80_FR_54957 80 FR 54781 - Eastern Shore Natural Gas Company; Notice of Intent To Prepare an Environmental Assessment For the Proposed System Reliability Project and Request for Comments on Environmental Issues

80 FR 54781 - Eastern Shore Natural Gas Company; Notice of Intent To Prepare an Environmental Assessment For the Proposed System Reliability Project and Request for Comments on Environmental Issues

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 176 (September 11, 2015)

Page Range54781-54783
FR Document2015-22915

Federal Register, Volume 80 Issue 176 (Friday, September 11, 2015)
[Federal Register Volume 80, Number 176 (Friday, September 11, 2015)]
[Notices]
[Pages 54781-54783]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-22915]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP15-498-000]


Eastern Shore Natural Gas Company; Notice of Intent To Prepare an 
Environmental Assessment For the Proposed System Reliability Project 
and Request for Comments on Environmental Issues

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the System Reliability Project 
involving construction and operation of facilities by Eastern Shore 
Natural Gas Company (Eastern Shore) in Kent, New Castle, and Sussex 
Counties, Delaware. The Commission will use this EA in its decision-
making process to determine whether the project is in the public 
convenience and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies on the project. You can make a difference by providing us with 
your specific comments or concerns about the project. Your comments 
should focus on the potential environmental effects, reasonable 
alternatives, and measures to avoid or lessen environmental impacts. 
Your input will help the Commission staff determine what issues they 
need to evaluate in the EA. To ensure that your comments are timely and 
properly recorded, please send your comments so that the Commission 
receives them in Washington, DC on or before October 5, 2015.
    If you sent comments on this project to the Commission before the 
opening of this docket on May 22, 2015, you will need to file those 
comments in Docket No. CP15-498-000 to ensure they are considered as 
part of this proceeding.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives should notify their constituents of this proposed 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the proposed facilities. The company 
would seek to negotiate a mutually acceptable agreement. However, if 
the Commission approves the project, that approval conveys with it the 
right of eminent domain. Therefore, if easement negotiations fail to 
produce an agreement, the pipeline company could initiate condemnation 
proceedings where compensation would be determined in accordance with 
state law.
    Eastern Shore provided landowners with a fact sheet prepared by the 
FERC entitled ``An Interstate Natural Gas Facility on My Land? What Do 
I Need to Know?'' This fact sheet addresses a number of typically asked 
questions, including the use of eminent domain and how to participate 
in the Commission's proceedings. It is also available for viewing on 
the FERC Web site (www.ferc.gov).

Public Participation

    For your convenience, there are three methods you can use to submit 
your comments to the Commission. The Commission encourages electronic 
filing of comments and has expert staff available to assist you at 
(202) 502-8258 or [email protected]. Please carefully follow these 
instructions so that your comments are properly recorded.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for submitting brief, 
text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file with your submission. 
New eFiling users must first create an account by clicking on 
``eRegister.'' If you are filing a comment on a particular project, 
please select ``Comment on a Filing'' as the filing type; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address. Be sure to reference the project docket number 
(CP15-498-000) with your submission:

Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
First Street NE., Room 1A, Washington, DC 20426.

Summary of the Proposed Project

    Eastern Shore proposes to construct and operate 10.1 miles of new 
natural gas pipeline loops \1\ in New Castle and Kent County, Delaware, 
and modify its existing Bridgeville Compressor Station in Sussex 
County, Delaware. According to Eastern Shore, its project would 
increase the reliability of natural gas to Eastern Shore's existing 
customers during high demand winter months; this need was not fully met 
in 2014 and 2015 and resulted in gas service ``brown outs.''
---------------------------------------------------------------------------

    \1\ A pipeline loop is a segment of pipe constructed parallel to 
an existing pipeline to increase capacity.
---------------------------------------------------------------------------

    The Eastern Shore System Reliability Project would consist of the 
following facilities:
     2.5 miles of 16-inch-diameter looping pipeline in New 
Castle County;
     pigging facilities \2\ at the existing Glasgow Control 
Station in New Castle County;
---------------------------------------------------------------------------

    \2\ A ``pig'' is a tool that the pipeline company inserts into 
and pushes through the pipeline for cleaning the pipeline, 
conducting internal inspections, or other purposes. A pipeline loop 
is a segment of pipe constructed parallel to an existing pipeline to 
increase capacity.
---------------------------------------------------------------------------

     about 7.6 miles of 16-inch diameter looping pipeline, one 
mainline valve assembly, pigging facilities, and one permanent access 
road in Kent County; and
     an additional 1,775 horsepower of compression, a new 
operations control station, and one permanent access road at the 
existing Bridgeville Compressor Station in Sussex County.
    The general location of the project facilities is shown in appendix 
1.\3\
---------------------------------------------------------------------------

    \3\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of appendices were sent to all those 
receiving this notice in the mail and are available at www.ferc.gov 
using the link called ``eLibrary'' or from the Commission's Public 
Reference Room, 888 First Street NE., Washington, DC 20426, or call 
(202) 502-8371. For instructions on connecting to eLibrary, refer to 
the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the proposed facilities would disturb about 156.7 
acres of land for the aboveground facilities and the pipeline. 
Following construction, Eastern Shore would maintain about

[[Page 54782]]

11.8 acres for permanent operation of the project's facilities; the 
remaining acreage would be restored and revert to former uses. All of 
the proposed pipeline route would parallel existing pipeline, utility, 
or road rights-of-way; about 3 percent of the proposed project would be 
contained within Eastern Shore's existing right-of-way and the rest of 
the project (97%) would be constructed on adjacent property.

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
\4\ to discover and address concerns the public may have about 
proposals. This process is referred to as ``scoping.'' The main goal of 
the scoping process is to focus the analysis in the EA on the important 
environmental issues. By this notice, the Commission requests public 
comments on the scope of the issues to address in the EA. We will 
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------

    \4\ ``We,'' ``us,'' and ``our'' refer to the environmental staff 
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------

    In the EA we will discuss impacts that could occur as a result of 
the construction and operation of the proposed project under these 
general headings:
     geology and soils;
     land use;
     water resources, fisheries, and wetlands;
     cultural resources;
     vegetation and wildlife;
     air quality and noise;
     endangered and threatened species;
     public safety; and
     cumulative impacts.
    We will also evaluate reasonable alternatives to the proposed 
project or portions of the project, and make recommendations on how to 
lessen or avoid impacts on the various resource areas.
    The EA will present our independent analysis of the issues. The EA 
will be available in the public record through eLibrary. Depending on 
the comments received during the scoping process, we may also publish 
and distribute the EA to the public for an allotted comment period. We 
will consider all comments on the EA before making our recommendations 
to the Commission. To ensure we have the opportunity to consider and 
address your comments, please carefully follow the instructions in the 
Public Participation section, beginning on page 2.
    With this notice, we are asking agencies with jurisdiction by law 
and/or special expertise with respect to the environmental issues of 
this project to formally cooperate with us in the preparation of the 
EA.\5\ Agencies that would like to request cooperating agency status 
should follow the instructions for filing comments provided under the 
Public Participation section of this notice.
---------------------------------------------------------------------------

    \5\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40, Code of Federal 
Regulations, Part 1501.6.
---------------------------------------------------------------------------

Consultations Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, we are using this notice to initiate consultation 
with the applicable State Historic Preservation Office (SHPO), and to 
solicit their views and those of other government agencies, interested 
Indian tribes, and the public on the project's potential effects on 
historic properties.\6\ We will define the project-specific Area of 
Potential Effects (APE) in consultation with the SHPO as the project 
develops. On natural gas facility projects, the APE at a minimum 
encompasses all areas subject to ground disturbance (examples include 
construction right-of-way, contractor/pipe storage yards, compressor 
stations, and access roads). Our EA for this project will document our 
findings on the impacts on historic properties and summarize the status 
of consultations under section 106.
---------------------------------------------------------------------------

    \6\ The Advisory Council on Historic Preservation's regulations 
are at Title 36, Code of Federal Regulations, Part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for project purposes, or who own homes within 
certain distances of aboveground facilities, and anyone who submits 
comments on the project. We will update the environmental mailing list 
as the analysis proceeds to ensure that we send the information related 
to this environmental review to all individuals, organizations, and 
government entities interested in and/or potentially affected by the 
proposed project.
    If we publish and distribute the EA, copies will be sent to the 
environmental mailing list for public review and comment. If you would 
prefer to receive a paper copy of the document instead of the CD 
version or would like to remove your name from the mailing list, please 
return the attached Information Request (appendix 2).

Becoming an Intervenor

    In addition to involvement in the EA scoping process, you may want 
to become an ``intervenor'' which is an official party to the 
Commission's proceeding. Intervenors play a more formal role in the 
process and are able to file briefs, appear at hearings, and be heard 
by the courts if they choose to appeal the Commission's final ruling. 
An intervenor formally participates in the proceeding by filing a 
request to intervene. Instructions for becoming an intervenor are in 
the ``Document-less Intervention Guide'' under the ``e-filing'' link on 
the Commission's Web site. Motions to intervene are more fully 
described at http://www.ferc.gov/resources/guides/how-to/intervene.asp.

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site at www.ferc.gov using the ``eLibrary'' link. Click on the 
eLibrary link, click on ``General Search'' and enter the docket number, 
excluding the last three digits in the Docket Number field (i.e., CP15-
498). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.

[[Page 54783]]

    Finally, public meetings or site visits will be posted on the 
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

    Dated: September 4, 2015.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2015-22915 Filed 9-10-15; 8:45 am]
 BILLING CODE 6717-01-P



                                                                           Federal Register / Vol. 80, No. 176 / Friday, September 11, 2015 / Notices                                                    54781

                                               allows you to keep track of all formal                     If you sent comments on this project               a comment on a particular project,
                                               issuances and submittals in specific                    to the Commission before the opening of               please select ‘‘Comment on a Filing’’ as
                                               dockets. This can reduce the amount of                  this docket on May 22, 2015, you will                 the filing type; or
                                               time you spend researching proceedings                  need to file those comments in Docket                   (3) You can file a paper copy of your
                                               by automatically providing you with                     No. CP15–498–000 to ensure they are                   comments by mailing them to the
                                               notification of these filings, document                 considered as part of this proceeding.                following address. Be sure to reference
                                               summaries, and direct links to the                         This notice is being sent to the                   the project docket number (CP15–498–
                                               documents. Go to www.ferc.gov/                          Commission’s current environmental                    000) with your submission:
                                               esubscribenow.htm.                                      mailing list for this project. State and              Kimberly D. Bose, Secretary, Federal
                                                  Finally, public meetings or site visits              local government representatives should                 Energy Regulatory Commission, 888
                                               will be posted on the Commission’s                      notify their constituents of this                       First Street NE., Room 1A,
                                               calendar located at www.ferc.gov/                       proposed project and encourage them to                  Washington, DC 20426.
                                               EventCalendar/EventsList.aspx along                     comment on their areas of concern.
                                                                                                          If you are a landowner receiving this              Summary of the Proposed Project
                                               with other related information.
                                                                                                       notice, a pipeline company                               Eastern Shore proposes to construct
                                                 Dated: September 4, 2015.                             representative may contact you about                  and operate 10.1 miles of new natural
                                               Kimberly D. Bose,                                       the acquisition of an easement to                     gas pipeline loops 1 in New Castle and
                                               Secretary.                                              construct, operate, and maintain the                  Kent County, Delaware, and modify its
                                               [FR Doc. 2015–22916 Filed 9–10–15; 8:45 pm]             proposed facilities. The company would                existing Bridgeville Compressor Station
                                               BILLING CODE 6717–01–P                                  seek to negotiate a mutually acceptable               in Sussex County, Delaware. According
                                                                                                       agreement. However, if the Commission                 to Eastern Shore, its project would
                                                                                                       approves the project, that approval                   increase the reliability of natural gas to
                                               DEPARTMENT OF ENERGY                                    conveys with it the right of eminent                  Eastern Shore’s existing customers
                                                                                                       domain. Therefore, if easement                        during high demand winter months; this
                                               Federal Energy Regulatory                               negotiations fail to produce an                       need was not fully met in 2014 and
                                               Commission                                              agreement, the pipeline company could                 2015 and resulted in gas service ‘‘brown
                                                                                                       initiate condemnation proceedings                     outs.’’
                                               [Docket No. CP15–498–000]                               where compensation would be                              The Eastern Shore System Reliability
                                                                                                       determined in accordance with state                   Project would consist of the following
                                               Eastern Shore Natural Gas Company;                      law.                                                  facilities:
                                               Notice of Intent To Prepare an                             Eastern Shore provided landowners                     • 2.5 miles of 16-inch-diameter
                                               Environmental Assessment For the                        with a fact sheet prepared by the FERC                looping pipeline in New Castle County;
                                               Proposed System Reliability Project                     entitled ‘‘An Interstate Natural Gas                     • pigging facilities 2 at the existing
                                               and Request for Comments on                             Facility on My Land? What Do I Need                   Glasgow Control Station in New Castle
                                               Environmental Issues                                    to Know?’’ This fact sheet addresses a                County;
                                                                                                       number of typically asked questions,                     • about 7.6 miles of 16-inch diameter
                                                  The staff of the Federal Energy                      including the use of eminent domain                   looping pipeline, one mainline valve
                                               Regulatory Commission (FERC or                          and how to participate in the                         assembly, pigging facilities, and one
                                               Commission) will prepare an                             Commission’s proceedings. It is also                  permanent access road in Kent County;
                                               environmental assessment (EA) that will                 available for viewing on the FERC Web                 and
                                               discuss the environmental impacts of                    site (www.ferc.gov).                                     • an additional 1,775 horsepower of
                                               the System Reliability Project involving                                                                      compression, a new operations control
                                               construction and operation of facilities                Public Participation
                                                                                                                                                             station, and one permanent access road
                                               by Eastern Shore Natural Gas Company                       For your convenience, there are three              at the existing Bridgeville Compressor
                                               (Eastern Shore) in Kent, New Castle, and                methods you can use to submit your                    Station in Sussex County.
                                               Sussex Counties, Delaware. The                          comments to the Commission. The                          The general location of the project
                                               Commission will use this EA in its                      Commission encourages electronic filing               facilities is shown in appendix 1.3
                                               decision-making process to determine                    of comments and has expert staff
                                               whether the project is in the public                    available to assist you at (202) 502–8258             Land Requirements for Construction
                                               convenience and necessity.                              or efiling@ferc.gov. Please carefully                   Construction of the proposed facilities
                                                  This notice announces the opening of                 follow these instructions so that your                would disturb about 156.7 acres of land
                                               the scoping process the Commission                      comments are properly recorded.                       for the aboveground facilities and the
                                               will use to gather input from the public                   (1) You can file your comments                     pipeline. Following construction,
                                               and interested agencies on the project.                 electronically using the eComment                     Eastern Shore would maintain about
                                               You can make a difference by providing                  feature on the Commission’s Web site
                                               us with your specific comments or                       (www.ferc.gov) under the link to                         1 A pipeline loop is a segment of pipe constructed

                                               concerns about the project. Your                        Documents and Filings. This is an easy                parallel to an existing pipeline to increase capacity.
                                                                                                                                                                2 A ‘‘pig’’ is a tool that the pipeline company
                                               comments should focus on the potential                  method for submitting brief, text-only                inserts into and pushes through the pipeline for
                                               environmental effects, reasonable                       comments on a project;                                cleaning the pipeline, conducting internal
                                               alternatives, and measures to avoid or                     (2) You can file your comments                     inspections, or other purposes. A pipeline loop is
                                               lessen environmental impacts. Your                      electronically by using the eFiling                   a segment of pipe constructed parallel to an existing
                                               input will help the Commission staff                    feature on the Commission’s Web site                  pipeline to increase capacity.
rmajette on DSK7SPTVN1PROD with NOTICES




                                                                                                                                                                3 The appendices referenced in this notice will
                                               determine what issues they need to                      (www.ferc.gov) under the link to                      not appear in the Federal Register. Copies of
                                               evaluate in the EA. To ensure that your                 Documents and Filings. With eFiling,                  appendices were sent to all those receiving this
                                               comments are timely and properly                        you can provide comments in a variety                 notice in the mail and are available at www.ferc.gov
                                               recorded, please send your comments so                  of formats by attaching them as a file                using the link called ‘‘eLibrary’’ or from the
                                                                                                                                                             Commission’s Public Reference Room, 888 First
                                               that the Commission receives them in                    with your submission. New eFiling                     Street NE., Washington, DC 20426, or call (202)
                                               Washington, DC on or before October 5,                  users must first create an account by                 502–8371. For instructions on connecting to
                                               2015.                                                   clicking on ‘‘eRegister.’’ If you are filing          eLibrary, refer to the last page of this notice.



                                          VerDate Sep<11>2014   15:14 Sep 10, 2015   Jkt 235001   PO 00000   Frm 00020   Fmt 4703   Sfmt 4703   E:\FR\FM\11SEN1.SGM   11SEN1


                                               54782                       Federal Register / Vol. 80, No. 176 / Friday, September 11, 2015 / Notices

                                               11.8 acres for permanent operation of                   in the Public Participation section,                      update the environmental mailing list as
                                               the project’s facilities; the remaining                 beginning on page 2.                                      the analysis proceeds to ensure that we
                                               acreage would be restored and revert to                   With this notice, we are asking                         send the information related to this
                                               former uses. All of the proposed                        agencies with jurisdiction by law and/                    environmental review to all individuals,
                                               pipeline route would parallel existing                  or special expertise with respect to the                  organizations, and government entities
                                               pipeline, utility, or road rights-of-way;               environmental issues of this project to                   interested in and/or potentially affected
                                               about 3 percent of the proposed project                 formally cooperate with us in the                         by the proposed project.
                                               would be contained within Eastern                       preparation of the EA.5 Agencies that                       If we publish and distribute the EA,
                                               Shore’s existing right-of-way and the                   would like to request cooperating                         copies will be sent to the environmental
                                               rest of the project (97%) would be                      agency status should follow the                           mailing list for public review and
                                               constructed on adjacent property.                       instructions for filing comments                          comment. If you would prefer to receive
                                                                                                       provided under the Public Participation                   a paper copy of the document instead of
                                               The EA Process                                          section of this notice.                                   the CD version or would like to remove
                                                  The National Environmental Policy                    Consultations Under Section 106 of the                    your name from the mailing list, please
                                               Act (NEPA) requires the Commission to                   National Historic Preservation Act                        return the attached Information Request
                                               take into account the environmental                                                                               (appendix 2).
                                               impacts that could result from an action                  In accordance with the Advisory
                                               whenever it considers the issuance of a                 Council on Historic Preservation’s                        Becoming an Intervenor
                                               Certificate of Public Convenience and                   implementing regulations for section
                                                                                                                                                                    In addition to involvement in the EA
                                               Necessity. NEPA also requires us 4 to                   106 of the National Historic
                                                                                                                                                                 scoping process, you may want to
                                               discover and address concerns the                       Preservation Act, we are using this
                                                                                                                                                                 become an ‘‘intervenor’’ which is an
                                               public may have about proposals. This                   notice to initiate consultation with the
                                                                                                       applicable State Historic Preservation                    official party to the Commission’s
                                               process is referred to as ‘‘scoping.’’ The                                                                        proceeding. Intervenors play a more
                                               main goal of the scoping process is to                  Office (SHPO), and to solicit their views
                                                                                                       and those of other government agencies,                   formal role in the process and are able
                                               focus the analysis in the EA on the                                                                               to file briefs, appear at hearings, and be
                                               important environmental issues. By this                 interested Indian tribes, and the public
                                                                                                       on the project’s potential effects on                     heard by the courts if they choose to
                                               notice, the Commission requests public                                                                            appeal the Commission’s final ruling.
                                               comments on the scope of the issues to                  historic properties.6 We will define the
                                                                                                       project-specific Area of Potential Effects                An intervenor formally participates in
                                               address in the EA. We will consider all                                                                           the proceeding by filing a request to
                                               filed comments during the preparation                   (APE) in consultation with the SHPO as
                                                                                                       the project develops. On natural gas                      intervene. Instructions for becoming an
                                               of the EA.                                                                                                        intervenor are in the ‘‘Document-less
                                                  In the EA we will discuss impacts that               facility projects, the APE at a minimum
                                                                                                       encompasses all areas subject to ground                   Intervention Guide’’ under the ‘‘e-filing’’
                                               could occur as a result of the                                                                                    link on the Commission’s Web site.
                                               construction and operation of the                       disturbance (examples include
                                                                                                       construction right-of-way, contractor/                    Motions to intervene are more fully
                                               proposed project under these general                                                                              described at http://www.ferc.gov/
                                               headings:                                               pipe storage yards, compressor stations,
                                                                                                       and access roads). Our EA for this                        resources/guides/how-to/intervene.asp.
                                                  • geology and soils;
                                                  • land use;                                          project will document our findings on                     Additional Information
                                                  • water resources, fisheries, and                    the impacts on historic properties and
                                                                                                       summarize the status of consultations                        Additional information about the
                                               wetlands;                                                                                                         project is available from the
                                                  • cultural resources;                                under section 106.
                                                                                                                                                                 Commission’s Office of External Affairs,
                                                  • vegetation and wildlife;                           Environmental Mailing List                                at (866) 208–FERC, or on the FERC Web
                                                  • air quality and noise;                                The environmental mailing list                         site at www.ferc.gov using the
                                                  • endangered and threatened species;                 includes federal, state, and local                        ‘‘eLibrary’’ link. Click on the eLibrary
                                                  • public safety; and                                                                                           link, click on ‘‘General Search’’ and
                                                                                                       government representatives and
                                                  • cumulative impacts.                                                                                          enter the docket number, excluding the
                                                                                                       agencies; elected officials;
                                                  We will also evaluate reasonable                                                                               last three digits in the Docket Number
                                                                                                       environmental and public interest
                                               alternatives to the proposed project or                                                                           field (i.e., CP15–498). Be sure you have
                                                                                                       groups; Native American Tribes; other
                                               portions of the project, and make                                                                                 selected an appropriate date range. For
                                                                                                       interested parties; and local libraries
                                               recommendations on how to lessen or                                                                               assistance, please contact FERC Online
                                                                                                       and newspapers. This list also includes
                                               avoid impacts on the various resource                                                                             Support at FercOnlineSupport@ferc.gov
                                                                                                       all affected landowners (as defined in
                                               areas.                                                                                                            or toll free at (866) 208–3676, or for
                                                                                                       the Commission’s regulations) who are
                                                  The EA will present our independent                                                                            TTY, contact (202) 502–8659. The
                                                                                                       potential right-of-way grantors, whose
                                               analysis of the issues. The EA will be                                                                            eLibrary link also provides access to the
                                                                                                       property may be used temporarily for
                                               available in the public record through                                                                            texts of formal documents issued by the
                                                                                                       project purposes, or who own homes
                                               eLibrary. Depending on the comments                                                                               Commission, such as orders, notices,
                                                                                                       within certain distances of aboveground
                                               received during the scoping process, we                                                                           and rulemakings.
                                                                                                       facilities, and anyone who submits
                                               may also publish and distribute the EA
                                                                                                       comments on the project. We will                             In addition, the Commission offers a
                                               to the public for an allotted comment
                                                                                                                                                                 free service called eSubscription which
                                               period. We will consider all comments                     5 The Council on Environmental Quality
                                                                                                                                                                 allows you to keep track of all formal
                                               on the EA before making our                             regulations addressing cooperating agency                 issuances and submittals in specific
rmajette on DSK7SPTVN1PROD with NOTICES




                                               recommendations to the Commission.                      responsibilities are at Title 40, Code of Federal
                                                                                                       Regulations, Part 1501.6.                                 dockets. This can reduce the amount of
                                               To ensure we have the opportunity to
                                                                                                         6 The Advisory Council on Historic Preservation’s       time you spend researching proceedings
                                               consider and address your comments,
                                                                                                       regulations are at Title 36, Code of Federal              by automatically providing you with
                                               please carefully follow the instructions                Regulations, Part 800. Those regulations define           notification of these filings, document
                                                                                                       historic properties as any prehistoric or historic
                                                 4 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the            district, site, building, structure, or object included
                                                                                                                                                                 summaries, and direct links to the
                                               environmental staff of the Commission’s Office of       in or eligible for inclusion in the National Register     documents. Go to www.ferc.gov/docs-
                                               Energy Projects.                                        of Historic Places.                                       filing/esubscription.asp.


                                          VerDate Sep<11>2014   15:14 Sep 10, 2015   Jkt 235001   PO 00000   Frm 00021   Fmt 4703   Sfmt 4703   E:\FR\FM\11SEN1.SGM    11SEN1


                                                                           Federal Register / Vol. 80, No. 176 / Friday, September 11, 2015 / Notices                                            54783

                                                 Finally, public meetings or site visits               recorded, please send your comments so                of formats by attaching them as a file
                                               will be posted on the Commission’s                      that the Commission receives them in                  with your submission. New eFiling
                                               calendar located at www.ferc.gov/                       Washington, DC on or before October 5,                users must first create an account by
                                               EventCalendar/EventsList.aspx along                     2015.                                                 clicking on ‘‘eRegister.’’ If you are filing
                                               with other related information.                            If you sent comments on this project               a comment on a particular project,
                                                 Dated: September 4, 2015.                             to the Commission before the opening of               please select ‘‘Comment on a Filing’’ as
                                                                                                       this docket on July 29, 2015, you will                the filing type; or
                                               Kimberly D. Bose,
                                                                                                       need to file those comments in Docket                    (3) You can file a paper copy of your
                                               Secretary.
                                                                                                       No. CP15–539–000 to ensure they are                   comments by mailing them to the
                                               [FR Doc. 2015–22915 Filed 9–10–15; 8:45 am]             considered as part of this proceeding.                following address. Be sure to reference
                                               BILLING CODE 6717–01–P                                     This notice is being sent to the                   the project docket number (CP15–539–
                                                                                                       Commission’s current environmental                    000) with your submission:
                                                                                                       mailing list for this project. State and
                                               DEPARTMENT OF ENERGY                                    local government representatives should               Kimberly D. Bose, Secretary, Federal
                                                                                                       notify their constituents of this                        Energy Regulatory Commission, 888
                                               Federal Energy Regulatory                                                                                        First Street NE., Room 1A,
                                               Commission                                              proposed project and encourage them to
                                                                                                       comment on their areas of concern.                       Washington, DC 20426.
                                               [Docket Nos. CP15–539–000; CP15–514–                       If you are a landowner receiving this              Summary of the Proposed Project
                                               000]                                                    notice, a pipeline company
                                                                                                       representative may contact you about                     Columbia Gulf plans to construct and
                                               Columbia Gulf Transmission, LLC;                        the acquisition of an easement to                     operate 51,800 horsepower (hp) of new
                                               Columbia Gas Transmission, LLC;                         construct, operate, and maintain the                  compression in Carter, Menifee and
                                               Notice of Intent To Prepare an                          proposed facilities. The company would                Montgomery Counties, Kentucky, and
                                               Environmental Impact Statement for                      seek to negotiate a mutually acceptable               modification of the existing Means
                                               the Rayne Xpress Expansion Project,                     agreement. However, if the Commission                 Measurement and Regulation Station in
                                               and Request for Comments on                             approves the project, that approval                   Montgomery County, Kentucky. The
                                               Environmental Issues                                    conveys with it the right of eminent                  project would provide about 621,000
                                                 The staff of the Federal Energy                       domain. Therefore, if easement                        Dekatherms per day of firm
                                               Regulatory Commission (FERC or                          negotiations fail to produce an                       transportation on its system.
                                               Commission) will evaluate the                           agreement, the pipeline company could                    The project would consist of the
                                               environmental impacts of the Rayne                      initiate condemnation proceedings                     following facilities:
                                               XPress Expansion Project (project) in an                where compensation would be                              • A new 36,400 hp Grayson
                                               environmental impact statement (EIS)                    determined in accordance with state                   Compressor Station consisting of two
                                               being prepared for the related Leach                    law.                                                  gas-driven compressor units at Milepost
                                               XPress Project filed by Columbia Gas                       Columbia Gulf provided landowners                  (MP) 68 on Columbia Gulf’s existing
                                               Transmission (Columbia Gas) in Docket                   with a fact sheet prepared by the FERC                Mainline 100, 200 and 300 pipelines in
                                               No. CP15–514.1 The Rayne XPress                         entitled ‘‘An Interstate Natural Gas                  in Carter County, Kentucky;
                                               Expansion Project involves construction                 Facility On My Land? What Do I Need                      • a new 15,400 hp Means Compressor
                                               and operation of facilities by Columbia                 To Know?’’ This fact sheet addresses a                Station consisting of two gas-driven
                                               Gulf Transmission, LLC (Columbia Gulf)                  number of typically asked questions,                  compressor units at MP 6.5 on Columbia
                                               in Carter, Menifee and Montgomery                       including the use of eminent domain                   Gulf’s existing Mainline 100, 200 and
                                               Counties, Kentucky. The Commission                      and how to participate in the                         300 pipelines in in Menifee and
                                               will use this EIS in its decision-making                Commission’s proceedings. It is also                  Montgomery Counties, Kentucky; and
                                               process to determine whether the                        available for viewing on the FERC Web                    • modifications to station piping and
                                               project is in the public convenience and                site (www.ferc.gov).                                  Supervisory Control and Data
                                               necessity.                                              Public Participation                                  Acquisition systems at the existing
                                                  This notice announces the opening of                                                                       Means Measurement and Regulation
                                               the scoping process the Commission                        For your convenience, there are three
                                                                                                                                                             Station in Montgomery County,
                                               will use to gather input from the public                methods you can use to submit your
                                                                                                                                                             Kentucky.
                                               and interested agencies on the project.                 comments to the Commission. The
                                                                                                       Commission encourages electronic filing                  The general location of the project
                                               You can make a difference by providing                                                                        facilities is shown in appendix 2.
                                               us with your specific comments or                       of comments and has expert staff
                                               concerns about the project. Your                        available to assist you at (202) 502–8258             Land Requirements for Construction
                                               comments should focus on the potential                  or efiling@ferc.gov. Please carefully
                                                                                                       follow these instructions so that your                  Construction of the proposed facilities
                                               environmental effects, reasonable                                                                             would disturb about 34 acres of land,
                                               alternatives, and measures to avoid or                  comments are properly recorded.
                                                                                                         (1) You can file your comments                      converting about 17 acres of land to
                                               lessen environmental impacts. Your                                                                            industrial land use under permanent
                                               input will help the Commission staff                    electronically using the eComment
                                                                                                       feature on the Commission’s Web site                  operation of the project’s facilities.
                                               determine what issues they need to                                                                            Columbia Gulf would restore the
                                               evaluate in the EIS. To ensure that your                (www.ferc.gov) under the link to
                                                                                                       Documents and Filings. This is an easy                remaining acreage to former uses.
                                               comments are timely and properly
                                                                                                       method for submitting brief, text-only                The EIS Process
rmajette on DSK7SPTVN1PROD with NOTICES




                                                 1A   Notice of Application was issued on June 22,     comments on a project;
                                               2015 for the Leach XPress Project. The NOI stated         (2) You can file your comments                        The National Environmental Policy
                                               that Columbia Gulf, one of Columbia Gas’s               electronically by using the eFiling                   Act (NEPA) requires the Commission to
                                               affiliates, may be proposing a project which may        feature on the Commission’s Web site                  take into account the environmental
                                               have some connection to the Leach XPress Project.                                                             impacts that could result from an action
                                               The Leach XPress Project was in the pre-filing
                                                                                                       (www.ferc.gov) under the link to
                                               phase until filed on June 8, 2015 under Docket No.      Documents and Filings. With eFiling,                  whenever it considers the issuance of a
                                               PF14–023.                                               you can provide comments in a variety                 Certificate of Public Convenience and


                                          VerDate Sep<11>2014   15:14 Sep 10, 2015   Jkt 235001   PO 00000   Frm 00022   Fmt 4703   Sfmt 4703   E:\FR\FM\11SEN1.SGM   11SEN1



Document Created: 2015-12-15 10:00:26
Document Modified: 2015-12-15 10:00:26
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 54781 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR