80_FR_51008 80 FR 50846 - Commission Information Collection Activities (FERC-725); Comment Request; Extension

80 FR 50846 - Commission Information Collection Activities (FERC-725); Comment Request; Extension

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 162 (August 21, 2015)

Page Range50846-50847
FR Document2015-20744

In compliance with the requirements of the Paperwork Reduction Act of 1995, 44 U.S.C. 3506(c)(2)(A), the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC-725 [Certification of Electric Reliability Organization; Procedures for Electric Reliability Standards].

Federal Register, Volume 80 Issue 162 (Friday, August 21, 2015)
[Federal Register Volume 80, Number 162 (Friday, August 21, 2015)]
[Notices]
[Pages 50846-50847]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-20744]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. IC15-12-000]


Commission Information Collection Activities (FERC-725); Comment 
Request; Extension

AGENCY: Federal Energy Regulatory Commission, DOE.

ACTION: Notice of information collection and request for comments.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, 44 U.S.C. 3506(c)(2)(A), the Federal Energy Regulatory 
Commission (Commission or FERC) is soliciting public comment on the 
currently approved information collection, FERC-725 [Certification of 
Electric Reliability Organization; Procedures for Electric Reliability 
Standards].

DATES: Comments on the collection of information are due October 20, 
2015.

ADDRESSES: You may submit comments (identified by Docket No. IC15-12-
000) by either of the following methods:
     eFiling at Commission's Web site: http://www.ferc.gov/docs-filing/efiling.asp
     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE., 
Washington, DC 20426.
    Instructions: All submissions must be formatted and filed in 
accordance with submission guidelines at: http://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support 
by email at [email protected], or by phone at: (866) 208-3676 
(toll-free), or (202) 502-8659 for TTY.
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at http://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at 
[email protected], telephone at (202) 502-8663, and fax at (202) 
273-0873.

SUPPLEMENTARY INFORMATION: 
    Title: FERC-725, Certification of Electric Reliability 
Organization; Procedures for Electric Reliability Standards
    OMB Control No.: 1902-0225
    Type of Request: Three-year extension of the FERC-725 information 
collection requirements with no changes to the current reporting 
requirements.
    Abstract: The FERC-725 information collection contains the 
following information collection elements:
     Self Assessment and Electric Reliability Organization 
(ERO) Application: The Commission requires the ERO to submit to FERC a 
performance assessment report every five years. The next assessment is 
due in 2019. Each Regional Entity submits a performance assessment 
report to the ERO. Submitting an application to become an ERO is also 
part of this collection.\1\
---------------------------------------------------------------------------

    \1\ The Commission does not expect any new ERO applications to 
be submitted in the next five years and is not including any burden 
for this requirement in the burden estimate. FERC still seeks to 
renew the regulations pertaining to a new ERO application under this 
renewal but is expecting the burden to be zero for the foreseeable 
future. 18 CFR 39.3 contains the regulation pertaining to ERO 
applications.
---------------------------------------------------------------------------

     Reliability Assessments: 18 CFR 39.11 requires the ERO to 
assess the reliability and adequacy of the Bulk-Power System in North 
America. Subsequently, the ERO must report to the Commission on its 
findings. Regional entities perform similar assessments within 
individual regions. Currently, the ERO submits to FERC three 
assessments each year: long term, winter, and summer. In addition, NERC 
also submits various other assessments as needed.
     Reliability Standards Development: Under Section 215 of 
the Federal Power Act (FPA), the ERO is charged with developing 
Reliability Standards. Regional Entities may also develop regional 
specific standards. Reliability Standards are one of the three 
principal mechanisms provided to FERC to ensure reliability on the 
Bulk-Power System.
     Reliability Compliance: Reliability Standards are 
mandatory and enforceable upon approval by FERC. In addition to the 
specific information collection requirements contained in each 
Reliability Standard (cleared under other information collections), 
there are general compliance, monitoring and enforcement information 
collection requirements imposed on applicable entities. Audits, spot 
checks, self-certifications, exception data submittals, violation 
reporting, and mitigation plan confirmation are included in this area.
     Stakeholder Survey: The ERO uses a stakeholder survey to 
solicit feedback from registered entities \2\ in preparation for its 
three year and five year self-performance assessment. The Commission 
assumes that the ERO will perform another survey prior to the 2019 
self- assessment.
---------------------------------------------------------------------------

    \2\ A ``registered entity'' is an entity that is registered with 
the ERO. All Bulk-Power System owners, operators and users are 
required to register with the ERO. Registration is the basis for 
determining the Reliability Standards with which an entity must 
comply. See http://www.nerc.com/page.php?cid=3%7C25 for more 
details.
---------------------------------------------------------------------------

     Other Reporting: This category refers to all other 
reporting requirements imposed on the ERO or regional entities in order 
to comply with the Commission's regulations. For example, FERC may 
require NERC to submit a special reliability assessment. This category 
is mentioned to capture these types of one-time filings required of 
NERC or the Regions.
    The Commission implements its responsibilities through 18 CFR part 
39. Without the FERC-725 information, the Commission, ERO, and Regional 
Entities will not have the data needed to determine whether sufficient 
and appropriate measures are being taken to ensure the reliability of 
the nation's electric grid.
    Type of Respondents: ERO and regional entities
    Estimate of Annual Burden: \3\ The Commission estimates the annual 
public reporting burden for the information collection as:
---------------------------------------------------------------------------

    \3\ The Commission defines burden as the total time, effort, or 
financial resources expended by persons to generate, maintain, 
retain, or disclose or provide information to or for a Federal 
agency. For further explanation of what is included in the 
information collection burden, reference 5 Code of Federal 
Regulations 1320.3.

[[Page 50847]]



                                    FERC-725--Certification of the ERO; Procedures for Electric Reliability Standards
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                           Average
                                       Type of reporting          Number of            Number of      Total number of   burden hours    Estimated total
         Type of respondent               requirement            respondents         responses per       responses       & cost per     annual burden  &
                                                                                      respondent                          response            cost
                                     .....................  (A)..................         (B) \4\    (A) x (B) = (C)              (D)          (C) x (D)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Electric Reliability Organization    Self-Assessment......  .....................                .2                .2           7,800              1,560
 (ERO) \1\.                                                                                                              \5\ $574,704           $114,941
                                     Reliability            .....................               5.5               5.5          15,600             85,800
                                      Assessments.                                                                     \5\ $1,149,408         $6,321,744
                                     Reliability            .....................               2                 2            12,480             24,960
                                      Compliance.                                                                        \5\ $919,526         $1,839,053
                                     Standards Development  .....................               1                 1            28,080             28,080
                                                                                                                       \6\ $1,865,916         $1,865,916
                                     Other Reporting......  1....................               1                 1              2080              2,080
                                                                                                                         \7\ $270,130           $270,130
Regional Entities..................  Self-Assessment......  .....................                .2               1.6          16,640             26,624
                                                                                                                       \6\ $1,105,728         $1,769,164
                                     Reliability            .....................               1                 8            15,600            124,800
                                      Assessments.                                                                     \6\ $1,036,620         $8,292,960
                                     Reliability            .....................               1                 8            40,560            324,480
                                      Compliance.                                                                      \5\ $2,988,461        $23,907,688
                                     Standards Development  .....................               1                 8             2,340             18,720
                                                                                                                         \6\ $155,493         $1,243,944
                                     Other Reporting......  8....................               1                 8             1,040              8,320
                                                                                                                         \7\ $135,065         $1,080,520
Registered Entities................  Stakeholder Survey...  .....................                .2             289                 8              2,312
                                                                                                                             \5\ $589           $170,221
                                     Reliability            estimated 1446.......               1              1446               400            578,400
                                      Compliance.                                                                         \5\ $29,472        $42,616,512
                                    --------------------------------------------------------------------------------------------------
    ERO                                                                             N/A                                                     142,480 hrs.
    Regional                                                                                                                                502,944 hrs.
    Registered                                                                                                                              580,712 hrs.
                                    --------------------------------------------------------------------------------------------------
        Total Cost.................  .....................  .....................  ................  ................  ..............        $89,492,791
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Comments: Comments are invited on: (1) Whether the collection of 
information is necessary for the proper performance of the functions of 
the Commission, including whether the information will have practical 
utility; (2) the accuracy of the agency's estimate of the burden and 
cost of the collection of information, including the validity of the 
methodology and assumptions used; (3) ways to enhance the quality, 
utility and clarity of the information collection; and (4) ways to 
minimize the burden of the collection of information on those who are 
to respond, including the use of automated collection techniques or 
other forms of information technology.
---------------------------------------------------------------------------

    \4\ In all instances below where the number of responses per 
respondent is ``1'' the Commission acknowledges that actual number 
of responses varies and cannot be estimated clearly.
    \5\ Uses the weighted hourly average wage (salary plus benefits) 
for electrical engineers and lawyers obtained from the Bureau of 
Labor Statistics (data for May 2014, posted on 4/1/2015 at http://www.bls.gov/oes/current/naics2_22.htm): $91.82/hour. The weighted 
average used the following calculation: [(0.20) * ($129.87) + (0.60) 
* ($66.45) + (0.2) * ($39.18)] = $73.68. $129.87/hour is the wage 
for lawyers. $66.45/hour is the wage for engineers. $39.17/hour is 
the wage for office and administrative support. Occupation codes are 
23-0000, 17-2071, and 43-0000 respectively.
    \6\ Uses the hourly average wage (salary plus benefits) for 
electrical engineers obtained from the Bureau of Labor Statistics 
(data for May 2014, posted on 4/1/2015 at http://www.bls.gov/oes/current/naics2_22.htm): $66.45/hour. Occupation code is 17-2071.
    \7\ Uses the hourly average wage (salary plus benefits) for 
lawyers obtained from the Bureau of Labor Statistics (data for May 
2014, posted on 4/1/2015 at http://www.bls.gov/oes/current/naics2_22.htm): $129.87/hour. Occupation code is 23-0000.

    Dated: August 17, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-20744 Filed 8-20-15; 8:45 am]
 BILLING CODE 6717-01-P



                                               50846                         Federal Register / Vol. 80, No. 162 / Friday, August 21, 2015 / Notices

                                                  The filings are accessible in the                       • eFiling at Commission’s Web site:                 winter, and summer. In addition, NERC
                                               Commission’s eLibrary system by                         http://www.ferc.gov/docs-filing/                       also submits various other assessments
                                               clicking on the links or querying the                   efiling.asp                                            as needed.
                                               docket number.                                             • Mail/Hand Delivery/Courier:                          • Reliability Standards Development:
                                                  Any person desiring to intervene or                  Federal Energy Regulatory Commission,                  Under Section 215 of the Federal Power
                                               protest in any of the above proceedings                 Secretary of the Commission, 888 First                 Act (FPA), the ERO is charged with
                                               must file in accordance with Rules 211                  Street NE., Washington, DC 20426.                      developing Reliability Standards.
                                               and 214 of the Commission’s                                Instructions: All submissions must be               Regional Entities may also develop
                                               Regulations (18 CFR 385.211 and                         formatted and filed in accordance with                 regional specific standards. Reliability
                                               385.214) on or before 5:00 p.m. Eastern                 submission guidelines at: http://                      Standards are one of the three principal
                                               time on the specified comment date.                     www.ferc.gov/help/submission-                          mechanisms provided to FERC to ensure
                                               Protests may be considered, but                         guide.asp. For user assistance contact
                                                                                                                                                              reliability on the Bulk-Power System.
                                               intervention is necessary to become a                   FERC Online Support by email at
                                                                                                       ferconlinesupport@ferc.gov, or by phone                   • Reliability Compliance: Reliability
                                               party to the proceeding.
                                                                                                       at: (866) 208–3676 (toll-free), or (202)               Standards are mandatory and
                                                  eFiling is encouraged. More detailed
                                                                                                       502–8659 for TTY.                                      enforceable upon approval by FERC. In
                                               information relating to filing
                                                                                                          Docket: Users interested in receiving               addition to the specific information
                                               requirements, interventions, protests,
                                                                                                       automatic notification of activity in this             collection requirements contained in
                                               service, and qualifying facilities filings
                                                                                                       docket or in viewing/downloading                       each Reliability Standard (cleared under
                                               can be found at: http://www.ferc.gov/
                                                                                                       comments and issuances in this docket                  other information collections), there are
                                               docs-filing/efiling/filing-req.pdf. For
                                                                                                       may do so at http://www.ferc.gov/docs-                 general compliance, monitoring and
                                               other information, call (866) 208–3676
                                                                                                       filing/docs-filing.asp.                                enforcement information collection
                                               (toll free). For TTY, call (202) 502–8659.
                                                                                                       FOR FURTHER INFORMATION CONTACT:                       requirements imposed on applicable
                                                 Dated: August 13, 2015.                                                                                      entities. Audits, spot checks, self-
                                                                                                       Ellen Brown may be reached by email
                                               Kimberly D. Bose,                                                                                              certifications, exception data submittals,
                                                                                                       at DataClearance@FERC.gov, telephone
                                               Secretary.                                              at (202) 502–8663, and fax at (202) 273–               violation reporting, and mitigation plan
                                               [FR Doc. 2015–20651 Filed 8–20–15; 8:45 am]             0873.                                                  confirmation are included in this area.
                                               BILLING CODE 6717–01–P                                  SUPPLEMENTARY INFORMATION:                                • Stakeholder Survey: The ERO uses
                                                                                                          Title: FERC–725, Certification of                   a stakeholder survey to solicit feedback
                                                                                                       Electric Reliability Organization;                     from registered entities 2 in preparation
                                               DEPARTMENT OF ENERGY                                    Procedures for Electric Reliability                    for its three year and five year self-
                                                                                                       Standards                                              performance assessment. The
                                               Federal Energy Regulatory                                                                                      Commission assumes that the ERO will
                                                                                                          OMB Control No.: 1902–0225
                                               Commission                                                 Type of Request: Three-year extension               perform another survey prior to the
                                               [Docket No. IC15–12–000]                                of the FERC–725 information collection                 2019 self- assessment.
                                                                                                       requirements with no changes to the                       • Other Reporting: This category
                                               Commission Information Collection                       current reporting requirements.                        refers to all other reporting requirements
                                               Activities (FERC–725); Comment                             Abstract: The FERC–725 information                  imposed on the ERO or regional entities
                                               Request; Extension                                      collection contains the following                      in order to comply with the
                                                                                                       information collection elements:                       Commission’s regulations. For example,
                                               AGENCY: Federal Energy Regulatory                          • Self Assessment and Electric
                                               Commission, DOE.                                                                                               FERC may require NERC to submit a
                                                                                                       Reliability Organization (ERO)                         special reliability assessment. This
                                               ACTION: Notice of information collection                Application: The Commission requires
                                               and request for comments.                                                                                      category is mentioned to capture these
                                                                                                       the ERO to submit to FERC a                            types of one-time filings required of
                                               SUMMARY:   In compliance with the                       performance assessment report every                    NERC or the Regions.
                                               requirements of the Paperwork                           five years. The next assessment is due
                                                                                                                                                                 The Commission implements its
                                               Reduction Act of 1995, 44 U.S.C.                        in 2019. Each Regional Entity submits a
                                                                                                                                                              responsibilities through 18 CFR part 39.
                                               3506(c)(2)(A), the Federal Energy                       performance assessment report to the
                                                                                                                                                              Without the FERC–725 information, the
                                               Regulatory Commission (Commission or                    ERO. Submitting an application to
                                                                                                                                                              Commission, ERO, and Regional Entities
                                               FERC) is soliciting public comment on                   become an ERO is also part of this
                                                                                                                                                              will not have the data needed to
                                               the currently approved information                      collection.1
                                                                                                          • Reliability Assessments: 18 CFR                   determine whether sufficient and
                                               collection, FERC–725 [Certification of                                                                         appropriate measures are being taken to
                                                                                                       39.11 requires the ERO to assess the
                                               Electric Reliability Organization;                                                                             ensure the reliability of the nation’s
                                                                                                       reliability and adequacy of the Bulk-
                                               Procedures for Electric Reliability                                                                            electric grid.
                                                                                                       Power System in North America.
                                               Standards].                                                                                                       Type of Respondents: ERO and
                                                                                                       Subsequently, the ERO must report to
                                               DATES:  Comments on the collection of                   the Commission on its findings.                        regional entities
                                               information are due October 20, 2015.                   Regional entities perform similar                         Estimate of Annual Burden: 3 The
                                               ADDRESSES: You may submit comments                      assessments within individual regions.                 Commission estimates the annual public
                                               (identified by Docket No. IC15–12–000)                  Currently, the ERO submits to FERC                     reporting burden for the information
                                               by either of the following methods:                     three assessments each year: long term,                collection as:
rmajette on DSK7SPTVN1PROD with NOTICES




                                                 1 The Commission does not expect any new ERO            2 A ‘‘registered entity’’ is an entity that is         3 The Commission defines burden as the total

                                               applications to be submitted in the next five years     registered with the ERO. All Bulk-Power System         time, effort, or financial resources expended by
                                               and is not including any burden for this                owners, operators and users are required to register   persons to generate, maintain, retain, or disclose or
                                               requirement in the burden estimate. FERC still          with the ERO. Registration is the basis for            provide information to or for a Federal agency. For
                                               seeks to renew the regulations pertaining to a new
                                                                                                       determining the Reliability Standards with which       further explanation of what is included in the
                                               ERO application under this renewal but is
                                               expecting the burden to be zero for the foreseeable     an entity must comply. See http://www.nerc.com/        information collection burden, reference 5 Code of
                                               future. 18 CFR 39.3 contains the regulation             page.php?cid=3%7C25 for more details.                  Federal Regulations 1320.3.
                                               pertaining to ERO applications.



                                          VerDate Sep<11>2014   15:07 Aug 20, 2015   Jkt 235001   PO 00000   Frm 00028   Fmt 4703   Sfmt 4703   E:\FR\FM\21AUN1.SGM   21AUN1


                                                                               Federal Register / Vol. 80, No. 162 / Friday, August 21, 2015 / Notices                                                                                               50847

                                                                FERC–725—CERTIFICATION OF THE ERO; PROCEDURES FOR ELECTRIC RELIABILITY STANDARDS
                                                                                                                                                                                                                      Average
                                                                                                                                                      Number of                                                                              Estimated total
                                                                            Type of reporting                        Number of                                                     Total number of                 burden hours
                                                Type of respondent                                                                                  responses per                                                                            annual burden
                                                                              requirement                           respondents                                                      responses                      & cost per
                                                                                                                                                      respondent                                                                                 & cost
                                                                                                                                                                                                                     response

                                                                                                                           (A)                              (B) 4                   (A) × (B) = (C)                        (D)                  (C) × (D)

                                               Electric Reliability       Self-Assessment .....               .................................                            .2                                .2                  7,800                 1,560
                                                 Organization                                                                                                                                                           5 $574,704                  $114,941
                                                 (ERO) 1.
                                                                          Reliability Assess-                 .................................                          5.5                             5.5                   15,600                 85,800
                                                                            ments.                                                                                                                                   5 $1,149,408                 $6,321,744
                                                                          Reliability Compli-                 .................................                          2                               2                     12,480                 24,960
                                                                            ance.                                                                                                                                       5 $919,526                $1,839,053
                                                                          Standards Develop-                  .................................                          1                               1                     28,080                 28,080
                                                                            ment.                                                                                                                                    6 $1,865,916                 $1,865,916
                                                                          Other Reporting ......              1 ..............................                           1                               1                       2080                  2,080
                                                                                                                                                                                                                        7 $270,130                  $270,130
                                               Regional Entities .....    Self-Assessment .....               .................................                              .2                          1.6                   16,640                 26,624
                                                                                                                                                                                                                     6 $1,105,728                 $1,769,164
                                                                          Reliability Assess-                 .................................                          1                               8                     15,600                124,800
                                                                            ments.                                                                                                                                   6 $1,036,620                 $8,292,960
                                                                          Reliability Compli-                 .................................                          1                               8                     40,560                324,480
                                                                            ance.                                                                                                                                    5 $2,988,461                $23,907,688
                                                                          Standards Develop-                  .................................                          1                               8                       2,340                18,720
                                                                            ment.                                                                                                                                       6 $155,493                $1,243,944
                                                                          Other Reporting ......              8 ..............................                           1                               8                       1,040                 8,320
                                                                                                                                                                                                                        7 $135,065                $1,080,520
                                               Registered Entities ..     Stakeholder Survey                  .................................                              .2                      289                                8              2,312
                                                                                                                                                                                                                               5 $589               $170,221
                                                                          Reliability Compli-                 estimated 1446 .......                                     1                         1446                             400              578,400
                                                                           ance.                                                                                                                                          5 $29,472              $42,616,512

                                               Subtotals:
                                                   ERO                                                                                               N/A                                                                                         142,480 hrs.
                                                   Regional                                                                                                                                                                                      502,944 hrs.
                                                   Registered                                                                                                                                                                                    580,712 hrs.

                                                    Total Burden          .................................   .................................   ............................    ............................    ........................     1,226,136 hrs.
                                                      Hours.
                                                        Total Cost ..     .................................   .................................   ............................    ............................    ........................       $89,492,791



                                                 Comments: Comments are invited on:                              Commission, including whether the                                              DEPARTMENT OF ENERGY
                                               (1) Whether the collection of                                     information will have practical utility;
                                               information is necessary for the proper                           (2) the accuracy of the agency’s estimate                                      Federal Energy Regulatory
                                               performance of the functions of the                               of the burden and cost of the collection                                       Commission
                                                                                                                 of information, including the validity of
                                                 4 In all instances below where the number of
                                                                                                                 the methodology and assumptions used;                                          [Docket No. AD14–15–000]
                                               responses per respondent is ‘‘1’’ the Commission
                                               acknowledges that actual number of responses                      (3) ways to enhance the quality, utility
                                               varies and cannot be estimated clearly.                           and clarity of the information collection;                                     Common Performance Metrics;
                                                 5 Uses the weighted hourly average wage (salary
                                                                                                                 and (4) ways to minimize the burden of                                         Request for Information on Common
                                               plus benefits) for electrical engineers and lawyers                                                                                              Performance Metrics for RTOs and
                                               obtained from the Bureau of Labor Statistics (data
                                                                                                                 the collection of information on those
                                               for May 2014, posted on 4/1/2015 at http://                       who are to respond, including the use                                          ISOs and Utilities Outside RTO and ISO
                                               www.bls.gov/oes/current/naics2_22.htm): $91.82/                   of automated collection techniques or                                          Regions
                                               hour. The weighted average used the following
                                               calculation: [(0.20) * ($129.87) + (0.60) * ($66.45)
                                                                                                                 other forms of information technology.
                                                                                                                                                                                                  On August 26, 2014, Commission
                                               + (0.2) * ($39.18)] = $73.68. $129.87/hour is the                   Dated: August 17, 2015.
                                               wage for lawyers. $66.45/hour is the wage for                                                                                                    Staff issued a ‘‘Common Metrics
                                               engineers. $39.17/hour is the wage for office and                 Kimberly D. Bose,                                                              Report,’’ establishing 30 common
                                               administrative support. Occupation codes are 23–                  Secretary.                                                                     metrics for independent system
                                               0000, 17–2071, and 43–0000 respectively.
                                                 6 Uses the hourly average wage (salary plus
                                                                                                                 [FR Doc. 2015–20744 Filed 8–20–15; 8:45 am]                                    operators (ISOs), regional transmission
                                               benefits) for electrical engineers obtained from the              BILLING CODE 6717–01–P                                                         organizations (RTOs), and utilities in
                                               Bureau of Labor Statistics (data for May 2014,                                                                                                   non-ISO/RTO regions. In that report,
rmajette on DSK7SPTVN1PROD with NOTICES




                                               posted on 4/1/2015 at http://www.bls.gov/oes/                                                                                                    Commission Staff indicated that upon
                                               current/naics2_22.htm): $66.45/hour. Occupation
                                               code is 17–2071.
                                                                                                                                                                                                approval by the Office of Management
                                                 7 Uses the hourly average wage (salary plus                                                                                                    and Budget (OMB) for additional data
                                               benefits) for lawyers obtained from the Bureau of                                                                                                collection, a notice would be issued
                                               Labor Statistics (data for May 2014, posted on 4/1/                                                                                              requesting that the ISOs, RTOs, and
                                               2015 at http://www.bls.gov/oes/current/naics2_
                                               22.htm): $129.87/hour. Occupation code is 23–
                                                                                                                                                                                                participating utilities in non-ISO/RTO
                                               0000.                                                                                                                                            regions provide performance


                                          VerDate Sep<11>2014   15:07 Aug 20, 2015      Jkt 235001        PO 00000       Frm 00029        Fmt 4703       Sfmt 4703       E:\FR\FM\21AUN1.SGM                  21AUN1



Document Created: 2018-02-23 11:00:56
Document Modified: 2018-02-23 11:00:56
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of information collection and request for comments.
DatesComments on the collection of information are due October 20, 2015.
ContactEllen Brown may be reached by email at [email protected], telephone at (202) 502-8663, and fax at (202) 273-0873.
FR Citation80 FR 50846 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR