DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 154 (August 11, 2015)

Page Range48092-48092
FR Document2015-19694

Federal Register, Volume 80 Issue 154 (Tuesday, August 11, 2015)
[Federal Register Volume 80, Number 154 (Tuesday, August 11, 2015)]
[Notices]
[Page 48092]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-19694]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14678-000]


Liquid Sun Hydro, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On May 1, 2015, the Liquid Sun Hydro, LLC, filed an application for 
a preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of the Bear Creek 
Hydroelectric Project (Bear Creek Project or project) to be located on 
Bear Creek, near Concrete, Skagit County, Washington. The sole purpose 
of a preliminary permit, if issued, is to grant the permit holder 
priority to file a license application during the permit term. A 
preliminary permit does not authorize the permit holder to perform any 
land-disturbing activities or otherwise enter upon lands or waters 
owned by others without the owners' express permission.
    The proposed project would consist of two developments: The Upper 
Bear Creek and the Lower Bear Creek, using some of the existing 
facilities from Puget Sound Power and Light Co.'s Bear Creek Project 
(P-3286) which was surrendered in 1983.

Upper Bear Creek Development

    The Upper Bear Creek development would consist of the following 
existing facilities: (1) A reservoir with a surface area of one acre 
and storage capacity of two acre-feet; (2) a 100-foot-long, 6-foot-high 
diversion with an integrated 30-foot-long, 6-foot-high ungated overflow 
spillway, (3) a powerhouse containing a 250-kilowatt (kW) Francis 
turbine; (4) an 8-foot-wide tailrace; and (5) a total of 1,850 feet of 
access roads. All of these facilities will be renovated or repaired. 
The Upper Bear Creek development would also consist of the following 
new facilities: (1) A 400-foot-long, 36-inch-diameter above-ground 
steel penstock routed through the existing penstock alignment; (2) a 
250-kW generator; (3) a 350-foot-long, 12.5-kilovolt (kV) three-phase 
transmission line interconnecting with the existing Bear Creek Project 
transmission line; and (4) appurtenant facilities. The estimated annual 
generation of the Upper Bear Creek development would be 1.2 gigawatt-
hours (GWh).

Lower Bear Creek Development

    The Lower Bear Creek development would consist of the following 
existing facilities: (1) A reservoir with a surface area of 1.7 acre; 
(2) a 235-foot-long, 24-foot-high diversion structure with an 
integrated 82-foot-long, 24-foot-high ungated overflow spillway; (3) a 
powerhouse containing three 600-kW Pelton turbines; (4) two tailraces; 
and (5) a total of 4,350 feet of access roads. All of these facilities 
will be renovated or repaired. The Lower Bear Creek development would 
also consist of the following new facilities: (1) A 2,800-foot-long, 
36-inch-diameter above-ground steel penstock routed through the 
existing penstock alignment; (2) a 4,000-kW Francis replacing the 
existing three Pelton turbines; (3) a 3.5-mile-long, 12.5-kV three-
phase transmission line interconnecting with the Puget Sound Energy 
transmission lines at Lake Tyree; and (4) appurtenant facilities. The 
estimated annual generation of the Lower Bear Creek development would 
be 15 GWh.
    Both developments would be operated as a run-of-river facilities 
and have no usable storage. The estimated total annual generation of 
the project would be 16.2 GWh.
    Applicant Contact: Mr. Terrance Meyer, Liquid Sun Hydro, LLC, 55753 
State Route 20, P.O. Box 205, Rockport, Washington 98283; phone: (785) 
865-8758.
    FERC Contact: Kelly Wolcott; phone: (202) 502-6480.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14678-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14678) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: August 5, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-19694 Filed 8-10-15; 8:45 am]
 BILLING CODE 6717-01-P



                                                    48092                        Federal Register / Vol. 80, No. 154 / Tuesday, August 11, 2015 / Notices

                                                    or toll free at (866) 208–3676, or for                  Upper Bear Creek Development                          (without notices of intent), or notices of
                                                    TTY, contact (202) 502–8659. The                           The Upper Bear Creek development                   intent to file competing applications: 60
                                                    eLibrary link also provides access to the               would consist of the following existing               days from the issuance of this notice.
                                                    texts of formal documents issued by the                 facilities: (1) A reservoir with a surface            Competing applications and notices of
                                                    Commission, such as orders, notices,                    area of one acre and storage capacity of              intent must meet the requirements of 18
                                                    and rulemakings.                                        two acre-feet; (2) a 100-foot-long, 6-foot-           CFR 4.36.
                                                       In addition, the Commission offers a                 high diversion with an integrated 30-                    The Commission strongly encourages
                                                    free service called eSubscription which                 foot-long, 6-foot-high ungated overflow               electronic filing. Please file comments,
                                                    allows you to keep track of all formal                  spillway, (3) a powerhouse containing a               motions to intervene, notices of intent,
                                                    issuances and submittals in specific                    250-kilowatt (kW) Francis turbine; (4)                and competing applications using the
                                                    dockets. This can reduce the amount of                  an 8-foot-wide tailrace; and (5) a total of           Commission’s eFiling system at http://
                                                    time you spend researching proceedings                  1,850 feet of access roads. All of these              www.ferc.gov/docs-filing/efiling.asp.
                                                    by automatically providing you with                     facilities will be renovated or repaired.             Commenters can submit brief comments
                                                    notification of these filings, document                 The Upper Bear Creek development                      up to 6,000 characters, without prior
                                                    summaries, and direct links to the                      would also consist of the following new               registration, using the eComment system
                                                    documents. Go to www.ferc.gov/docs-                     facilities: (1) A 400-foot-long, 36-inch-             at http://www.ferc.gov/docs-filing/
                                                    filing/esubscription.asp.                               diameter above-ground steel penstock                  ecomment.asp. You must include your
                                                                                                            routed through the existing penstock                  name and contact information at the end
                                                       Finally, public meetings or site visits                                                                    of your comments. For assistance,
                                                                                                            alignment; (2) a 250-kW generator; (3) a
                                                    will be posted on the Commission’s                                                                            please contact FERC Online Support at
                                                                                                            350-foot-long, 12.5-kilovolt (kV) three-
                                                    calendar located at www.ferc.gov/                                                                             FERCOnlineSupport@ferc.gov, (866)
                                                                                                            phase transmission line interconnecting
                                                    EventCalendar/EventsList.aspx along                                                                           208–3676 (toll free), or (202) 502–8659
                                                                                                            with the existing Bear Creek Project
                                                    with other related information.                                                                               (TTY). In lieu of electronic filing, please
                                                                                                            transmission line; and (4) appurtenant
                                                      Dated: August 5, 2015.                                facilities. The estimated annual                      send a paper copy to: Secretary, Federal
                                                    Nathaniel J. Davis, Sr.,                                generation of the Upper Bear Creek                    Energy Regulatory Commission, 888
                                                    Deputy Secretary.                                       development would be 1.2 gigawatt-                    First Street NE., Washington, DC 20426.
                                                    [FR Doc. 2015–19687 Filed 8–10–15; 8:45 am]             hours (GWh).                                          The first page of any filing should
                                                                                                                                                                  include docket number P–14678–000.
                                                    BILLING CODE 6717–01–P                                  Lower Bear Creek Development
                                                                                                                                                                     More information about this project,
                                                                                                               The Lower Bear Creek development                   including a copy of the application, can
                                                    DEPARTMENT OF ENERGY                                    would consist of the following existing               be viewed or printed on the ‘‘eLibrary’’
                                                                                                            facilities: (1) A reservoir with a surface            link of Commission’s Web site at
                                                    Federal Energy Regulatory                               area of 1.7 acre; (2) a 235-foot-long, 24-            http://www.ferc.gov/docs-filing/
                                                    Commission                                              foot-high diversion structure with an                 elibrary.asp. Enter the docket number
                                                                                                            integrated 82-foot-long, 24-foot-high                 (P–14678) in the docket number field to
                                                    [Project No. 14678–000]                                 ungated overflow spillway; (3) a                      access the document. For assistance,
                                                                                                            powerhouse containing three 600-kW                    contact FERC Online Support.
                                                    Liquid Sun Hydro, LLC; Notice of                        Pelton turbines; (4) two tailraces; and (5)
                                                                                                            a total of 4,350 feet of access roads. All              Dated: August 5, 2015.
                                                    Preliminary Permit Application
                                                                                                            of these facilities will be renovated or              Nathaniel J. Davis, Sr.,
                                                    Accepted for Filing and Soliciting
                                                    Comments, Motions To Intervene, and                     repaired. The Lower Bear Creek                        Deputy Secretary.
                                                    Competing Applications                                  development would also consist of the                 [FR Doc. 2015–19694 Filed 8–10–15; 8:45 am]
                                                                                                            following new facilities: (1) A 2,800-                BILLING CODE 6717–01–P
                                                       On May 1, 2015, the Liquid Sun                       foot-long, 36-inch-diameter above-
                                                    Hydro, LLC, filed an application for a                  ground steel penstock routed through
                                                    preliminary permit, pursuant to section                 the existing penstock alignment; (2) a                DEPARTMENT OF ENERGY
                                                    4(f) of the Federal Power Act (FPA),                    4,000-kW Francis replacing the existing
                                                    proposing to study the feasibility of the               three Pelton turbines; (3) a 3.5-mile-                Federal Energy Regulatory
                                                    Bear Creek Hydroelectric Project (Bear                  long, 12.5-kV three-phase transmission                Commission
                                                    Creek Project or project) to be located on              line interconnecting with the Puget
                                                                                                            Sound Energy transmission lines at Lake               Combined Notice of Filings
                                                    Bear Creek, near Concrete, Skagit
                                                    County, Washington. The sole purpose                    Tyree; and (4) appurtenant facilities.                  Take notice that the Commission has
                                                    of a preliminary permit, if issued, is to               The estimated annual generation of the                received the following Natural Gas
                                                    grant the permit holder priority to file                Lower Bear Creek development would                    Pipeline Rate and Refund Report
                                                    a license application during the permit                 be 15 GWh.                                            Filings:
                                                    term. A preliminary permit does not                        Both developments would be
                                                                                                            operated as a run-of-river facilities and             Filings Instituting Proceedings
                                                    authorize the permit holder to perform
                                                    any land-disturbing activities or                       have no usable storage. The estimated                   Docket Numbers: PR15–40–000.
                                                    otherwise enter upon lands or waters                    total annual generation of the project
                                                                                                                                                                    Applicants: Kinder Morgan Keystone
                                                    owned by others without the owners’                     would be 16.2 GWh.
                                                                                                                                                                  Gas Storage LLC.
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                                                                               Applicant Contact: Mr. Terrance
                                                    express permission.                                                                                             Description: Submits tariff filing per
                                                                                                            Meyer, Liquid Sun Hydro, LLC, 55753
                                                       The proposed project would consist of                State Route 20, P.O. Box 205, Rockport,               284.123(e) + (g): DART Implementation
                                                    two developments: The Upper Bear                        Washington 98283; phone: (785) 865–                   Filing to be effective 10/1/2015; Filing
                                                    Creek and the Lower Bear Creek, using                   8758.                                                 Type: 1280.
                                                    some of the existing facilities from Puget                 FERC Contact: Kelly Wolcott; phone:                  Filed Date: 7/31/15.
                                                    Sound Power and Light Co.’s Bear Creek                  (202) 502–6480.                                         Accession Number: 20150731–5093.
                                                    Project (P–3286) which was surrendered                     Deadline for filing comments, motions                Comments Due: 5 p.m. ET
                                                    in 1983.                                                to intervene, competing applications                  8/21/15


                                               VerDate Sep<11>2014   16:44 Aug 10, 2015   Jkt 235001   PO 00000   Frm 00023   Fmt 4703   Sfmt 4703   E:\FR\FM\11AUN1.SGM   11AUN1



Document Created: 2016-09-27 22:25:16
Document Modified: 2016-09-27 22:25:16
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 48092 