80_FR_51010 80 FR 50848 - Igiugig Village Council; Notice Concluding Pre-Filing Process and Approving Process Plan and Schedule

80 FR 50848 - Igiugig Village Council; Notice Concluding Pre-Filing Process and Approving Process Plan and Schedule

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 162 (August 21, 2015)

Page Range50848-50849
FR Document2015-20745

Federal Register, Volume 80 Issue 162 (Friday, August 21, 2015)
[Federal Register Volume 80, Number 162 (Friday, August 21, 2015)]
[Notices]
[Pages 50848-50849]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-20745]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13511-002]


Igiugig Village Council; Notice Concluding Pre-Filing Process and 
Approving Process Plan and Schedule

    a. Type of Filing: Notice of Intent to File an Application for a 
Hydrokinetic Pilot Project.
    b. Project No.: 13511-002.
    c. Date Filed: April 1, 2015.
    d. Submitted By: Igiugig Village Council (Igiugig).
    e. Name of Project: Igiugig Hydrokinetic Project.
    f. Location: On the Kvichak River in the Lake and Peninsula 
Borough, near the town of Igiugig, Alaska. The project would not occupy 
any federal lands.
    g. Filed Pursuant to: 18 CFR 5.3 and 5.5 of the Commission's 
regulations.
    h. Applicant Contact: AlexAnna Salmon, President, Igiugig Village 
Council, P.O. Box 4008, Igiugig, Alaska 99613; (907) 533-3211.
    i. FERC Contact: Dianne Rodman (202) 502-6077.
    j. Igiugig has filed with the Commission: (1) A notice of intent to 
file an application for a pilot hydrokinetic hydropower project and a 
draft license application with monitoring plans; (2) a request for 
waivers of certain Integrated Licensing Process regulations necessary 
for

[[Page 50849]]

expedited processing of a license application for a hydrokinetic pilot 
project; (3) a proposed process plan and schedule; and (4) a request to 
be designated as the non-federal representative for section 7 of the 
Endangered Species Act (ESA) consultation and for section 106 
consultation under the National Historic Preservation Act.
    k. A notice was issued on April 23, 2015, soliciting comments on 
the draft license application from agencies and stakeholders. Comments 
were filed by non-governmental organizations and individuals.
    l. On April 23, 2015, Igiugig was designated as the non-federal 
representative for section 7 consultation under the ESA and for section 
106 consultation under the National Historic Preservation Act.
    m. The proposed Igiugig Hydrokinetic Project would consist of: (1) 
An in-stream 20- kilowatt (kW), 64-foot-long, 11-foot-high, 43-foot-
wide pontoon-mounted RivGen Power System Turbine Generator Unit (TGU) 
in Phase 1; (2) an additional in-stream 20-kW pontoon-mounted TGU in 
Phase 2; (3) two anchoring systems consisting of a 13,000-pound anchor, 
chain, shackles, and 150 feet of mooring; (4) a 375-foot-long, coated 
and weighted combined power, data, and environmental monitoring cable 
from the TGU for Phase 1; and a 675-foot-long cable from the TGU for 
Phase 2; (5) an existing 10-foot-long by 8-foot-wide shore station for 
housing project electronics and Issue biological assessment February 
15, 2015.
    n. controls; and (6) appurtenant facilities. The project is 
estimated to have an annual generation of 409,504 kilowatt-hours.
    o. The pre-filing process has been concluded and the requisite 
regulations have been waived such that the process and schedule 
indicated below can be implemented.
    p. The post-filing process will be conducted pursuant to the 
following schedule. Revisions to the schedule may be made as needed.

------------------------------------------------------------------------
             Milestones                              Dates
------------------------------------------------------------------------
Final license application expected..  November 2, 2015.
Issue notice of acceptance and ready  November 17, 2015.
 for environmental analysis and
 request for interventions.
Recommendations, Conditions,          December 17, 2015.
 Comments and Interventions due.
Issue notice of availability of       February 15, 2016.
 environmental assessment.
Issue biological assessment.........  February 15, 2016.
Comments due and 10(j) resolution,    March 16, 2016.
 if needed.
------------------------------------------------------------------------

    q. Register online at http://ferc.gov/esubscribenow.htm to be 
notified via email of new filing and issuances related to this or other 
pending projects. For assistance, contact FERC Online Support.

    Dated: August 17, 2015.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2015-20745 Filed 8-20-15; 8:45 am]
 BILLING CODE 6717-01-P



                                               50848                         Federal Register / Vol. 80, No. 162 / Friday, August 21, 2015 / Notices

                                               information on the common metrics on                    proposed by LNG Development                           process by Commission staff, after
                                               a schedule to be specified in the notice.1              Company, LLC and Oregon Pipeline                      which speakers will be called. The
                                                  Consistent with the OMB-approved                     Company, LLC and the Washington                       meeting will end once all speakers have
                                               data collection 2 and past practice                     Expansion Project proposed by                         provided their comments or at the end
                                               regarding this effort, ISOs, RTOs, and                  Northwest Pipeline LLC in the above-                  time for each meeting stated above,
                                               utilities in non-ISO/RTO regions are                    referenced dockets. The draft EIS was                 whichever comes first. If a significant
                                               encouraged to submit information                        issued on August 5, 2015, and the                     number of people are interested in
                                               responsive to the 30 common metrics                     public comment period for the                         providing verbal comments, a time limit
                                               listed in the August 2014 report.                       document will end on October 6, 2015.                 of three minutes may be implemented
                                               Information submitted should cover the                  The notice of availability for the draft              for each commenter to ensure all those
                                               2010–2014 period, and should be                         EIS clarifies the methods to submit                   wishing to comment have the
                                               submitted by October 30, 2015.3                         written and electronic comments. In                   opportunity to do so within the
                                               Commission staff plans to contact                       lieu of sending written or electronic                 designated meeting time. Speakers
                                               representatives of the ISOs, RTOs, and                  comments, the Commission invites you                  should structure their oral comments
                                               utilities in non-ISO/RTO regions that                   to attend one of the public comment                   accordingly. If time limits are
                                               have previously participated in this                    meetings its staff will conduct in the                implemented, they will be strictly
                                               effort.                                                 project area to receive oral comments on              enforced to ensure that as many
                                                  For further information, please                      the draft EIS. Transcripts of the                     individuals as possible are given an
                                               contact: Eric Krall, Office of Energy                   meetings will be available for review in              opportunity to comment. It is important
                                               Market Regulation, Federal Energy                       eLibrary under the project docket                     to note that oral comments hold the
                                               Regulatory Commission, 888 First Street                 numbers. The meeting times and                        same weight as written or electronically
                                               NE., Washington, DC 20426, (202) 502–                   locations are provided below.                         submitted comments.
                                               6180, eric.krall@ferc.gov.
                                                                                                                                                               Dated: August 17, 2015.
                                                 Dated: August 17, 2015.                                                                                     Kimberly D. Bose,
                                               Kimberly D. Bose,                                       Date and time                   Location              Secretary.
                                               Secretary.                                                                                                    [FR Doc. 2015–20742 Filed 8–20–15; 8:45 am]
                                               [FR Doc. 2015–20743 Filed 8–20–15; 8:45 am]             September 14,       Kent Senior Activity Center,      BILLING CODE 6717–01–P
                                               BILLING CODE 6717–01–P                                    2015, 6             600 East Smith Street,
                                                                                                         p.m.–9 p.m.         Kent, Washington 98030,
                                                                                                                             (253) 856–5150.
                                                                                                       September 15,       Sedro-Woolley Community
                                                                                                                                                             DEPARTMENT OF ENERGY
                                               DEPARTMENT OF ENERGY
                                                                                                         2015, 6             Center, 703 Pacific Street,
                                                                                                         p.m.–9 p.m.         Sedro-Woolley, Wash-
                                                                                                                                                             Federal Energy Regulatory
                                               Federal Energy Regulatory                                                                                     Commission
                                                                                                                             ington 98284, (360) 855–
                                               Commission                                                                    3568.                           [Project No. 13511–002]
                                               [Docket Nos. CP09–6–001; CP09–7–001;                    September 16,       Snohomish Senior Center,
                                               Docket No. CP13–507–000]                                  2015, 6             506 4th Street, Snoho-          Igiugig Village Council; Notice
                                                                                                         p.m.–9 p.m.         mish, WA 98290, (360)           Concluding Pre-Filing Process and
                                               LNG Development Company, LLC;                                                 568–0934.
                                                                                                       September 17,       Southwest Washington Fair-        Approving Process Plan and Schedule
                                               Oregon Pipeline Company, LLC;
                                                                                                         2015, 6             grounds-Community                  a. Type of Filing: Notice of Intent to
                                               Northwest Pipeline LLC; Notice of
                                                                                                         p.m.–9 p.m.         Events Building, 2555 N
                                               Public Meetings for Comments On the                                                                           File an Application for a Hydrokinetic
                                                                                                                             National Avenue, Che-
                                               Draft Environmental Impact Statement                                          halis, Washington 98532,        Pilot Project.
                                               for the Oregon LNG Terminal and                                               (360) 736–6072.                    b. Project No.: 13511–002.
                                               Pipeline Project and Washington                         September 21,       Clatsop County Fairgrounds-          c. Date Filed: April 1, 2015.
                                               Expansion Project                                         2015, 1             Exhibit Hall, 92937                d. Submitted By: Igiugig Village
                                                                                                         p.m.–4 p.m.         Walluski Loop, Astoria, Or-     Council (Igiugig).
                                                 The staff of the Federal Energy                                             egon 97103, (503) 325–             e. Name of Project: Igiugig
                                               Regulatory Commission (Commission)                                            4600.                           Hydrokinetic Project.
                                               has prepared a draft environmental                      September 21,       Clatsop County Fairgrounds-          f. Location: On the Kvichak River in
                                               impact statement (EIS) for the Oregon                     2015, 6             Exhibit Hall, 92937
                                                                                                                                                             the Lake and Peninsula Borough, near
                                               LNG Terminal and Pipeline Project                         p.m.–9 p.m.         Walluski Loop, Astoria, Or-
                                                                                                                             egon 97103, (503) 325–          the town of Igiugig, Alaska. The project
                                                  1 Common Metrics Commission Staff Report,                                  4600.                           would not occupy any federal lands.
                                               Docket No. AD14–15–000, at 4 (Aug. 26, 2014).           September 22,       Vernonia High School-Com-            g. Filed Pursuant to: 18 CFR 5.3 and
                                                  2 On August 6, 2015, OMB approved a request for        2015, 6             mons Area, 1000 Missouri        5.5 of the Commission’s regulations.
                                               reinstatement and revision of information collection      p.m.–9 p.m.         Avenue, Vernonia, Oregon           h. Applicant Contact: AlexAnna
                                               FERC–922, ‘‘Performance Metrics for ISOs, RTOs                                97064, (503) 429–1333.          Salmon, President, Igiugig Village
                                               and Regions Outside ISOs and RTOs’’ (OMB                September 23,       Summit Grove Lodge, 30810         Council, P.O. Box 4008, Igiugig, Alaska
                                               Control No. 1902–0262).                                   2015, 6             NE Timmen Road,
                                                  3 Information should be submitted in docket no.                                                            99613; (907) 533–3211.
                                                                                                         p.m.–9 p.m.         Ridgefield, WA 98642,
                                               AD14–15–000. Submissions must be formatted and                                360–263–6623.
                                                                                                                                                                i. FERC Contact: Dianne Rodman
                                               filed in accordance with the submission guidelines      September 24,       Red Lion Hotel, 510 S Kelso       (202) 502–6077.
                                               described at: http://www.ferc.gov/resources/guides/                                                              j. Igiugig has filed with the
                                                                                                         2015, 6             Drive, Kelso, Washington
rmajette on DSK7SPTVN1PROD with NOTICES




                                               submission-guide.asp. Submissions must be in an
                                               acceptable file format as described at: http://           p.m.–9 p.m.         98626, (360) 636–4400.          Commission: (1) A notice of intent to
                                               www.ferc.gov/docs-filing/elibrary/accept-file-                                                                file an application for a pilot
                                               formats.asp. The numeric values corresponding to          The Commission’s staff will begin the               hydrokinetic hydropower project and a
                                               all charts and tables containing metrics must be        sign-up of speakers one-half hour before              draft license application with
                                               submitted in an accompanying file, in one of the
                                               following formats: Microsoft Office 2003/2007/
                                                                                                       the meeting begins. The comment                       monitoring plans; (2) a request for
                                               2010: Excel (.xls or .xlsx), or ASCII Comma             meeting will begin with a brief                       waivers of certain Integrated Licensing
                                               Separated Value (.csv).                                 description of our environmental review               Process regulations necessary for


                                          VerDate Sep<11>2014   15:07 Aug 20, 2015   Jkt 235001   PO 00000   Frm 00030   Fmt 4703   Sfmt 4703   E:\FR\FM\21AUN1.SGM   21AUN1


                                                                                      Federal Register / Vol. 80, No. 162 / Friday, August 21, 2015 / Notices                                                                                  50849

                                               expedited processing of a license                                      under the ESA and for section 106                                       the TGU for Phase 2; (5) an existing 10-
                                               application for a hydrokinetic pilot                                   consultation under the National Historic                                foot-long by 8-foot-wide shore station
                                               project; (3) a proposed process plan and                               Preservation Act.                                                       for housing project electronics and Issue
                                               schedule; and (4) a request to be                                         m. The proposed Igiugig Hydrokinetic                                 biological assessment February 15,
                                               designated as the non-federal                                          Project would consist of: (1) An in-                                    2015.
                                               representative for section 7 of the                                                                                                              n. controls; and (6) appurtenant
                                                                                                                      stream 20- kilowatt (kW), 64-foot-long,
                                               Endangered Species Act (ESA)                                                                                                                   facilities. The project is estimated to
                                                                                                                      11-foot-high, 43-foot-wide pontoon-
                                               consultation and for section 106                                                                                                               have an annual generation of 409,504
                                               consultation under the National Historic                               mounted RivGen Power System Turbine
                                                                                                                      Generator Unit (TGU) in Phase 1; (2) an                                 kilowatt-hours.
                                               Preservation Act.
                                                  k. A notice was issued on April 23,                                 additional in-stream 20-kW pontoon-                                       o. The pre-filing process has been
                                               2015, soliciting comments on the draft                                 mounted TGU in Phase 2; (3) two                                         concluded and the requisite regulations
                                               license application from agencies and                                  anchoring systems consisting of a                                       have been waived such that the process
                                               stakeholders. Comments were filed by                                   13,000-pound anchor, chain, shackles,                                   and schedule indicated below can be
                                               non-governmental organizations and                                     and 150 feet of mooring; (4) a 375-foot-                                implemented.
                                               individuals.                                                           long, coated and weighted combined                                        p. The post-filing process will be
                                                  l. On April 23, 2015, Igiugig was                                   power, data, and environmental                                          conducted pursuant to the following
                                               designated as the non-federal                                          monitoring cable from the TGU for                                       schedule. Revisions to the schedule may
                                               representative for section 7 consultation                              Phase 1; and a 675-foot-long cable from                                 be made as needed.

                                                                                                                             Milestones                                                                                                Dates

                                               Final license application expected ........................................................................................................................................     November 2, 2015.
                                               Issue notice of acceptance and ready for environmental analysis and request for interventions .......................................                                           November 17, 2015.
                                               Recommendations, Conditions, Comments and Interventions due .....................................................................................                               December 17, 2015.
                                               Issue notice of availability of environmental assessment ....................................................................................................                   February 15, 2016.
                                               Issue biological assessment .................................................................................................................................................   February 15, 2016.
                                               Comments due and 10(j) resolution, if needed ....................................................................................................................               March 16, 2016.



                                                 q. Register online at http://ferc.gov/                               Protection Agency (‘‘EPA’’) and is now                                  Comments should reference the ‘‘Lin
                                               esubscribenow.htm to be notified via                                   subject to public comment, after which                                  Electric Superfund Site, Proposed
                                               email of new filing and issuances                                      EPA may modify or withdraw its                                          Settlement Agreement’’ and ‘‘EPA
                                               related to this or other pending projects.                             consent if comments received disclose                                   Docket No. CERC–03–2015–0182CR,’’
                                               For assistance, contact FERC Online                                    facts or considerations that indicate that                              and should be forwarded to Robin E.
                                               Support.                                                               the Proposed Agreement is                                               Eiseman at the above address.
                                                 Dated: August 17, 2015.                                              inappropriate, improper, or inadequate.                                 FOR FURTHER INFORMATION CONTACT:
                                               Kimberly D. Bose,                                                      The Proposed Agreement would resolve                                    Robin E. Eiseman (3RC41), U.S.
                                                                                                                      potential EPA claims under Section                                      Environmental Protection Agency, 1650
                                               Secretary.
                                                                                                                      107(a) of CERCLA, against Danny E.                                      Arch Street, Philadelphia, PA 19103,
                                               [FR Doc. 2015–20745 Filed 8–20–15; 8:45 am]
                                                                                                                      Lusk and Gordon M. Lusk, (‘‘Settling                                    Phone: (215) 814–2612; eiseman.robin@
                                               BILLING CODE 6717–01–P
                                                                                                                      Parties’’). The Proposed Agreement                                      epa.gov.
                                                                                                                      would require Settling Parties to
                                                                                                                                                                                                Dated: August 17, 2015.
                                                                                                                      reimburse EPA $21,358.00 for response
                                               ENVIRONMENTAL PROTECTION                                               costs incurred by EPA for the Site.                                     Karen Melvin,
                                               AGENCY                                                                    For thirty (30) days following the date                              Acting Director, Hazardous Site Cleanup
                                                                                                                      of publication of this notice, EPA will                                 Division, U.S. Environmental Protection
                                               [FRL 9932–99–Region 3]                                                                                                                         Agency, Region III.
                                                                                                                      receive written comments relating to the
                                               Notice of Administrative Settlement                                    Proposed Agreement. EPA’s response to                                   [FR Doc. 2015–20724 Filed 8–20–15; 8:45 am]
                                               Agreement Pursuant to Section 122(H)                                   any comments received will be available                                 BILLING CODE 6560–50–P
                                               of the Comprehensive Environmental                                     for public inspection at the U.S.
                                               Response, Compensation, and Liability                                  Environmental Protection Agency,
                                               Act of 1980, as Amended                                                Region III, 1650 Arch Street,                                           ENVIRONMENTAL PROTECTION
                                                                                                                      Philadelphia, PA 19103.                                                 AGENCY
                                               AGENCY: Environmental Protection
                                               Agency.                                                                DATES: Comments must be submitted on                                    [FRL–9932–91–Region 10]
                                                                                                                      or before thirty (30) days after the date
                                               ACTION: Notice; request for public                                                                                                             Final National Pollutant Discharge
                                                                                                                      of publication of this notice.
                                               comment.                                                                                                                                       Elimination System (NPDES) General
                                                                                                                      ADDRESSES: The Proposed Agreement
                                               SUMMARY:   In accordance with the                                      and additional background information                                   Permit for Stormwater Discharges from
                                               Comprehensive Environmental                                            relating to the Proposed Agreement are                                  Industrial Activities Availability for
                                               Response, Compensation, and Liability                                  available for public inspection at the                                  Idaho, Federal Operators in
                                               Act (‘‘CERCLA’’), notice is hereby given                               U.S. Environmental Protection Agency,                                   Washington, and the Spokane Tribe
rmajette on DSK7SPTVN1PROD with NOTICES




                                               that a proposed administrative                                         Region III, 1650 Arch Street,                                           AGENCY: Environmental Protection
                                               settlement agreement for recovery of                                   Philadelphia, PA 19103. A copy of the                                   Agency (EPA).
                                               response costs (‘‘Proposed Agreement’’)                                Proposed Agreement may be obtained                                      ACTION: Notice of corrections to the 2015
                                               associated with the Lin Electric                                       from Robin E. Eiseman (3RC41), Senior                                   Multi-Sector General Permit.
                                               Superfund Site, Bluefield, Mercer                                      Assistant Regional Counsel, U.S.
                                               County, West Virginia (‘‘Site’’) was                                   Environmental Protection Agency, 1650                                   SUMMARY: The Environmental Protection
                                               executed by the Environmental                                          Arch Street, Philadelphia, PA 19103.                                    Agency (EPA) previously announced the


                                          VerDate Sep<11>2014        15:07 Aug 20, 2015        Jkt 235001     PO 00000       Frm 00031       Fmt 4703      Sfmt 4703     E:\FR\FM\21AUN1.SGM             21AUN1



Document Created: 2018-02-23 11:01:15
Document Modified: 2018-02-23 11:01:15
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 50848 