80_FR_55330 80 FR 55153 - In the Matter of Dominion Nuclear Connecticut, Inc. (Millstone Power Station Unit 2)

80 FR 55153 - In the Matter of Dominion Nuclear Connecticut, Inc. (Millstone Power Station Unit 2)

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 80, Issue 177 (September 14, 2015)

Page Range55153-55157
FR Document2015-22951

The U.S. Nuclear Regulatory Commission (NRC) and the Dominion Nuclear Connecticut, Inc. (DNC) engaged in mediation as part of the NRC's Alternative Dispute Resolution Program which resulted in a settlement agreement as reflected in the confirmatory order relating to Millstone Unit 2.

Federal Register, Volume 80 Issue 177 (Monday, September 14, 2015)
[Federal Register Volume 80, Number 177 (Monday, September 14, 2015)]
[Notices]
[Pages 55153-55157]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-22951]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 50-336 and EA-13-188; NRC-2015-0217]


In the Matter of Dominion Nuclear Connecticut, Inc. (Millstone 
Power Station Unit 2)

AGENCY: Nuclear Regulatory Commission.

ACTION: Confirmatory order; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) and the Dominion 
Nuclear Connecticut, Inc. (DNC) engaged in mediation as part of the 
NRC's Alternative Dispute Resolution Program which resulted in a 
settlement agreement as reflected in the confirmatory order relating to 
Millstone Unit 2.

DATES: Effective Date: August 26, 2015.

ADDRESSES: Please refer to Docket ID NRC-2015-0217 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2015-0217. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For questions about this Order, 
contact the individual listed in the FOR FURTHER INFORMATION CONTACT 
section of this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced (if it available in 
ADAMS) is provided the first time that a document is referenced.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Richard Guzman, Office of Nuclear 
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001; telephone: 301-415-1030, email: [email protected].

[[Page 55154]]


SUPPLEMENTARY INFORMATION: The text of the Order is attached.

    Dated at Rockville, Maryland, this 3rd day of September 2015.

    For the Nuclear Regulatory Commission.
Dave J. Vito,
Acting Chief, Concerns Resolution Branch, Office of Enforcement.

UNITED STATES OF AMERICA

NUCLEAR REGULATORY COMMISSION

    In the Matter of Dominion Nuclear Connecticut, Inc. (Millstone 
Power Station Unit 2)

Docket No. 50-336
License No. DPR-65
EA-13-188

CONFIRMATORY ORDER MODIFYING LICENSE

(EFFECTIVE IMMEDIATELY)

I.

    Dominion Nuclear Connecticut, Inc. (DNC or Licensee) is the holder 
of Facility Operating License No. DPR-65 issued by the Nuclear 
Regulatory Commission (NRC or Commission) pursuant to Title 10 of the 
Code of Federal Regulations (10 CFR) part 50 on September 26, 1975. The 
license authorizes the operation of Millstone Power Station (Millstone) 
Unit 2 in accordance with conditions specified therein. Millstone Power 
Station Unit 2 is located in the vicinity of Waterford, Connecticut.
    This Confirmatory Order is the result of an agreement reached 
during an alternative dispute resolution (ADR) mediation process which 
included one meeting on July 14, 2015, and two follow up 
teleconferences on July 16, 2015 and July 24, 2015.

II.

    On May 23, 2013, the NRC's Office of Investigations (OI) completed 
an investigation to determine if DNC staff at Millstone deliberately 
violated NRC requirements in section 50.59 of Title 10 of the Code of 
Federal Regulations (10 CFR), ``Changes, Tests, and Experiments,'' when 
implementing changes to documents related to the Millstone Unit 2 
chemical and volume control system (CVCS) charging pumps and spent fuel 
decay time limits. The investigation also evaluated whether DNC staff 
deliberately submitted inaccurate and incomplete information to the NRC 
pertaining to these changes.
    Based on the evidence developed during this investigation, the NRC 
concluded that three apparent violations occurred, two of which were 
considered for escalated enforcement action. The first apparent 
violation (AV) involved changes made by DNC to Section 14.6.1 of the 
Millstone Unit 2 Updated Final Safety Analysis Report (UFSAR) that 
removed credit for the CVCS charging pump flow in the mitigation of the 
design basis accident involving the inadvertent opening of pressurizer 
power operated relief valves (PORVs), without obtaining prior NRC 
approval. The NRC found that willfulness was associated with this 
apparent violation. DNC does not agree that willfulness was associated 
with this apparent violation.
    The second AV involved the failure by DNC to provide complete and 
accurate information to the NRC in reports and other documents 
pertaining to the aforementioned UFSAR change, including a failure to 
notify the Commission of information having significant implications 
for public health and safety. Willfulness was not associated with this 
apparent violation.
    The third AV involved changes made by DNC to Chapter 9 of the 
Millstone Unit 2 UFSAR and Section 3/4.9.3 of the Technical 
Specification Bases that decreased the required amount of irradiated 
fuel decay time from 150 to 100 hours prior to fuel movement in the 
reactor vessel, without obtaining prior NRC approval. Willfulness was 
not associated with this apparent violation.
    In a letter dated April 29, 2015, the NRC provided DNC the results 
of the investigation, informed DNC that escalated enforcement action 
was being considered for two of the three apparent violations, and 
offered DNC the opportunity to attend a predecisional enforcement 
conference or to participate in ADR in which a neutral mediator with no 
decision-making authority would facilitate discussions between the NRC 
and DNC. The neutral mediator would assist the NRC and DNC in reaching 
an agreement, if possible. DNC chose to participate in ADR. This 
Confirmatory Order is issued pursuant to the agreement reached during 
the ADR process.

III.

    In response to the NRC's offer, DNC requested use of the NRC ADR 
process to resolve differences it had with the NRC. During that ADR 
process, a preliminary settlement agreement was reached the terms of 
which are set forth in Section IV below.
    Based on those commitments, the NRC agreed not to take further 
enforcement action on the three apparent violations identified in the 
NRC April 29, 2015, letter.
    On August 20, 2015, DNC consented to issuing this Confirmatory 
Order with the commitments, as described in Section IV below. DNC 
further agreed that this Confirmatory Order is to be effective upon 
issuance and that it has waived its right to a hearing.
    I find that the DNC's commitments as set forth in Section IV are 
acceptable and necessary and conclude that with these commitments the 
plant's safety is reasonably assured. In view of the foregoing, I have 
determined that public health and safety require that DNC's commitments 
be confirmed by this Confirmatory Order. Based on the above and DNC's 
consent, this Confirmatory Order is effective upon issuance. By no 
later than thirty (30) days after the completion of the commitments in 
Section IV, DNC is required to notify the NRC in writing and summarize 
its actions.

IV.

    Accordingly, pursuant to Sections 104b, 161b, 161i, 161o, 182 and 
186 of the Atomic Energy Act of 1954, as amended, and the Commission's 
regulations in 10 CFR 2.202 and 10 CFR part 50, IT IS HEREBY ORDERED 
THAT LICENSE NO. DPR-65 IS MODIFIED AS FOLLOWS:
    Compliance.
    1. Within sixty (60) calendar days of the date of this Confirmatory 
Order, DNC will:
    a. Revise, as necessary, Standing Order 14-016 dated May 11, 2014, 
to incorporate applicable Millstone Unit 2 Technical Specifications 
(TSs); limiting conditions of operations (LCOs); actions; and 
surveillances that reflect the safety analysis of the inadvertent 
opening of the PORVs prior to implementation of Amendment No. 283. This 
revision of the standing order will be made available for NRC review 
prior to implementation.
    b. Complete an operability evaluation for the use of charging pumps 
in accordance with Standing Order 14-016, as revised by paragraph 1.a., 
associated with the inadvertent opening of PORVs and make the 
operability evaluation available to NRC for review; and
    c. Evaluate the effect of three pump charging pump operation (i.e., 
three charging pumps auto start and provide flow) with the current 
plant configuration. If the evaluation concludes no adverse effect, 
revised Standing Order 14-016 will be changed to require that three 
charging pumps auto start and provide flow. This evaluation will be 
made available for NRC review.
    2. By no later than February 15, 2016, DNC will submit a license 
amendment request to the NRC addressing the use of charging pumps in 
the analysis of the inadvertent opening of PORVs. If DNC

[[Page 55155]]

does not submit a license amendment request by February 15, 2016, the 
Millstone Unit 2 design and licensing basis for the operation of 
charging pumps to mitigate the inadvertent opening of PORVs that was in 
place prior to Amendment No. 283 (dated September 9, 2004) will be 
reinstated by this Confirmatory Order, and DNC will take all actions 
necessary to conform Millstone Unit 2 to the reinstated design and 
licensing basis.
    3. DNC's Standing Order 14-016 (Rev. 0, dated May 11, 2014), as 
revised in accordance with paragraph 1 above, will remain in place 
until the NRC makes a final determination on the license amendment 
request submitted under paragraph 2 above.
    4. If the NRC denies the license amendment request submitted under 
paragraph 2 above, or the licensee withdraws the license amendment 
request, the Millstone Unit 2 design and licensing basis for the 
operation of charging pumps to mitigate the inadvertent opening of 
PORVs that was in place prior to implementation of Amendment No. 283 
(dated September 9, 2004) will be reinstated by this Confirmatory 
Order, and DNC will take all actions necessary to conform Millstone 
Unit 2 to the reinstated design and licensing basis.
    5. By no later than February 15, 2016, DNC will submit a license 
amendment request seeking NRC approval of the spent fuel pool heat load 
analysis and any associated technical specification changes. This will 
be treated as a high priority review by the NRC.
    6. DNC's Standing Order 14-021 (Rev. 0 dated July 9, 2014) will 
remain in place until the NRC makes a final determination on the 
license amendment request submitted under paragraph 5 above.
    7. If the NRC denies the license amendment request submitted under 
paragraph 5 above, or the licensee withdraws the license amendment 
request, TS 3/4.9.3.1 in the Millstone Unit 2 license will be revised 
by this Confirmatory Order to require 150 hours of decay time before 
moving irradiated fuel from the reactor to the spent fuel pool, and 
changes made by Licensing Basis Document Change Request 10-MP2-007 
(dated June 22, 2010) to Chapter 9 of the Millstone Unit 2 UFSAR and to 
the TS Bases will be replaced by the prior content of those documents. 
DNC will take all actions necessary to conform Millstone Unit 2 to the 
requirements of the revised TS and UFSAR.
    Assessment.
    8. By no later than June 30, 2016, DNC will complete a self-
assessment of its 10 CFR 50.59 program and procedures (including 
applicability, screening and evaluations) including a review of 
procedures, implementation, initial training, continuing training, and 
safety review committee activities. A majority of the self-assessment 
team will be comprised of a combination of non-Dominion industry 
experts and peers. The assessment will also address the Millstone 
Nuclear Oversight organization's responsibilities and the effectiveness 
of the execution of those responsibilities regarding the 10 CFR 50.59 
program.
    a. DNC shall make available to the NRC, upon request, the results 
of the assessment and any corrective actions DNC will take to address 
the results.
    b. DNC will complete corrective actions resulting from findings of 
the assessment consistent with the requirements of the Millstone 
Corrective Action Program.
    9. DNC has conducted two apparent cause evaluations to address the 
issues included in this Confirmatory Order.
    a. The results of these evaluations will be made available to the 
NRC for review.
    10. By no later than March 1, 2016, DNC will complete a common 
cause evaluation of 10 CFR 50.59 issues that have been identified after 
July 1, 2012, with emphasis on any underlying culture-related issues 
that specifically may exist in the Millstone Power Station Engineering 
and Licensing groups and the Facility Safety Review Committee. The team 
will include a member trained in cultural issues. Interviews of a 
sample of the staff members from the above groups will be included in 
the evaluation. In regard to this evaluation, DNC shall:
    a. Make the results of the evaluation available to the NRC.
    b. Communicate to Millstone Power Station employees the results of 
the evaluation within three (3) months of receiving the evaluation 
results.
    c. Review the results of the common cause evaluation and initiate 
corrective actions as appropriate within 30 days of receiving 
evaluation results.
    Extent of Condition.
    11. By no later than June 30, 2016, DNC will complete a formal 
sampling program, using MIL Standard 105 or similar, of products 
(applicability determinations, screenings, and evaluations) completed 
using the DNC 10 CFR 50.59 programs and procedures.
    a. The reviewers conducting the sampling program will be third 
party independent reviewers.
    b. Applicability determinations, screenings, and evaluations will 
be sampled as separate populations.
    c. For each population, the sampling time period will begin in 2002 
and end as of the date of this Confirmatory Order.
    d. DNC will enter any identified deficiencies into DNC's corrective 
action program.
    e. Pursuant to Section 3.3 of the NRC Enforcement Policy, the NRC 
will consider exercising enforcement discretion to refrain from issuing 
a Notice of Violation or civil penalty for any non-willful Severity 
Level II, III, or IV violation identified as part of the sampling 
program described above, if the violation meets all of the following 
criteria:
    (1) the violation has the same or similar cause as the apparent 
violations of 10 CFR 50.59 that are the subject of this Confirmatory 
Order;
    (2) the violation is a newly-found violation that occurred prior to 
issuance of this Confirmatory Order;
    (3) the violation does not substantially change the safety 
significance or the character of the regulatory concerns arising out of 
the apparent violations that underlie this Confirmatory Order; and
    (4) the violation is corrected, by both immediate corrective 
action(s) and long-term comprehensive corrective action(s), within a 
reasonable time following identification.
    f. The NRC will also consider discretion for any DNC-identified 
performance deficiencies that meet the criteria listed in paragraph 
11.e and are categorized as a Green or White finding under the NRC's 
Reactor Oversight Program.
    Communication.
    12. By no later than thirty (30) calendar days after the issuance 
of this Confirmatory Order, DNC's Chief Nuclear Officer will issue a 
fleet-wide communication (written or recorded) to reinforce the 
importance of providing complete and accurate information to the NRC, 
including requirements for updating out-of-date information, and the 
potential consequences of a failure to comply with these requirements. 
The communication, whether written or recorded, and any associated 
materials or references, will be made available to the NRC.
    13. By no later than December 31, 2016, DNC will provide a 
presentation at an industry forum to discuss the events that led to 
this Confirmatory Order, the lessons learned, and actions taken. The 
presentation and any associated material will be made available to the 
NRC.
    Training.
    14. DNC will review its plant access training and revise it as 
necessary to

[[Page 55156]]

ensure that it includes training on compliance with NRC requirements, 
including, but not limited to, 10 CFR 50.5 and 50.9. Any revisions will 
be made available to the NRC.
    15. Notwithstanding that NRC and DNC disagree about whether a 
willful violation occurred, DNC will develop and provide focused 
training to Dominion corporate Engineering and Licensing personnel who 
perform work for Millstone and to DNC Engineering and Licensing 
personnel, to ensure awareness of the importance of complying with 
regulatory requirements, and the potential consequences of a failure to 
comply, including what constitutes a willful violation of NRC 
requirements. DNC will provide this training by April 1, 2016, and will 
repeat it 12 months after the initial training session. The training 
and any associated training materials will be made available to the 
NRC.
    16. DNC will develop and provide focused training to Dominion 
corporate Engineering and Licensing personnel performing work for 
Millstone and to DNC Engineering and Licensing personnel, covering the 
requirements of 10 CFR 50.9, emphasizing the importance of providing 
complete and accurate information to the NRC and of informing the NRC 
promptly upon discovery of inaccurate information or omissions 
associated with pending NRC licensing actions or other information 
submitted to the NRC. DNC will provide this training by April 1, 2016. 
The training and any associated training materials will be made 
available to the NRC.
    Other Considerations.
    17. The NRC agrees not to pursue any further enforcement action 
relating to the notice of apparent violations (Case no. EA-13-188, 
Inspection Report 05000336/2015201, Office of Investigations Report No. 
1-2012-008), dated April 29, 2015.
    18. This Confirmatory Order will not be considered an escalated 
enforcement action by the NRC for future assessment of violations 
occurring at Millstone Power Station Unit 2.
    19. In the event of the transfer of the operating license of 
Millstone Power Station Unit 2 to another entity, the commitments 
hereunder shall survive any transfer of ownership and will be binding 
on the new licensee.
    The Director, Office of Enforcement, may, in writing, relax or 
rescind any of the above conditions upon demonstration by the Licensee 
of good cause.

V.

    Any person adversely affected by this Confirmatory Order, other 
than DNC, may request a hearing within 30 days of issuance. Where good 
cause is shown, consideration will be given to extending the time to 
request a hearing. A request for extension of time must be made in 
writing to the Director, Office of Enforcement, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555, and include a statement of good cause 
for the extension.
    All documents filed in NRC adjudicatory proceedings, including a 
request for hearing, a petition for leave to intervene, any motion or 
other document filed in the proceeding prior to the submission of a 
request for hearing or petition to intervene, and documents filed by 
interested governmental entities participating under 10 CFR 2.315(c), 
must be filed in accordance with the NRC E-Filing rule (72 FR 49139, 
August 28, 2007). The E-Filing process requires participants to submit 
and serve all adjudicatory documents over the internet, or in some 
cases to mail copies on electronic storage media. Participants may not 
submit paper copies of their filings unless they seek an exemption in 
accordance with the procedures described below.
    To comply with the procedural requirements of E-Filing, at least 
ten (10) days prior to the filing deadline, the participant should 
contact the Office of the Secretary by email at [email protected], 
or by telephone at 301-415-1677, to (1) request a digital ID 
certificate, which allows the participant (or its counsel or 
representative) to digitally sign documents and access the E-Submittal 
server for any proceeding in which it is participating; and (2) advise 
the Secretary that the participant will be submitting a request or 
petition for hearing (even in instances in which the participant, or 
its counsel or representative, already holds an NRC-issued digital ID 
certificate). Based upon this information, the Secretary will establish 
an electronic docket for the hearing in this proceeding if the 
Secretary has not already established an electronic docket.
    Information about applying for a digital ID certificate is 
available on NRC's public Web site at http://www.nrc.gov/site-help/e-submittals/apply-certificates.html. System requirements for accessing 
the E-Submittal server are detailed in NRC's ``Guidance for Electronic 
Submission,'' which is available on the agency's public Web site at 
http://www.nrc.gov/site-help/e-submittals.html. Participants may 
attempt to use other software not listed on the Web site, but should 
note that the NRC's E-Filing system does not support unlisted software, 
and the NRC Meta System Help Desk will not be able to offer assistance 
in using unlisted software.
    If a participant is electronically submitting a document to the NRC 
in accordance with the E-Filing rule, the participant must file the 
document using the NRC's online, Web-based submission form. Further 
information on the Web-based submission form is available on the NRC's 
public Web site at http://www.nrc.gov/site-help/e-submittals.html.
    Once a participant has obtained a digital ID certificate and a 
docket has been created, the participant can then submit a request for 
hearing or petition for leave to intervene. Submissions should be in 
Portable Document Format (PDF) in accordance with NRC guidance 
available on the NRC public Web site at http://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the 
documents are submitted through the NRC's E-Filing system. To be 
timely, an electronic filing must be submitted to the E-Filing system 
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of 
a transmission, the E-Filing system time-stamps the document and sends 
the submitter an email notice confirming receipt of the document. The 
E-Filing system also distributes an email notice that provides access 
to the document to the NRC Office of the General Counsel and any others 
who have advised the Office of the Secretary that they wish to 
participate in the proceeding, so that the filer need not serve the 
documents on those participants separately. Therefore, applicants and 
other participants (or their counsel or representative) must apply for 
and receive a digital ID certificate before a hearing request/petition 
to intervene is filed so that they can obtain access to the document 
via the E-Filing system.
    A person filing electronically using the agency's adjudicatory E-
Filing system may seek assistance by contacting the NRC Electronic 
Filing Help Desk through the ``Contact Us'' link located on the NRC Web 
site at http://www.nrc.gov/site-help/e-submittals.html, by email at 
[email protected], or by a toll-free call at (866) 672-7640. The 
NRC Electronic Filing Help Desk is available between 8 a.m. and 8 p.m., 
Eastern Time, Monday through Friday, excluding government holidays.

[[Page 55157]]

    Participants who believe that they have a good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted by: (1) first class mail 
addressed to the Office of the Secretary of the Commission, U.S. 
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: 
Rulemaking and Adjudications Staff; or (2) courier, express mail, or 
expedited delivery service to the Office of the Secretary, Sixteenth 
Floor, One White Flint North, 11555 Rockville Pike, Rockville, 
Maryland, 20852, Attention: Rulemaking and Adjudications Staff. 
Participants filing a document in this manner are responsible for 
serving the document on all other participants. Filing is considered 
complete by first-class mail as of the time of deposit in the mail, or 
by courier, express mail, or expedited delivery service upon depositing 
the document with the provider of the service. A presiding officer, 
having granted an exemption request from using E-Filing, may require a 
participant or party to use E-Filing if the presiding officer 
subsequently determines that the reason for granting the exemption from 
use of E-Filing no longer exists.
    Documents submitted in adjudicatory proceedings will appear in 
NRC's electronic hearing docket which is available to the public at 
http://ehd1.nrc.gov/ehd/, unless excluded pursuant to an order of the 
Commission, or the presiding officer. Participants are requested not to 
include personal privacy information, such as social security numbers, 
home addresses, or home phone numbers in their filings, unless an NRC 
regulation or other law requires submission of such information. With 
respect to copyrighted works, except for limited excerpts that serve 
the purpose of the adjudicatory filings and would constitute a Fair Use 
application, participants are requested not to include copyrighted 
materials in their submission.
    If a person (other than DNC) requests a hearing, that person shall 
set forth with particularity the manner in which his interest is 
adversely affected by this Confirmatory Order and shall address the 
criteria set forth in 10 CFR 2.309(d) and (f).
    If a hearing is requested by a person whose interest is adversely 
affected, the Commission will issue an order designating the time and 
place of any hearing. If a hearing is held, the issue to be considered 
at such hearing shall be whether this Confirmatory Order should be 
sustained.
    In the absence of any request for hearing, or written approval of 
an extension of time in which to request a hearing, the provisions 
specified in Section IV above shall be final 30 days from the date of 
issuance without further order or proceedings. If an extension of time 
for requesting a hearing has been approved, the provisions specified in 
Section IV shall be final when the extension expires if a hearing 
request has not been received.

    Dated at Rockville, Maryland, this 26th day of August 2015.

 For the Nuclear Regulatory Commission.

Scott A. Morris,
Director, Division of Inspection and Regional Support, Office of 
Nuclear Reactor Regulation

[FR Doc. 2015-22951 Filed 9-11-15; 8:45 am]
BILLING CODE 7590-01-P



                                                                        Federal Register / Vol. 80, No. 177 / Monday, September 14, 2015 / Notices                                           55153

                                              management fee in these limited                         the following are examples of expenses                NUCLEAR REGULATORY
                                              circumstances, as appropriate,                          that are not appropriate uses of a                    COMMISSION
                                              recognizing that the awardee would                      management fee:
                                                                                                                                                            [Docket Nos. 50–336 and EA–13–188; NRC–
                                              only incur such expenses as a result of                                                                       2015–0217]
                                              its support of the NSF-funded activity.                 Æ Alcoholic beverages
                                                 Prior Approval of Management Fees—                   Æ Tickets to concerts, sporting and                   In the Matter of Dominion Nuclear
                                              A management fee proposal must be                         other events                                        Connecticut, Inc. (Millstone Power
                                              submitted to NSF that provides                          Æ Vacation or other travel for non-                   Station Unit 2)
                                              sufficient visibility into each expense
                                                                                                        business purposes                                   AGENCY:  Nuclear Regulatory
                                              category to identify its intended
                                              purpose. Agreement on management fee                    Æ Social or sporting club memberships                 Commission.
                                              amounts shall be completed and a                        Æ Meals or social activities for non-                 ACTION: Confirmatory order; issuance.
                                              specific dollar amount established prior                  business purposes
                                              to the initiation of work under an                                                                            SUMMARY:   The U.S. Nuclear Regulatory
                                                                                                      Æ Meals or social activities for business             Commission (NRC) and the Dominion
                                              award, or any subsequent period not
                                              authorized as part of the initial award.                  purposes that are so extravagant as to              Nuclear Connecticut, Inc. (DNC)
                                              Any amount negotiated shall be                            constitute entertainment                            engaged in mediation as part of the
                                              expressly set forth in the terms and                    Æ Luxury or personal items                            NRC’s Alternative Dispute Resolution
                                              conditions of the award. Awardees may                                                                         Program which resulted in a settlement
                                                                                                      Æ Lobbying as set forth at 2 CFR                      agreement as reflected in the
                                              draw down the management fee in                           200.450 and FAR 31.205–22, as
                                              proportion to the amount incurred                                                                             confirmatory order relating to Millstone
                                                                                                        appropriate to the recipient type                   Unit 2.
                                              during the performance period. Fee
                                              established for a period longer than one                  In addition, costs incurred under the               DATES: Effective Date: August 26, 2015.
                                              year shall be subject to adjustment in                  award that are otherwise allowable                    ADDRESSES: Please refer to Docket ID
                                              the event of a significant change to the                under the governing cost principles                   NRC–2015–0217 when contacting the
                                              budget or work scope.                                   must be classified as direct or indirect              NRC about the availability of
                                                 The following expense categories will                charges to the award and shall not be                 information regarding this document.
                                              be used in the negotiation and award of                 included as proposed management fee                   You may obtain publicly-available
                                              a management fee:                                       elements.                                             information related to this document
                                                 • Working capital necessary to fund                                                                        using any of the following methods:
                                              operations under an award—An amount                       Documentation Requirements on Use                      • Federal Rulemaking Web site: Go to
                                              for working capital may be necessary to                 of Management Fees—Even though the                    http://www.regulations.gov and search
                                              ensure a level of retained earnings                     management fee represents an amount                   for Docket ID NRC–2015–0217. Address
                                              available to the organization in order to               in excess of allowable cost and is                    questions about NRC dockets to Carol
                                              secure credit and borrowing to assure                   therefore not subject to the governing                Gallagher; telephone: 301–415–3463;
                                              the financial health of the organization.               cost principles, NSF, as a matter of                  email: Carol.Gallagher@nrc.gov. For
                                                 • Facilities capital necessary to                    policy, has determined that review of                 questions about this Order, contact the
                                              acquire assets for performance—An                       appropriate use of such funds is                      individual listed in the FOR FURTHER
                                              amount for facilities capital may be                    necessary. Information available on                   INFORMATION CONTACT section of this
                                              necessary to allow the organization to                  actual uses of management fee                         document.
                                              acquire major assets and to address                     previously awarded by NSF in the                         • NRC’s Agencywide Documents
                                              expenses that require immediate                         preceding five-year period under any                  Access and Management System
                                              substantive financial outlays but that are              award shall be included in the                        (ADAMS): You may obtain publicly-
                                              only reimbursed through depreciation                                                                          available documents online in the
                                                                                                      proposing organization’s fee proposal.
                                              or amortization over a period of years.                                                                       ADAMS Public Documents collection at
                                                                                                      As a term and condition of the award,
                                                 • Other ordinary and necessary                                                                             http://www.nrc.gov/reading-rm/
                                                                                                      the awardee will be required to provide               adams.html. To begin the search, select
                                              expenses for business operations that
                                              are not otherwise reimbursable under                    information (typically annually) on the               ‘‘ADAMS Public Documents’’ and then
                                              the governing cost principles—An                        actual use(s) of the management fee.                  select ‘‘Begin Web-based ADAMS
                                              amount for other expenses that are                      NSF will conduct reviews of this                      Search.’’ For problems with ADAMS,
                                              ordinary and necessary but not                          information regarding the extent to                   please contact the NRC’s Public
                                              otherwise reimbursable may be                           which the awardee fee proposals have                  Document Room (PDR) reference staff at
                                              necessary to provide a reasonable                       proven reliable when compared with                    1–800–397–4209, 301–415–4737, or by
                                              allowance for management initiative                     actual uses of management fee (both as                email to pdr.resource@nrc.gov. The
                                              and investments that will directly or                   to the fee amount as well as the planned              ADAMS accession number for each
                                              indirectly benefit the NSF-funded                       uses of the fee). Unexplained failure to              document referenced (if it available in
                                              activity. Inclusion of amounts under                    reasonably adhere to planned uses of fee              ADAMS) is provided the first time that
                                              this category warrants careful                          will result in reduction of future                    a document is referenced.
                                              consideration of the benefits that may be               management fee amounts under the                         • NRC’s PDR: You may examine and
                                              obtained when providing management                      award.                                                purchase copies of public documents at
                                              fee. Examples of potential appropriate                                                                        the NRC’s PDR, Room O1–F21, One
                                                                                                        Dated: September 9, 2015.                           White Flint North, 11555 Rockville
                                              needs include expenses related to
                                                                                                      Suzanne H. Plimpton,
tkelley on DSK3SPTVN1PROD with NOTICES




                                              contract terminations and losses, certain                                                                     Pike, Rockville, Maryland 20852.
                                              appropriate educational and public                      Reports Clearance Officer, National Science           FOR FURTHER INFORMATION CONTACT:
                                              outreach activities, and financial                      Foundation.                                           Richard Guzman, Office of Nuclear
                                              incentives to obtain and retain high                    [FR Doc. 2015–23015 Filed 9–11–15; 8:45 am]           Reactor Regulation, U.S. Nuclear
                                              caliber staff.                                          BILLING CODE 7555–01–P                                Regulatory Commission, Washington,
                                                 • Prohibited Use of Management                                                                             DC 20555–0001; telephone: 301–415–
                                              Fees—Although not an exhaustive list,                                                                         1030, email: Richard.Guzman@nrc.gov.


                                         VerDate Sep<11>2014   18:15 Sep 11, 2015   Jkt 235001   PO 00000   Frm 00072   Fmt 4703   Sfmt 4703   E:\FR\FM\14SEN1.SGM   14SEN1


                                              55154                     Federal Register / Vol. 80, No. 177 / Monday, September 14, 2015 / Notices

                                              SUPPLEMENTARY INFORMATION:             The text of      changes made by DNC to Section 14.6.1                 that this Confirmatory Order is to be
                                              the Order is attached.                                  of the Millstone Unit 2 Updated Final                 effective upon issuance and that it has
                                                Dated at Rockville, Maryland, this 3rd day            Safety Analysis Report (UFSAR) that                   waived its right to a hearing.
                                              of September 2015.                                      removed credit for the CVCS charging                     I find that the DNC’s commitments as
                                                For the Nuclear Regulatory Commission.                pump flow in the mitigation of the                    set forth in Section IV are acceptable
                                              Dave J. Vito,                                           design basis accident involving the                   and necessary and conclude that with
                                                                                                      inadvertent opening of pressurizer                    these commitments the plant’s safety is
                                              Acting Chief, Concerns Resolution Branch,
                                              Office of Enforcement.                                  power operated relief valves (PORVs),                 reasonably assured. In view of the
                                                                                                      without obtaining prior NRC approval.                 foregoing, I have determined that public
                                              UNITED STATES OF AMERICA                                The NRC found that willfulness was                    health and safety require that DNC’s
                                              NUCLEAR REGULATORY                                      associated with this apparent violation.              commitments be confirmed by this
                                              COMMISSION                                              DNC does not agree that willfulness was               Confirmatory Order. Based on the above
                                                                                                      associated with this apparent violation.              and DNC’s consent, this Confirmatory
                                                In the Matter of Dominion Nuclear                        The second AV involved the failure                 Order is effective upon issuance. By no
                                              Connecticut, Inc. (Millstone Power Station              by DNC to provide complete and
                                              Unit 2)
                                                                                                                                                            later than thirty (30) days after the
                                                                                                      accurate information to the NRC in                    completion of the commitments in
                                              Docket No. 50–336
                                                                                                      reports and other documents pertaining                Section IV, DNC is required to notify the
                                              License No. DPR–65
                                              EA–13–188                                               to the aforementioned UFSAR change,                   NRC in writing and summarize its
                                                                                                      including a failure to notify the                     actions.
                                              CONFIRMATORY ORDER                                      Commission of information having
                                              MODIFYING LICENSE                                       significant implications for public                   IV.
                                              (EFFECTIVE IMMEDIATELY)                                 health and safety. Willfulness was not                   Accordingly, pursuant to Sections
                                                                                                      associated with this apparent violation.              104b, 161b, 161i, 161o, 182 and 186 of
                                              I.                                                         The third AV involved changes made                 the Atomic Energy Act of 1954, as
                                                 Dominion Nuclear Connecticut, Inc.                   by DNC to Chapter 9 of the Millstone                  amended, and the Commission’s
                                              (DNC or Licensee) is the holder of                      Unit 2 UFSAR and Section 3/4.9.3 of the               regulations in 10 CFR 2.202 and 10 CFR
                                              Facility Operating License No. DPR–65                   Technical Specification Bases that                    part 50, IT IS HEREBY ORDERED THAT
                                              issued by the Nuclear Regulatory                        decreased the required amount of                      LICENSE NO. DPR–65 IS MODIFIED AS
                                              Commission (NRC or Commission)                          irradiated fuel decay time from 150 to                FOLLOWS:
                                              pursuant to Title 10 of the Code of                     100 hours prior to fuel movement in the                  Compliance.
                                              Federal Regulations (10 CFR) part 50 on                 reactor vessel, without obtaining prior                  1. Within sixty (60) calendar days of
                                              September 26, 1975. The license                         NRC approval. Willfulness was not                     the date of this Confirmatory Order,
                                              authorizes the operation of Millstone                   associated with this apparent violation.              DNC will:
                                              Power Station (Millstone) Unit 2 in                        In a letter dated April 29, 2015, the                 a. Revise, as necessary, Standing
                                              accordance with conditions specified                    NRC provided DNC the results of the                   Order 14–016 dated May 11, 2014, to
                                              therein. Millstone Power Station Unit 2                 investigation, informed DNC that                      incorporate applicable Millstone Unit 2
                                              is located in the vicinity of Waterford,                escalated enforcement action was being                Technical Specifications (TSs); limiting
                                              Connecticut.                                            considered for two of the three apparent              conditions of operations (LCOs);
                                                 This Confirmatory Order is the result                violations, and offered DNC the                       actions; and surveillances that reflect
                                              of an agreement reached during an                       opportunity to attend a predecisional                 the safety analysis of the inadvertent
                                              alternative dispute resolution (ADR)                    enforcement conference or to participate              opening of the PORVs prior to
                                              mediation process which included one                    in ADR in which a neutral mediator                    implementation of Amendment No. 283.
                                              meeting on July 14, 2015, and two                       with no decision-making authority                     This revision of the standing order will
                                              follow up teleconferences on July 16,                   would facilitate discussions between the              be made available for NRC review prior
                                              2015 and July 24, 2015.                                 NRC and DNC. The neutral mediator                     to implementation.
                                                                                                      would assist the NRC and DNC in                          b. Complete an operability evaluation
                                              II.                                                                                                           for the use of charging pumps in
                                                                                                      reaching an agreement, if possible. DNC
                                                 On May 23, 2013, the NRC’s Office of                 chose to participate in ADR. This                     accordance with Standing Order 14–
                                              Investigations (OI) completed an                        Confirmatory Order is issued pursuant                 016, as revised by paragraph 1.a.,
                                              investigation to determine if DNC staff                 to the agreement reached during the                   associated with the inadvertent opening
                                              at Millstone deliberately violated NRC                  ADR process.                                          of PORVs and make the operability
                                              requirements in section 50.59 of Title 10                                                                     evaluation available to NRC for review;
                                              of the Code of Federal Regulations (10                  III.                                                  and
                                              CFR), ‘‘Changes, Tests, and                                In response to the NRC’s offer, DNC                   c. Evaluate the effect of three pump
                                              Experiments,’’ when implementing                        requested use of the NRC ADR process                  charging pump operation (i.e., three
                                              changes to documents related to the                     to resolve differences it had with the                charging pumps auto start and provide
                                              Millstone Unit 2 chemical and volume                    NRC. During that ADR process, a                       flow) with the current plant
                                              control system (CVCS) charging pumps                    preliminary settlement agreement was                  configuration. If the evaluation
                                              and spent fuel decay time limits. The                   reached the terms of which are set forth              concludes no adverse effect, revised
                                              investigation also evaluated whether                    in Section IV below.                                  Standing Order 14–016 will be changed
                                              DNC staff deliberately submitted                           Based on those commitments, the                    to require that three charging pumps
                                              inaccurate and incomplete information                   NRC agreed not to take further                        auto start and provide flow. This
tkelley on DSK3SPTVN1PROD with NOTICES




                                              to the NRC pertaining to these changes.                 enforcement action on the three                       evaluation will be made available for
                                                 Based on the evidence developed                      apparent violations identified in the                 NRC review.
                                              during this investigation, the NRC                      NRC April 29, 2015, letter.                              2. By no later than February 15, 2016,
                                              concluded that three apparent violations                   On August 20, 2015, DNC consented                  DNC will submit a license amendment
                                              occurred, two of which were considered                  to issuing this Confirmatory Order with               request to the NRC addressing the use
                                              for escalated enforcement action. The                   the commitments, as described in                      of charging pumps in the analysis of the
                                              first apparent violation (AV) involved                  Section IV below. DNC further agreed                  inadvertent opening of PORVs. If DNC


                                         VerDate Sep<11>2014   18:15 Sep 11, 2015   Jkt 235001   PO 00000   Frm 00073   Fmt 4703   Sfmt 4703   E:\FR\FM\14SEN1.SGM   14SEN1


                                                                        Federal Register / Vol. 80, No. 177 / Monday, September 14, 2015 / Notices                                             55155

                                              does not submit a license amendment                     CFR 50.59 program and procedures                         c. For each population, the sampling
                                              request by February 15, 2016, the                       (including applicability, screening and               time period will begin in 2002 and end
                                              Millstone Unit 2 design and licensing                   evaluations) including a review of                    as of the date of this Confirmatory
                                              basis for the operation of charging                     procedures, implementation, initial                   Order.
                                              pumps to mitigate the inadvertent                       training, continuing training, and safety                d. DNC will enter any identified
                                              opening of PORVs that was in place                      review committee activities. A majority               deficiencies into DNC’s corrective
                                              prior to Amendment No. 283 (dated                       of the self-assessment team will be                   action program.
                                              September 9, 2004) will be reinstated by                comprised of a combination of non-                       e. Pursuant to Section 3.3 of the NRC
                                              this Confirmatory Order, and DNC will                   Dominion industry experts and peers.                  Enforcement Policy, the NRC will
                                              take all actions necessary to conform                   The assessment will also address the                  consider exercising enforcement
                                              Millstone Unit 2 to the reinstated design               Millstone Nuclear Oversight                           discretion to refrain from issuing a
                                              and licensing basis.                                    organization’s responsibilities and the               Notice of Violation or civil penalty for
                                                 3. DNC’s Standing Order 14–016 (Rev.                 effectiveness of the execution of those               any non-willful Severity Level II, III, or
                                              0, dated May 11, 2014), as revised in                   responsibilities regarding the 10 CFR                 IV violation identified as part of the
                                              accordance with paragraph 1 above, will                 50.59 program.                                        sampling program described above, if
                                              remain in place until the NRC makes a                      a. DNC shall make available to the                 the violation meets all of the following
                                              final determination on the license                      NRC, upon request, the results of the                 criteria:
                                              amendment request submitted under                       assessment and any corrective actions                    (1) the violation has the same or
                                              paragraph 2 above.                                      DNC will take to address the results.                 similar cause as the apparent violations
                                                 4. If the NRC denies the license                        b. DNC will complete corrective                    of 10 CFR 50.59 that are the subject of
                                              amendment request submitted under                       actions resulting from findings of the                this Confirmatory Order;
                                              paragraph 2 above, or the licensee                      assessment consistent with the                           (2) the violation is a newly-found
                                              withdraws the license amendment                         requirements of the Millstone Corrective              violation that occurred prior to issuance
                                              request, the Millstone Unit 2 design and                Action Program.                                       of this Confirmatory Order;
                                              licensing basis for the operation of                       9. DNC has conducted two apparent                     (3) the violation does not substantially
                                              charging pumps to mitigate the                          cause evaluations to address the issues               change the safety significance or the
                                              inadvertent opening of PORVs that was                   included in this Confirmatory Order.                  character of the regulatory concerns
                                              in place prior to implementation of                        a. The results of these evaluations will           arising out of the apparent violations
                                              Amendment No. 283 (dated September                      be made available to the NRC for                      that underlie this Confirmatory Order;
                                              9, 2004) will be reinstated by this                     review.                                               and
                                              Confirmatory Order, and DNC will take                      10. By no later than March 1, 2016,                   (4) the violation is corrected, by both
                                              all actions necessary to conform                        DNC will complete a common cause                      immediate corrective action(s) and long-
                                              Millstone Unit 2 to the reinstated design               evaluation of 10 CFR 50.59 issues that                term comprehensive corrective
                                              and licensing basis.                                    have been identified after July 1, 2012,              action(s), within a reasonable time
                                                 5. By no later than February 15, 2016,               with emphasis on any underlying                       following identification.
                                              DNC will submit a license amendment                     culture-related issues that specifically                 f. The NRC will also consider
                                              request seeking NRC approval of the                     may exist in the Millstone Power                      discretion for any DNC-identified
                                              spent fuel pool heat load analysis and                  Station Engineering and Licensing                     performance deficiencies that meet the
                                              any associated technical specification                  groups and the Facility Safety Review                 criteria listed in paragraph 11.e and are
                                              changes. This will be treated as a high                 Committee. The team will include a                    categorized as a Green or White finding
                                              priority review by the NRC.                             member trained in cultural issues.                    under the NRC’s Reactor Oversight
                                                 6. DNC’s Standing Order 14–021 (Rev.                 Interviews of a sample of the staff                   Program.
                                              0 dated July 9, 2014) will remain in                    members from the above groups will be                    Communication.
                                              place until the NRC makes a final                       included in the evaluation. In regard to                 12. By no later than thirty (30)
                                              determination on the license                            this evaluation, DNC shall:                           calendar days after the issuance of this
                                              amendment request submitted under                          a. Make the results of the evaluation              Confirmatory Order, DNC’s Chief
                                              paragraph 5 above.                                      available to the NRC.                                 Nuclear Officer will issue a fleet-wide
                                                 7. If the NRC denies the license                        b. Communicate to Millstone Power                  communication (written or recorded) to
                                              amendment request submitted under                       Station employees the results of the                  reinforce the importance of providing
                                              paragraph 5 above, or the licensee                      evaluation within three (3) months of                 complete and accurate information to
                                              withdraws the license amendment                         receiving the evaluation results.                     the NRC, including requirements for
                                              request, TS 3/4.9.3.1 in the Millstone                     c. Review the results of the common                updating out-of-date information, and
                                              Unit 2 license will be revised by this                  cause evaluation and initiate corrective              the potential consequences of a failure
                                              Confirmatory Order to require 150 hours                 actions as appropriate within 30 days of              to comply with these requirements. The
                                              of decay time before moving irradiated                  receiving evaluation results.                         communication, whether written or
                                              fuel from the reactor to the spent fuel                    Extent of Condition.                               recorded, and any associated materials
                                              pool, and changes made by Licensing                        11. By no later than June 30, 2016,                or references, will be made available to
                                              Basis Document Change Request 10–                       DNC will complete a formal sampling                   the NRC.
                                              MP2–007 (dated June 22, 2010) to                        program, using MIL Standard 105 or                       13. By no later than December 31,
                                              Chapter 9 of the Millstone Unit 2                       similar, of products (applicability                   2016, DNC will provide a presentation
                                              UFSAR and to the TS Bases will be                       determinations, screenings, and                       at an industry forum to discuss the
                                              replaced by the prior content of those                  evaluations) completed using the DNC                  events that led to this Confirmatory
tkelley on DSK3SPTVN1PROD with NOTICES




                                              documents. DNC will take all actions                    10 CFR 50.59 programs and procedures.                 Order, the lessons learned, and actions
                                              necessary to conform Millstone Unit 2                      a. The reviewers conducting the                    taken. The presentation and any
                                              to the requirements of the revised TS                   sampling program will be third party                  associated material will be made
                                              and UFSAR.                                              independent reviewers.                                available to the NRC.
                                                 Assessment.                                             b. Applicability determinations,                      Training.
                                                 8. By no later than June 30, 2016, DNC               screenings, and evaluations will be                      14. DNC will review its plant access
                                              will complete a self-assessment of its 10               sampled as separate populations.                      training and revise it as necessary to


                                         VerDate Sep<11>2014   18:15 Sep 11, 2015   Jkt 235001   PO 00000   Frm 00074   Fmt 4703   Sfmt 4703   E:\FR\FM\14SEN1.SGM   14SEN1


                                              55156                     Federal Register / Vol. 80, No. 177 / Monday, September 14, 2015 / Notices

                                              ensure that it includes training on                     V.                                                    site-help/e-submittals.html. Participants
                                              compliance with NRC requirements,                          Any person adversely affected by this              may attempt to use other software not
                                              including, but not limited to, 10 CFR                   Confirmatory Order, other than DNC,                   listed on the Web site, but should note
                                              50.5 and 50.9. Any revisions will be                    may request a hearing within 30 days of               that the NRC’s E-Filing system does not
                                              made available to the NRC.                              issuance. Where good cause is shown,                  support unlisted software, and the NRC
                                                 15. Notwithstanding that NRC and                     consideration will be given to extending              Meta System Help Desk will not be able
                                              DNC disagree about whether a willful                    the time to request a hearing. A request              to offer assistance in using unlisted
                                              violation occurred, DNC will develop                    for extension of time must be made in                 software.
                                              and provide focused training to                         writing to the Director, Office of                       If a participant is electronically
                                              Dominion corporate Engineering and                      Enforcement, U.S. Nuclear Regulatory                  submitting a document to the NRC in
                                              Licensing personnel who perform work                    Commission, Washington, DC 20555,                     accordance with the E-Filing rule, the
                                              for Millstone and to DNC Engineering                    and include a statement of good cause                 participant must file the document
                                              and Licensing personnel, to ensure                      for the extension.                                    using the NRC’s online, Web-based
                                              awareness of the importance of                             All documents filed in NRC                         submission form. Further information
                                              complying with regulatory                               adjudicatory proceedings, including a                 on the Web-based submission form is
                                              requirements, and the potential                         request for hearing, a petition for leave             available on the NRC’s public Web site
                                              consequences of a failure to comply,                    to intervene, any motion or other                     at http://www.nrc.gov/site-help/e-
                                              including what constitutes a willful                    document filed in the proceeding prior                submittals.html.
                                              violation of NRC requirements. DNC                      to the submission of a request for                       Once a participant has obtained a
                                              will provide this training by April 1,                  hearing or petition to intervene, and                 digital ID certificate and a docket has
                                              2016, and will repeat it 12 months after                documents filed by interested                         been created, the participant can then
                                              the initial training session. The training              governmental entities participating                   submit a request for hearing or petition
                                              and any associated training materials                   under 10 CFR 2.315(c), must be filed in               for leave to intervene. Submissions
                                              will be made available to the NRC.                      accordance with the NRC E-Filing rule                 should be in Portable Document Format
                                                                                                      (72 FR 49139, August 28, 2007). The E-                (PDF) in accordance with NRC guidance
                                                 16. DNC will develop and provide
                                                                                                      Filing process requires participants to               available on the NRC public Web site at
                                              focused training to Dominion corporate
                                                                                                      submit and serve all adjudicatory                     http://www.nrc.gov/site-help/e-
                                              Engineering and Licensing personnel
                                                                                                      documents over the internet, or in some               submittals.html. A filing is considered
                                              performing work for Millstone and to
                                                                                                      cases to mail copies on electronic                    complete at the time the documents are
                                              DNC Engineering and Licensing
                                                                                                      storage media. Participants may not                   submitted through the NRC’s E-Filing
                                              personnel, covering the requirements of
                                                                                                      submit paper copies of their filings                  system. To be timely, an electronic
                                              10 CFR 50.9, emphasizing the
                                                                                                      unless they seek an exemption in                      filing must be submitted to the E-Filing
                                              importance of providing complete and
                                                                                                      accordance with the procedures                        system no later than 11:59 p.m. Eastern
                                              accurate information to the NRC and of
                                                                                                      described below.                                      Time on the due date. Upon receipt of
                                              informing the NRC promptly upon
                                                                                                         To comply with the procedural                      a transmission, the E-Filing system
                                              discovery of inaccurate information or
                                                                                                      requirements of E-Filing, at least ten                time-stamps the document and sends
                                              omissions associated with pending NRC
                                                                                                      (10) days prior to the filing deadline, the           the submitter an email notice
                                              licensing actions or other information
                                                                                                      participant should contact the Office of              confirming receipt of the document. The
                                              submitted to the NRC. DNC will provide
                                                                                                      the Secretary by email at                             E-Filing system also distributes an email
                                              this training by April 1, 2016. The
                                                                                                      hearing.docket@nrc.gov, or by telephone               notice that provides access to the
                                              training and any associated training
                                                                                                      at 301–415–1677, to (1) request a digital             document to the NRC Office of the
                                              materials will be made available to the
                                                                                                      ID certificate, which allows the                      General Counsel and any others who
                                              NRC.
                                                                                                      participant (or its counsel or                        have advised the Office of the Secretary
                                                 Other Considerations.                                representative) to digitally sign                     that they wish to participate in the
                                                 17. The NRC agrees not to pursue any                 documents and access the E-Submittal                  proceeding, so that the filer need not
                                              further enforcement action relating to                  server for any proceeding in which it is              serve the documents on those
                                              the notice of apparent violations (Case                 participating; and (2) advise the                     participants separately. Therefore,
                                              no. EA–13–188, Inspection Report                        Secretary that the participant will be                applicants and other participants (or
                                              05000336/2015201, Office of                             submitting a request or petition for                  their counsel or representative) must
                                              Investigations Report No. 1–2012–008),                  hearing (even in instances in which the               apply for and receive a digital ID
                                              dated April 29, 2015.                                   participant, or its counsel or                        certificate before a hearing request/
                                                                                                      representative, already holds an NRC-                 petition to intervene is filed so that they
                                                 18. This Confirmatory Order will not
                                                                                                      issued digital ID certificate). Based upon            can obtain access to the document via
                                              be considered an escalated enforcement
                                                                                                      this information, the Secretary will                  the E-Filing system.
                                              action by the NRC for future assessment
                                              of violations occurring at Millstone                    establish an electronic docket for the                   A person filing electronically using
                                              Power Station Unit 2.                                   hearing in this proceeding if the                     the agency’s adjudicatory E-Filing
                                                                                                      Secretary has not already established an              system may seek assistance by
                                                 19. In the event of the transfer of the              electronic docket.                                    contacting the NRC Electronic Filing
                                              operating license of Millstone Power                       Information about applying for a                   Help Desk through the ‘‘Contact Us’’
                                              Station Unit 2 to another entity, the                   digital ID certificate is available on                link located on the NRC Web site at
                                              commitments hereunder shall survive                     NRC’s public Web site at http://                      http://www.nrc.gov/site-help/e-
                                              any transfer of ownership and will be
tkelley on DSK3SPTVN1PROD with NOTICES




                                                                                                      www.nrc.gov/site-help/e-submittals/                   submittals.html, by email at
                                              binding on the new licensee.                            apply-certificates.html. System                       MSHD.Resource@nrc.gov, or by a toll-
                                                 The Director, Office of Enforcement,                 requirements for accessing the E-                     free call at (866) 672–7640. The NRC
                                              may, in writing, relax or rescind any of                Submittal server are detailed in NRC’s                Electronic Filing Help Desk is available
                                              the above conditions upon                               ‘‘Guidance for Electronic Submission,’’               between 8 a.m. and 8 p.m., Eastern
                                              demonstration by the Licensee of good                   which is available on the agency’s                    Time, Monday through Friday,
                                              cause.                                                  public Web site at http://www.nrc.gov/                excluding government holidays.


                                         VerDate Sep<11>2014   18:15 Sep 11, 2015   Jkt 235001   PO 00000   Frm 00075   Fmt 4703   Sfmt 4703   E:\FR\FM\14SEN1.SGM   14SEN1


                                                                        Federal Register / Vol. 80, No. 177 / Monday, September 14, 2015 / Notices                                           55157

                                                 Participants who believe that they                   be considered at such hearing shall be                    and Low-Level Waste and Spent
                                              have a good cause for not submitting                    whether this Confirmatory Order should                    Fuel Storage and Transportation
                                              documents electronically must file an                   be sustained.                                             Business Lines (Public Meeting);
                                              exemption request, in accordance with                     In the absence of any request for                       (Contact: Damaris Marcano: 301–
                                              10 CFR 2.302(g), with their initial paper               hearing, or written approval of an                        415–7328).
                                              filing requesting authorization to                      extension of time in which to request a                 This meeting will be webcast live at
                                              continue to submit documents in paper                   hearing, the provisions specified in                  the Web address—http://www.nrc.gov/.
                                              format. Such filings must be submitted                  Section IV above shall be final 30 days
                                              by: (1) first class mail addressed to the               from the date of issuance without                     Week of October 5, 2015—Tentative
                                              Office of the Secretary of the                          further order or proceedings. If an
                                                                                                                                                              There are no meetings scheduled for
                                              Commission, U.S. Nuclear Regulatory                     extension of time for requesting a
                                                                                                                                                            the week of October 5, 2015.
                                              Commission, Washington, DC 20555–                       hearing has been approved, the
                                              0001, Attention: Rulemaking and                         provisions specified in Section IV shall              Week of October 12, 2015—Tentative
                                              Adjudications Staff; or (2) courier,                    be final when the extension expires if a
                                                                                                                                                              There are no meetings scheduled for
                                              express mail, or expedited delivery                     hearing request has not been received.
                                                                                                                                                            the week of October 12, 2015.
                                              service to the Office of the Secretary,                   Dated at Rockville, Maryland, this 26th day
                                              Sixteenth Floor, One White Flint North,                 of August 2015.                                       Week of October 19, 2015—Tentative
                                              11555 Rockville Pike, Rockville,                         For the Nuclear Regulatory Commission.
                                              Maryland, 20852, Attention:                                                                                   Monday, October 19, 2015
                                                                                                      Scott A. Morris,
                                              Rulemaking and Adjudications Staff.                     Director, Division of Inspection and Regional         9:30 a.m. Briefing on Security Issues
                                              Participants filing a document in this                  Support, Office of Nuclear Reactor                        (Closed—Ex. 1).
                                              manner are responsible for serving the                  Regulation
                                              document on all other participants.                                                                           Wednesday, October 21, 2015
                                                                                                      [FR Doc. 2015–22951 Filed 9–11–15; 8:45 am]
                                              Filing is considered complete by first-                 BILLING CODE 7590–01–P                                9:00 a.m. Joint Meeting of the Federal
                                              class mail as of the time of deposit in                                                                            Energy Regulatory Commission and
                                              the mail, or by courier, express mail, or                                                                          the Nuclear Regulatory Commission
                                              expedited delivery service upon                         NUCLEAR REGULATORY                                         (Public Meeting); (Contact: Tania
                                              depositing the document with the                        COMMISSION                                                 Martinez-Navedo: 301–415–6561).
                                              provider of the service. A presiding                                                                          *      *     *    *      *
                                              officer, having granted an exemption                    [NRC–2015–0001]
                                                                                                                                                               The schedule for Commission
                                              request from using E-Filing, may require
                                                                                                      Sunshine Act Meeting Notice                           meetings is subject to change on short
                                              a participant or party to use E-Filing if
                                              the presiding officer subsequently                                                                            notice. For more information or to verify
                                                                                                      DATE: September 14, 21, 28, October 5,                the status of meetings, contact Glenn
                                              determines that the reason for granting                 12, 19, 2015.
                                              the exemption from use of E-Filing no                                                                         Ellmers at 301–415–0442 or via email at
                                                                                                      PLACE: Commissioners’ Conference                      Glenn.Ellmers@nrc.gov.
                                              longer exists.                                          Room, 11555 Rockville Pike, Rockville,
                                                 Documents submitted in adjudicatory                                                                        *      *     *    *      *
                                                                                                      Maryland.
                                              proceedings will appear in NRC’s                                                                                 The NRC Commission Meeting
                                                                                                      STATUS: Public and Closed.
                                              electronic hearing docket which is                                                                            Schedule can be found on the Internet
                                              available to the public at http://                      Week of September 14, 2015                            at: http://www.nrc.gov/public-involve/
                                              ehd1.nrc.gov/ehd/, unless excluded                        There are no meetings scheduled for                 public-meetings/schedule.html.
                                              pursuant to an order of the Commission,                 the week of September 14, 2015.                       *      *     *    *      *
                                              or the presiding officer. Participants are                                                                       The NRC provides reasonable
                                              requested not to include personal                       Week of September 21, 2015—Tentative
                                                                                                                                                            accommodation to individuals with
                                              privacy information, such as social                     Tuesday, September 22, 2015                           disabilities where appropriate. If you
                                              security numbers, home addresses, or                                                                          need a reasonable accommodation to
                                              home phone numbers in their filings,                    9:30 a.m. Discussion of Management
                                                                                                          and Personnel Issues (Closed—Ex. 2                participate in these public meetings, or
                                              unless an NRC regulation or other law                                                                         need this meeting notice or the
                                              requires submission of such                                 & 6).
                                                                                                                                                            transcript or other information from the
                                              information. With respect to                            Thursday, September 24, 2015                          public meetings in another format (e.g.
                                              copyrighted works, except for limited                                                                         braille, large print), please notify
                                              excerpts that serve the purpose of the                  9:30 a.m. Strategic Programmatic
                                                                                                          Overview of the New Reactors                      Kimberly Meyer, NRC Disability
                                              adjudicatory filings and would
                                                                                                          Business Line (Public Meeting);                   Program Manager, at 301–287–0727, by
                                              constitute a Fair Use application,
                                                                                                          (Contact: Donna Williams: 301–                    videophone at 240–428–3217, or by
                                              participants are requested not to include
                                                                                                          415–1322).                                        email at Kimberly.Meyer-Chambers@
                                              copyrighted materials in their
                                                                                                        This meeting will be webcast live at                nrc.gov. Determinations on requests for
                                              submission.
                                                 If a person (other than DNC) requests                the Web address—http://www.nrc.gov/.                  reasonable accommodation will be
                                              a hearing, that person shall set forth                                                                        made on a case-by-case basis.
                                                                                                      Week of September 28, 2015—Tentative
                                              with particularity the manner in which                                                                        *      *     *    *      *
                                              his interest is adversely affected by this              Monday, September 28, 2015                               Members of the public may request to
                                              Confirmatory Order and shall address                    1:30 p.m. NRC All Employees Meeting                   receive this information electronically.
tkelley on DSK3SPTVN1PROD with NOTICES




                                              the criteria set forth in 10 CFR 2.309(d)                   (Public Meeting), Marriott Bethesda               If you would like to be added to the
                                              and (f).                                                    North Hotel, 5701 Marinelli Road,                 distribution, please contact the Nuclear
                                                 If a hearing is requested by a person                    Rockville, MD 20852.                              Regulatory Commission, Office of the
                                              whose interest is adversely affected, the                                                                     Secretary, Washington, DC 20555 (301–
                                              Commission will issue an order                          Thursday, October 1, 2015                             415–1969), or email
                                              designating the time and place of any                   9:00 a.m. Strategic Programmatic                      Brenda.Akstulewicz@nrc.gov or
                                              hearing. If a hearing is held, the issue to                 Overview of the Decommissioning                   Patricia.Jimenez@nrc.gov.


                                         VerDate Sep<11>2014   18:15 Sep 11, 2015   Jkt 235001   PO 00000   Frm 00076   Fmt 4703   Sfmt 4703   E:\FR\FM\14SEN1.SGM   14SEN1



Document Created: 2018-02-26 10:15:00
Document Modified: 2018-02-26 10:15:00
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionConfirmatory order; issuance.
DatesEffective Date: August 26, 2015.
ContactRichard Guzman, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-1030, email: [email protected]
FR Citation80 FR 55153 