80_FR_51464 80 FR 51301 - Notice of Intent To Amend the Resource Management Plan for the Headwaters Forest Reserve, California, and Prepare an Associated Environmental Assessment

80 FR 51301 - Notice of Intent To Amend the Resource Management Plan for the Headwaters Forest Reserve, California, and Prepare an Associated Environmental Assessment

DEPARTMENT OF THE INTERIOR
Bureau of Land Management

Federal Register Volume 80, Issue 163 (August 24, 2015)

Page Range51301-51302
FR Document2015-20711

In compliance with the National Environmental Policy Act of 1969, as amended (NEPA), and the Federal Land Policy and Management Act of 1976, as amended, the Bureau of Land Management (BLM) Arcata Field Office, Arcata, California, intends to prepare a Resource Management Plan (RMP) amendment with an associated Environmental Assessment (EA) for the Headwaters Forest Reserve and by this notice is announcing the beginning of the scoping process to solicit public comments and identify issues. As the Headwaters Forest Reserve is jointly managed by the BLM and the California Department of Fish and Wildlife (CDFW), the BLM and CDFW intend to concurrently prepare a negative declaration under the California Environmental Quality Act (CEQA).

Federal Register, Volume 80 Issue 163 (Monday, August 24, 2015)
[Federal Register Volume 80, Number 163 (Monday, August 24, 2015)]
[Notices]
[Pages 51301-51302]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-20711]


-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Bureau of Land Management

[LLCAN03900 L17110000.DU0000.15X]


Notice of Intent To Amend the Resource Management Plan for the 
Headwaters Forest Reserve, California, and Prepare an Associated 
Environmental Assessment

AGENCY: Bureau of Land Management, Interior.

ACTION: Notice of intent.

-----------------------------------------------------------------------

SUMMARY: In compliance with the National Environmental Policy Act of 
1969, as amended (NEPA), and the Federal Land Policy and Management Act 
of 1976, as amended, the Bureau of Land Management (BLM) Arcata Field 
Office, Arcata, California, intends to prepare a Resource Management 
Plan (RMP) amendment with an associated Environmental Assessment (EA) 
for the Headwaters Forest Reserve and by this notice is announcing the 
beginning of the scoping process to solicit public comments and 
identify issues. As the Headwaters Forest Reserve is jointly managed by 
the BLM and the California Department of Fish and Wildlife

[[Page 51302]]

(CDFW), the BLM and CDFW intend to concurrently prepare a negative 
declaration under the California Environmental Quality Act (CEQA).

DATES: This notice initiates the public scoping process for the RMP 
amendment with an associated EA. Comments on issues may be submitted in 
writing until September 23, 2015. The date(s) and location(s) of any 
scoping meetings will be announced at least 15 days in advance through 
local news media, newspapers and the BLM Web site at: http://www.blm.gov/ca/st/en/fo/arcata/headwaters.html. In order to be included 
in the analysis, all comments must be received prior to the close of 
the 30-day scoping period or 15 days after the last public meeting, 
whichever is later. We will provide additional opportunities for public 
participation as appropriate.

ADDRESSES: You may submit comments on issues and planning criteria 
related to the Headwaters Forest Reserve Resource Management Plan 
Amendment/EA by any of the following methods:
     Email: [email protected].
     Fax: 707-825-2301.
     Mail: 1695 Heindon Road, Arcata, CA 95521.
    Documents pertinent to this proposal may be examined at the Arcata 
Field Office, 1695 Heindon Road, Arcata, CA.

FOR FURTHER INFORMATION CONTACT: Benjamin Blom, Headwaters Manager, 
707-825-2300; 1695 Heindon Road, Arcata, CA 95521, [email protected]. 
Contact Mr. Blom to have your name added to our mailing list. Persons 
who use a telecommunications device for the deaf (TDD) may call the 
Federal Information Relay Service (FIRS) at 800-877-8339, to contact 
the above individual during normal business hours. The FIRS is 
available 24 hours a day, 7 days a week, to leave a message or question 
with the above individual. You will receive a reply during normal 
business hours.

SUPPLEMENTARY INFORMATION: This document provides notice that the BLM 
Arcata Field Office, Arcata, California, intends to prepare an RMP 
amendment with an associated EA for the Headwaters Forest Reserve, 
announces the beginning of the scoping process, and seeks public input 
on issues and planning criteria. As the Headwaters Forest Reserve is 
jointly managed by the BLM and the CDFW, the BLM and CDFW intend to 
concurrently prepare an EA under NEPA and a negative declaration under 
CEQA. The planning area is located in Humboldt County, California, and 
encompasses approximately 7,500 acres of public land. The purpose of 
the public scoping process is to determine relevant issues that will 
influence the scope of the environmental analysis, including 
alternatives, and guide the planning process. Preliminary issues for 
the plan amendment area have been identified by BLM personnel; Federal, 
State, and local agencies; and other stakeholders. The issues include 
forest ecology, fuels, and wildlife habitat. Preliminary planning 
criteria are that: The plan amendment will focus exclusively on forest 
restoration and related programs in the Headwaters Forest Reserve; the 
plan amendment will be compatible with the existing plans and policies 
of local, State, and Federal agencies with an interest in the 
Headwaters Forest Reserve; the plan amendment will be consistent with 
the State of California Ecological Reserve Regulations; and that all 
proposed management actions and alternatives will consider current 
scientific information, research and technology, and inventory and 
monitoring information. You may submit comments on issues and planning 
criteria in writing to the BLM at any public scoping meeting, or you 
may submit them to the BLM using one of the methods listed in the 
ADDRESSES section above. To be most helpful, you should submit comments 
by the close of the 30-day scoping period or within 15 days after the 
last public meeting, whichever is later.
    The BLM will utilize and coordinate the NEPA scoping process to 
help fulfill the public involvement process under the National Historic 
Preservation Act (54 U.S.C. 306108) as provided in 36 CFR 800.2(d)(3). 
The information about historic and cultural resources within the area 
potentially affected by the proposed action will assist the BLM in 
identifying and evaluating impacts to such resources.
    The BLM will consult with Indian tribes on a government-to-
government basis in accordance with Executive Order 13175 and other 
policies. Tribal concerns, including impacts on Indian trust assets and 
potential impacts to cultural resources, will be given due 
consideration. Federal, State, and local agencies, along with tribes 
and other stakeholders that may be interested in or affected by the 
proposed action that the BLM is evaluating are invited to participate 
in the scoping process and, if eligible, may request or be asked by the 
BLM to participate in the development of the environmental analysis as 
a cooperating agency. Before including your address, phone number, 
email address, or other personal identifying information in your 
comment, you should be aware that your entire comment, including your 
personal identifying information, may be made publicly available at any 
time. While you can ask us in your comment to withhold your personal 
identifying information from public review, we cannot guarantee that we 
will be able to do so. The minutes and list of attendees for each 
scoping meeting will be available to the public and open for 30 days 
after the meeting to any participant who wishes to clarify the views he 
or she expressed. The BLM will evaluate identified issues to be 
addressed in the plan, and will place them into one of three 
categories:
    1. Issues to be resolved in the plan amendment;
    2. Issues to be resolved through policy or administrative action; 
or
    3. Issues beyond the scope of this plan amendment.
    The BLM will provide an explanation in the Draft Plan Amendment/EA 
as to why an issue was placed in category two or three. The public is 
also encouraged to help identify any management questions and concerns 
that should be addressed in the plan. The BLM will work collaboratively 
with interested parties to identify the management decisions that are 
best suited to local, regional, and national needs and concerns.
    The BLM will use an interdisciplinary approach to develop the plan 
amendment in order to consider the variety of resource issues and 
concerns identified. Specialists with expertise in the following 
disciplines will be involved in the planning process: forest ecology, 
wildlife biology, fire and fuels management, fish biology, geology, 
botany, and hydrology.

    Authority:  40 CFR 1501.7 and 43 CFR 1610.2.

Thomas Pogacnik,
Deputy State Director.
[FR Doc. 2015-20711 Filed 8-21-15; 8:45 am]
BILLING CODE 4310-40-P



                                                                           Federal Register / Vol. 80, No. 163 / Monday, August 24, 2015 / Notices                                                  51301

                                              constitutes the final decision of the BLM               fully analyzed applicable Greater Sage-               to oil and gas exploration and
                                              and makes the Approved RMP                              Grouse conservation measures,                         development activities on BLM-
                                              Amendment effective immediately.                        including measures effecting lands                    administered lands in the WRFO
                                              ADDRESSES: Copies of the ROD/                           within the WFRO. The BLM expects to                   Planning Area and do not address other
                                              Approved RMP Amendment are                              make a comprehensive set of decisions                 resources or resource allocations, or
                                              available upon request from the Field                   for managing Greater Sage-Grouse on                   authorize development of those
                                              Manager, White River Field Office,                      lands administered by the WRFO in the                 resources. Approximately 1.7 million
                                              Bureau of Land Management, 220 East                     Record of Decision for the Northwest                  acres of Federal oil and gas mineral
                                              Market Street, Meeker, CO 81641 or via                  Colorado Greater Sage-Grouse Plan                     estate is open to leasing and would be
                                              the Internet at http://www.blm.gov/co/                  Amendment. That decision will amend                   subject to lease stipulations and other
                                              st/en/fo/wrfo.html.                                     the 1997 WRFO RMP, as needed,                         management actions developed during
                                              FOR FURTHER INFORMATION CONTACT:                        including any of the changes made to                  this planning effort (i.e., BLM-leasable
                                              Heather Sauls, Planning and                             the 1997 WRFO as part of this Approved                acres not associated with WSAs or
                                              Environmental Coordinator; telephone                    RMP Amendment for Oil and Gas                         surface estate managed by the National
                                              970–878–3855; White River Field                         Development. In the interim, leasing in               Park Service or U.S. Forest Service).
                                              Office, 220 East Market Street, Meeker,                 Greater Sage-Grouse habitat will                      Major decisions include adopting the
                                              CO 81641; email hsauls@blm.gov.                         continue to be deferred until a final                 Dinosaur Trail MLP; using thresholds to
                                              Persons who use a telecommunications                    decision has been made on the                         promote clustered development to allow
                                              device for the deaf (TDD) may call the                  Northwest Colorado Greater Sage-                      for year-round drilling while reducing
                                              Federal Information Relay Service                       Grouse Plan Amendment. The BLM                        habitat loss due to behavioral avoidance
                                              (FIRS) at 1–800–877–8339 to contact the                 initiated scoping for the RMP                         by big game; using a tiered approach to
                                                                                                      Amendment in 2006 and collected                       managing lands with wilderness
                                              above individual during normal
                                                                                                      information and public input via public               characteristics and identifying specific
                                              business hours. The FIRS is available 24
                                                                                                      meetings in order to develop the Draft                success criteria for reclamation.
                                              hours a day, seven days a week, to leave
                                                                                                      RMP Amendment/Environmental                             The Approved RMP Amendment does
                                              a message or question with the above
                                                                                                      Impact Statement (EIS) in August 2012.                not include implementation decisions
                                              individual. You will receive a reply
                                                                                                      Based on public and agency comments,                  that would be appealable to the Interior
                                              during normal business hours.
                                                                                                      the BLM developed the Proposed RMP                    Board of Land Appeals under 43 CFR
                                              SUPPLEMENTARY INFORMATION: The                          Amendment by combining various
                                              WRFO has worked with the public,                                                                              part 4, subpart E.
                                                                                                      elements of all the alternatives
                                              interest groups, stakeholders,                                                                                  Authority: 40 CFR 1506.6.
                                                                                                      considered in the Draft RMP
                                              cooperating agencies, tribes, the                       Amendment/EIS. The BLM published                      Ruth Welch,
                                              Northwest Colorado Resource Advisory                    the Proposed RMP Amendment/Final                      BLM Colorado State Director.
                                              Council, and neighboring BLM offices                    EIS on March 27, 2015 (80 FR 16424),                  [FR Doc. 2015–20882 Filed 8–21–15; 8:45 am]
                                              for the past nine years through the oil                 and made it available for a 30-day                    BILLING CODE 4310–JB–P
                                              and gas amendment development                           public protest period. During the protest
                                              process. The result is an Approved RMP                  period for the Proposed RMP
                                              Amendment for oil and gas                               Amendment/Final EIS, the BLM                          DEPARTMENT OF THE INTERIOR
                                              development that seeks to provide for a                 received 11 protest letters on a variety
                                              level of oil and gas development that is                of issues. From those protest letters, the            Bureau of Land Management
                                              appropriate to the Nation’s energy needs                BLM granted in part one protest
                                              in a responsible manner of multiple use                                                                       [LLCAN03900 L17110000.DU0000.15X]
                                                                                                      regarding the requirement in BLM’s
                                              that maintains the ecological integrity of              ACEC Manual that the BLM conduct a                    Notice of Intent To Amend the
                                              the area and important natural, cultural,               timely evaluation of ACEC nominations.                Resource Management Plan for the
                                              social and historical values.                           As explained in the ROD, the BLM will
                                                 Included as part of the RMP                                                                                Headwaters Forest Reserve, California,
                                                                                                      evaluate these nominated areas to                     and Prepare an Associated
                                              Amendment is the Dinosaur Trail                         determine whether they satisfy the
                                              Master Leasing Plan (MLP), which will                                                                         Environmental Assessment
                                                                                                      relevance and importance criteria
                                              minimize the impacts from oil and gas                   consistent with BLM’s planning                        AGENCY:   Bureau of Land Management,
                                              exploration and development to                          regulations and provide temporary                     Interior.
                                              important natural resources and areas in                (interim) management for those areas                  ACTION: Notice of intent.
                                              that portion of the planning area,                      found to meet the criteria. The BLM
                                              including the Dinosaur National                         included a timeline for conducting these              SUMMARY:   In compliance with the
                                              Monument, Areas of Critical                             evaluations in the ROD. The BLM also                  National Environmental Policy Act of
                                              Environmental Concern (ACECs), and                      made minor editorial modifications to                 1969, as amended (NEPA), and the
                                              Wilderness Study Areas (WSAs), .                        the Approved RMP Amendment to                         Federal Land Policy and Management
                                              Impacts will be minimized by managing                   provide further clarification of some of              Act of 1976, as amended, the Bureau of
                                              leasing opportunities in a phased                       the decisions.                                        Land Management (BLM) Arcata Field
                                              approach and imposing controlled                           BLM regulations also require a 60-day              Office, Arcata, California, intends to
                                              surface use stipulations for visual                     Governor’s Consistency Review period                  prepare a Resource Management Plan
                                              resources, night skies, and soundscapes.                for the Proposed RMP Amendment/                       (RMP) amendment with an associated
                                                 While the WRFO Approved RMP                          Final EIS to review consistency with                  Environmental Assessment (EA) for the
tkelley on DSK3SPTVN1PROD with NOTICES




                                              Amendment for Oil and Gas                               approved state or local plans, policies,              Headwaters Forest Reserve and by this
                                              Development contains some                               or programs. The Governor did not                     notice is announcing the beginning of
                                              conservation management measures for                    identify any inconsistencies with                     the scoping process to solicit public
                                              Greater Sage-Grouse habitat, the                        approved state or local plans, policies,              comments and identify issues. As the
                                              Northwest Colorado BLM Greater Sage-                    or programs.                                          Headwaters Forest Reserve is jointly
                                              Grouse Plan Amendment and                                  Management decisions outlined in the               managed by the BLM and the California
                                              Environmental Impact Statement (EIS)                    Approved RMP Amendment apply only                     Department of Fish and Wildlife


                                         VerDate Sep<11>2014   16:48 Aug 21, 2015   Jkt 235001   PO 00000   Frm 00106   Fmt 4703   Sfmt 4703   E:\FR\FM\24AUN1.SGM   24AUN1


                                              51302                        Federal Register / Vol. 80, No. 163 / Monday, August 24, 2015 / Notices

                                              (CDFW), the BLM and CDFW intend to                      land. The purpose of the public scoping               comment, you should be aware that
                                              concurrently prepare a negative                         process is to determine relevant issues               your entire comment, including your
                                              declaration under the California                        that will influence the scope of the                  personal identifying information, may
                                              Environmental Quality Act (CEQA).                       environmental analysis, including                     be made publicly available at any time.
                                              DATES: This notice initiates the public                 alternatives, and guide the planning                  While you can ask us in your comment
                                              scoping process for the RMP                             process. Preliminary issues for the plan              to withhold your personal identifying
                                              amendment with an associated EA.                        amendment area have been identified by                information from public review, we
                                              Comments on issues may be submitted                     BLM personnel; Federal, State, and local              cannot guarantee that we will be able to
                                              in writing until September 23, 2015.                    agencies; and other stakeholders. The                 do so. The minutes and list of attendees
                                              The date(s) and location(s) of any                      issues include forest ecology, fuels, and             for each scoping meeting will be
                                              scoping meetings will be announced at                   wildlife habitat. Preliminary planning                available to the public and open for 30
                                              least 15 days in advance through local                  criteria are that: The plan amendment                 days after the meeting to any participant
                                              news media, newspapers and the BLM                      will focus exclusively on forest                      who wishes to clarify the views he or
                                              Web site at: http://www.blm.gov/ca/st/                  restoration and related programs in the               she expressed. The BLM will evaluate
                                              en/fo/arcata/headwaters.html. In order                  Headwaters Forest Reserve; the plan                   identified issues to be addressed in the
                                              to be included in the analysis, all                     amendment will be compatible with the                 plan, and will place them into one of
                                              comments must be received prior to the                  existing plans and policies of local,                 three categories:
                                              close of the 30-day scoping period or 15                State, and Federal agencies with an                     1. Issues to be resolved in the plan
                                              days after the last public meeting,                     interest in the Headwaters Forest                     amendment;
                                              whichever is later. We will provide                     Reserve; the plan amendment will be                     2. Issues to be resolved through policy
                                              additional opportunities for public                     consistent with the State of California               or administrative action; or
                                              participation as appropriate.                           Ecological Reserve Regulations; and that                3. Issues beyond the scope of this plan
                                              ADDRESSES: You may submit comments                      all proposed management actions and                   amendment.
                                              on issues and planning criteria related                 alternatives will consider current                      The BLM will provide an explanation
                                              to the Headwaters Forest Reserve                        scientific information, research and                  in the Draft Plan Amendment/EA as to
                                              Resource Management Plan                                technology, and inventory and                         why an issue was placed in category
                                              Amendment/EA by any of the following                    monitoring information. You may                       two or three. The public is also
                                              methods:                                                submit comments on issues and                         encouraged to help identify any
                                                • Email: headwaters@blm.gov.                          planning criteria in writing to the BLM               management questions and concerns
                                                • Fax: 707–825–2301.                                  at any public scoping meeting, or you                 that should be addressed in the plan.
                                                • Mail: 1695 Heindon Road, Arcata,                    may submit them to the BLM using one                  The BLM will work collaboratively with
                                              CA 95521.                                               of the methods listed in the ADDRESSES                interested parties to identify the
                                                Documents pertinent to this proposal                  section above. To be most helpful, you                management decisions that are best
                                              may be examined at the Arcata Field                     should submit comments by the close of                suited to local, regional, and national
                                              Office, 1695 Heindon Road, Arcata, CA.                  the 30-day scoping period or within 15                needs and concerns.
                                              FOR FURTHER INFORMATION CONTACT:                        days after the last public meeting,                     The BLM will use an interdisciplinary
                                              Benjamin Blom, Headwaters Manager,                      whichever is later.                                   approach to develop the plan
                                              707–825–2300; 1695 Heindon Road,                           The BLM will utilize and coordinate                amendment in order to consider the
                                              Arcata, CA 95521, bblom@blm.gov.                        the NEPA scoping process to help fulfill              variety of resource issues and concerns
                                              Contact Mr. Blom to have your name                      the public involvement process under                  identified. Specialists with expertise in
                                              added to our mailing list. Persons who                  the National Historic Preservation Act                the following disciplines will be
                                              use a telecommunications device for the                 (54 U.S.C. 306108) as provided in 36                  involved in the planning process: forest
                                              deaf (TDD) may call the Federal                         CFR 800.2(d)(3). The information about                ecology, wildlife biology, fire and fuels
                                              Information Relay Service (FIRS) at                     historic and cultural resources within                management, fish biology, geology,
                                              800–877–8339, to contact the above                      the area potentially affected by the                  botany, and hydrology.
                                              individual during normal business                       proposed action will assist the BLM in                  Authority: 40 CFR 1501.7 and 43 CFR
                                              hours. The FIRS is available 24 hours a                 identifying and evaluating impacts to                 1610.2.
                                              day, 7 days a week, to leave a message                  such resources.                                       Thomas Pogacnik,
                                              or question with the above individual.                     The BLM will consult with Indian
                                              You will receive a reply during normal                                                                        Deputy State Director.
                                                                                                      tribes on a government-to-government
                                              business hours.                                                                                               [FR Doc. 2015–20711 Filed 8–21–15; 8:45 am]
                                                                                                      basis in accordance with Executive
                                              SUPPLEMENTARY INFORMATION: This                         Order 13175 and other policies. Tribal                BILLING CODE 4310–40–P

                                              document provides notice that the BLM                   concerns, including impacts on Indian
                                              Arcata Field Office, Arcata, California,                trust assets and potential impacts to
                                              intends to prepare an RMP amendment                     cultural resources, will be given due                 DEPARTMENT OF THE INTERIOR
                                              with an associated EA for the                           consideration. Federal, State, and local              Bureau of Land Management
                                              Headwaters Forest Reserve, announces                    agencies, along with tribes and other
                                              the beginning of the scoping process,                   stakeholders that may be interested in or             [LLMTC 00900.L16100000.DP0000,
                                              and seeks public input on issues and                    affected by the proposed action that the              MO#4500082592]
                                              planning criteria. As the Headwaters                    BLM is evaluating are invited to
                                                                                                                                                            Notice of Public Meeting, Dakotas
                                              Forest Reserve is jointly managed by the                participate in the scoping process and,
                                                                                                                                                            Resource Advisory Council Meeting
tkelley on DSK3SPTVN1PROD with NOTICES




                                              BLM and the CDFW, the BLM and                           if eligible, may request or be asked by
                                              CDFW intend to concurrently prepare                     the BLM to participate in the                         AGENCY:   Bureau of Land Management,
                                              an EA under NEPA and a negative                         development of the environmental                      Interior.
                                              declaration under CEQA. The planning                    analysis as a cooperating agency. Before              ACTION: Notice of Public Meeting.
                                              area is located in Humboldt County,                     including your address, phone number,
                                              California, and encompasses                             email address, or other personal                      SUMMARY:  In accordance with the
                                              approximately 7,500 acres of public                     identifying information in your                       Federal Land Policy and Management


                                         VerDate Sep<11>2014   16:48 Aug 21, 2015   Jkt 235001   PO 00000   Frm 00107   Fmt 4703   Sfmt 4703   E:\FR\FM\24AUN1.SGM   24AUN1



Document Created: 2015-12-15 10:55:08
Document Modified: 2015-12-15 10:55:08
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of intent.
DatesThis notice initiates the public scoping process for the RMP amendment with an associated EA. Comments on issues may be submitted in writing until September 23, 2015. The date(s) and location(s) of any scoping meetings will be announced at least 15 days in advance through local news media, newspapers and the BLM Web site at: http:// www.blm.gov/ca/st/en/fo/arcata/headwaters.html. In order to be included in the analysis, all comments must be received prior to the close of the 30-day scoping period or 15 days after the last public meeting, whichever is later. We will provide additional opportunities for public participation as appropriate.
ContactBenjamin Blom, Headwaters Manager, 707-825-2300; 1695 Heindon Road, Arcata, CA 95521, [email protected] Contact Mr. Blom to have your name added to our mailing list. Persons who use a telecommunications device for the deaf (TDD) may call the Federal Information Relay Service (FIRS) at 800-877-8339, to contact the above individual during normal business hours. The FIRS is available 24 hours a day, 7 days a week, to leave a message or question with the above individual. You will receive a reply during normal business hours.
FR Citation80 FR 51301 

2025 Federal Register | Disclaimer | Privacy Policy