The Coast Guard has issued a temporary deviation from the operating schedule that governs the Burlington Northern Santa Fe (BNSF) Railway Bridge across the Snake River, mile 1.5, at Burbank, WA. The deviation is necessary to accommodate maintenance to replace movable rail joints. This deviation allows the bridge to remain in the closed- to-navigation position during maintenance activities.

Federal Register, Volume 80 Issue 178 (Tuesday, September 15, 2015)
[Federal Register Volume 80, Number 178 (Tuesday, September 15, 2015)]
[Rules and Regulations]
[Pages 55256-55257]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-23141]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2015-0873]


Drawbridge Operation Regulation; Snake River, Burbank, WA

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulation.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the Burlington Northern Santa Fe (BNSF) 
Railway Bridge across the Snake River, mile 1.5, at Burbank, WA. The 
deviation is necessary to accommodate maintenance to replace movable 
rail joints. This deviation allows the bridge to remain in the closed-
to-navigation position during maintenance activities.

DATES: This deviation is effective from 7 a.m. on September 28, 2015 
until 7 p.m. on October 1, 2015.

ADDRESSES: The docket for this deviation, [USCG-2015-0873] is available 
at http://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH.'' Click on Open Docket Folder on the line 
associated with this deviation. You may also visit the Docket 
Management Facility in Room W12-140 on the ground floor of the 
Department of Transportation West Building, 1200 New Jersey Avenue SE., 
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, 
except Federal holidays.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email Mr. Steven Fischer, Bridge 
Administrator, Thirteenth Coast Guard District; telephone 206-220-7282, 
email [email protected]. If you have questions on viewing the 
docket, call Cheryl Collins, Program Manager, Docket Operations, 
telephone 202-366-9826.

SUPPLEMENTARY INFORMATION: BNSF has requested that the BNSF Snake River 
Bridge across the Snake River, mile 1.5, remain in the closed-to-
navigation position to vessel traffic to perform railroad bridge 
maintenance. During this maintenance period, movable rail joints will 
be replaced at both ends of the lift span. The BNSF Snake River Bridge, 
mile 1.5, provides 14.1 feet of vertical clearance above Columbia River 
Datum 0.0 while in the closed position. The normal operating schedule 
for the BNSF Snake River Bridge 3.08 operates in accordance with 33 CFR 
117.1058, and is automated and is normally maintained in the fully 
open-to-navigation position.
    The deviation allows the lift span of the BNSF Snake River Bridge 
across the Snake River, mile 1.5, to remain in the closed-to-navigation 
position, and need not open for maritime traffic from 7 a.m. to 3 p.m. 
on September 28, 2015; from 7 a.m. to 7 p.m. on September 29, 2015; 
from 7 a.m. to 3 p.m. on September 30, 2015; and from 7 a.m. to 7 p.m. 
on October 1, 2015. During the active maintenance, BNSF will lower the 
lift span in closed-to-navigation position. Waterway usage on this part 
of the

[[Page 55257]]

Snake River includes vessels ranging from commercial tug and tow 
vessels to recreational pleasure craft including cabin cruisers and 
sailing vessels.
    Vessels able to pass through the bridge in the closed-to-navigation 
position may do so at any time. The span will be able to open for 
maritime emergencies, but any time lost to emergency openings will 
necessitate a time extension added to the approved dates. No immediate 
alternate route for vessels to pass is available on this part of the 
river. The Coast Guard will also inform the users of the waterways 
through our Local and Broadcast Notices to Mariners of the change in 
operating schedule for the bridge so that vessels can arrange their 
transits to minimize any impact caused by the temporary deviation.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the designated 
time period. This deviation from the operating regulations is 
authorized under 33 CFR 117.35.

    Dated: September 8, 2015.
Steven M. Fischer,
Bridge Administrator, Thirteenth Coast Guard District.
[FR Doc. 2015-23141 Filed 9-14-15; 8:45 am]
 BILLING CODE 9110-04-P



                                                55256            Federal Register / Vol. 80, No. 178 / Tuesday, September 15, 2015 / Rules and Regulations

                                                   (2) Changing type of coverage.                         (5) Periodic revision. Periodically,                Northern Santa Fe (BNSF) Railway
                                                Procedures may be established for                       certain features, rules or procedures of              Bridge across the Snake River, mile 1.5,
                                                TRICARE Reserve Select members to                       TRICARE Reserve Select may be                         at Burbank, WA. The deviation is
                                                request to change type of coverage                      revised. If such revisions will have a                necessary to accommodate maintenance
                                                during open enrollment as described in                  significant effect on members’ or                     to replace movable rail joints. This
                                                paragraph (d)(1)(iii) of this section or on             survivors’ costs or access to care,                   deviation allows the bridge to remain in
                                                the occasion of a qualifying life event                 members or survivors may be given the                 the closed-to-navigation position during
                                                that changes immediate family                           opportunity to change their type of                   maintenance activities.
                                                composition as described in paragraph                   coverage or terminate coverage                        DATES: This deviation is effective from
                                                (d)(1)(ii) of this section by submitting a              coincident with the revisions.                        7 a.m. on September 28, 2015 until 7
                                                completed request in the appropriate                    *     *      *    *     *                             p.m. on October 1, 2015.
                                                format.                                                   (f) Administration. The Director,                   ADDRESSES: The docket for this
                                                   (3) Suspension and termination.                      Healthcare Operations in the Defense                  deviation, [USCG–2015–0873] is
                                                Suspension/termination of coverage for                  Health Agency may establish other rules               available at http://www.regulations.gov.
                                                the TRS member/survivor will result in                  and procedures for the effective                      Type the docket number in the
                                                suspension/termination of coverage for                  administration of TRICARE Reserve                     ‘‘SEARCH’’ box and click ‘‘SEARCH.’’
                                                the member’s/survivor’s family                          Select, and may authorize exceptions to               Click on Open Docket Folder on the line
                                                members in TRICARE Reserve Select,                      requirements of this section, if                      associated with this deviation. You may
                                                except as described in paragraph                        permitted by law.                                     also visit the Docket Management
                                                (d)(1)(iv) of this section. Procedures may                (g) Terminology. The following terms                Facility in Room W12–140 on the
                                                be established for coverage to be                       are applicable to the TRICARE Reserve                 ground floor of the Department of
                                                suspended or terminated as follows.                     Select program.                                       Transportation West Building, 1200
                                                   (i) Coverage shall terminate when                      (1) Coverage. This term means the                   New Jersey Avenue SE., Washington,
                                                members or survivors no longer qualify                  medical benefits covered under the                    DC 20590, between 9 a.m. and 5 p.m.,
                                                for TRICARE Reserve Select as specified                 TRICARE Standard or Extra programs as                 Monday through Friday, except Federal
                                                in paragraph (b) of this section, with one              further outlined in other sections of 32              holidays.
                                                exception. If a member is involuntarily                 CFR part 199 whether delivered in                     FOR FURTHER INFORMATION CONTACT: If
                                                separated from the Selected Reserve                     military treatment facilities or                      you have questions on this temporary
                                                under other than adverse conditions, as                 purchased from civilian sources.                      deviation, call or email Mr. Steven
                                                characterized by the Secretary                            (2) Immediate family member. This                   Fischer, Bridge Administrator,
                                                concerned, and is covered by TRICARE                    term means spouse (except former                      Thirteenth Coast Guard District;
                                                Reserve Select on the last day of his or                spouses) as defined in § 199.3(b)(2)(i), or           telephone 206–220–7282, email d13-pf-
                                                her membership in the Selected                          child as defined in § 199.3(b)(2)(ii).                d13bridges@uscg.mil. If you have
                                                Reserve, then TRICARE Reserve Select                      (3) Qualified member. This term                     questions on viewing the docket, call
                                                coverage may terminate up to 180 days                   means a member who has satisfied all                  Cheryl Collins, Program Manager,
                                                after the date on which the member was                  the criteria that must be met before the              Docket Operations, telephone 202–366–
                                                separated from the Selected Reserve.                    member is authorized for TRS coverage.                9826.
                                                This applies regardless of type of                        (4) Qualified survivor. This term                   SUPPLEMENTARY INFORMATION: BNSF has
                                                coverage. This exception expires                        means an immediate family member                      requested that the BNSF Snake River
                                                December 31, 2018.                                      who has satisfied all the criteria that               Bridge across the Snake River, mile 1.5,
                                                   (ii) Coverage may terminate for                      must be met before the survivor is                    remain in the closed-to-navigation
                                                members, former members, and                            authorized for TRS coverage.                          position to vessel traffic to perform
                                                survivors who gain coverage under                         Dated: September 4, 2015.                           railroad bridge maintenance. During this
                                                another TRICARE program.                                Aaron Siegel,                                         maintenance period, movable rail joints
                                                   (iii) Coverage may be suspended and                  Alternate OSD Federal Register Liaison                will be replaced at both ends of the lift
                                                finally terminated for members/                         Officer, Department of Defense.                       span. The BNSF Snake River Bridge,
                                                survivors who fail to make premium                      [FR Doc. 2015–22815 Filed 9–14–15; 8:45 am]           mile 1.5, provides 14.1 feet of vertical
                                                payments in accordance with                                                                                   clearance above Columbia River Datum
                                                                                                        BILLING CODE 5001–06–P
                                                established procedures.                                                                                       0.0 while in the closed position. The
                                                   (iv) Coverage may be suspended and                                                                         normal operating schedule for the BNSF
                                                finally terminated for members/                                                                               Snake River Bridge 3.08 operates in
                                                survivors upon request at any time by                   DEPARTMENT OF HOMELAND
                                                                                                        SECURITY                                              accordance with 33 CFR 117.1058, and
                                                submitting a completed request in the                                                                         is automated and is normally
                                                appropriate format in accordance with                   Coast Guard                                           maintained in the fully open-to-
                                                established procedures.                                                                                       navigation position.
                                                   (v) Under paragraph (d)(3)(iii) or (iv)              33 CFR Part 117                                          The deviation allows the lift span of
                                                of this section, TRICARE Reserve Select                                                                       the BNSF Snake River Bridge across the
                                                coverage may first be suspended for a                   [Docket No. USCG–2015–0873]                           Snake River, mile 1.5, to remain in the
                                                period of up to one year followed by                                                                          closed-to-navigation position, and need
                                                final termination. Procedures may be                    Drawbridge Operation Regulation;                      not open for maritime traffic from 7 a.m.
                                                established for the suspension to be                    Snake River, Burbank, WA                              to 3 p.m. on September 28, 2015; from
mstockstill on DSK4VPTVN1PROD with RULES




                                                lifted upon request before final                        AGENCY: Coast Guard, DHS.                             7 a.m. to 7 p.m. on September 29, 2015;
                                                termination is applied.                                 ACTION:Notice of deviation from                       from 7 a.m. to 3 p.m. on September 30,
                                                   (4) Processing. Upon receipt of a                    drawbridge regulation.                                2015; and from 7 a.m. to 7 p.m. on
                                                completed request in the appropriate                                                                          October 1, 2015. During the active
                                                format, enrollment actions will be                      SUMMARY:  The Coast Guard has issued a                maintenance, BNSF will lower the lift
                                                processed into DEERS in accordance                      temporary deviation from the operating                span in closed-to-navigation position.
                                                with established procedures.                            schedule that governs the Burlington                  Waterway usage on this part of the


                                           VerDate Sep<11>2014   19:08 Sep 14, 2015   Jkt 235001   PO 00000   Frm 00036   Fmt 4700   Sfmt 4700   E:\FR\FM\15SER1.SGM   15SER1


                                                                 Federal Register / Vol. 80, No. 178 / Tuesday, September 15, 2015 / Rules and Regulations                                      55257

                                                Snake River includes vessels ranging                    ADDRESSES:   Documents mentioned in                   Skanska-Koch Inc. and Kiewit
                                                from commercial tug and tow vessels to                  this preamble are part of docket [USCG–               Infrastructure for this project.
                                                recreational pleasure craft including                   2014–0002]. To view documents                            Construction operations are sensitive
                                                cabin cruisers and sailing vessels.                     mentioned in this preamble as being                   to water movement, and wake from
                                                   Vessels able to pass through the                     available in the docket, go to http://                passing vessels could pose significant
                                                bridge in the closed-to-navigation                      www.regulations.gov, type the docket                  risk of injury or death to construction
                                                position may do so at any time. The                     number in the ‘‘SEARCH’’ box and click                workers. In order to minimize such
                                                span will be able to open for maritime                  ‘‘SEARCH.’’ Click on Open Docket                      unexpected or uncontrolled movement
                                                emergencies, but any time lost to                       Folder on the line associated with this               of water, the RNA will limit vessel
                                                emergency openings will necessitate a                   rulemaking. You may also visit the                    speed and wake of all vessels operating
                                                time extension added to the approved                    Docket Management Facility in Room                    in the vicinity of the bridge construction
                                                dates. No immediate alternate route for                 W12–140 on the ground floor of the                    zone. This will be achieved by
                                                vessels to pass is available on this part               Department of Transportation West                     implementing a five (5) knot speed limit
                                                of the river. The Coast Guard will also                 Building, 1200 New Jersey Avenue SE.,                 and ‘‘NO WAKE’’ zone in the vicinity of
                                                inform the users of the waterways                       Washington, DC 20590, between 9 a.m.                  the construction as well as providing a
                                                through our Local and Broadcast                         and 5 p.m., Monday through Friday,                    means to suspend all vessel traffic for
                                                Notices to Mariners of the change in                    except Federal holidays.                              emergent situations that pose imminent
                                                operating schedule for the bridge so that               FOR FURTHER INFORMATION CONTACT: If
                                                                                                                                                              threat to waterway users in the area.
                                                vessels can arrange their transits to                                                                            After consulting with PANYNJ,
                                                                                                        you have questions on this rule, contact
                                                minimize any impact caused by the                                                                             Skanska-Koch Inc., and Kiewit
                                                                                                        BMC Craig Lapiejko, Coast Guard First
                                                temporary deviation.                                                                                          Infrastructure, the Coast Guard has
                                                                                                        District Waterways Management
                                                   In accordance with 33 CFR 117.35(e),                                                                       determined that certain aspects of the
                                                                                                        Branch, telephone (617) 223–8381,
                                                the drawbridge must return to its regular                                                                     construction project can only be
                                                                                                        email craig.d.lapiejko@uscg.mil; or Mr.
                                                operating schedule immediately at the                                                                         completed in the channel and will
                                                                                                        Jeff Yunker, Coast Guard Sector New
                                                end of the designated time period. This                                                                       require closing the waterway. For
                                                                                                        York Waterways Management Division,
                                                deviation from the operating regulations                                                                      instance, barges are expected to be used
                                                                                                        U.S. Coast Guard; telephone 718–354–
                                                is authorized under 33 CFR 117.35.                                                                            at times while portions of the bridge are
                                                                                                        4195, email jeff.m.yunker@uscg.mil. If
                                                                                                                                                              being raised and the barges’ presence
                                                  Dated: September 8, 2015.                             you have questions on viewing or
                                                                                                                                                              might limit maneuverability in the
                                                Steven M. Fischer,                                      submitting material to the docket, call
                                                                                                                                                              waterway. Also, the Coast Guard
                                                Bridge Administrator, Thirteenth Coast Guard            Cheryl Collins, Program Manager,
                                                                                                                                                              anticipates that crane and cutting
                                                District.                                               Docket Operations, telephone (202)
                                                                                                                                                              operations may create the potential for
                                                [FR Doc. 2015–23141 Filed 9–14–15; 8:45 am]             366–9826.
                                                                                                                                                              falling debris into the waterway. It is
                                                BILLING CODE 9110–04–P                                  SUPPLEMENTARY INFORMATION:                            expected that the construction efforts
                                                                                                        Table of Acronyms                                     that might require waterway closures
                                                                                                                                                              will not take place until the summer of
                                                DEPARTMENT OF HOMELAND                                  DHS Department of Homeland Security                   2016.
                                                SECURITY                                                NPRM Notice of Proposed Rulemaking
                                                                                                        FR Federal Register                                   C. Discussion of Comments, Changes
                                                Coast Guard                                                                                                   and the Final Rule
                                                                                                        A. Regulatory History and Information
                                                                                                                                                                No comments were received
                                                33 CFR Part 165                                           On January 9, 2015, we published a                  concerning this rule. Due to schedule
                                                                                                        NPRM entitled Regulated Navigation                    delays, the overall timeline of the
                                                [Docket Number USCG–2014–0002]                          Area, Kill Van Kull and Newark Bay;                   project has changed. Waterway closures
                                                                                                        Bayonne, NJ, NY in the Federal                        are now expected during the summer of
                                                RIN 1625–AA11
                                                                                                        Register. We received no comments on                  2016. Completion of the entire project is
                                                Regulated Navigation Area, Kill Van                     the proposed rule.                                    now slated for 2017.
                                                Kull and Newark Bay; Bayonne, NJ, NY                      No public meeting was requested and
                                                                                                        none was held.                                        D. Regulatory Analyses
                                                AGENCY:  Coast Guard, DHS.                                                                                      We developed this rule after
                                                                                                        B. Basis and Purpose
                                                ACTION: Temporary final rule.                                                                                 considering numerous statutes and
                                                                                                           Under the Ports and Waterways Safety               executive orders related to rulemaking.
                                                SUMMARY:   The United States Coast                      Act, the Coast Guard has the authority                Below we summarize our analyses
                                                Guard is establishing a Regulated                       to establish Regulated Navigation Areas               based on these statutes and executive
                                                Navigation Area (RNA) on the navigable                  in defined water areas that are                       orders.
                                                waters of Kill Van Kull and Newark Bay                  hazardous or in which hazardous
                                                surrounding the Bayonne Bridge. In                      conditions are determined to exist. See               1. Regulatory Planning and Review
                                                response to a planned Bayonne Bridge                    33 U.S.C. 1231; 50 U.S.C. 191; 33 CFR                    This rule is not a significant
                                                construction project, this rule will                    1.05–1, 6.04–1, 6.04–6, and 160.5; and                regulatory action under section 3(f) of
                                                establish a speed restriction in the                    Department of Homeland Security                       Executive Order 12866, Regulatory
                                                waters surrounding the Bayonne Bridge.                  Delegation No. 0170.1.                                Planning and Review, as supplemented
                                                This rule will allow the Coast Guard to                    The purpose of this rulemaking is to               by Executive Order 13563, Improving
mstockstill on DSK4VPTVN1PROD with RULES




                                                prohibit vessel traffic through the RNA                 ensure the safety of vessels and workers              Regulation and Regulatory Review, and
                                                when necessary to safeguard people and                  from hazards associated with                          does not require an assessment of
                                                vessels from the hazards associated with                construction on the Bayonne Bridge.                   potential costs and benefits under
                                                bridge construction.                                    The current Bayonne Bridge was built in               section 6(a)(3) of Executive Order 12866
                                                DATES: This rule is effective from                      1931 and carries the NY/NJ Route 440.                 or under section 1 of Executive Order
                                                October 15, 2015 until December 31,                     The Port Authority New York/New                       13563. The Office of Management and
                                                2017.                                                   Jersey (PANYNJ) has contracted                        Budget has not reviewed it under those


                                           VerDate Sep<11>2014   19:08 Sep 14, 2015   Jkt 235001   PO 00000   Frm 00037   Fmt 4700   Sfmt 4700   E:\FR\FM\15SER1.SGM   15SER1



Document Created: 2015-12-15 10:08:59
Document Modified: 2015-12-15 10:08:59
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionNotice of deviation from drawbridge regulation.
DatesThis deviation is effective from 7 a.m. on September 28, 2015 until 7 p.m. on October 1, 2015.
ContactIf you have questions on this temporary deviation, call or email Mr. Steven Fischer, Bridge Administrator, Thirteenth Coast Guard District; telephone 206-220-7282, email [email protected] If you have questions on viewing the docket, call Cheryl Collins, Program Manager, Docket Operations, telephone 202-366-9826.