NUCLEAR REGULATORY COMMISSION

Federal Register Volume 80, Issue 155 (August 12, 2015)

Page Range48343-48348
FR Document2015-19853

The U.S. Nuclear Regulatory Commission (NRC) is issuing a confirmatory order to Entergy Operations, Inc. (Entergy), confirming an agreement reached in an Alternative Dispute Resolution mediation session held on September 22, 2014. As part of this agreement, Entergy will take actions to review and evaluate its security procedures; strengthen its procedures and set expectations regarding the conduct of security personnel; and conduct a presentation describing the event that formed the bases for the violation and the lessons learned, to its employees and the industry. Entergy is required to have an independent safety culture assessment conducted of the security organization at its River Bend Station. Entergy is also required to notify the NRC periodically of the status of its efforts.

Federal Register, Volume 80 Issue 155 (Wednesday, August 12, 2015)
[Federal Register Volume 80, Number 155 (Wednesday, August 12, 2015)]
[Notices]
[Pages 48343-48348]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-19853]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. (as Shown in the Attachment); License Nos. (as Shown in 
the Attachment): EA-14-009; NRC-2015-0135]


In the Matter of All Power Reactor Licensees Owned and Operated 
by Entergy Nuclear Operations, Inc.; Entergy Operations, Inc.; and 
Entergy Nuclear Generation Company

AGENCY: Nuclear Regulatory Commission.

ACTION: Confirmatory order; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing a 
confirmatory order to Entergy Operations, Inc. (Entergy), confirming an 
agreement reached in an Alternative Dispute Resolution mediation 
session held on September 22, 2014. As part of this agreement, Entergy 
will take actions to review and evaluate its security procedures; 
strengthen its procedures and set expectations regarding the conduct of 
security personnel; and conduct a presentation describing the event 
that formed the bases for the violation and the lessons learned, to its 
employees and the industry. Entergy is required to have an independent 
safety culture assessment conducted of the security organization at its 
River Bend Station. Entergy is also required to notify the NRC 
periodically of the status of its efforts.

DATES: The confirmatory order was issued on December 3, 2014.

ADDRESSES: Please refer to Docket ID NRC-2015-0135 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this action by the 
following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2015-0135. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: Carol.Gallagher@nrc.gov. For questions about the Order, 
contact the individual listed in the FOR FURTHER INFORMATION CONTACT 
section of this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may access publicly available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select NRC: ADAMS Public Documents and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The 
ADAMS accession number for each document referenced (if that document 
is publicly available in ADAMS) is provided the first time that a 
document is referenced.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Christi Maier, Region IV, U.S. Nuclear 
Regulatory Commission, Washington DC 20555-001; 817-200-1217; or by 
email to Christi.Maier@nrc.gov.

SUPPLEMENTARY INFORMATION: The text of the Order is attached.

    Dated this 3rd day of December 2014.

    For The Nuclear Regulatory Commission.
Marc L. Dapas,
Regional Administrator.

    Editorial Note:  This document was received for publication by 
the Office of the Federal Register on August 7, 2015.

ATTACHMENT--CONFIRMATORY ORDER MODIFYING LICENSE

UNITED STATES OF AMERICA

NUCLEAR REGULATORY COMMISSION

In the Matter of All Power Reactor Licensees Owned and Operated by 
Entergy Nuclear Operations, Inc.; Entergy Operations, Inc. and Entergy 
Nuclear Generation Company [Docket Nos. (as shown in Attachment); 
License Nos. (as shown in Attachment)]

EA-14-009

Confirmatory Order Modifying License

I.
    The licensees identified in Attachment 1 to this Order hold 
licenses issued by the U.S. Nuclear Regulatory Commission (NRC or 
Commission) pursuant to Title 10 of the Code of Federal Regulations (10 
CFR) Part 50, ``Domestic Licensing of Production and Utilization 
Facilities.'' The licenses authorize the operation of the listed 
facilities in accordance with conditions specified therein.
    This Confirmatory Order is the result of an agreement reached 
during an alternative dispute resolution (ADR) mediation session 
conducted on September 22, 2014, in Arlington, Texas.
II.
    On March 21, 2012, the NRC initiated a special inspection to 
determine the circumstances surrounding a security event, which 
occurred on March 18, 2012, at Entergy Operations, Inc.'s (Entergy or 
Licensee), River Bend Station (RBS or facility). In addition, on March 
21, 2012, the NRC's Office of Investigations (OI), Region IV Field 
Office, initiated an investigation at RBS to determine if Entergy 
employees willfully violated NRC security requirements at RBS. The 
investigation was completed on December 31, 2013, and was documented in 
OI Report 4-2012-022. Based on the evidence developed during the 
investigation, OI's Region IV Field Office concluded that the willful 
actions of an unidentified individual caused Entergy to be in violation 
of 10 CFR part 73, ``Physical Protection of Plants and Materials.''
    While the NRC investigation did not identify the individual 
responsible for the security-related violation, the OI

[[Page 48344]]

Region IV Field Office did establish several facts that are germane to 
the conclusion of the investigation. Details of the security event and 
the subsequent inspection and investigation are described in Attachment 
2 to this Order. Attachment 2 includes Security-Related Information 
(SRI); therefore, it is not publicly available.
    The NRC determined that as the result of the willful actions of an 
unidentified individual, Entergy failed to comply with 10 CFR part 73. 
The NRC described the results of the inspection and investigation in a 
letter to Entergy dated July 16, 2014. In response to the NRC's letter, 
Entergy requested ADR to resolve this matter. This confirmatory order 
is issued pursuant to the agreement reached during the ADR process.
III.
    On September 22, 2014, the NRC and Entergy met in an ADR session 
mediated by a professional mediator, arranged through the Cornell 
University Scheinman Institute on Conflict Resolution. ADR is a process 
in which a neutral mediator, with no decision-making authority, assists 
the parties in reaching an agreement on resolving any differences 
regarding the dispute. During the ADR session, a preliminary settlement 
agreement was reached. The elements of that preliminary agreement, with 
the exception of the section that includes SRI, are described below. 
The portions of the agreement that contain SRI, as well as the sections 
of this Confirmatory Order that address SRI, are described in the 
aforementioned non-public Attachment. The following description of the 
preliminary ADR agreement, and the required actions described in 
Section V of this Confirmatory Order, include references to the non-
public Attachment to allow for public release of this Confirmatory 
Order. The publicly available elements of the agreement consist of the 
following:
    The NRC recognizes the corrective actions that Entergy has already 
implemented associated with the apparent violation and preliminary 
finding. Entergy's corrective actions are described in the non-public 
Attachment.
    A. The NRC and Entergy agree that a willful violation of Title 10 
Code of Federal Regulations (10 CFR) Part 73 occurred on March 18, 
2012, at River Bend Station. However, the NRC and Entergy disagree on 
the specific aspects of that willful characterization of the violation. 
The details regarding these aspects are described in the non-public 
Attachment.
    1. The NRC concluded that the security-related violation occurred 
because of the deliberate misconduct of an unidentified security 
officer at River Bend Station.
    2. Entergy does not believe that willful intent was involved in all 
aspects of the violation.
    B. Within 4 months from the date of this Confirmatory Order, 
Entergy will revise its security procedures.
    C. Within 3 months from the date of this Confirmatory Order, 
Entergy will, at each of its nuclear plants, conduct a review of its 
controls for SRI and communicate to the NRC the results of the review. 
Within 6 months from the date of this Confirmatory Order, Entergy will 
establish new controls and will provide its proposed controls to the 
NRC for its review. The NRC will communicate to Entergy any concerns 
regarding the controls within 60 days of submittal for resolution in a 
manner acceptable to both parties. Entergy will implement the controls 
within 15 months from the date of this Confirmatory Order. The details 
regarding these controls are described in the non-public Attachment.
    D. Within 9 months from the date of this Confirmatory Order, 
Entergy will review and evaluate the location and storage of SRI at 
each of its nuclear plants. The details are described in the non-public 
Attachment.
    E. Entergy will develop a ``commitment to compliance'' statement or 
a similar document highlighting the special responsibilities of nuclear 
security personnel. This document will explain that nuclear security 
personnel need to comply with regulations and procedures, and it will 
describe the potential consequences if compliance does not occur. 
Within 12 months from the date of this Confirmatory Order, Entergy will 
require at each of its nuclear plants that nuclear security personnel 
read and sign the statement (subject to any collective bargaining 
obligations it may have). Entergy will include the reading and signing 
of this statement in the initial qualification process of nuclear 
security personnel. The details are described in the non-public 
Attachment.
    F. Within 6 months from the date of this Confirmatory Order, 
Entergy will identify those security posts in each of its nuclear 
plants that should be subject to certain decorum standards that will 
ensure a professional environment in those areas. Once identified, 
Entergy will establish decorum protocols for those security posts. In 
addition, within 6 months of the date of this Confirmatory Order, 
Entergy will provide its proposed decorum protocols to the NRC for its 
review. The NRC will communicate to Entergy any concerns regarding the 
proposed decorum protocols within 60 days of submittal for resolution 
in a manner acceptable to both parties. Entergy will implement the 
decorum protocols within 12 months from the date of this Confirmatory 
Order.
    G. Within 4 months from the date of this Confirmatory Order, 
Entergy will prepare a ``lessons learned'' presentation to be delivered 
to Entergy nuclear employees at each of its nuclear plants describing 
the event that formed the basis for this violation. Prior to making the 
presentation, Entergy will provide its proposed presentation to the NRC 
for its review. The NRC will communicate to Entergy any concerns 
regarding the presentation within 30 days of submittal. Entergy will 
deliver the presentation to Entergy nuclear employees within 12 months 
of this Confirmatory Order.
    H. Within 4 months from the date of this Confirmatory Order, 
Entergy will prepare a presentation describing the event that formed 
the basis for this violation. The presentation will be delivered to the 
Nuclear Security Working Group and the National Nuclear Security 
Conference (subject to acceptance of the conference-organizing 
committees). This presentation will include, among other subjects, the 
subjects covered in the non-public Attachment to this Confirmatory 
Order. Prior to making the presentation, Entergy will provide its 
proposed presentation to the NRC for its review. The NRC will 
communicate to Entergy any concerns regarding the presentation within 
30 days of submittal. Entergy will deliver the presentation within 12 
months of this Confirmatory Order.
    I. Within 6 months from the date of this Confirmatory Order, 
Entergy will ensure that an independent third party conducts a safety 
culture assessment of the Security organization at River Bend Station. 
The results will be incorporated into Entergy's corrective action 
program as appropriate. A copy of the completed assessment will be made 
available for NRC review.
    J. Within 4 months from the date of this Confirmatory Order, 
Entergy will prepare refresher training on the provisions of 10 CFR 
50.5 and 50.9 for Entergy employees at each of its nuclear plants. 
Prior to conducting the training, Entergy will provide its proposed 
refresher training plan to the NRC for its review. The NRC will 
communicate to Entergy any concerns regarding the plan within 30 days 
of submittal for resolution in a manner acceptable to both parties. 
Entergy will complete administration of this refresher training

[[Page 48345]]

within 12 months of this Confirmatory Order.
    K. Notification to the NRC When Actions Are Completed
    1. Unless otherwise specified, Entergy will submit written 
notification to the Director, Division of Reactor Safety, USNRC Region 
IV, 1600 East Lamar Blvd., Arlington, Texas 76011-4511, at intervals 
not to exceed 6 months, 1 year, and annually thereafter until the terms 
of the Confirmatory Order are completed, providing a status of each 
item in the Order.
    2. Entergy will provide its basis for concluding that the terms of 
the Confirmatory Order have been satisfied, to the NRC, in writing
    L. Inspection Follow-up
    Based on the corrective actions and enhancements described above, 
the NRC will conduct follow-up inspections using NRC Inspection 
Procedure 92702, ``Followup on Corrective Actions for Violations and 
Deviations.''
    M. Administrative Items
    1. The NRC and Entergy Operations, Inc., agree that the above 
elements will be incorporated into this Confirmatory Order and that the 
NRC will consider the order an escalated enforcement action.
    2. The NRC and Entergy agree that the issues described in the NRC's 
Inspection Report and Investigation Report to Entergy Operations, Inc., 
of July 16, 2014 (EA-14-009) resulted in a violation of NRC security 
requirements. The details regarding the violation are described in the 
non-public Attachment.
    3. In consideration of the significant corrective actions Entergy 
has already taken and the additional actions Entergy has committed to 
taking to enhance its security program, the NRC agrees to reduce the 
severity level of the escalated enforcement sanction. The NRC agrees to 
issue a Notice of Violation for a security-related violation and impose 
a $70,000 civil penalty for the matter discussed in the NRC's 
Inspection Report and Investigation Report to Entergy Operations, Inc., 
of July 16, 2014 (EA-14-009). The issuance of the Notice of Violation 
and civil penalty is considered escalated enforcement. The NRC 
communicates, in the non-public Attachment, the basis for its original 
conclusion regarding the characterization of the violation.
    4. This agreement is binding upon successors and assigns of Entergy 
Operations, Inc.
    N. Within thirty days of the date of the Confirmatory Order, 
Entergy shall pay a civil penalty of $70,000.
    O. Entergy agrees that this Confirmatory Order is to be effective 
upon issuance and waives its right to a hearing in connection with this 
Order.
    P. If Entergy fulfills its commitments under this Order, the NRC 
will not take further enforcement action based on the violations of NRC 
requirements described in Enclosure 2 of the letter transmitting this 
Order.
    On November 21, 2014, Entergy consented to issuing this 
Confirmatory Order with the commitments, as described in Section V 
below.
IV.
    Since the Licensee has agreed to take additional actions to address 
NRC concerns, as set forth in Section III above, the NRC has concluded 
that its concerns can be resolved through issuance of this Confirmatory 
Order.
    I find that Entergy's commitments as set forth in Section V are 
acceptable and necessary and conclude that with these commitments 
public health and safety are reasonably assured. In view of the 
foregoing, I have determined that public health and safety require that 
Entergy's commitments be confirmed by this Confirmatory Order. Based on 
the above and Entergy's consent, this Confirmatory Order is effective 
30 days after its issuance.
V.
    Accordingly, pursuant to Sections 104b, 161b, 161i, 161o, 182 and 
186 of the Atomic Energy Act of 1954, as amended, and the Commission's 
regulations in 10 CFR 2.202 and 10 CFR parts 50 and 73, IT IS HEREBY 
ORDERED THAT THE ACTIONS DESCRIBED BELOW WILL BE TAKEN AT RIVER BEND 
STATION AND OTHER NUCLEAR POWER PLANTS IN ENTERGY'S FLEET AND THAT 
REACTOR OPERATING LICENSE NO. NPF-47 IS MODIFIED AS FOLLOWS WITH 
RESPECT TO THE ACTIONS TO BE TAKEN AT THE RIVER BEND STATION:
    A. The NRC and Entergy agree that a willful violation of Title 10 
Code of Federal Regulations (10 CFR) Part 73 occurred on March 18, 
2012, at River Bend Station. However, the NRC and Entergy disagree on 
the specific aspects of that willful characterization of the violation. 
The details regarding these aspects are described in the non-public 
Attachment.
    1. The NRC concluded that the security-related violation occurred 
because of the deliberate misconduct of an unidentified security 
officer at River Bend Station.
    2. However, Entergy does not believe that willful intent was 
involved in all aspects of the violation.
    B. Within 4 months from the date of this Confirmatory Order, 
Entergy will revise its security procedures.
    C. Within 3 months from the date of this Confirmatory Order, 
Entergy will, at each of its nuclear plants, conduct a review of its 
controls for SRI and communicate to the NRC the results of the review. 
Within 6 months from the date of this Confirmatory Order, Entergy will 
establish new controls and will provide its proposed controls to the 
NRC for its review. The NRC will communicate to Entergy any concerns 
regarding the controls within 60 days of submittal for resolution in a 
manner acceptable to both parties. Entergy will implement the controls 
within 15 months from the date of this Confirmatory Order. The details 
regarding these controls are described in the non-public Attachment.
    D. Within 9 months from the date of this Confirmatory Order, 
Entergy will review and evaluate the location and storage of SRI at 
each of its nuclear plants. The details are described in the non-public 
Attachment.
    E. Entergy will develop a ``commitment to compliance'' statement or 
a similar document highlighting the special responsibilities of nuclear 
security personnel. This document will explain that nuclear security 
personnel need to comply with regulations and procedures, and it will 
describe the potential consequences if compliance does not occur. 
Within 12 months from the date of this Confirmatory Order, Entergy will 
require at each of its nuclear plants that nuclear security personnel 
read and sign the statement (subject to any collective bargaining 
obligations it may have). Entergy will include the reading and signing 
of this statement in the initial qualification process of nuclear 
security personnel. The details are described in the non-public 
Attachment.
    F. Within 6 months from the date of this Confirmatory Order, 
Entergy will identify those security posts in each of its nuclear 
plants that should be subject to certain decorum standards that will 
ensure a professional environment in those areas. Once identified, 
Entergy will establish decorum protocols for those security posts. In 
addition, within 6 months of the date of this Confirmatory Order, 
Entergy will provide its proposed decorum protocols to the NRC for its 
review. The NRC will communicate to Entergy any concerns regarding the 
proposed decorum protocols within 60 days of submittal for resolution 
in a manner acceptable to both parties. Entergy will implement the 
decorum protocols within 12 months

[[Page 48346]]

from the date of this Confirmatory Order.
    G. Within 4 months from the date of this Confirmatory Order, 
Entergy will prepare a ``lessons learned'' presentation to be delivered 
to Entergy nuclear employees at each of its nuclear plants describing 
the event that formed the basis for this violation. Prior to making the 
presentation, Entergy will provide its proposed presentation to the NRC 
for its review. The NRC will communicate to Entergy any concerns 
regarding the presentation within 30 days of submittal. Entergy will 
deliver the presentation to Entergy nuclear employees within 12 months 
of this Confirmatory Order.
    H. Within 4 months from the date of this Confirmatory Order, 
Entergy will prepare a presentation describing the event that formed 
the basis for this violation. The presentation will be delivered to the 
Nuclear Security Working Group and the National Nuclear Security 
Conference (subject to acceptance of the conference-organizing 
committees). This presentation will include, among other subjects, the 
subjects covered by the non-public Attachment to this Confirmatory 
Order. Prior to making the presentation, Entergy will provide its 
proposed presentation to the NRC for its review. The NRC will 
communicate to Entergy any concerns regarding the presentation within 
30 days of submittal. Entergy will deliver the presentation within 12 
months of this Confirmatory Order.
    I. Within 6 months from the date of this Confirmatory Order, 
Entergy will ensure that an independent, third party conducts a safety 
culture assessment of the Security organization at River Bend Station. 
The results will be incorporated into Entergy's corrective action 
program as appropriate. A copy of the completed assessment will be made 
available for NRC review.
    J. Within 4 months from the date of this Confirmatory Order, 
Entergy will prepare refresher training on the provisions of 10 CFR 
50.5 and 50.9 for Entergy employees at each of its nuclear plants. 
Prior to conducting the training, Entergy will provide its proposed 
refresher training plan to the NRC for its review. The NRC will 
communicate to Entergy any concerns regarding the plan within 30 days 
of submittal for resolution in a manner acceptable to both parties. 
Entergy will complete administration of this refresher training within 
12 months of this Confirmatory Order.
    K. Notification to the NRC When Actions Are Completed
    1. Unless otherwise specified, Entergy will submit written 
notification to the Director, Division of Reactor Safety, USNRC Region 
IV, 1600 East Lamar Blvd., Arlington, Texas 76011-4511, at intervals 
not to exceed 6 months, 1 year, and annually thereafter until the terms 
of the Confirmatory Order are completed, providing a status of each 
item in the Order.
    2. Entergy will provide its basis for concluding that the terms of 
the Confirmatory Order have been satisfied, to the NRC, in writing
    L. Inspection Follow-up
    Based on the corrective actions and enhancements described above, 
the NRC will conduct follow-up inspections using NRC Inspection 
Procedure 92702, ``Followup on Corrective Actions for Violations and 
Deviations.''
    M. Administrative Items
    1. The NRC and Entergy Operations, Inc., agree that the above 
elements will be incorporated into this Confirmatory Order and that the 
NRC will consider the order an escalated enforcement action.
    2. The NRC and Entergy agree that the issues in the NRC's 
Inspection Report and Investigation Report (EA-14-009) described in a 
July 16, 2014, letter to Entergy Operations, Inc., resulted in a 
violation of NRC security requirements. The details regarding the 
violation are described in the non-public Attachment.
    3. In consideration of the significant corrective actions Entergy 
has already taken and the additional actions Entergy has committed to 
taking to enhance its security program, the NRC agrees to reduce the 
severity level of the escalated enforcement sanction. The NRC agrees to 
issue a Notice of Violation for a security-related violation and impose 
a $70,000 civil penalty for the matter discussed in the July 16, 2014, 
letter to Entergy Operations, Inc., regarding the NRC's Inspection 
Report and Investigation Report (EA-14-009). The issuance of the Notice 
of Violation and civil penalty is considered escalated enforcement. The 
NRC communicates, in the non-public Attachment, the basis for its 
original conclusion regarding the characterization of the violation.
    4. This agreement is binding upon successors and assigns of Entergy 
Operations, Inc.
    N. Within 30 days of the date of the Confirmatory Order, Entergy 
shall pay a civil penalty of $70,000.
    O. Entergy agrees that this Confirmatory Order is to be effective 
upon issuance and waives its right to a hearing in connection with this 
Order
    P. If Entergy fulfills its commitments under this Order, the NRC 
will not take further enforcement action based on the violations of NRC 
requirements described in Enclosure 2 of the letter transmitting this 
Order.
    The Regional Administrator, Region IV, may, in writing, relax or 
rescind any of the above conditions upon demonstration by Entergy of 
good cause.
VI.
    Any person adversely affected by this Confirmatory Order, other 
than Entergy, may request a hearing within 30 days of its publication 
in the Federal Register. Where good cause is shown, consideration will 
be given to extending the time to request a hearing. A request for 
extension of time must be made in writing to the Director, Office of 
Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555, 
and include a statement of good cause for the extension.
    This Order and its Attachments contain information up to the 
Security-Related Information designation, as defined in 10 CFR 73.2, 
and its disclosure to unauthorized individuals is prohibited by 10 CFR 
73.21 and 10 CFR 73.22. Therefore, any redacted material will not be 
made available for public inspection in the NRC Public Document Room or 
electronically in the NRC's Agencywide Documents Access and Management 
System. Any person requesting to obtain a copy of this order or 
portions thereof will be required to demonstrate their trust and 
reliability through a Federal Bureau of Investigation background check 
and criminal history check, as well as demonstrate a ``need to know'' 
such information.
    If a person other than the licensee requests a hearing, that person 
shall set forth with particularity the manner in which his interest is 
adversely affected by this Confirmatory Order and shall address the 
criteria set forth in 10 CFR 2.309(d) and (f).
    If a hearing is requested by a person whose interest is adversely 
affected, the Commission will issue an order designating the time and 
place of any hearing. If a hearing is held, the issue to be considered 
at such hearing shall be whether this Confirmatory Order should be 
sustained.
    In the absence of any request for hearing, or written approval of 
an extension of time in which to request a hearing, the provisions 
specified in Section V above shall be effective and final thirty days 
after issuance of this Confirmatory Order without further order or 
proceedings. If an extension of time for requesting a hearing has been 
approved, the provisions specified in Section V shall be final when the 
extension expires if a hearing request has not been received.

[[Page 48347]]

    A REQUEST FOR HEARING SHALL NOT STAY THE EFFECTIVENESS OF THIS 
ORDER.
    All documents filed in NRC adjudicatory proceedings, including a 
request for hearing, a petition for leave to intervene, any motion or 
other document filed in the proceeding prior to the submission of a 
request for hearing or petition to intervene, and documents filed by 
interested governmental entities participating under 10 CFR 2.315(c), 
must be filed in accordance with the NRC E-Filing rule (72 FR 49139, 
August 28, 2007), as amended by 77 FR 46562; August 3, 2012 (codified 
in pertinent part at 10 CFR part 2, subpart C). The E-Filing process 
requires participants to submit and serve all adjudicatory documents 
over the internet, or in some cases to mail copies on electronic 
storage media. Participants may not submit paper copies of their 
filings unless they seek an exemption in accordance with the procedures 
described below.
    To comply with the procedural requirements of E-Filing, at least 10 
days prior to the filing deadline, the participant should contact the 
Office of the Secretary by email at hearing.docket@nrc.gov, or by 
telephone at (301) 415-1677, to request (1) a digital ID certificate, 
which allows the participant (or its counsel or representative) to 
digitally sign documents and access the E-Submittal server for any 
proceeding in which it is participating; and (2) advise the Secretary 
that the participant will be submitting a request or petition for 
hearing (even in instances in which the participant, or its counsel or 
representative, already holds an NRC-issued digital ID certificate). 
Based upon this information, the Secretary will establish an electronic 
docket for the hearing in this proceeding if the Secretary has not 
already established an electronic docket.
    Information about applying for a digital ID certificate is 
available on NRC's public Web site at http://www.nrc.gov/site-help/e-submittals.html. System requirements for accessing the E-Submittal 
server are detailed in NRC's ``Guidance for Electronic Submission,'' 
which is available on the agency's public Web site at http://www.nrc.gov/site-help/e-submittals.html. Participants may attempt to 
use other software not listed on the Web site, but should note that the 
NRC's E-Filing system does not support unlisted software, and the NRC 
Meta System Help Desk will not be able to offer assistance in using 
unlisted software.
    If a participant is electronically submitting a document to the NRC 
in accordance with the E-Filing rule, the participant must file the 
document using the NRC's online, Web-based submission form. In order to 
serve documents through the Electronic Information Exchange (EIE), 
users will be required to install a Web browser plug-in from the NRC 
Web site. Further information on the Web-based submission form, 
including the installation of the Web browser plug-in, is available on 
the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals.html.
    Once a participant has obtained a digital ID certificate and a 
docket has been created, the participant can then submit a request for 
hearing or petition for leave to intervene through the EIE. Submissions 
should be in Portable Document Format (PDF) in accordance with NRC 
guidance available on the NRC public Web site at http://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the 
time the documents are submitted through the NRC's E-Filing system. To 
be timely, an electronic filing must be submitted to the E-Filing 
system no later than 11:59 p.m. Eastern Time on the due date. Upon 
receipt of a transmission, the E-Filing system time-stamps the document 
and sends the submitter an email notice confirming receipt of the 
document. The E-Filing system also distributes an email notice that 
provides access to the document to the NRC's Office of the General 
Counsel and any others who have advised the Office of the Secretary 
that they wish to participate in the proceeding, so that the filer need 
not serve the documents on those participants separately. Therefore, 
any others who wish to participate in the proceeding (or their counsel 
or representative) must apply for and receive a digital ID certificate 
before a hearing request/petition to intervene is filed so that they 
can obtain access to the document via the E-Filing system.
    A person filing electronically using the agency's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System 
Help Desk through the ``Contact Us'' link located on the NRC Web site 
at http://www.nrc.gov/site-help/e-submittals.html, by email at 
MSHD.Resource@nrc.gov, or by a toll-free call at (866) 672-7640. The 
NRC Meta System Help Desk is available between 8 a.m. and 8 p.m., 
Eastern Time, Monday through Friday, excluding government holidays.
    Participants who believe that they have a good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted by: (1) First class mail 
addressed to the Office of the Secretary of the Commission, U.S. 
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: 
Rulemaking and Adjudications Staff; or (2) courier, express mail, or 
expedited delivery service to the Office of the Secretary, Sixteenth 
Floor, One White Flint North, 11555 Rockville Pike, Rockville, 
Maryland, 20852, Attention: Rulemaking and Adjudications Staff. 
Participants filing a document in this manner are responsible for 
serving the document on all other participants. Filing is considered 
complete by first-class mail as of the time of deposit in the mail, or 
by courier, express mail, or expedited delivery service upon depositing 
the document with the provider of the service. A presiding officer, 
having granted an exemption request from using E-Filing, may require a 
participant or party to use E-Filing if the presiding officer 
subsequently determines that the reason for granting the exemption from 
use of E-Filing no longer exists.
    Documents submitted in adjudicatory proceedings will appear in 
NRC's electronic hearing docket which is available to the public at 
http://ehd1.nrc.gov/ehd/, unless excluded pursuant to an order of the 
Commission, or the presiding officer. Participants are requested not to 
include personal privacy information, such as social security numbers, 
home addresses, or home phone numbers in their filings, unless an NRC 
regulation or other law requires submission of such information. With 
respect to copyrighted works, except for limited excerpts that serve 
the purpose of the adjudicatory filings and would constitute a Fair Use 
application, participants are requested not to include copyrighted 
materials in their submission.


    For The Nuclear Regulatory Commission
    Dated this 3rd day of December 2014.
Marc L. Dapas,
Regional Administrator.

Attachments: as stated

[[Page 48348]]

Attachment 1

All Power Reactor Licensees Owned and Operated By Entergy Nuclear 
Operations, Inc.; Entergy Operations, Inc.; and Entergy Nuclear 
Generation Company

Arkansas Nuclear One, Units 1 and 2

Entergy Operations, Inc.
Docket Nos. 50-313, 50-368
License Nos. DRP-51; NPF-6
Mr. Jeremy Browning, Site Vice President
Arkansas Nuclear One
Entergy Operations, Inc.
1448 SR 333
Russellville, AR 72802-0967

Grand Gulf Nuclear Station

Entergy Operations, Inc.
Docket No. 50-416
License No. NPF-29
Mr. Kevin J. Mulligan, Site Vice President
Entergy Operations, Inc.
Grand Gulf Nuclear Station
P.O. Box 756
Port Gibson, MS 39150

Indian Point Nuclear Generating Unit Nos. 2 and 3

Entergy Nuclear Operations, Inc.
Docket Nos. 50-247 and 50-286
License Nos. DPR-26 and DPR-64
John Ventosa, Vice President, Operations
Entergy Nuclear Operations, Inc.
Indian Point Energy Center
450 Broadway, GSB
P.O. Box 249
Buchanan, NY 10511-0249

James A. FitzPatrick Nuclear Power Plant

Entergy Nuclear Operations, Inc.
Docket No. 50-333
License No. DPR-59
Lawrence Coyle, Executive Vice President
Entergy Nuclear Operations, Inc.
James A. FitzPatrick Nuclear Power Plant
P.O. Box 110
Lycoming, NY 13093

Palisades Nuclear Plant

Entergy Nuclear Operations, Inc.
Docket No. 50-255
License No. DPR-20
Anthony J. Vitale, Site Vice President
Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant
27780 Blue Star Memorial Highway
Covert, MI 49043

Pilgrim Nuclear Power Station

Entergy Nuclear Generation Company
Docket No. 50-293
License No. DPR-35
John Dent, Jr., Vice President--Site Vice President
Entergy Nuclear Operations
Pilgrim Nuclear Power Station
600 Rocky Hill Road
Plymouth, MA 02360-5508

River Bend Station

Entergy Operations, Inc.
Docket No. 50-458
License No. NPF-47
Mr. Eric W. Olson, Site Vice President
Entergy Operations, Inc.
River Bend Station
5485 US Highway 61N
St. Francisville, LA 70775

Vermont Yankee Nuclear Power Station

Entergy Nuclear Operations, Inc.
Docket No. 50-271
License No. DPR-28
Christopher J. Wamser, Site Vice President
Entergy Nuclear Operations, Inc.
Vermont Yankee Nuclear Power Station
320 Governor Hunt Road
Vernon, VT 05354

Waterford Steam Electric Station, Unit 3

Entergy Operations, Inc.
Docket No. 50-382
License No. NPF-38
Mr. Michael R. Chisum, Site Vice President
Entergy Operations, Inc.
Waterford Steam Electric Station
17265 River Road
Killona, LA 70057-0751

Attachment 2--Redacted

    Editorial Note:  This document was received for publication by 
the Office of the Federal Register on August 7, 2015.

[FR Doc. 2015-19853 Filed 8-11-15; 8:45 am]
 BILLING CODE 7590-01-P



                                                                             Federal Register / Vol. 80, No. 155 / Wednesday, August 12, 2015 / Notices                                                48343

                                                  of Docketing included an opportunity to                 to review and evaluate its security                      For The Nuclear Regulatory Commission.
                                                  request a hearing and to petition for                   procedures; strengthen its procedures                  Marc L. Dapas,
                                                  leave to intervene. No requests for a                   and set expectations regarding the                     Regional Administrator.
                                                  hearing or leave to intervene were                      conduct of security personnel; and
                                                                                                                                                                   Editorial Note: This document was
                                                  submitted.                                              conduct a presentation describing the                  received for publication by the Office of the
                                                     The NRC prepared a safety evaluation                 event that formed the bases for the                    Federal Register on August 7, 2015.
                                                  report (SER) (ADAMS Accession No.                       violation and the lessons learned, to its
                                                  ML15050A428) to document its review                     employees and the industry. Entergy is                 ATTACHMENT—CONFIRMATORY
                                                  and evaluation of the amendment                         required to have an independent safety                 ORDER MODIFYING LICENSE
                                                  request. Also in connection with this                   culture assessment conducted of the                    UNITED STATES OF AMERICA
                                                  action, the Commission prepared an                      security organization at its River Bend
                                                  Environmental Assessment (EA)                           Station. Entergy is also required to                   NUCLEAR REGULATORY
                                                  (ADAMS Accession No. ML15022A575)                       notify the NRC periodically of the status              COMMISSION
                                                  and a Finding of No Significant Impact                  of its efforts.                                        In the Matter of All Power Reactor
                                                  (FONSI) (ADAMS Accession No.                                                                                   Licensees Owned and Operated by
                                                  ML15026A683). The Notice of                             DATES: The confirmatory order was
                                                                                                                                                                 Entergy Nuclear Operations, Inc.;
                                                  Availability of the EA and FONSI for the                issued on December 3, 2014.
                                                                                                                                                                 Entergy Operations, Inc. and Entergy
                                                  NA ISFSI was published in the Federal                   ADDRESSES:   Please refer to Docket ID                 Nuclear Generation Company [Docket
                                                  Register on February 27, 2015 (80 FR                    NRC–2015–0135 when contacting the                      Nos. (as shown in Attachment); License
                                                  10726).                                                 NRC about the availability of                          Nos. (as shown in Attachment)]
                                                     As required by the Act and the NRC’s                 information regarding this document.
                                                  rules and regulations in 10 CFR Chapter                                                                        EA–14–009
                                                                                                          You may obtain publicly-available
                                                  1, the staff made the appropriate                       information related to this action by the              Confirmatory Order Modifying License
                                                  findings which are contained in the                     following methods:                                     I.
                                                  SER. The NRC approved and issued
                                                                                                             • Federal Rulemaking Web site: Go to                   The licensees identified in
                                                  Amendment No. 4 to SNM–2507, held
                                                                                                          http://www.regulations.gov and search                  Attachment 1 to this Order hold licenses
                                                  by Dominion for the receipt, possession,
                                                                                                          for Docket ID NRC–2015–0135. Address                   issued by the U.S. Nuclear Regulatory
                                                  transfer, and storage of spent fuel and
                                                                                                          questions about NRC dockets to Carol                   Commission (NRC or Commission)
                                                  associated radioactive materials at the
                                                                                                          Gallagher; telephone: 301–415–3463;                    pursuant to Title 10 of the Code of
                                                  NA ISFSI. Pursuant to 10 CFR 72.46(d),
                                                                                                          email: Carol.Gallagher@nrc.gov. For                    Federal Regulations (10 CFR) Part 50,
                                                  the NRC is providing notice of the
                                                                                                          questions about the Order, contact the                 ‘‘Domestic Licensing of Production and
                                                  action taken. Amendment No. 4 was
                                                                                                          individual listed in the FOR FURTHER                   Utilization Facilities.’’ The licenses
                                                  effective as of the date of issuance,
                                                                                                          INFORMATION CONTACT section of this                    authorize the operation of the listed
                                                  August 3, 2015.
                                                                                                          document.                                              facilities in accordance with conditions
                                                    Dated at Rockville, Maryland, this 3rd day
                                                  of August, 2015.                                           • NRC’s Agencywide Documents                        specified therein.
                                                                                                          Access and Management System                              This Confirmatory Order is the result
                                                    For the Nuclear Regulatory Commission.
                                                                                                          (ADAMS): You may access publicly                       of an agreement reached during an
                                                  Michele Sampson,                                                                                               alternative dispute resolution (ADR)
                                                                                                          available documents online in the
                                                  Chief, Licensing Branch, Division of Spent                                                                     mediation session conducted on
                                                                                                          ADAMS Public Documents collection at
                                                  Fuel Management, Office of Nuclear Material
                                                                                                          http://www.nrc.gov/reading-rm/                         September 22, 2014, in Arlington,
                                                  Safety and Safeguards.
                                                                                                          adams.html. To begin the search, select                Texas.
                                                  [FR Doc. 2015–19807 Filed 8–11–15; 8:45 am]
                                                                                                          NRC: ADAMS Public Documents and                        II.
                                                  BILLING CODE 7590–01–P
                                                                                                          then select ‘‘Begin Web-based ADAMS
                                                                                                          Search.’’ For problems with ADAMS,                        On March 21, 2012, the NRC initiated
                                                                                                          please contact the NRC’s Public                        a special inspection to determine the
                                                  NUCLEAR REGULATORY                                                                                             circumstances surrounding a security
                                                  COMMISSION                                              Document Room (PDR) reference staff at
                                                                                                          1–800–397–4209, 301–415–4737, or by                    event, which occurred on March 18,
                                                  [Docket Nos. (as Shown in the Attachment);              email to pdr.resource@nrc.gov. The                     2012, at Entergy Operations, Inc.’s
                                                  License Nos. (as Shown in the Attachment):              ADAMS accession number for each                        (Entergy or Licensee), River Bend
                                                  EA–14–009; NRC–2015–0135]                                                                                      Station (RBS or facility). In addition, on
                                                                                                          document referenced (if that document
                                                                                                          is publicly available in ADAMS) is                     March 21, 2012, the NRC’s Office of
                                                  In the Matter of All Power Reactor                                                                             Investigations (OI), Region IV Field
                                                  Licensees Owned and Operated by                         provided the first time that a document
                                                                                                          is referenced.                                         Office, initiated an investigation at RBS
                                                  Entergy Nuclear Operations, Inc.;                                                                              to determine if Entergy employees
                                                  Entergy Operations, Inc.; and Entergy                      • NRC’s PDR: You may examine and                    willfully violated NRC security
                                                  Nuclear Generation Company                              purchase copies of public documents at                 requirements at RBS. The investigation
                                                                                                          the NRC’s PDR, Room O1–F21, One                        was completed on December 31, 2013,
                                                  AGENCY:  Nuclear Regulatory                             White Flint North, 11555 Rockville
                                                  Commission.                                                                                                    and was documented in OI Report 4–
                                                                                                          Pike, Rockville, Maryland 20852.                       2012–022. Based on the evidence
                                                  ACTION: Confirmatory order; issuance.
                                                                                                          FOR FURTHER INFORMATION CONTACT:                       developed during the investigation, OI’s
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  SUMMARY:  The U.S. Nuclear Regulatory                   Christi Maier, Region IV, U.S. Nuclear                 Region IV Field Office concluded that
                                                  Commission (NRC) is issuing a                           Regulatory Commission, Washington DC                   the willful actions of an unidentified
                                                  confirmatory order to Entergy                           20555–001; 817–200–1217; or by email                   individual caused Entergy to be in
                                                  Operations, Inc. (Entergy), confirming                  to Christi.Maier@nrc.gov.                              violation of 10 CFR part 73, ‘‘Physical
                                                  an agreement reached in an Alternative                                                                         Protection of Plants and Materials.’’
                                                  Dispute Resolution mediation session                    SUPPLEMENTARY INFORMATION:               The text of      While the NRC investigation did not
                                                  held on September 22, 2014. As part of                  the Order is attached.                                 identify the individual responsible for
                                                  this agreement, Entergy will take actions                 Dated this 3rd day of December 2014.                 the security-related violation, the OI


                                             VerDate Sep<11>2014   18:16 Aug 11, 2015   Jkt 235001   PO 00000   Frm 00057   Fmt 4703   Sfmt 4703   E:\FR\FM\12AUN1.SGM   12AUN1


                                                  48344                      Federal Register / Vol. 80, No. 155 / Wednesday, August 12, 2015 / Notices

                                                  Region IV Field Office did establish                    because of the deliberate misconduct of               regarding the proposed decorum
                                                  several facts that are germane to the                   an unidentified security officer at River             protocols within 60 days of submittal
                                                  conclusion of the investigation. Details                Bend Station.                                         for resolution in a manner acceptable to
                                                  of the security event and the subsequent                   2. Entergy does not believe that                   both parties. Entergy will implement the
                                                  inspection and investigation are                        willful intent was involved in all                    decorum protocols within 12 months
                                                  described in Attachment 2 to this Order.                aspects of the violation.                             from the date of this Confirmatory
                                                  Attachment 2 includes Security-Related                     B. Within 4 months from the date of                Order.
                                                  Information (SRI); therefore, it is not                 this Confirmatory Order, Entergy will                    G. Within 4 months from the date of
                                                  publicly available.                                     revise its security procedures.                       this Confirmatory Order, Entergy will
                                                     The NRC determined that as the result                   C. Within 3 months from the date of                prepare a ‘‘lessons learned’’
                                                  of the willful actions of an unidentified               this Confirmatory Order, Entergy will, at             presentation to be delivered to Entergy
                                                  individual, Entergy failed to comply                    each of its nuclear plants, conduct a                 nuclear employees at each of its nuclear
                                                  with 10 CFR part 73. The NRC described                  review of its controls for SRI and                    plants describing the event that formed
                                                  the results of the inspection and                       communicate to the NRC the results of                 the basis for this violation. Prior to
                                                  investigation in a letter to Entergy dated              the review. Within 6 months from the                  making the presentation, Entergy will
                                                  July 16, 2014. In response to the NRC’s                 date of this Confirmatory Order, Entergy              provide its proposed presentation to the
                                                  letter, Entergy requested ADR to resolve                will establish new controls and will                  NRC for its review. The NRC will
                                                  this matter. This confirmatory order is                 provide its proposed controls to the                  communicate to Entergy any concerns
                                                  issued pursuant to the agreement                        NRC for its review. The NRC will                      regarding the presentation within 30
                                                  reached during the ADR process.                         communicate to Entergy any concerns                   days of submittal. Entergy will deliver
                                                                                                          regarding the controls within 60 days of
                                                  III.                                                                                                          the presentation to Entergy nuclear
                                                                                                          submittal for resolution in a manner
                                                                                                                                                                employees within 12 months of this
                                                     On September 22, 2014, the NRC and                   acceptable to both parties. Entergy will
                                                                                                                                                                Confirmatory Order.
                                                  Entergy met in an ADR session                           implement the controls within 15
                                                  mediated by a professional mediator,                                                                             H. Within 4 months from the date of
                                                                                                          months from the date of this
                                                  arranged through the Cornell University                 Confirmatory Order. The details                       this Confirmatory Order, Entergy will
                                                  Scheinman Institute on Conflict                         regarding these controls are described in             prepare a presentation describing the
                                                  Resolution. ADR is a process in which                   the non-public Attachment.                            event that formed the basis for this
                                                  a neutral mediator, with no decision-                      D. Within 9 months from the date of                violation. The presentation will be
                                                  making authority, assists the parties in                this Confirmatory Order, Entergy will                 delivered to the Nuclear Security
                                                  reaching an agreement on resolving any                  review and evaluate the location and                  Working Group and the National
                                                  differences regarding the dispute.                      storage of SRI at each of its nuclear                 Nuclear Security Conference (subject to
                                                  During the ADR session, a preliminary                   plants. The details are described in the              acceptance of the conference-organizing
                                                  settlement agreement was reached. The                   non-public Attachment.                                committees). This presentation will
                                                  elements of that preliminary agreement,                    E. Entergy will develop a                          include, among other subjects, the
                                                  with the exception of the section that                  ‘‘commitment to compliance’’ statement                subjects covered in the non-public
                                                  includes SRI, are described below. The                  or a similar document highlighting the                Attachment to this Confirmatory Order.
                                                  portions of the agreement that contain                  special responsibilities of nuclear                   Prior to making the presentation,
                                                  SRI, as well as the sections of this                    security personnel. This document will                Entergy will provide its proposed
                                                  Confirmatory Order that address SRI,                    explain that nuclear security personnel               presentation to the NRC for its review.
                                                  are described in the aforementioned                     need to comply with regulations and                   The NRC will communicate to Entergy
                                                  non-public Attachment. The following                    procedures, and it will describe the                  any concerns regarding the presentation
                                                  description of the preliminary ADR                      potential consequences if compliance                  within 30 days of submittal. Entergy
                                                  agreement, and the required actions                     does not occur. Within 12 months from                 will deliver the presentation within 12
                                                  described in Section V of this                          the date of this Confirmatory Order,                  months of this Confirmatory Order.
                                                  Confirmatory Order, include references                  Entergy will require at each of its                      I. Within 6 months from the date of
                                                  to the non-public Attachment to allow                   nuclear plants that nuclear security                  this Confirmatory Order, Entergy will
                                                  for public release of this Confirmatory                 personnel read and sign the statement                 ensure that an independent third party
                                                  Order. The publicly available elements                  (subject to any collective bargaining                 conducts a safety culture assessment of
                                                  of the agreement consist of the                         obligations it may have). Entergy will                the Security organization at River Bend
                                                  following:                                              include the reading and signing of this               Station. The results will be incorporated
                                                     The NRC recognizes the corrective                    statement in the initial qualification                into Entergy’s corrective action program
                                                  actions that Entergy has already                        process of nuclear security personnel.                as appropriate. A copy of the completed
                                                  implemented associated with the                         The details are described in the non-                 assessment will be made available for
                                                  apparent violation and preliminary                      public Attachment.                                    NRC review.
                                                  finding. Entergy’s corrective actions are                  F. Within 6 months from the date of                   J. Within 4 months from the date of
                                                  described in the non-public Attachment.                 this Confirmatory Order, Entergy will                 this Confirmatory Order, Entergy will
                                                     A. The NRC and Entergy agree that a                  identify those security posts in each of              prepare refresher training on the
                                                  willful violation of Title 10 Code of                   its nuclear plants that should be subject             provisions of 10 CFR 50.5 and 50.9 for
                                                  Federal Regulations (10 CFR) Part 73                    to certain decorum standards that will                Entergy employees at each of its nuclear
                                                  occurred on March 18, 2012, at River                    ensure a professional environment in                  plants. Prior to conducting the training,
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  Bend Station. However, the NRC and                      those areas. Once identified, Entergy                 Entergy will provide its proposed
                                                  Entergy disagree on the specific aspects                will establish decorum protocols for                  refresher training plan to the NRC for its
                                                  of that willful characterization of the                 those security posts. In addition, within             review. The NRC will communicate to
                                                  violation. The details regarding these                  6 months of the date of this                          Entergy any concerns regarding the plan
                                                  aspects are described in the non-public                 Confirmatory Order, Entergy will                      within 30 days of submittal for
                                                  Attachment.                                             provide its proposed decorum protocols                resolution in a manner acceptable to
                                                     1. The NRC concluded that the                        to the NRC for its review. The NRC will               both parties. Entergy will complete
                                                  security-related violation occurred                     communicate to Entergy any concerns                   administration of this refresher training


                                             VerDate Sep<11>2014   18:16 Aug 11, 2015   Jkt 235001   PO 00000   Frm 00058   Fmt 4703   Sfmt 4703   E:\FR\FM\12AUN1.SGM   12AUN1


                                                                             Federal Register / Vol. 80, No. 155 / Wednesday, August 12, 2015 / Notices                                          48345

                                                  within 12 months of this Confirmatory                   upon issuance and waives its right to a                  B. Within 4 months from the date of
                                                  Order.                                                  hearing in connection with this Order.                this Confirmatory Order, Entergy will
                                                     K. Notification to the NRC When                         P. If Entergy fulfills its commitments             revise its security procedures.
                                                  Actions Are Completed                                   under this Order, the NRC will not take                  C. Within 3 months from the date of
                                                     1. Unless otherwise specified, Entergy               further enforcement action based on the               this Confirmatory Order, Entergy will, at
                                                  will submit written notification to the                 violations of NRC requirements                        each of its nuclear plants, conduct a
                                                  Director, Division of Reactor Safety,                   described in Enclosure 2 of the letter                review of its controls for SRI and
                                                  USNRC Region IV, 1600 East Lamar                        transmitting this Order.                              communicate to the NRC the results of
                                                  Blvd., Arlington, Texas 76011–4511, at                     On November 21, 2014, Entergy                      the review. Within 6 months from the
                                                  intervals not to exceed 6 months, 1 year,               consented to issuing this Confirmatory                date of this Confirmatory Order, Entergy
                                                  and annually thereafter until the terms                 Order with the commitments, as                        will establish new controls and will
                                                  of the Confirmatory Order are                           described in Section V below.                         provide its proposed controls to the
                                                  completed, providing a status of each                                                                         NRC for its review. The NRC will
                                                  item in the Order.                                      IV.                                                   communicate to Entergy any concerns
                                                     2. Entergy will provide its basis for                   Since the Licensee has agreed to take              regarding the controls within 60 days of
                                                  concluding that the terms of the                        additional actions to address NRC                     submittal for resolution in a manner
                                                  Confirmatory Order have been satisfied,                 concerns, as set forth in Section III                 acceptable to both parties. Entergy will
                                                  to the NRC, in writing                                  above, the NRC has concluded that its                 implement the controls within 15
                                                     L. Inspection Follow-up                              concerns can be resolved through                      months from the date of this
                                                     Based on the corrective actions and                  issuance of this Confirmatory Order.                  Confirmatory Order. The details
                                                  enhancements described above, the NRC                      I find that Entergy’s commitments as               regarding these controls are described in
                                                  will conduct follow-up inspections                      set forth in Section V are acceptable and             the non-public Attachment.
                                                  using NRC Inspection Procedure 92702,                   necessary and conclude that with these                   D. Within 9 months from the date of
                                                  ‘‘Followup on Corrective Actions for                    commitments public health and safety                  this Confirmatory Order, Entergy will
                                                  Violations and Deviations.’’                            are reasonably assured. In view of the                review and evaluate the location and
                                                     M. Administrative Items                              foregoing, I have determined that public              storage of SRI at each of its nuclear
                                                     1. The NRC and Entergy Operations,                   health and safety require that Entergy’s              plants. The details are described in the
                                                  Inc., agree that the above elements will                commitments be confirmed by this                      non-public Attachment.
                                                  be incorporated into this Confirmatory                  Confirmatory Order. Based on the above                   E. Entergy will develop a
                                                  Order and that the NRC will consider                    and Entergy’s consent, this                           ‘‘commitment to compliance’’ statement
                                                  the order an escalated enforcement                      Confirmatory Order is effective 30 days               or a similar document highlighting the
                                                  action.                                                 after its issuance.                                   special responsibilities of nuclear
                                                     2. The NRC and Entergy agree that the                                                                      security personnel. This document will
                                                                                                          V.
                                                  issues described in the NRC’s Inspection                                                                      explain that nuclear security personnel
                                                  Report and Investigation Report to                        Accordingly, pursuant to Sections                   need to comply with regulations and
                                                  Entergy Operations, Inc., of July 16,                   104b, 161b, 161i, 161o, 182 and 186 of                procedures, and it will describe the
                                                  2014 (EA–14–009) resulted in a                          the Atomic Energy Act of 1954, as                     potential consequences if compliance
                                                  violation of NRC security requirements.                 amended, and the Commission’s                         does not occur. Within 12 months from
                                                  The details regarding the violation are                 regulations in 10 CFR 2.202 and 10 CFR                the date of this Confirmatory Order,
                                                  described in the non-public Attachment.                 parts 50 and 73, IT IS HEREBY                         Entergy will require at each of its
                                                     3. In consideration of the significant               ORDERED THAT THE ACTIONS                              nuclear plants that nuclear security
                                                  corrective actions Entergy has already                  DESCRIBED BELOW WILL BE TAKEN                         personnel read and sign the statement
                                                  taken and the additional actions Entergy                AT RIVER BEND STATION AND                             (subject to any collective bargaining
                                                  has committed to taking to enhance its                  OTHER NUCLEAR POWER PLANTS IN                         obligations it may have). Entergy will
                                                  security program, the NRC agrees to                     ENTERGY’S FLEET AND THAT                              include the reading and signing of this
                                                  reduce the severity level of the escalated              REACTOR OPERATING LICENSE NO.                         statement in the initial qualification
                                                  enforcement sanction. The NRC agrees                    NPF–47 IS MODIFIED AS FOLLOWS                         process of nuclear security personnel.
                                                  to issue a Notice of Violation for a                    WITH RESPECT TO THE ACTIONS TO                        The details are described in the non-
                                                  security-related violation and impose a                 BE TAKEN AT THE RIVER BEND                            public Attachment.
                                                  $70,000 civil penalty for the matter                    STATION:                                                 F. Within 6 months from the date of
                                                  discussed in the NRC’s Inspection                         A. The NRC and Entergy agree that a                 this Confirmatory Order, Entergy will
                                                  Report and Investigation Report to                      willful violation of Title 10 Code of                 identify those security posts in each of
                                                  Entergy Operations, Inc., of July 16,                   Federal Regulations (10 CFR) Part 73                  its nuclear plants that should be subject
                                                  2014 (EA–14–009). The issuance of the                   occurred on March 18, 2012, at River                  to certain decorum standards that will
                                                  Notice of Violation and civil penalty is                Bend Station. However, the NRC and                    ensure a professional environment in
                                                  considered escalated enforcement. The                   Entergy disagree on the specific aspects              those areas. Once identified, Entergy
                                                  NRC communicates, in the non-public                     of that willful characterization of the               will establish decorum protocols for
                                                  Attachment, the basis for its original                  violation. The details regarding these                those security posts. In addition, within
                                                  conclusion regarding the                                aspects are described in the non-public               6 months of the date of this
                                                  characterization of the violation.                      Attachment.                                           Confirmatory Order, Entergy will
                                                                                                            1. The NRC concluded that the
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                     4. This agreement is binding upon                                                                          provide its proposed decorum protocols
                                                  successors and assigns of Entergy                       security-related violation occurred                   to the NRC for its review. The NRC will
                                                  Operations, Inc.                                        because of the deliberate misconduct of               communicate to Entergy any concerns
                                                     N. Within thirty days of the date of                 an unidentified security officer at River             regarding the proposed decorum
                                                  the Confirmatory Order, Entergy shall                   Bend Station.                                         protocols within 60 days of submittal
                                                  pay a civil penalty of $70,000.                           2. However, Entergy does not believe                for resolution in a manner acceptable to
                                                     O. Entergy agrees that this                          that willful intent was involved in all               both parties. Entergy will implement the
                                                  Confirmatory Order is to be effective                   aspects of the violation.                             decorum protocols within 12 months


                                             VerDate Sep<11>2014   18:16 Aug 11, 2015   Jkt 235001   PO 00000   Frm 00059   Fmt 4703   Sfmt 4703   E:\FR\FM\12AUN1.SGM   12AUN1


                                                  48346                      Federal Register / Vol. 80, No. 155 / Wednesday, August 12, 2015 / Notices

                                                  from the date of this Confirmatory                      Director, Division of Reactor Safety,                 described in Enclosure 2 of the letter
                                                  Order.                                                  USNRC Region IV, 1600 East Lamar                      transmitting this Order.
                                                     G. Within 4 months from the date of                  Blvd., Arlington, Texas 76011–4511, at                   The Regional Administrator, Region
                                                  this Confirmatory Order, Entergy will                   intervals not to exceed 6 months, 1 year,             IV, may, in writing, relax or rescind any
                                                  prepare a ‘‘lessons learned’’                           and annually thereafter until the terms               of the above conditions upon
                                                  presentation to be delivered to Entergy                 of the Confirmatory Order are                         demonstration by Entergy of good cause.
                                                  nuclear employees at each of its nuclear                completed, providing a status of each                 VI.
                                                  plants describing the event that formed                 item in the Order.
                                                  the basis for this violation. Prior to                     2. Entergy will provide its basis for                 Any person adversely affected by this
                                                  making the presentation, Entergy will                   concluding that the terms of the                      Confirmatory Order, other than Entergy,
                                                  provide its proposed presentation to the                Confirmatory Order have been satisfied,               may request a hearing within 30 days of
                                                  NRC for its review. The NRC will                        to the NRC, in writing                                its publication in the Federal Register.
                                                  communicate to Entergy any concerns                        L. Inspection Follow-up                            Where good cause is shown,
                                                  regarding the presentation within 30                       Based on the corrective actions and                consideration will be given to extending
                                                  days of submittal. Entergy will deliver                 enhancements described above, the NRC                 the time to request a hearing. A request
                                                  the presentation to Entergy nuclear                                                                           for extension of time must be made in
                                                                                                          will conduct follow-up inspections
                                                  employees within 12 months of this                                                                            writing to the Director, Office of
                                                                                                          using NRC Inspection Procedure 92702,
                                                  Confirmatory Order.                                                                                           Enforcement, U.S. Nuclear Regulatory
                                                                                                          ‘‘Followup on Corrective Actions for
                                                     H. Within 4 months from the date of                                                                        Commission, Washington, DC 20555,
                                                                                                          Violations and Deviations.’’
                                                  this Confirmatory Order, Entergy will                                                                         and include a statement of good cause
                                                                                                             M. Administrative Items
                                                  prepare a presentation describing the                                                                         for the extension.
                                                                                                             1. The NRC and Entergy Operations,                    This Order and its Attachments
                                                  event that formed the basis for this                    Inc., agree that the above elements will
                                                  violation. The presentation will be                                                                           contain information up to the Security-
                                                                                                          be incorporated into this Confirmatory                Related Information designation, as
                                                  delivered to the Nuclear Security
                                                                                                          Order and that the NRC will consider                  defined in 10 CFR 73.2, and its
                                                  Working Group and the National
                                                                                                          the order an escalated enforcement                    disclosure to unauthorized individuals
                                                  Nuclear Security Conference (subject to
                                                                                                          action.                                               is prohibited by 10 CFR 73.21 and 10
                                                  acceptance of the conference-organizing
                                                                                                             2. The NRC and Entergy agree that the              CFR 73.22. Therefore, any redacted
                                                  committees). This presentation will
                                                                                                          issues in the NRC’s Inspection Report                 material will not be made available for
                                                  include, among other subjects, the
                                                                                                          and Investigation Report (EA–14–009)                  public inspection in the NRC Public
                                                  subjects covered by the non-public
                                                  Attachment to this Confirmatory Order.                  described in a July 16, 2014, letter to               Document Room or electronically in the
                                                  Prior to making the presentation,                       Entergy Operations, Inc., resulted in a               NRC’s Agencywide Documents Access
                                                  Entergy will provide its proposed                       violation of NRC security requirements.               and Management System. Any person
                                                  presentation to the NRC for its review.                 The details regarding the violation are               requesting to obtain a copy of this order
                                                  The NRC will communicate to Entergy                     described in the non-public Attachment.               or portions thereof will be required to
                                                  any concerns regarding the presentation                    3. In consideration of the significant             demonstrate their trust and reliability
                                                  within 30 days of submittal. Entergy                    corrective actions Entergy has already                through a Federal Bureau of
                                                  will deliver the presentation within 12                 taken and the additional actions Entergy              Investigation background check and
                                                  months of this Confirmatory Order.                      has committed to taking to enhance its                criminal history check, as well as
                                                     I. Within 6 months from the date of                  security program, the NRC agrees to                   demonstrate a ‘‘need to know’’ such
                                                  this Confirmatory Order, Entergy will                   reduce the severity level of the escalated            information.
                                                  ensure that an independent, third party                 enforcement sanction. The NRC agrees                     If a person other than the licensee
                                                  conducts a safety culture assessment of                 to issue a Notice of Violation for a                  requests a hearing, that person shall set
                                                  the Security organization at River Bend                 security-related violation and impose a               forth with particularity the manner in
                                                  Station. The results will be incorporated               $70,000 civil penalty for the matter                  which his interest is adversely affected
                                                  into Entergy’s corrective action program                discussed in the July 16, 2014, letter to             by this Confirmatory Order and shall
                                                  as appropriate. A copy of the completed                 Entergy Operations, Inc., regarding the               address the criteria set forth in 10 CFR
                                                  assessment will be made available for                   NRC’s Inspection Report and                           2.309(d) and (f).
                                                  NRC review.                                             Investigation Report (EA–14–009). The                    If a hearing is requested by a person
                                                     J. Within 4 months from the date of                  issuance of the Notice of Violation and               whose interest is adversely affected, the
                                                  this Confirmatory Order, Entergy will                   civil penalty is considered escalated                 Commission will issue an order
                                                  prepare refresher training on the                       enforcement. The NRC communicates,                    designating the time and place of any
                                                  provisions of 10 CFR 50.5 and 50.9 for                  in the non-public Attachment, the basis               hearing. If a hearing is held, the issue to
                                                  Entergy employees at each of its nuclear                for its original conclusion regarding the             be considered at such hearing shall be
                                                  plants. Prior to conducting the training,               characterization of the violation.                    whether this Confirmatory Order should
                                                  Entergy will provide its proposed                          4. This agreement is binding upon                  be sustained.
                                                  refresher training plan to the NRC for its              successors and assigns of Entergy                        In the absence of any request for
                                                  review. The NRC will communicate to                     Operations, Inc.                                      hearing, or written approval of an
                                                  Entergy any concerns regarding the plan                    N. Within 30 days of the date of the               extension of time in which to request a
                                                  within 30 days of submittal for                         Confirmatory Order, Entergy shall pay a               hearing, the provisions specified in
                                                  resolution in a manner acceptable to                    civil penalty of $70,000.                             Section V above shall be effective and
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  both parties. Entergy will complete                        O. Entergy agrees that this                        final thirty days after issuance of this
                                                  administration of this refresher training               Confirmatory Order is to be effective                 Confirmatory Order without further
                                                  within 12 months of this Confirmatory                   upon issuance and waives its right to a               order or proceedings. If an extension of
                                                  Order.                                                  hearing in connection with this Order                 time for requesting a hearing has been
                                                     K. Notification to the NRC When                         P. If Entergy fulfills its commitments             approved, the provisions specified in
                                                  Actions Are Completed                                   under this Order, the NRC will not take               Section V shall be final when the
                                                     1. Unless otherwise specified, Entergy               further enforcement action based on the               extension expires if a hearing request
                                                  will submit written notification to the                 violations of NRC requirements                        has not been received.


                                             VerDate Sep<11>2014   18:16 Aug 11, 2015   Jkt 235001   PO 00000   Frm 00060   Fmt 4703   Sfmt 4703   E:\FR\FM\12AUN1.SGM   12AUN1


                                                                             Federal Register / Vol. 80, No. 155 / Wednesday, August 12, 2015 / Notices                                           48347

                                                     A REQUEST FOR HEARING SHALL                             If a participant is electronically                 documents electronically must file an
                                                  NOT STAY THE EFFECTIVENESS OF                           submitting a document to the NRC in                   exemption request, in accordance with
                                                  THIS ORDER.                                             accordance with the E-Filing rule, the                10 CFR 2.302(g), with their initial paper
                                                     All documents filed in NRC                           participant must file the document                    filing requesting authorization to
                                                  adjudicatory proceedings, including a                   using the NRC’s online, Web-based                     continue to submit documents in paper
                                                  request for hearing, a petition for leave               submission form. In order to serve                    format. Such filings must be submitted
                                                  to intervene, any motion or other                       documents through the Electronic                      by: (1) First class mail addressed to the
                                                  document filed in the proceeding prior                  Information Exchange (EIE), users will                Office of the Secretary of the
                                                  to the submission of a request for                      be required to install a Web browser                  Commission, U.S. Nuclear Regulatory
                                                  hearing or petition to intervene, and                   plug-in from the NRC Web site. Further
                                                                                                                                                                Commission, Washington, DC 20555–
                                                  documents filed by interested                           information on the Web-based
                                                                                                                                                                0001, Attention: Rulemaking and
                                                  governmental entities participating                     submission form, including the
                                                                                                          installation of the Web browser plug-in,              Adjudications Staff; or (2) courier,
                                                  under 10 CFR 2.315(c), must be filed in                                                                       express mail, or expedited delivery
                                                  accordance with the NRC E-Filing rule                   is available on the NRC’s public Web
                                                                                                          site at http://www.nrc.gov/site-help/e-               service to the Office of the Secretary,
                                                  (72 FR 49139, August 28, 2007), as
                                                                                                          submittals.html.                                      Sixteenth Floor, One White Flint North,
                                                  amended by 77 FR 46562; August 3,
                                                                                                             Once a participant has obtained a                  11555 Rockville Pike, Rockville,
                                                  2012 (codified in pertinent part at 10
                                                  CFR part 2, subpart C). The E-Filing                    digital ID certificate and a docket has               Maryland, 20852, Attention:
                                                  process requires participants to submit                 been created, the participant can then                Rulemaking and Adjudications Staff.
                                                  and serve all adjudicatory documents                    submit a request for hearing or petition              Participants filing a document in this
                                                  over the internet, or in some cases to                  for leave to intervene through the EIE.               manner are responsible for serving the
                                                  mail copies on electronic storage media.                Submissions should be in Portable                     document on all other participants.
                                                  Participants may not submit paper                       Document Format (PDF) in accordance                   Filing is considered complete by first-
                                                  copies of their filings unless they seek                with NRC guidance available on the                    class mail as of the time of deposit in
                                                  an exemption in accordance with the                     NRC public Web site at http://                        the mail, or by courier, express mail, or
                                                  procedures described below.                             www.nrc.gov/site-help/e-                              expedited delivery service upon
                                                                                                          submittals.html. A filing is considered               depositing the document with the
                                                     To comply with the procedural
                                                                                                          complete at the time the documents are                provider of the service. A presiding
                                                  requirements of E-Filing, at least 10
                                                                                                          submitted through the NRC’s E-Filing                  officer, having granted an exemption
                                                  days prior to the filing deadline, the
                                                                                                          system. To be timely, an electronic
                                                  participant should contact the Office of                                                                      request from using E-Filing, may require
                                                                                                          filing must be submitted to the E-Filing
                                                  the Secretary by email at                                                                                     a participant or party to use E-Filing if
                                                                                                          system no later than 11:59 p.m. Eastern
                                                  hearing.docket@nrc.gov, or by telephone                                                                       the presiding officer subsequently
                                                                                                          Time on the due date. Upon receipt of
                                                  at (301) 415–1677, to request (1) a                                                                           determines that the reason for granting
                                                                                                          a transmission, the E-Filing system
                                                  digital ID certificate, which allows the                time-stamps the document and sends                    the exemption from use of E-Filing no
                                                  participant (or its counsel or                          the submitter an email notice                         longer exists.
                                                  representative) to digitally sign                       confirming receipt of the document. The                  Documents submitted in adjudicatory
                                                  documents and access the E-Submittal                    E-Filing system also distributes an email             proceedings will appear in NRC’s
                                                  server for any proceeding in which it is                notice that provides access to the
                                                  participating; and (2) advise the                                                                             electronic hearing docket which is
                                                                                                          document to the NRC’s Office of the                   available to the public at http://
                                                  Secretary that the participant will be                  General Counsel and any others who
                                                  submitting a request or petition for                                                                          ehd1.nrc.gov/ehd/, unless excluded
                                                                                                          have advised the Office of the Secretary              pursuant to an order of the Commission,
                                                  hearing (even in instances in which the                 that they wish to participate in the
                                                  participant, or its counsel or                                                                                or the presiding officer. Participants are
                                                                                                          proceeding, so that the filer need not                requested not to include personal
                                                  representative, already holds an NRC-                   serve the documents on those
                                                  issued digital ID certificate). Based upon                                                                    privacy information, such as social
                                                                                                          participants separately. Therefore, any
                                                  this information, the Secretary will                                                                          security numbers, home addresses, or
                                                                                                          others who wish to participate in the
                                                  establish an electronic docket for the                  proceeding (or their counsel or                       home phone numbers in their filings,
                                                  hearing in this proceeding if the                       representative) must apply for and                    unless an NRC regulation or other law
                                                  Secretary has not already established an                receive a digital ID certificate before a             requires submission of such
                                                  electronic docket.                                      hearing request/petition to intervene is              information. With respect to
                                                     Information about applying for a                     filed so that they can obtain access to               copyrighted works, except for limited
                                                  digital ID certificate is available on                  the document via the E-Filing system.                 excerpts that serve the purpose of the
                                                  NRC’s public Web site at http://                           A person filing electronically using               adjudicatory filings and would
                                                  www.nrc.gov/site-help/e-                                the agency’s adjudicatory E-Filing                    constitute a Fair Use application,
                                                  submittals.html. System requirements                    system may seek assistance by                         participants are requested not to include
                                                  for accessing the E-Submittal server are                contacting the NRC Meta System Help                   copyrighted materials in their
                                                  detailed in NRC’s ‘‘Guidance for                        Desk through the ‘‘Contact Us’’ link                  submission.
                                                  Electronic Submission,’’ which is                       located on the NRC Web site at http://
                                                  available on the agency’s public Web                    www.nrc.gov/site-help/e-                                For The Nuclear Regulatory Commission
                                                  site at http://www.nrc.gov/site-help/e-                 submittals.html, by email at                            Dated this 3rd day of December 2014.
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  submittals.html. Participants may                       MSHD.Resource@nrc.gov, or by a toll-                  Marc L. Dapas,
                                                  attempt to use other software not listed                free call at (866) 672–7640. The NRC                  Regional Administrator.
                                                  on the Web site, but should note that the               Meta System Help Desk is available
                                                  NRC’s E-Filing system does not support                  between 8 a.m. and 8 p.m., Eastern                    Attachments: as stated
                                                  unlisted software, and the NRC Meta                     Time, Monday through Friday,
                                                  System Help Desk will not be able to                    excluding government holidays.
                                                  offer assistance in using unlisted                         Participants who believe that they
                                                  software.                                               have a good cause for not submitting


                                             VerDate Sep<11>2014   18:16 Aug 11, 2015   Jkt 235001   PO 00000   Frm 00061   Fmt 4703   Sfmt 4703   E:\FR\FM\12AUN1.SGM   12AUN1


                                                  48348                      Federal Register / Vol. 80, No. 155 / Wednesday, August 12, 2015 / Notices

                                                  Attachment 1                                            John Dent, Jr., Vice President—Site Vice              NRC about the availability of
                                                  All Power Reactor Licensees Owned                         President                                           information regarding this document.
                                                  and Operated By Entergy Nuclear                         Entergy Nuclear Operations                            You may access information related to
                                                                                                          Pilgrim Nuclear Power Station                         this document, which the NRC
                                                  Operations, Inc.; Entergy Operations,
                                                                                                          600 Rocky Hill Road                                   possesses and is publicly available,
                                                  Inc.; and Entergy Nuclear Generation
                                                                                                          Plymouth, MA 02360–5508                               using the following methods:
                                                  Company
                                                                                                          River Bend Station                                       • Federal Rulemaking Web site: Go to
                                                  Arkansas Nuclear One, Units 1 and 2                                                                           http://www.regulations.gov and search
                                                                                                          Entergy Operations, Inc.                              for Docket ID NRC–2014–0253. Address
                                                  Entergy Operations, Inc.                                Docket No. 50–458
                                                  Docket Nos. 50–313, 50–368                                                                                    questions about NRC dockets to Carol
                                                                                                          License No. NPF–47                                    Gallagher; telephone: 301–415–3463;
                                                  License Nos. DRP–51; NPF–6                              Mr. Eric W. Olson, Site Vice President
                                                  Mr. Jeremy Browning, Site Vice                                                                                email: Carol.Gallagher@nrc.gov.
                                                                                                          Entergy Operations, Inc.
                                                    President                                             River Bend Station                                       • NRC’s Agencywide Documents
                                                  Arkansas Nuclear One                                    5485 US Highway 61N                                   Access and Management System
                                                  Entergy Operations, Inc.                                St. Francisville, LA 70775                            (ADAMS): You may access publicly
                                                  1448 SR 333                                                                                                   available documents online in the NRC
                                                  Russellville, AR 72802–0967                             Vermont Yankee Nuclear Power Station                  Library at http://www.nrc.gov/reading-
                                                  Grand Gulf Nuclear Station                              Entergy Nuclear Operations, Inc.                      rm/adams.html. To begin the search,
                                                                                                          Docket No. 50–271                                     select ‘‘ADAMS Public Documents’’ and
                                                  Entergy Operations, Inc.                                License No. DPR–28                                    then select ‘‘Begin Web-based ADAMS
                                                  Docket No. 50–416                                       Christopher J. Wamser, Site Vice                      Search.’’ For problems with ADAMS,
                                                  License No. NPF–29                                        President                                           please contact the NRC’s Public
                                                  Mr. Kevin J. Mulligan, Site Vice                        Entergy Nuclear Operations, Inc.                      Document Room (PDR) reference staff at
                                                    President                                             Vermont Yankee Nuclear Power Station                  1–800–397–4209, 301–415–4737, or by
                                                  Entergy Operations, Inc.                                320 Governor Hunt Road                                email to pdr.resource@nrc.gov. The
                                                  Grand Gulf Nuclear Station                              Vernon, VT 05354                                      ADAMS accession number for each
                                                  P.O. Box 756                                                                                                  document referenced in this notice (if
                                                  Port Gibson, MS 39150                                   Waterford Steam Electric Station, Unit 3              that document is available in ADAMS)
                                                  Indian Point Nuclear Generating Unit                    Entergy Operations, Inc.                              is provided the first time that a
                                                  Nos. 2 and 3                                            Docket No. 50–382                                     document is referenced. Revision 0 of
                                                                                                          License No. NPF–38                                    Regulatory Guide 5.84, is available in
                                                  Entergy Nuclear Operations, Inc.                        Mr. Michael R. Chisum, Site Vice                      ADAMS under Accession No.
                                                  Docket Nos. 50–247 and 50–286                             President                                           ML15083A412. The regulatory analysis
                                                  License Nos. DPR–26 and DPR–64                          Entergy Operations, Inc.                              may be found in ADAMS under
                                                  John Ventosa, Vice President,                           Waterford Steam Electric Station                      Accession No. ML14218A861.
                                                    Operations
                                                  Entergy Nuclear Operations, Inc.
                                                                                                          17265 River Road                                         • NRC’s PDR: You may examine and
                                                                                                          Killona, LA 70057–0751                                purchase copies of public documents at
                                                  Indian Point Energy Center
                                                  450 Broadway, GSB                                       Attachment 2—Redacted                                 the NRC’s PDR, Room O1–F21, One
                                                  P.O. Box 249                                                                                                  White Flint North, 11555 Rockville
                                                  Buchanan, NY 10511–0249                                   Editorial Note: This document was                   Pike, Rockville, Maryland 20852.
                                                                                                          received for publication by the Office of the            Regulatory guides are not
                                                  James A. FitzPatrick Nuclear Power                      Federal Register on August 7, 2015.                   copyrighted, and NRC approval is not
                                                  Plant                                                   [FR Doc. 2015–19853 Filed 8–11–15; 8:45 am]           required to reproduce them.
                                                  Entergy Nuclear Operations, Inc.                        BILLING CODE 7590–01–P                                FOR FURTHER INFORMATION CONTACT:
                                                  Docket No. 50–333                                                                                             Wesley W. Held, Office of Nuclear
                                                  License No. DPR–59                                                                                            Security and Incident Response,
                                                  Lawrence Coyle, Executive Vice                          NUCLEAR REGULATORY                                    telephone: 301–415–1583, email:
                                                    President                                             COMMISSION                                            wesley.held@nrc.gov, or Richard A.
                                                  Entergy Nuclear Operations, Inc.                        [NRC–2014–0253]                                       Jervey, Office of Nuclear Regulatory
                                                  James A. FitzPatrick Nuclear Power                                                                            Research, telephone: 301–415–6201,
                                                    Plant                                                 Fitness-for-Duty Programs for New                     email: richard.jervey@nrc.gov. Both are
                                                  P.O. Box 110                                            Nuclear Power Plant Construction                      staff of the U.S. Nuclear Regulatory
                                                  Lycoming, NY 13093                                      Sites                                                 Commission, Washington, DC 20555–
                                                  Palisades Nuclear Plant                                 AGENCY:  Nuclear Regulatory                           0001.
                                                  Entergy Nuclear Operations, Inc.                        Commission.                                           SUPPLEMENTARY INFORMATION:
                                                  Docket No. 50–255                                       ACTION: Regulatory guide; issuance.
                                                                                                                                                                I. Introduction
                                                  License No. DPR–20
                                                  Anthony J. Vitale, Site Vice President                  SUMMARY:   The U.S. Nuclear Regulatory                  The NRC is issuing a new guide in the
                                                  Entergy Nuclear Operations, Inc.                        Commission (NRC) is issuing a new                     NRC’s ‘‘Regulatory Guide’’ series. This
                                                                                                          regulatory guide (RG), RG 5.84,
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  Palisades Nuclear Plant                                                                                       series was developed to describe and
                                                  27780 Blue Star Memorial Highway                        ‘‘Fitness-for-Duty Programs at New                    make available to the public information
                                                  Covert, MI 49043                                        Reactor Construction Sites.’’ This RG                 regarding methods that are acceptable to
                                                                                                          provides guidance for implementing                    the NRC staff for implementing specific
                                                  Pilgrim Nuclear Power Station                           fitness-for-duty (FFD) requirements at                parts of the agency’s regulations,
                                                  Entergy Nuclear Generation Company                      nuclear power plant construction sites.               techniques that the staff uses in
                                                  Docket No. 50–293                                       ADDRESSES: Please refer to Docket ID                  evaluating specific issues or postulated
                                                  License No. DPR–35                                      NRC–2014–0253 when contacting the                     events, and data that the staff needs in


                                             VerDate Sep<11>2014   18:16 Aug 11, 2015   Jkt 235001   PO 00000   Frm 00062   Fmt 4703   Sfmt 4703   E:\FR\FM\12AUN1.SGM   12AUN1



Document Created: 2016-09-27 22:27:25
Document Modified: 2016-09-27 22:27:25
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionConfirmatory order; issuance.
DatesThe confirmatory order was issued on December 3, 2014.
ContactChristi Maier, Region IV, U.S. Nuclear Regulatory Commission, Washington DC 20555-001; 817-200-1217; or by email to [email protected]
FR Citation80 FR 48343 