80_FR_52919 80 FR 52750 - Albany Engineering Corporation; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

80 FR 52750 - Albany Engineering Corporation; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 169 (September 1, 2015)

Page Range52750-52751
FR Document2015-21594

Federal Register, Volume 80 Issue 169 (Tuesday, September 1, 2015)
[Federal Register Volume 80, Number 169 (Tuesday, September 1, 2015)]
[Notices]
[Pages 52750-52751]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-21594]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14692-000]


Albany Engineering Corporation; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

    On July 7, 2015, Albany Engineering Corporation filed an 
application for a preliminary permit, pursuant to section 4(f) of the 
Federal Power Act (FPA), proposing to study the feasibility of the Lyon 
Mountain Energy Storage Project (Lyon Mountain Project or project) to 
be located in the Hamlet of Lyon Mountain in the Town of Dannemora, 
Clinton County, New York. The sole purpose of a preliminary permit, if 
issued, is to grant the permit holder priority to file a license 
application during the permit term. A preliminary permit does not 
authorize the permit holder to perform any land-disturbing activities 
or otherwise enter upon lands or waters owned by others without the 
owners' express permission.
    The proposed project would consist of the following: (1) Upper and 
lower reservoirs comprising various existing underground levels and 
voids within the rock confines of the Lyon Mountain mine; (2) two 15-
foot-diameter, 2,000-foot-long vertical water conveyance structures 
between the upper reservoir and the powerhouse, consisting of grouted 
steel casings within existing bedrock; (3) a 15-foot-diameter, 2,000-
foot-long horizontal water conveyance

[[Page 52751]]

structure between the powerhouse and the lower reservoir, consisting of 
grouted steel casings within existing bedrock; (4) an 80-foot-wide by 
300-foot-long by 40-foot-high underground powerhouse chamber; (5) an 
40-foot-wide by 275-foot-long underground switchgear and equipment 
chamber; (6) 100 turbine-generators each rated at 2.4 megawatts; and 
(7) a 115-kilovolt (kV) transmission line approximately 1,000 feet long 
from the powerhouse to an existing transmission line. The estimated 
annual generation of the Lyon Mountain Project would be 421 gigawatt-
hours.
    Applicant Contact: Mr. James A. Besha, Albany Engineering 
Corporation, 5 Washington Square, Albany, NY 12205; phone: (518) 456-
7712.
    FERC Contact: Woohee Choi; phone: (202) 502-6336.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR Sec.  4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14692-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14692) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: August 26, 2015.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2015-21594 Filed 8-31-15; 8:45 am]
 BILLING CODE 6717-01-P



                                                  52750                      Federal Register / Vol. 80, No. 169 / Tuesday, September 1, 2015 / Notices

                                                  inspection and reproduction at the                      comments or documents with the                        888 First Street NE., Washington, DC
                                                  Commission’s Public Reference Room,                     Commission relating to the merits of an               20426.
                                                  located at 888 First Street NE., Room                   issue that may affect the responsibilities               This filing is accessible on-line at
                                                  2A, Washington, DC 20426, or by calling                 of a particular resource agency, they                 http://www.ferc.gov, using the
                                                  (202) 502–8371. This filing may also be                 must also serve a copy of the document                ‘‘eLibrary’’ link and is available for
                                                  viewed on the Commission’s Web site at                  on that resource agency. A copy of all                review in the Commission’s Public
                                                  http://www.ferc.gov/docs-filing/                        other filings in reference to this                    Reference Room in Washington, DC.
                                                  elibrary.asp. Enter the docket number                   application must be accompanied by                    There is an ‘‘eSubscription’’ link on the
                                                  excluding the last three digits in the                  proof of service on all persons listed in             Web site that enables subscribers to
                                                  docket number field to access the                       the service list prepared by the                      receive email notification when a
                                                  document. A copy is also available for                  Commission in this proceeding, in                     document is added to a subscribed
                                                  inspection and reproduction at the                      accordance with 18 CFR 4.34(b) and                    docket(s). For assistance with any FERC
                                                  address in item (h) above.                              385.2010.                                             Online service, please email
                                                     You may also register online at                                                                            FERCOnlineSupport@ferc.gov, or call
                                                                                                            Dated: August 26, 2015.
                                                  http://www.ferc.gov/docs-filing/                                                                              (866) 208–3676 (toll free). For TTY, call
                                                  esubscription.asp to be notified via                    Kimberly Bose,
                                                                                                                                                                (202) 502–8659.
                                                  email of new filings and issuances                      Secretary.
                                                                                                                                                                   Comment Date: 5:00 p.m. Eastern time
                                                  related to this or other pending projects.              [FR Doc. 2015–21593 Filed 8–31–15; 8:45 am]
                                                                                                                                                                on September 25, 2015.
                                                  For assistance, contact FERC Online                     BILLING CODE 6717–01–P
                                                                                                                                                                  Dated: August 26, 2015.
                                                  Support.
                                                     m. Individuals desiring to be included                                                                     Kimberly D. Bose,
                                                  on the Commission’s mailing list should                 DEPARTMENT OF ENERGY                                  Secretary.
                                                  so indicate by writing to the Secretary                                                                       [FR Doc. 2015–21592 Filed 8–31–15; 8:45 am]
                                                  of the Commission.                                      Federal Energy Regulatory                             BILLING CODE 6717–01–P
                                                     n. Comments, Protests, or Motions to                 Commission
                                                  Intervene: Anyone may submit
                                                  comments, a protest, or a motion to                     [Docket No. OR15–36–000]                              DEPARTMENT OF ENERGY
                                                  intervene in accordance with the
                                                  requirements of Rules of Practice and                   NST Express, LLC; Notice of Petition                  Federal Energy Regulatory
                                                  Procedure, 18 CFR 385.210, .211, .214.                  for Declaratory Order                                 Commission
                                                  In determining the appropriate action to                                                                      [Project No. 14692–000]
                                                  take, the Commission will consider all                     Take notice that on August 25, 2015,
                                                  protests or other comments filed, but                   pursuant to Rule 207(a)(2) of the Federal
                                                                                                                                                                Albany Engineering Corporation;
                                                  only those who file a motion to                         Energy Regulatory Commission’s
                                                                                                          (Commission) Rules of Practice and                    Notice of Preliminary Permit
                                                  intervene in accordance with the                                                                              Application Accepted for Filing and
                                                  Commission’s Rules may become a                         Procedure, 18 CFR 385.207(a)(2) (2014),
                                                                                                                                                                Soliciting Comments, Motions To
                                                  party to the proceeding. Any comments,                  NST Express, LLC (NST or Petitioner)
                                                                                                                                                                Intervene, and Competing Applications
                                                  protests, or motions to intervene must                  filed a petition for a declaratory order
                                                  be received on or before the specified                  seeking approval of the service priorities               On July 7, 2015, Albany Engineering
                                                  comment date for the particular                         and rate structure (but not specific rates)           Corporation filed an application for a
                                                  application.                                            to be offered in an open season to be                 preliminary permit, pursuant to section
                                                     o. Filing and Service of Responsive                  conducted by NST for the NST Express                  4(f) of the Federal Power Act (FPA),
                                                  Documents: All filings must (1) bear in                 Pipeline, all as more fully explained in              proposing to study the feasibility of the
                                                  all capital letters the title                           the petition.                                         Lyon Mountain Energy Storage Project
                                                  ‘‘COMMENTS’’, ‘‘PROTEST’’, or                              Any person desiring to intervene or to             (Lyon Mountain Project or project) to be
                                                  ‘‘MOTION TO INTERVENE’’ as                              protest this filing must file in                      located in the Hamlet of Lyon Mountain
                                                  applicable; (2) set forth in the heading                accordance with Rules 211 and 214 of                  in the Town of Dannemora, Clinton
                                                  the name of the applicant and the                       the Commission’s Rules of Practice and                County, New York. The sole purpose of
                                                  project number of the application to                    Procedure (18 CFR 385.211, 385.214).                  a preliminary permit, if issued, is to
                                                  which the filing responds; (3) furnish                  Protests will be considered by the                    grant the permit holder priority to file
                                                  the name, address, and telephone                        Commission in determining the                         a license application during the permit
                                                  number of the person protesting or                      appropriate action to be taken, but will              term. A preliminary permit does not
                                                  intervening; and (4) otherwise comply                   not serve to make protestants parties to              authorize the permit holder to perform
                                                  with the requirements of 18 CFR                         the proceeding. Any person wishing to                 any land-disturbing activities or
                                                  385.2001 through 385.2005. All                          become a party must file a notice of                  otherwise enter upon lands or waters
                                                  comments, motions to intervene, or                      intervention or motion to intervene, as               owned by others without the owners’
                                                  protests must set forth their evidentiary               appropriate. Such notices, motions, or                express permission.
                                                  basis and otherwise comply with the                     protests must be filed on or before the                  The proposed project would consist of
                                                  requirements of 18 CFR 4.34(b). All                     comment date. Anyone filing a motion                  the following: (1) Upper and lower
                                                  comments, motions to intervene, or                      to intervene or protest must serve a copy             reservoirs comprising various existing
                                                  protests should relate to project works                 of that document on the Petitioner.                   underground levels and voids within
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  which are the subject of the amendment                     The Commission encourages                          the rock confines of the Lyon Mountain
                                                  application. Agencies may obtain copies                 electronic submission of protests and                 mine; (2) two 15-foot-diameter, 2,000-
                                                  of the application directly from the                    interventions in lieu of paper using the              foot-long vertical water conveyance
                                                  applicant. A copy of any protest or                     ‘‘eFiling’’ link at http://www.ferc.gov.              structures between the upper reservoir
                                                  motion to intervene must be served                      Persons unable to file electronically                 and the powerhouse, consisting of
                                                  upon each representative of the                         should submit an original and 5 copies                grouted steel casings within existing
                                                  applicant specified in the particular                   of the protest or intervention to the                 bedrock; (3) a 15-foot-diameter, 2,000-
                                                  application. If an intervener files                     Federal Energy Regulatory Commission,                 foot-long horizontal water conveyance


                                             VerDate Sep<11>2014   20:18 Aug 31, 2015   Jkt 235001   PO 00000   Frm 00018   Fmt 4703   Sfmt 4703   E:\FR\FM\01SEN1.SGM   01SEN1


                                                                             Federal Register / Vol. 80, No. 169 / Tuesday, September 1, 2015 / Notices                                           52751

                                                  structure between the powerhouse and                    ENVIRONMENTAL PROTECTION                              for the modified sections of the draft
                                                  the lower reservoir, consisting of                      AGENCY                                                general permit sets forth principal facts
                                                  grouted steel casings within existing                                                                         and the significant factual, legal,
                                                                                                          [FRL–9933–36—Region 1]
                                                  bedrock; (4) an 80-foot-wide by 300-                                                                          methodological and policy questions
                                                  foot-long by 40-foot-high underground                   Notice of a Re-Opening of the Public                  considered in the development of these
                                                  powerhouse chamber; (5) an 40-foot-                     Comment Period on Select Sections of                  sections of the draft permit and is
                                                  wide by 275-foot-long underground                       the Draft Small Municipal Separate                    available upon request. A brief summary
                                                  switchgear and equipment chamber; (6)                   Storm Sewer System (MS4) NPDES                        is provided as SUPPLEMENTARY
                                                  100 turbine-generators each rated at 2.4                General Permit—New Hampshire                          INFORMATION below.
                                                  megawatts; and (7) a 115-kilovolt (kV)                                                                        FOR FURTHER INFORMATION CONTACT:
                                                  transmission line approximately 1,000                   AGENCY: Environmental Protection                      Additional information concerning the
                                                  feet long from the powerhouse to an                     Agency (EPA).                                         draft General Permits may be obtained
                                                  existing transmission line. The                         ACTION: Notice of reopening of a public               between the hours of 9 a.m. and 5 p.m.
                                                  estimated annual generation of the Lyon                 comment period.                                       Monday through Friday, excluding
                                                  Mountain Project would be 421                                                                                 holidays, from Newton Tedder, Office of
                                                  gigawatt-hours.                                         SUMMARY:   The Director of the Office of              Ecosystem Protection, 5 Post Office
                                                                                                          Ecosystem Protection, EPA-New                         Square—Suite 100, Boston, MA 02109–
                                                     Applicant Contact: Mr. James A.
                                                                                                          England, is reopening the public                      3912; telephone: 617–918–1038; email:
                                                  Besha, Albany Engineering Corporation,
                                                                                                          comment period for certain provisions                 tedder.newton@epa.gov.
                                                  5 Washington Square, Albany, NY
                                                                                                          of the draft National Pollutant Discharge
                                                  12205; phone: (518) 456–7712.                                                                                 SUPPLEMENTARY INFORMATION: All
                                                                                                          Elimination System (NPDES) general
                                                     FERC Contact: Woohee Choi; phone:                                                                          NPDES permits must be consistent with
                                                                                                          permit for discharges from small
                                                  (202) 502–6336.                                                                                               applicable state water quality standards
                                                                                                          Municipal Separate Storm Sewer
                                                                                                                                                                and regulations. Since the release of the
                                                     Deadline for filing comments, motions                Systems (MS4s) to certain waters of the
                                                                                                                                                                original draft general permit, NHDES
                                                  to intervene, competing applications                    State of New Hampshire, originally
                                                                                                                                                                has made changes to their water quality
                                                  (without notices of intent), or notices of              released as draft February 12, 2013. The
                                                                                                                                                                standards. On November 22, 2014, Env-
                                                  intent to file competing applications: 60               reopened comment period applies to the
                                                                                                                                                                Wq 1701.03, ‘‘Compliance Schedules in
                                                  days from the issuance of this notice.                  following sections only: Section 2.1.1,
                                                                                                                                                                NPDES Permits’’ was adopted. The rule
                                                  Competing applications and notices of                   Section 2.2 (including all subsections)
                                                                                                                                                                allows for compliance schedules to be
                                                  intent must meet the requirements of 18                 and Section 2.3.6 (including all
                                                                                                                                                                included in NPDES permits. EPA has
                                                  CFR § 4.36.                                             subsections), Appendix F (excluding
                                                                                                                                                                amended the language in Section 2.1.1,
                                                     The Commission strongly encourages                   attachments) and Appendix H
                                                                                                                                                                Section 2.2, and Appendix F and has
                                                  electronic filing. Please file comments,                (excluding attachments). The reopening
                                                                                                                                                                added specific schedules leading to
                                                  motions to intervene, notices of intent,                of this notice is pursuant to 40 CFR
                                                                                                                                                                compliance with water quality
                                                  and competing applications using the                    124.14.
                                                                                                                                                                standards consistent with Env-Wq
                                                  Commission’s eFiling system at http://                  DATES:  Comment on the draft general                  1701.03 and 40 CFR 122.47.
                                                  www.ferc.gov/docs-filing/efiling.asp.                   permits must be received on or before                    Additionally, EPA received numerous
                                                  Commenters can submit brief comments                    November 2, 2015.                                     comments on Section 2.2 and Appendix
                                                  up to 6,000 characters, without prior                     Any interested person may file a                    H seeking clarity on the proposed
                                                  registration, using the eComment system                 written response to material filed by any             requirements. Accordingly, EPA has
                                                  at http://www.ferc.gov/docs-filing/                     other person during this comment                      revised Section 2.2 and Appendix H to
                                                  ecomment.asp. You must include your                     period. These must be received                        provide clarity of permit requirements
                                                  name and contact information at the end                 November 20, 2015.                                    and certainty on applicability of permit
                                                  of your comments. For assistance,                         Public Hearing Information: EPA will                provisions.
                                                  please contact FERC Online Support at                   hold a public hearing, if necessary, in                  EPA also received multiple comments
                                                  FERCOnlineSupport@ferc.gov, (866)                       accordance with 40 CFR 124.12 and will                on Section 2.3.6 seeking clarification on
                                                  208–3676 (toll free), or (202) 502–8659                 provide interested parties with the                   requirements, closer adherence to state
                                                  (TTY). In lieu of electronic filing, please             opportunity to provide written and/or                 law and a reduced administrative
                                                  send a paper copy to: Secretary, Federal                oral comments for the official                        burden. EPA has revised Section 2.3.6 to
                                                  Energy Regulatory Commission, 888                       administrative record.                                address these comments.
                                                  First Street NE., Washington, DC 20426.                 ADDRESSES: Comments on the modified                      The proposed language changes to
                                                  The first page of any filing should                     sections of the draft general permits                 Section 2.1.1, Section 2.2, Section 2.3.6,
                                                  include docket number P–14692–000.                      shall be submitted by one of the                      Appendix F and Appendix H of the
                                                     More information about this project,                 following methods:                                    New Hampshire Draft Small MS4 Permit
                                                  including a copy of the application, can                  (1) Email: tedder.newton@epa.gov or                 along with statement of basis for the
                                                  be viewed or printed on the ‘‘eLibrary’’                  (2) Mail: Newton Tedder, US EPA—                    proposed changes can be found at
                                                  link of the Commission’s Web site at                    Region 1, 5 Post Office Square—Suite                  http://www.epa.gov/region1/npdes/
                                                  http://www.ferc.gov/docs-filing/                        100, Mail Code OEP06–4, Boston, MA                    stormwater/MS4_2013_NH.html. In
                                                  elibrary.asp. Enter the docket number                   02109–3912                                            addition, all comments received on the
                                                  (P–14692) in the docket number field to                   No facsimiles (faxes) will be accepted.             proposed language modifications will be
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  access the document. For assistance,                      The draft permit is based on an                     posted on the same Web site.
                                                  contact FERC Online Support.                            administrative record available for                      A comprehensive summary of the
                                                                                                          public review at EPA—Region 1, Office                 basis for the all draft permit conditions
                                                    Dated: August 26, 2015.                               of Ecosystem Protection, 5 Post Office                including the applicable statutory and
                                                  Kimberly D. Bose,                                       Square—Suite 100, Boston,                             regulatory authority is included in the
                                                  Secretary.                                              Massachusetts 02109–3912. A                           original fact sheet to the 2013 draft
                                                  [FR Doc. 2015–21594 Filed 8–31–15; 8:45 am]             reasonable fee may be charged for                     permit available at: http://www.epa.gov/
                                                  BILLING CODE 6717–01–P                                  copying requests. The statement of basis              region1/npdes/stormwater/nh/2013/


                                             VerDate Sep<11>2014   20:18 Aug 31, 2015   Jkt 235001   PO 00000   Frm 00019   Fmt 4703   Sfmt 4703   E:\FR\FM\01SEN1.SGM   01SEN1



Document Created: 2018-02-26 10:04:55
Document Modified: 2018-02-26 10:04:55
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 52750 

2025 Federal Register | Disclaimer | Privacy Policy