80_FR_55527 80 FR 55349 - Adam R. Rousselle II; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

80 FR 55349 - Adam R. Rousselle II; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 178 (September 15, 2015)

Page Range55349-55349
FR Document2015-23151

Federal Register, Volume 80 Issue 178 (Tuesday, September 15, 2015)
[Federal Register Volume 80, Number 178 (Tuesday, September 15, 2015)]
[Notices]
[Page 55349]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-23151]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14682-000]


Adam R. Rousselle II; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On June 17, 2015, Adam R. Rousselle II filed an application for a 
preliminary permit under section 4(f) of the Federal Power Act 
proposing to study the feasibility of the proposed Paint Creek Dam 
Water Power Project No. 14682-000, to be located at the existing U.S. 
Army Corps of Engineers' Paint Creek Lake, near the town of Bainbridge, 
Highland County, Ohio. The sole purpose of a preliminary permit, if 
issued, is to grant the permit holder priority to file a license 
application during the permit term. A preliminary permit does not 
authorize the permit holder to perform any land-disturbing activities 
or otherwise enter upon lands or waters owned by others without the 
owners' express permission.
    The proposed project would be located completely within lands owned 
by the United States and use an existing concrete intake tower located 
in Paint Creek Lake and an existing 1,100-foot-long, 48-foot-diameter 
tunnel conveying the lake water from the intake tower to the outlet 
works downstream of the dam. The proposed project would consist of the 
following new facilities: (1) Two 80-foot-long, 8-foot-diameter steel 
penstocks attached to the outlet works and ending at the turbine 
assembly; (2) a 50-foot-long, 30-foot-wide, 30-foot-high concrete 
powerhouse located approximately 100 feet downstream of the outlet 
works and containing two Kaplan turbine-generators with a combined 
installed capacity of 2.14 megawatts; (3) a 500-foot-long, 14.7 
kilovolt transmission line; and (4) appurtenant facilities. The project 
is estimated to generate 13,100 megawatt hours annually.
    Applicant Contact: Adam R. Rousselle II, 104 Autumn Trace Drive, 
New Hope, PA 18938; phone: 215-485-1708.
    FERC Contact: Sergiu Serban, (202) 502-6211.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14682-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14682) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: September 9, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-23151 Filed 9-14-15; 8:45 am]
BILLING CODE 6717-0-1P



                                                                            Federal Register / Vol. 80, No. 178 / Tuesday, September 15, 2015 / Notices                                                 55349

                                                    Issued in Washington, DC, September 9,                Docket No. EL15–89, Midcontinent                      capacity of 2.14 megawatts; (3) a 500-
                                                  2015.                                                       Independent System Operator, Inc.                 foot-long, 14.7 kilovolt transmission
                                                  Nanda Srinivasan,                                         For more information, contact Chris                 line; and (4) appurtenant facilities. The
                                                  Director, Office of Survey Development and              Miller, Office of Energy Market                       project is estimated to generate 13,100
                                                  Statistical Integration, U.S. Energy                    Regulation, Federal Energy Regulatory                 megawatt hours annually.
                                                  Information Administration.
                                                                                                          Commission at (317) 249–5936 or                          Applicant Contact: Adam R. Rousselle
                                                  [FR Doc. 2015–23136 Filed 9–14–15; 8:45 am]             christopher.miller@ferc.gov; or Jason                 II, 104 Autumn Trace Drive, New Hope,
                                                  BILLING CODE 6450–01–P                                  Strong, Office of Energy Market                       PA 18938; phone: 215–485–1708.
                                                                                                          Regulation, Federal Energy Regulatory
                                                                                                          Commission at (202) 502–6124 or                          FERC Contact: Sergiu Serban, (202)
                                                  DEPARTMENT OF ENERGY                                    jason.strong@ferc.gov.                                502–6211.
                                                  Federal Energy Regulatory                                 Dated: September 9, 2015.                              Deadline for filing comments, motions
                                                  Commission                                              Kimberly D. Bose,                                     to intervene, competing applications
                                                                                                          Secretary.                                            (without notices of intent), or notices of
                                                  Notice of Commission Staff                                                                                    intent to file competing applications: 60
                                                                                                          [FR Doc. 2015–23149 Filed 9–14–15; 8:45 am]
                                                  Attendance                                                                                                    days from the issuance of this notice.
                                                                                                          BILLING CODE 6717–01–P
                                                     The Federal Energy Regulatory                                                                              Competing applications and notices of
                                                  Commission (Commission) hereby gives                                                                          intent must meet the requirements of 18
                                                  notice that members of the                              DEPARTMENT OF ENERGY                                  CFR 4.36.
                                                  Commission’s staff may attend the                                                                                The Commission strongly encourages
                                                  following meeting related to the                        Federal Energy Regulatory                             electronic filing. Please file comments,
                                                  transmission planning activities of the                 Commission                                            motions to intervene, notices of intent,
                                                  Midcontinent Independent System                         [Project No. 14682–000]                               and competing applications using the
                                                  Operator, Inc. (MISO):                                                                                        Commission’s eFiling system at http://
                                                  MISO Planning Advisory Committee                        Adam R. Rousselle II; Notice of                       www.ferc.gov/docs-filing/efiling.asp.
                                                  September 16, 2015, 9 a.m.–4:00 p.m.                    Preliminary Permit Application                        Commenters can submit brief comments
                                                     (EST)                                                Accepted for Filing and Soliciting                    up to 6,000 characters, without prior
                                                     The above-referenced meeting will be                 Comments, Motions To Intervene, and                   registration, using the eComment system
                                                  held at:                                                Competing Applications
                                                                                                                                                                at http://www.ferc.gov/docs-filing/
                                                  MISO Headquarters, 720 City Center                         On June 17, 2015, Adam R. Rousselle                ecomment.asp. You must include your
                                                     Drive, Carmel, IN 46032                              II filed an application for a preliminary             name and contact information at the end
                                                     Further information may be found at                  permit under section 4(f) of the Federal              of your comments. For assistance,
                                                  www.misoenergy.org.                                     Power Act proposing to study the                      please contact FERC Online Support at
                                                     The discussions at the meeting                       feasibility of the proposed Paint Creek               FERCOnlineSupport@ferc.gov, (866)
                                                  described above may address matters at                  Dam Water Power Project No. 14682–                    208–3676 (toll free), or (202) 502–8659
                                                  issue in the following proceedings:                     000, to be located at the existing U.S.               (TTY). In lieu of electronic filing, please
                                                  Docket Nos. ER13–1944, et al., PJM                      Army Corps of Engineers’ Paint Creek                  send a paper copy to: Secretary, Federal
                                                       Interconnection, LLC                               Lake, near the town of Bainbridge,
                                                  Docket No. ER14–1174, Southwest                                                                               Energy Regulatory Commission, 888
                                                                                                          Highland County, Ohio. The sole                       First Street NE., Washington, DC 20426.
                                                       Power Pool, Inc.                                   purpose of a preliminary permit, if
                                                  Docket No. ER14–1736, Midcontinent                                                                            The first page of any filing should
                                                                                                          issued, is to grant the permit holder                 include docket number P–14682–000.
                                                       Independent System Operator, Inc.                  priority to file a license application
                                                  Docket No. ER14–2445, Midcontinent                      during the permit term. A preliminary                    More information about this project,
                                                       Independent System Operator, Inc.                  permit does not authorize the permit                  including a copy of the application, can
                                                  Docket No. ER13–1864, Southwest                                                                               be viewed or printed on the ‘‘eLibrary’’
                                                                                                          holder to perform any land-disturbing
                                                       Power Pool, Inc.                                                                                         link of Commission’s Web site at
                                                  Docket No. EL14–21, Southwest Power                     activities or otherwise enter upon lands
                                                                                                          or waters owned by others without the                 http://www.ferc.gov/docs-filing/
                                                       Pool, Inc. v. Midcontinent
                                                                                                          owners’ express permission.                           elibrary.asp. Enter the docket number
                                                       Independent System Operator, Inc.
                                                  Docket No. EL14–30, Midcontinent                           The proposed project would be                      (P–14682) in the docket number field to
                                                       Independent System Operator, Inc.                  located completely within lands owned                 access the document. For assistance,
                                                       v. Southwest Power Pool, Inc.                      by the United States and use an existing              contact FERC Online Support.
                                                  Docket No. EL11–34, Midwest                             concrete intake tower located in Paint
                                                                                                                                                                  Dated: September 9, 2015.
                                                       Independent Transmission System                    Creek Lake and an existing 1,100-foot-
                                                                                                          long, 48-foot-diameter tunnel conveying               Kimberly D. Bose,
                                                       Operator, Inc.
                                                  Docket No. ER11–1844, Midwest                           the lake water from the intake tower to               Secretary.
                                                       Independent Transmission System                    the outlet works downstream of the                    [FR Doc. 2015–23151 Filed 9–14–15; 8:45 am]
                                                       Operator, Inc.                                     dam. The proposed project would                       BILLING CODE 6717–0–1P
                                                  Docket No. EL13–88, Northern Indiana                    consist of the following new facilities:
                                                       Public Service Company v.                          (1) Two 80-foot-long, 8-foot-diameter
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                       Midcontinent Independent System                    steel penstocks attached to the outlet
                                                       Operator, Inc. and PJM                             works and ending at the turbine
                                                       Interconnection, L.L.C.                            assembly; (2) a 50-foot-long, 30-foot-
                                                  Docket Nos. ER13–1923, et al.,                          wide, 30-foot-high concrete powerhouse
                                                       Midcontinent Independent System                    located approximately 100 feet
                                                       Operator, Inc.                                     downstream of the outlet works and
                                                  Docket Nos. ER13–1937, et al.,                          containing two Kaplan turbine-
                                                       Southwest Power Pool, Inc.                         generators with a combined installed


                                             VerDate Sep<11>2014   19:04 Sep 14, 2015   Jkt 235001   PO 00000   Frm 00028   Fmt 4703   Sfmt 9990   E:\FR\FM\15SEN1.SGM   15SEN1



Document Created: 2015-12-15 10:09:25
Document Modified: 2015-12-15 10:09:25
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 55349 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR