80_FR_48249 80 FR 48095 - Wilkesboro Hydroelectric Company; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests

80 FR 48095 - Wilkesboro Hydroelectric Company; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 154 (August 11, 2015)

Page Range48095-48096
FR Document2015-19693

Federal Register, Volume 80 Issue 154 (Tuesday, August 11, 2015)
[Federal Register Volume 80, Number 154 (Tuesday, August 11, 2015)]
[Notices]
[Pages 48095-48096]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-19693]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No., P-12642-007]


Wilkesboro Hydroelectric Company; Notice of Application Accepted 
for Filing, Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Proceeding: Amendment of License.
    b. Project No.: 12642-007.
    c. Date Filed: June 19, 2015.
    d. Licensee: Wilkesboro Hydroelectric Company.
    e. Name of Project: W. Kerr Scott Hydropower Project.
    f. Location: The proposed project would be located at the existing 
U.S. Army Corps of Engineers' (Corps) W. Kerr Scott dam on the Yadkin 
River, near Wilkesboro in Wilkes County, North Carolina. A total of 3.5 
acres of federal lands, administered by the Corps, would be occupied by 
the proposed project.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Licensee Contact: Mr. Kevin Edwards, P.O. Box 143, Mayodan, NC 
27027, Telephone: (336) 589-6138, Email: [email protected].
    i. FERC Contact: Mr. M Joseph Fayyad, (202) 502-8759, 
[email protected].
    j. Deadline for filing comments, interventions and protests is 30 
days from the issuance date of this notice by the Commission. The 
Commission strongly encourages electronic filing. Please file motions 
to intervene, protests

[[Page 48096]]

and comments using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-12642-007.
    k. Description of Request: The licensee proposes to revise the 
design of the project facilities as follows: (1) Change the design and 
placement of the intake structure to be located approximately 900 feet 
north of the existing intake tower on the north bank of the reservoir, 
rather than utilizing the existing intake tower for the hydroelectric 
project; (2) change the size and location of the penstock from the 
existing discharge conduit to an 800-foot-long tunnel bored through the 
rock north abutment of the dam. The size of the penstock will change 
from the 11 feet in diameter to 10 feet in diameter for the sections of 
penstock not bored through the rock, and reduce to 6 to 8 feet in 
diameter for the steel-lined rock tunnel; (3) change the powerhouse 
location from the south bank of the existing discharge channel to the 
north bank of the discharge channel; (4) reduce the number of 
generating units from two, to a single turbine and generator, having a 
hydraulic capacity of 500 cubic feet per second (cfs) and an installed 
capacity of 2,000 kilowatts (kW); (5) add a new impact basin structure; 
(6) a 32-foot-long, 90-foot-wide tailrace; and (7) change the 
transmission length from 150 feet to 500 feet. The proposed change to 
the generating units would reduce the hydraulic capacity from 800 cfs 
to 500 cfs and the installed capacity from 4,000 kW to 2,000 kW.
    l. This filing may be viewed on the Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and 
issuances related to this or other pending projects. For assistance, 
call 1-866-208-3676 or email [email protected], for TTY, call 
(202) 502-8659. A copy is also available for inspection and 
reproduction in the Commission's Public Reference Room located at 888 
First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 
502-8371.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.212 and .214. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or 
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis and otherwise comply with the requirements of 18 CFR 
4.34(b). All comments, motions to intervene, or protests should relate 
to project works which are the subject of the license amendment. 
Agencies may obtain copies of the application directly from the 
applicant. A copy of any protest or motion to intervene must be served 
upon each representative of the applicant specified in the particular 
application. If an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.
    p. A license applicant must file, no later than 60 days following 
the date of issuance of this notice: (1) A copy of the water quality 
certification; (2) a copy of the request for certification, including 
proof of the date on which the certifying agency received the request; 
or (3) evidence of waiver of water quality certification.

    Dated: August 5, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-19693 Filed 8-10-15; 8:45 am]
BILLING CODE 6717-01-P



                                                                                 Federal Register / Vol. 80, No. 154 / Tuesday, August 11, 2015 / Notices                                                 48095

                                                    summarize the status of consultations                   and newspapers. This list also includes               allows you to keep track of all formal
                                                    under Section 106.                                      all affected landowners (as defined in                issuances and submittals in specific
                                                                                                            the Commission’s regulations) who are                 dockets. This can reduce the amount of
                                                    Public Participation
                                                                                                            potential right-of-way grantors, whose                time you spend researching proceedings
                                                       You can make a difference by                         property may be used temporarily for                  by automatically providing you with
                                                    providing us with your specific                         project purposes, or who own homes                    notification of these filings, document
                                                    comments or concerns about the                          within certain distances of aboveground               summaries, and direct links to the
                                                    alternatives presented above and about                  facilities, as well as anyone who                     documents. Go to www.ferc.gov/
                                                    the projects in general. Your comments                  submits comments on the projects. We                  esubscribenow.htm.
                                                    should focus on the potential                           will update the environmental mailing                    Finally, public meetings or site visits
                                                    environmental effects, reasonable                       list as the analysis proceeds to ensure               will be posted on the Commission’s
                                                    alternatives, and measures to avoid or                  that we send the information related to               calendar located at www.ferc.gov/
                                                    lessen environmental impacts. The more                  this environmental review to all                      EventCalendar/EventsList.aspx along
                                                    specific your comments, the more useful                 individuals, organizations, and                       with other related information.
                                                    they will be. To ensure that your                       government entities interested in and/or                Dated: August 5, 2015.
                                                    comments are considered in a timely                     potentially affected by the planned
                                                    manner and properly recorded, please                                                                          Nathaniel J. Davis, Sr.,
                                                                                                            projects.
                                                    send your comments so that the                             Copies of the completed draft EIS will             Deputy Secretary.
                                                    Commission receives them in                             be sent to the environmental mailing list             [FR Doc. 2015–19695 Filed 8–10–15; 8:45 am]
                                                    Washington, DC on or before September                   for public review and comment. If you                 BILLING CODE 6717–01–P
                                                    4, 2015.                                                would prefer to receive a paper copy of
                                                       For your convenience, there are three                the document instead of the CD version
                                                    methods you can use to submit your                      or would like to remove your name from                DEPARTMENT OF ENERGY
                                                    comments to the Commission. In all                      the mailing list, please return the
                                                    instances, please reference the                         attached Information Request                          Federal Energy Regulatory
                                                    appropriate project docket number                       (appendix 2).                                         Commission
                                                    (PF15–6–000 for the ACP Project) with                                                                         [Project No., P–12642–007]
                                                                                                            Becoming an Intervenor
                                                    your submission. The Commission
                                                    encourages electronic filing of                           Once Atlantic files an application                  Wilkesboro Hydroelectric Company;
                                                    comments and has expert staff available                 with the Commission, you may want to                  Notice of Application Accepted for
                                                    to assist you at (202) 502–8258 or                      become an ‘‘intervenor,’’ which is an                 Filing, Soliciting Comments, Motions
                                                    efiling@ferc.gov.                                       official party to the Commission’s                    To Intervene, and Protests
                                                       (1) You can file your comments                       proceeding. Intervenors play a more
                                                    electronically using the eComment                       formal role in the process and are able                  Take notice that the following
                                                    feature located on the Commission’s                     to file briefs, appear at hearings, and be            hydroelectric application has been filed
                                                    Web site (www.ferc.gov) under the link                  heard by the courts if they choose to                 with the Commission and is available
                                                    to Documents and Filings. This is an                    appeal the Commission’s final ruling.                 for public inspection:
                                                    easy method for interested persons to                   An intervenor formally participates in                   a. Type of Proceeding: Amendment of
                                                    submit brief, text-only comments on a                   the proceeding by filing a request to                 License.
                                                    project;                                                intervene. Instructions for becoming an                  b. Project No.: 12642–007.
                                                       (2) You can file your comments                       intervenor are in the User’s Guide under                 c. Date Filed: June 19, 2015.
                                                    electronically using the eFiling feature                the ‘‘e-filing’’ link on the Commission’s                d. Licensee: Wilkesboro Hydroelectric
                                                    located on the Commission’s Web site                    Web site. Please note that the                        Company.
                                                    (www.ferc.gov) under the link to                        Commission will not accept requests for                  e. Name of Project: W. Kerr Scott
                                                    Documents and Filings. With eFiling,                    intervenor status at this time. You must              Hydropower Project.
                                                    you can provide comments in a variety                   wait until the Commission receives                       f. Location: The proposed project
                                                    of formats by attaching them as a file                  formal applications for the projects.                 would be located at the existing U.S.
                                                    with your submission. New eFiling                                                                             Army Corps of Engineers’ (Corps) W.
                                                                                                            Additional Information                                Kerr Scott dam on the Yadkin River,
                                                    users must first create an account by
                                                    clicking on ‘‘eRegister.’’ You must select                 Additional information about the ACP               near Wilkesboro in Wilkes County,
                                                    the type of filing you are making. If you               Project is available from the                         North Carolina. A total of 3.5 acres of
                                                    are filing a comment on a particular                    Commission’s Office of External Affairs,              federal lands, administered by the
                                                    project, please select ‘‘Comment on a                   at (866) 208–FERC, or on the FERC Web                 Corps, would be occupied by the
                                                    Filing;’’ or                                            site (www.ferc.gov) using the eLibrary                proposed project.
                                                       (3) You can file a paper copy of your                link. Click on the eLibrary link, click on               g. Filed Pursuant to: Federal Power
                                                    comments by mailing them to the                         ‘‘General Search,’’ and enter the docket              Act, 16 U.S.C. 791a–825r.
                                                    following address: Kimberly D. Bose,                    number, excluding the last three digits                  h. Licensee Contact: Mr. Kevin
                                                    Secretary, Federal Energy Regulatory                    (i.e., PF15–6). Be sure you have selected             Edwards, P.O. Box 143, Mayodan, NC
                                                    Commission, 888 First Street NE., Room                  an appropriate date range. For                        27027, Telephone: (336) 589–6138,
                                                    1A, Washington, DC 20426.                               assistance, please contact FERC Online                Email: kevin@piedmonthydrotech.com.
                                                                                                            Support at FercOnlineSupport@ferc.gov                    i. FERC Contact: Mr. M Joseph
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    Environmental Mailing List                              or toll free at (866) 208–3676, or for                Fayyad, (202) 502–8759, mo.fayyad@
                                                      The environmental mailing list                        TTY, contact (202) 502–8659. The                      ferc.gov.
                                                    includes federal, state, and local                      eLibrary link also provides access to the                j. Deadline for filing comments,
                                                    government representatives and                          texts of formal documents issued by the               interventions and protests is 30 days
                                                    agencies; elected officials;                            Commission, such as orders, notices,                  from the issuance date of this notice by
                                                    environmental and public interest                       and rulemakings.                                      the Commission. The Commission
                                                    groups; Native American Tribes; other                      In addition, the Commission offers a               strongly encourages electronic filing.
                                                    interested parties; and local libraries                 free service called eSubscription which               Please file motions to intervene, protests


                                               VerDate Sep<11>2014   16:44 Aug 10, 2015   Jkt 235001   PO 00000   Frm 00026   Fmt 4703   Sfmt 4703   E:\FR\FM\11AUN1.SGM   11AUN1


                                                    48096                        Federal Register / Vol. 80, No. 154 / Tuesday, August 11, 2015 / Notices

                                                    and comments using the Commission’s                     TTY, call (202) 502–8659. A copy is also                 p. A license applicant must file, no
                                                    eFiling system at http://www.ferc.gov/                  available for inspection and                          later than 60 days following the date of
                                                    docs-filing/efiling.asp. Commenters can                 reproduction in the Commission’s                      issuance of this notice: (1) A copy of the
                                                    submit brief comments up to 6,000                       Public Reference Room located at 888                  water quality certification; (2) a copy of
                                                    characters, without prior registration,                 First Street NE., Room 2A, Washington,                the request for certification, including
                                                    using the eComment system at http://                    DC 20426, or by calling (202) 502–8371.               proof of the date on which the certifying
                                                    www.ferc.gov/docs-filing/                                  m. Individuals desiring to be included             agency received the request; or (3)
                                                    ecomment.asp. You must include your                     on the Commission’s mailing list should               evidence of waiver of water quality
                                                    name and contact information at the end                 so indicate by writing to the Secretary               certification.
                                                    of your comments. For assistance,                       of the Commission.                                      Dated: August 5, 2015.
                                                    please contact FERC Online Support at                      n. Comments, Protests, or Motions to               Nathaniel J. Davis, Sr.,
                                                    FERCOnlineSupport@ferc.gov, (866)                       Intervene: Anyone may submit
                                                    208–3676 (toll free), or (202) 502–8659                                                                       Deputy Secretary.
                                                                                                            comments, a protest, or a motion to
                                                    (TTY). In lieu of electronic filing, please                                                                   [FR Doc. 2015–19693 Filed 8–10–15; 8:45 am]
                                                                                                            intervene in accordance with the
                                                    send a paper copy to: Secretary, Federal                requirements of Rules of Practice and                 BILLING CODE 6717–01–P
                                                    Energy Regulatory Commission, 888                       Procedure, 18 CFR 385.210, .211, .212
                                                    First Street NE., Washington, DC 20426.                 and .214. In determining the appropriate
                                                    The first page of any filing should                                                                           DEPARTMENT OF ENERGY
                                                                                                            action to take, the Commission will
                                                    include docket number P–12642–007.                      consider all protests or other comments
                                                       k. Description of Request: The                                                                             Federal Energy Regulatory
                                                                                                            filed, but only those who file a motion               Commission
                                                    licensee proposes to revise the design of               to intervene in accordance with the
                                                    the project facilities as follows: (1)                  Commission’s Rules may become a                       Combined Notice of Filings
                                                    Change the design and placement of the                  party to the proceeding. Any comments,
                                                    intake structure to be located                          protests, or motions to intervene must                  Take notice that the Commission has
                                                    approximately 900 feet north of the                     be received on or before the specified                received the following Natural Gas
                                                    existing intake tower on the north bank                                                                       Pipeline Rate and Refund Report filings:
                                                                                                            comment date for the particular
                                                    of the reservoir, rather than utilizing the
                                                                                                            application.                                          Filings Instituting Proceedings
                                                    existing intake tower for the
                                                                                                               o. Filing and Service of Responsive                   Docket Numbers: RP15–1128–000.
                                                    hydroelectric project; (2) change the size
                                                    and location of the penstock from the                   Documents: Any filing must (1) bear in                   Applicants: Columbia Gas
                                                    existing discharge conduit to an 800-                   all capital letters the title                         Transmission, LLC.
                                                    foot-long tunnel bored through the rock                 ‘‘COMMENTS’’, ‘‘PROTEST’’, or                            Description: Columbia Gas
                                                    north abutment of the dam. The size of                  ‘‘MOTION TO INTERVENE’’ as                            Transmission, LLC submits Off System
                                                    the penstock will change from the 11                    applicable; (2) set forth in the heading              Capacity Request.
                                                    feet in diameter to 10 feet in diameter                 the name of the applicant and the                        Filed Date: 7/23/15.
                                                    for the sections of penstock not bored                  project number of the application to                     Accession Number: 20150723–5037.
                                                    through the rock, and reduce to 6 to 8                  which the filing responds; (3) furnish                   Comments Due: 5 p.m. ET 8/4/15.
                                                    feet in diameter for the steel-lined rock               the name, address, and telephone
                                                                                                            number of the person protesting or                       Docket Numbers: RP15–1129–000
                                                    tunnel; (3) change the powerhouse                                                                                Applicants: Equitrans, L.P.
                                                    location from the south bank of the                     intervening; and (4) otherwise comply
                                                                                                                                                                     Description: Request of Equitrans, L.P.
                                                    existing discharge channel to the north                 with the requirements of 18 CFR
                                                                                                                                                                  for Partial Tariff Waiver.
                                                    bank of the discharge channel; (4)                      385.2001 through 385.2005. All
                                                                                                                                                                     Filed Date: 7/23/15.
                                                    reduce the number of generating units                   comments, motions to intervene, or
                                                                                                                                                                     Accession Number: 20150723–5038.
                                                    from two, to a single turbine and                       protests must set forth their evidentiary
                                                                                                                                                                     Comments Due: 5 p.m. ET 8/4/15.
                                                    generator, having a hydraulic capacity                  basis and otherwise comply with the
                                                                                                            requirements of 18 CFR 4.34(b). All                      Docket Numbers: RP15–1130–000.
                                                    of 500 cubic feet per second (cfs) and an                                                                        Applicants: WestGas InterState, Inc.
                                                    installed capacity of 2,000 kilowatts                   comments, motions to intervene, or
                                                                                                            protests should relate to project works                  Description: Compliance filing
                                                    (kW); (5) add a new impact basin                                                                              20150723_WGI Order 801 Compliance
                                                    structure; (6) a 32-foot-long, 90-foot-                 which are the subject of the license
                                                                                                            amendment. Agencies may obtain                        System Map to be effective 8/24/2015.
                                                    wide tailrace; and (7) change the                                                                                Filed Date: 7/23/15.
                                                    transmission length from 150 feet to 500                copies of the application directly from
                                                                                                            the applicant. A copy of any protest or                  Accession Number: 20150723–5068.
                                                    feet. The proposed change to the                                                                                 Comments Due: 5 p.m. ET 8/4/15.
                                                    generating units would reduce the                       motion to intervene must be served
                                                    hydraulic capacity from 800 cfs to 500                  upon each representative of the                          Docket Numbers: RP15–1131–000.
                                                    cfs and the installed capacity from 4,000               applicant specified in the particular                    Applicants: Equitrans, L.P.
                                                    kW to 2,000 kW.                                         application. If an intervener files                      Description: § 4(d) Rate Filing:
                                                       l. This filing may be viewed on the                  comments or documents with the                        Negotiated Capacity Release
                                                    Commission’s Web site at http://                        Commission relating to the merits of an               Agreements—07/24/2015 to be effective
                                                    www.ferc.gov/docs-filing/elibrary.asp.                  issue that may affect the responsibilities            7/24/2015.
                                                    Enter the docket number excluding the                   of a particular resource agency, they                    Filed Date: 7/24/15.
                                                    last three digits in the docket number                  must also serve a copy of the document                   Accession Number: 20150724–5048.
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    field to access the document. You may                   on that resource agency. A copy of all                   Comments Due: 5 p.m. ET 8/5/15.
                                                    also register online at http://                         other filings in reference to this                       The filings are accessible in the
                                                    www.ferc.gov/docs-filing/                               application must be accompanied by                    Commission’s eLibrary system by
                                                    esubscription.asp to be notified via                    proof of service on all persons listed in             clicking on the links or querying the
                                                    email of new filings and issuances                      the service list prepared by the                      docket number.
                                                    related to this or other pending projects.              Commission in this proceeding, in                        Any person desiring to intervene or
                                                    For assistance, call 1–866–208–3676 or                  accordance with 18 CFR 4.34(b) and                    protest in any of the above proceedings
                                                    email FERCOnlineSupport@ferc.gov, for                   385.2010.                                             must file in accordance with Rules 211


                                               VerDate Sep<11>2014   16:44 Aug 10, 2015   Jkt 235001   PO 00000   Frm 00027   Fmt 4703   Sfmt 4703   E:\FR\FM\11AUN1.SGM   11AUN1



Document Created: 2016-09-27 22:25:13
Document Modified: 2016-09-27 22:25:13
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 48095 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR