Plants,’’ or a fuel
                                              environmental impacts of license                        ADAMS Public Documents collection at                  cycle facility license under 10 CFR part
                                              renewal for Seabrook are not so great                   http://www.nrc.gov/reading-rm/                        76, ‘‘Certification of Gaseous Diffusion
                                              that preserving the option of license                   adams.html. To begin the search, select               Plants,’’ having the need to possess or
                                              renewal for energy-planning                             ‘‘ADAMS Public Documents’’ and then                   use SNM within their facility, the NRC
                                              decisionmakers would be unreasonable.                   select ‘‘Begin Web-based ADAMS                        typically has included in their license a
                                              This recommendation is based on: (1)                    Search.’’ For problems with ADAMS,                    condition granting a general license to
                                              the analysis and findings in the GEIS;                  please contact the NRC’s Public                       use SNM under 10 CFR part 70,
                                              (2) information provided in the                         Document Room (PDR) reference staff at                ‘‘Domestic Licensing of Special Nuclear
                                              environmental report and other                          1–800–397–4209, 301–415–4737, or by                   Material.’’ The RG applies to facilities
                                              documents submitted by NextEra; (3)                     email to pdr.resource@nrc.gov. The                    that contain SNM of a type and quantity
tkelley on DSK3SPTVN1PROD with NOTICES




                                              consultation with Federal, State, local,                ADAMS accession number for each                       to require an MAA. An MAA is any
                                              and Tribal agencies; (4) the NRC staff’s                document referenced in this notice (if                location which contains special nuclear
                                              independent environmental review; and                   that document is available in ADAMS)                  material, within a vault or a building,
                                              (5) consideration of public comments                    is provided the first time that a                     the roof, walls, and floor of which each
                                              received during the scoping process and                 document is referenced. Revision 1 of                 constitute a physical barrier.
                                              on the draft Supplemental                               Regulatory Guide 5.27 is available in                    This RG is being revised because it
                                              Environmental Impact Statement.                         ADAMS under Accession No.                             was out-of-date with current, related


                                         VerDate Sep<11>2014   18:24 Aug 06, 2015   Jkt 235001   PO 00000   Frm 00085   Fmt 4703   Sfmt 4703   E:\FR\FM\07AUN1.SGM   07AUN1


                                                                             Federal Register / Vol. 80, No. 152 / Friday, August 7, 2015 / Notices                                            47535

                                              guidance and references in the CFR.                     § 50.109 indicates that the Commission                Federal Employees’ Group Life
                                              Related specifications and standards for                likely intended to apply this provision               Insurance (FEGLI) categories in
                                              SNM monitors and metal detectors have                   to only power reactors, and NRC                       accordance with sections 870.401(a)(2)
                                              been updated or developed since the                     practice has been consistent with this                and 870.402(a)(3) of title 5 of the Code
                                              previous revision was issued in 1974.                   rulemaking record. The part 52 issue                  of Federal Regulations. These include
                                              This revision has been developed to                     finality provisions do not apply to non-              changes to premium rates for Option A
                                              provide detection practices and criteria                power reactors because part 52 does not               (most age bands), Option B (most age
                                              that licensees may use to meet NRC                      apply to non-power reactors.                          bands), Option C (most age bands), and
                                              regulations in 10 CFR part 73 and to                       This RG could be applied to                        Post-Retirement Basic Insurance. These
                                              augment programmatic information                        applications for part 50 operating                    rates will be effective the first pay
                                              within the general reference, NUREG–                    licenses, part 52 combined licenses, part             period beginning on or after January 1,
                                              1964, ‘‘Access Control Systems:                         70 licenses, and part 76 certificates of              2016. The FEGLI Open Season will be
                                              Technical Information for NRC                           compliance docketed by the NRC as of                  held from September 1, 2016 through
                                              Licensees,’’ issued in April of 2011.                   the date of issuance of the RG, as well               September 30, 2016.
                                              NUREG–1964 may be found in ADAMS                        as future such applications submitted                 DATES: These rates will be effective the
                                              under Accession No. ML1115A078.                         after the issuance of the RG. Such action             first pay period beginning on or after
                                                                                                      would not constitute backfitting as                   January 1, 2016.
                                              II. Additional Information                              defined in 10 CFR 50.109, 70.76, or
                                                                                                                                                            FOR FURTHER INFORMATION CONTACT:
                                                 DG–5038 was published in the                         76.76, or be otherwise inconsistent with
                                              Federal Register on March 26, 2014, (79                                                                       Delon Pinto, Delon.Pinto@opm.gov,
                                                                                                      the applicable issue finality provision in
                                              FR 16832) for a 30 day public comment                                                                         (202) 606–0004.
                                                                                                      10 CFR part 52, inasmuch as such
                                              period. The public comment period                       applicants or potential applicants are                SUPPLEMENTARY INFORMATION: This
                                              closed on April 25, 2014. Public                        not within the scope of entities                      notice announces an upcoming FEGLI
                                              comments on DG–5038 and the staff                       protected by 10 CFR 50.109, 70.76, and                Open Season between September 1,
                                              responses to the public comments are                    76.76, or the relevant issue finality                 2016 and September 30, 2016 and also
                                              available at ADAMS Accession Number                     provisions in part 52. Backfitting                    announces changes to FEGLI Option A
                                              ML14288A653.                                            restrictions were not intended to apply               (most age bands), Option B (most age
                                                                                                      to every NRC action that substantially                bands), Option C (most age bands), and
                                              III. Congressional Review Act                                                                                 Post-Retirement Basic Insurance.
                                                                                                      changes settled expectations, and
                                                 This regulatory guide is a rule as                   applicants have no reasonable                            Open Seasons are one method by
                                              defined in the Congressional Review                     expectation that future requirements                  which healthy individuals can be
                                              Act (5 U.S.C. 801–808). However, the                    may change, see 54 FR 15372 (April 18,                attracted to join and reduce the risk
                                              Office of Management and Budget has                     1989), at 15385–86. Although the issue                profile of the program. Some less
                                              not found it to be a major rule as                      finality provisions in part 52 are                    healthy individuals may elect coverage
                                              defined in the Congressional Review                     intended to provide regulatory stability              during Open Seasons. To mitigate this
                                              Act.                                                    and issue finality, the matters addressed             risk, the effective date for employees in
                                                                                                      in this RG (concerning certain security               active pay status who make an Open
                                              IV. Backfitting and Issue Finality                                                                            Season election would be delayed one
                                                                                                      requirements in part 73) are not within
                                                 This RG applies to applicants for, and               the scope of issues that may be resolved              full year to October 1, 2017, subject to
                                              current and future holders of special                   for design certification, design approval             FEGLI law and regulation, including
                                              nuclear material licenses under 10 CFR                  or a manufacturing license, and                       applicable pay and duty status
                                              part 70, and operating licenses under                   therefore are not subject to issue finality           requirements.
                                              part 50, combined licenses under part                   protections in part 52.                                  FEGLI premium rates are assessed
                                              52, and certificates of compliance or                                                                         based on Program experience in
                                              approvals of a compliance plan for                         Dated at Rockville, Maryland, this 23rd day        accordance with FEGLI statutes at
                                                                                                      of July 2015.                                         8711(b), 8714a(e), 8714b(e), and
                                              gaseous diffusion plants under part 76
                                              if they are also applicants for, or holders                For the Nuclear Regulatory Commission.             8714c(e), and OPM’s Annual FEGLI Rate
                                              of, special nuclear material licenses                   Thomas H. Boyce,                                      Review Process. The premium rates in
                                              under part 70. Issuance of this RG does                 Chief, Regulatory Guidance and Generic                the FEGLI program represent estimates
                                              not constitute backfitting under 10 CFR                 Issues Branch, Division of Engineering, Office        of premium income necessary to pay
                                              parts 50, 70, or 76, and is not otherwise               of Nuclear Regulatory Research.                       future expected benefits costs. The rates
                                              inconsistent with the issue finality                    [FR Doc. 2015–19445 Filed 8–6–15; 8:45 am]            for all coverage categories are specific to
                                              provisions in 10 CFR part 52. As                        BILLING CODE 7590–01–P                                the experience of the FEGLI group and
                                              discussed in the ‘‘Implementation’’                                                                           are not based on mortality rates within
                                              section of the RG, the NRC has no                                                                             the general population. Actuarial
                                              current intention to impose this RG on                  OFFICE OF PERSONNEL                                   analysis of changing mortality rates
                                              holders of part 50 operating licenses,                  MANAGEMENT                                            makes periodic premium adjustments
                                              part 52 combined licenses, part 70                                                                            necessary.
                                              licensees, or part 76 certificates of                   Federal Employees’ Group Life                            OPM has completed a study of
                                              compliance. Moreover, the guidance in                   Insurance Program; Premium Changes                    funding and claims experience within
                                              the RG addresses security issues, which                 and Open Season                                       the FEGLI Program. Based on this
                                              are matters separate from the technical                 AGENCY: U.S. Office of Personnel                      updated actuarial analysis of actual
tkelley on DSK3SPTVN1PROD with NOTICES




                                              requirements to operate a facility                      Management.                                           claims experience, OPM has determined
                                              covered by backfitting and issue finality               ACTION: Notice.
                                                                                                                                                            that changes are required to Option A,
                                              provisions.                                                                                                   Option B, Option C and Post-Retirement
                                                 The NRC has determined that the                      SUMMARY:  The Office of Personnel                     Basic Insurance premiums. These
                                              backfit provisions in § 50.109 do not                   Management (OPM) is announcing an                     changes reflect updated mortality and
                                              apply to non-power reactor licensees                    upcoming FEGLI Open Season and                        claims rates from actual program
                                              because the rulemaking record for                       changes in premium rates for certain                  experience within each FEGLI category.


                                         VerDate Sep<11>2014   18:24 Aug 06, 2015   Jkt 235001   PO 00000   Frm 00086   Fmt 4703   Sfmt 4703   E:\FR\FM\07AUN1.SGM   07AUN1



Document Created: 2015-12-15 10:57:21
Document Modified: 2015-12-15 10:57:21
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionRegulatory guide; issuance.
ContactAl Tardiff, Office of Nuclear Security and Incident Response, telephone: 301-415-7015, email: [email protected] or, Richard Jervey, Office of Nuclear Regulatory Research, telephone: telephone: 301-251-7404, email: [email protected]; U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
FR Citation80 FR 47534 