80_FR_50930 80 FR 50768 - Drawbridge Operation Regulation; Hood Canal, Port Gamble, WA

80 FR 50768 - Drawbridge Operation Regulation; Hood Canal, Port Gamble, WA

DEPARTMENT OF HOMELAND SECURITY
Coast Guard

Federal Register Volume 80, Issue 162 (August 21, 2015)

Page Range50768-50768
FR Document2015-20671

The Coast Guard has issued a temporary deviation from the operating schedule that governs the Hood Canal Floating Drawbridge across Hood Canal (Admiralty Inlet), mile 5.0, near Port Gamble, WA. This deviation allows the bridge to open the draw span half-way, 300 feet; as opposed to all the way, which is 600 feet. One half of the span will remain closed, allowing for the replacements of bridge anchors for this section of the bridge.

Federal Register, Volume 80 Issue 162 (Friday, August 21, 2015)
[Federal Register Volume 80, Number 162 (Friday, August 21, 2015)]
[Rules and Regulations]
[Page 50768]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-20671]



[[Page 50768]]

-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2015-0767]


Drawbridge Operation Regulation; Hood Canal, Port Gamble, WA

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulation.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the Hood Canal Floating Drawbridge 
across Hood Canal (Admiralty Inlet), mile 5.0, near Port Gamble, WA. 
This deviation allows the bridge to open the draw span half-way, 300 
feet; as opposed to all the way, which is 600 feet. One half of the 
span will remain closed, allowing for the replacements of bridge 
anchors for this section of the bridge.

DATES: This deviation is effective from 6 a.m. on August 27, 2015, 
until 7 p.m. on September 30, 2015.

ADDRESSES: The docket for this deviation, [USCG-2015-0767] is available 
at http://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH.'' Click on Open Docket Folder on the line 
associated with this deviation. You may also visit the Docket 
Management Facility in Room W12-140 on the ground floor of the 
Department of Transportation West Building, 1200 New Jersey Avenue SE., 
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, 
except Federal holidays.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email Mr. Steven Fischer, Bridge 
Administrator, Thirteenth Coast Guard District; telephone 206-220-7282, 
email [email protected]. If you have questions on viewing the 
docket, call Cheryl Collins, Program Manager, Docket Operations, 
telephone 202-366-9826.

SUPPLEMENTARY INFORMATION: Washington Department of Transportation 
(WSDOT) has requested that the Hood Canal Floating Drawbridge only open 
half of the span to facilitate safe and uninterrupted bridge anchor 
replacements. The Hood Canal Floating Drawbridge crosses Hood Canal, 
mile 5.0, near Port Gamble, WA. The bridge has two fixed spans (East 
and West), and one draw span (Main). The East span provides 50 feet of 
vertical clearance, and the West span provides 35 feet of vertical 
clearance. The Main span provides zero feet of vertical clearance in 
the closed-to-navigation position, and unlimited vertical clearance in 
the open-to-navigation position. Vertical clearances are referenced to 
mean high-water elevation.
    The deviation period allows the draw span of the Hood Canal 
Floating Drawbridge across Hood Canal, mile 5.0, to open half-way from 
6 a.m. on August 27, 2015 until 7 p.m. on September 30, 2015.
    During the time of the deviation, the drawbridge will not be able 
to operate according to the normal operating schedule. The normal 
operating schedule for the bridge is in accordance with 33 CFR 
117.1045, which allows, with at least one hour's notice, on signal, for 
the draw to open horizontally for 300 feet unless the maximum opening 
of 600 feet is requested; and need not open for vessel traffic from 3 
p.m. to 6:15 p.m. daily from 3 p.m. on May 22 to 6:16 p.m. on September 
30. The bridge shall operate in accordance to 33 CFR 117.1045 at all 
other times. Waterway usage on this part of Hood Canal includes vessels 
ranging from commercial tug and barge to U.S. Navy vessels, and vessels 
attending the missions of the U.S. Navy to small pleasure craft.
    Vessels able to pass through the East and West spans may do so at 
anytime. The Main span does not provide passage in the closed-to-
navigation position. The bridge will be able to open half the Main span 
for Navy vessels during emergencies, when requested by the Department 
of the Navy. The Hood Canal Floating Drawbridge has two immediate 
alternate spans for vessels to pass (East span and West span). The 
Coast Guard will also inform the users of the waterways through our 
Local and Broadcast Notices to Mariners of the change in operating 
schedule for the bridge so that vessels can arrange their transits to 
minimize any impact caused by the temporary deviation.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the effective 
period of this temporary deviation. This deviation from the operating 
regulations is authorized under 33 CFR 117.35.

    Dated: August 11, 2015.
Steven M. Fischer,
Bridge Administrator, Thirteenth Coast Guard District.
[FR Doc. 2015-20671 Filed 8-20-15; 8:45 am]
 BILLING CODE 9110-04-P



                                             50768              Federal Register / Vol. 80, No. 162 / Friday, August 21, 2015 / Rules and Regulations

                                             DEPARTMENT OF HOMELAND                                  vertical clearance, and the West span                 DEPARTMENT OF HOMELAND
                                             SECURITY                                                provides 35 feet of vertical clearance.               SECURITY
                                                                                                     The Main span provides zero feet of
                                             Coast Guard                                             vertical clearance in the closed-to-                  Coast Guard
                                                                                                     navigation position, and unlimited
                                             33 CFR Part 117                                         vertical clearance in the open-to-                    33 CFR Part 117
                                             [Docket No. USCG–2015–0767]                             navigation position. Vertical clearances              [Docket No. USCG–2015–0351]
                                                                                                     are referenced to mean high-water
                                             Drawbridge Operation Regulation;                        elevation.                                            Drawbridge Operation Regulation;
                                             Hood Canal, Port Gamble, WA                                The deviation period allows the draw               Lewis and Clark River, Astoria, OR
                                                                                                     span of the Hood Canal Floating
                                             AGENCY: Coast Guard, DHS.                               Drawbridge across Hood Canal, mile 5.0,               AGENCY: Coast Guard, DHS.
                                             ACTION:Notice of deviation from                         to open half-way from 6 a.m. on August                ACTION:Notice of deviation from
                                             drawbridge regulation.                                  27, 2015 until 7 p.m. on September 30,                drawbridge regulation.
                                             SUMMARY:    The Coast Guard has issued a                2015.                                                 SUMMARY:    The Coast Guard has issued a
                                             temporary deviation from the operating                     During the time of the deviation, the              temporary deviation from the operating
                                             schedule that governs the Hood Canal                    drawbridge will not be able to operate                schedule that governs the Oregon State
                                             Floating Drawbridge across Hood Canal                   according to the normal operating                     (Lewis and Clark River) Highway Bridge
                                             (Admiralty Inlet), mile 5.0, near Port                  schedule. The normal operating                        across the Lewis and Clark River, mile
                                             Gamble, WA. This deviation allows the                   schedule for the bridge is in accordance              1.0, at Astoria, OR. The deviation is
                                             bridge to open the draw span half-way,                  with 33 CFR 117.1045, which allows,                   necessary to accommodate bridge
                                             300 feet; as opposed to all the way,                    with at least one hour’s notice, on                   maintenance activities. This deviation
                                             which is 600 feet. One half of the span                 signal, for the draw to open horizontally             allows the bridge to remain in the
                                             will remain closed, allowing for the                    for 300 feet unless the maximum                       closed-to-navigation position and need
                                             replacements of bridge anchors for this                 opening of 600 feet is requested; and                 not open to maritime traffic.
                                             section of the bridge.                                  need not open for vessel traffic from 3               DATES: This deviation is effective from
                                             DATES: This deviation is effective from
                                                                                                     p.m. to 6:15 p.m. daily from 3 p.m. on                7 a.m. on August 20, 2015 to 5 p.m. on
                                             6 a.m. on August 27, 2015, until 7 p.m.                 May 22 to 6:16 p.m. on September 30.                  October 30, 2015.
                                             on September 30, 2015.                                  The bridge shall operate in accordance
                                                                                                                                                           ADDRESSES: The docket for this
                                                                                                     to 33 CFR 117.1045 at all other times.
                                             ADDRESSES: The docket for this                                                                                deviation, [USCG–2015–0351] is
                                                                                                     Waterway usage on this part of Hood
                                             deviation, [USCG–2015–0767] is                          Canal includes vessels ranging from                   available at http://www.regulations.gov.
                                             available at http://www.regulations.gov.                commercial tug and barge to U.S. Navy                 Type the docket number in the
                                             Type the docket number in the                           vessels, and vessels attending the                    ‘‘SEARCH’’ box and click ‘‘SEARCH.’’
                                             ‘‘SEARCH’’ box and click ‘‘SEARCH.’’                    missions of the U.S. Navy to small                    Click on Open Docket Folder on the line
                                             Click on Open Docket Folder on the line                 pleasure craft.                                       associated with this deviation. You may
                                             associated with this deviation. You may                                                                       also visit the Docket Management
                                             also visit the Docket Management                           Vessels able to pass through the East              Facility in Room W12–140 on the
                                             Facility in Room W12–140 on the                         and West spans may do so at anytime.                  ground floor of the Department of
                                             ground floor of the Department of                       The Main span does not provide passage                Transportation West Building, 1200
                                             Transportation West Building, 1200                      in the closed-to-navigation position. The             New Jersey Avenue SE., Washington,
                                             New Jersey Avenue SE., Washington,                      bridge will be able to open half the Main             DC 20590, between 9 a.m. and 5 p.m.,
                                             DC 20590, between 9 a.m. and 5 p.m.,                    span for Navy vessels during                          Monday through Friday, except Federal
                                             Monday through Friday, except Federal                   emergencies, when requested by the                    holidays.
                                             holidays.                                               Department of the Navy. The Hood
                                                                                                                                                           FOR FURTHER INFORMATION CONTACT: If
                                                                                                     Canal Floating Drawbridge has two
                                             FOR FURTHER INFORMATION CONTACT: If                                                                           you have questions on this temporary
                                                                                                     immediate alternate spans for vessels to
                                             you have questions on this temporary                    pass (East span and West span). The                   deviation, call or email Steven M.
                                             deviation, call or email Mr. Steven                     Coast Guard will also inform the users                Fischer, Thirteenth Coast Guard District
                                             Fischer, Bridge Administrator,                          of the waterways through our Local and                Bridge Program Administrator,
                                             Thirteenth Coast Guard District;                        Broadcast Notices to Mariners of the                  telephone 206–220–7282, email d13-pf-
                                             telephone 206–220–7282, email d13-pf-                   change in operating schedule for the                  d13bridgesuscg.mil. If you have
                                             d13bridges@uscg.mil. If you have                        bridge so that vessels can arrange their              questions on viewing the docket, call
                                             questions on viewing the docket, call                   transits to minimize any impact caused                Cheryl Collins, Program Manager,
                                             Cheryl Collins, Program Manager,                        by the temporary deviation.                           Docket Operations, telephone 202–366–
                                             Docket Operations, telephone 202–366–                                                                         9826.
                                             9826.                                                      In accordance with 33 CFR 117.35(e),
                                                                                                                                                           SUPPLEMENTARY INFORMATION: The
                                                                                                     the drawbridge must return to its regular
                                             SUPPLEMENTARY INFORMATION:
                                                                                                     operating schedule immediately at the                 Oregon Department of Transportation
                                             Washington Department of                                end of the effective period of this                   (ODOT) has requested that the Lewis
                                             Transportation (WSDOT) has requested                    temporary deviation. This deviation                   and Clark River Bridge, mile 1.0, remain
                                             that the Hood Canal Floating                            from the operating regulations is                     in the closed-to-navigation position, and
                                             Drawbridge only open half of the span                   authorized under 33 CFR 117.35.                       need not open to vessel traffic Monday,
                                             to facilitate safe and uninterrupted                                                                          Tuesday, Wednesday, Friday and
rmajette on DSK7SPTVN1PROD with RULES




                                             bridge anchor replacements. The Hood                      Dated: August 11, 2015.                             Saturday. The bascule span will be
                                             Canal Floating Drawbridge crosses Hood                  Steven M. Fischer,                                    available to open on Thursdays from 7
                                             Canal, mile 5.0, near Port Gamble, WA.                  Bridge Administrator, Thirteenth Coast Guard          a.m. to 4 p.m., when given 3 hours
                                             The bridge has two fixed spans (East                    District.                                             advanced notice. The bridge will
                                             and West), and one draw span (Main).                    [FR Doc. 2015–20671 Filed 8–20–15; 8:45 am]           operate as normal on Sundays. The
                                             The East span provides 50 feet of                       BILLING CODE 9110–04–P                                deviation is necessary to facilitate


                                        VerDate Sep<11>2014   14:16 Aug 20, 2015   Jkt 235001   PO 00000   Frm 00012   Fmt 4700   Sfmt 4700   E:\FR\FM\21AUR1.SGM   21AUR1



Document Created: 2018-02-23 11:00:42
Document Modified: 2018-02-23 11:00:42
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionNotice of deviation from drawbridge regulation.
DatesThis deviation is effective from 6 a.m. on August 27, 2015, until 7 p.m. on September 30, 2015.
ContactIf you have questions on this temporary deviation, call or email Mr. Steven Fischer, Bridge Administrator, Thirteenth Coast Guard District; telephone 206-220-7282, email [email protected] If you have questions on viewing the docket, call Cheryl Collins, Program Manager, Docket Operations, telephone 202-366-9826.
FR Citation80 FR 50768 

2025 Federal Register | Disclaimer | Privacy Policy