80 FR 55656 - Perry Nuclear Power Plant, Unit 1; Consideration of Approval of Transfer of License and Conforming Amendment

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 80, Issue 179 (September 16, 2015)

Page Range55656-55661
FR Document2015-23183

The U.S. Nuclear Regulatory Commission (NRC) received and is considering approval of an application filed by FirstEnergy Nuclear Operating Company (FENOC) on June 30, 2015. The application seeks NRC approval of the direct transfer of the leased interests in NPF-58 for Perry Nuclear Power Plant, Unit 1, from the current holder, the Ohio Edison Company (OE), to FirstEnergy Nuclear Generation, LLC (FENGen). The NRC is also considering amending the facility operating license for administrative purposes to reflect the proposed transfer. The application contains sensitive unclassified non-safeguards information (SUNSI).

Federal Register, Volume 80 Issue 179 (Wednesday, September 16, 2015)
[Federal Register Volume 80, Number 179 (Wednesday, September 16, 2015)]
[Notices]
[Pages 55656-55661]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-23183]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket No. 50-440; NRC-2015-0212]


Perry Nuclear Power Plant, Unit 1; Consideration of Approval of 
Transfer of License and Conforming Amendment

AGENCY: Nuclear Regulatory Commission.

ACTION: Application for direct transfer of license; opportunity to 
comment, request a hearing, and petition for leave to intervene; order.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) received and is 
considering approval of an application filed by FirstEnergy Nuclear 
Operating Company (FENOC) on June 30, 2015. The application seeks NRC 
approval of the direct transfer of the leased interests in NPF-58 for 
Perry Nuclear Power Plant, Unit 1, from the current holder, the Ohio 
Edison Company (OE), to FirstEnergy Nuclear Generation, LLC (FENGen). 
The NRC is also considering amending the facility operating license for 
administrative purposes to reflect the proposed transfer. The 
application contains sensitive unclassified non-safeguards information 
(SUNSI).

DATES: Comments must be filed by October 16, 2015. A request for a 
hearing must be filed by October 6, 2015. Any potential party as 
defined in Sec.  2.4 of Title 10 of the Code of Federal Regulations (10 
CFR), who believes access to SUNSI is necessary to respond to this 
notice must request document access by September 28, 2015.

ADDRESSES: You may submit comments by any of the following methods 
(unless this document describes a different method for submitting 
comments on a specific subject):
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2015-0212. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     Email comments to: [email protected]. If you do not 
receive an automatic email reply confirming receipt, then contact us at 
301-415-1677.
     Fax comments to: Secretary, U.S. Nuclear Regulatory 
Commission at 301-415-1101.

[[Page 55657]]

     Mail comments to: Secretary, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001, ATTN: Rulemakings and 
Adjudications Staff.
     Hand deliver comments to: 11555 Rockville Pike, Rockville, 
Maryland 20852, between 7:30 a.m. and 4:15 p.m. (Eastern Time) Federal 
workdays; telephone: 301-415-1677.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Kimberly Green, Office of Nuclear 
Reactor Regulation, telephone: 301-415-1627, email: 
[email protected]; U.S. Nuclear Regulatory Commission, Washington 
DC 20555-0001.

SUPPLEMENTARY INFORMATION: 

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2015-0212 when contacting the NRC 
about the availability of information for this action. You may obtain 
publicly-available information related to this action by any of the 
following methods:
     Federal rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2015-0212.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
Application for Order Consenting to Transfer of Licenses and Approving 
Conforming License Amendments is available in ADAMS under Accession No. 
ML15181A366.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

B. Submitting Comments

    Please include Docket ID NRC-2015-0212, facility name, unit number, 
application date, and subject in your comment submission.
    The NRC cautions you not to include identifying or contact 
information that you do not want to be publicly disclosed in your 
comment submission. The NRC will post all comment submissions at http://www.regulations.gov as well as enter the comment submissions into 
ADAMS. The NRC does not routinely edit comment submissions to remove 
identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment into ADAMS.

II. Introduction

    The NRC is considering the issuance of an order under 10 CFR 50.80 
approving the direct transfer of Perry Nuclear Power Plant, Unit 1, 
NPF-58, to the extent currently held by OE. The transfer would be to 
FENGen. The NRC is also considering amending the facility operating 
license for administrative purposes to reflect the proposed transfer.
    Following approval of the proposed direct transfer of control of 
the license, FENGen would acquire 12.58 percent of OE's ownership 
interest in the facility.
    No physical changes to the Perry Nuclear Power Plant, Unit 1, or 
operational changes are being proposed in the application.
    The NRC's regulations at 10 CFR 50.80 state that no license, or any 
right thereunder, shall be transferred, directly or indirectly, through 
transfer of control of the license, unless the Commission gives its 
consent in writing. The Commission will approve an application for the 
direct transfer of a license if the Commission determines that the 
proposed transferee is qualified to hold the license, and that the 
transfer is otherwise consistent with applicable provisions of law, 
regulations, and orders issued by the Commission.
    Before issuance of the proposed conforming license amendment, the 
Commission will have made findings required by the Atomic Energy Act of 
1954, as amended (the Act), and the Commission's regulations.
    As provided in 10 CFR 2.1315, unless otherwise determined by the 
Commission with regard to a specific application, the Commission has 
determined that any amendment to the license of a utilization facility, 
which does no more than conform the license to reflect the transfer 
action involves no significant hazards consideration. No contrary 
determination has been made with respect to this specific license 
amendment application. In light of the generic determination reflected 
in 10 CFR 2.1315, no public comments with respect to significant 
hazards considerations are being solicited, notwithstanding the general 
comment procedures contained in 10 CFR 50.91.

III. Opportunity to Comment

    Within 30 days from the date of publication of this notice, persons 
may submit written comments regarding the license transfer application, 
as provided for in 10 CFR 2.1305. The Commission will consider and, if 
appropriate, respond to these comments, but such comments will not 
otherwise constitute part of the decisional record. Comments should be 
submitted as described in the ADDRESSES section of this document.

IV. Opportunity To Request a Hearing and Petition for Leave To 
Intervene

    Within 20 days from the date of publication of this notice, any 
person(s) whose interest may be affected by the Commission's action on 
the application may request a hearing and intervention via electronic 
submission through the NRC's E-filing system. Requests for a hearing 
and petitions for leave to intervene should be filed in accordance with 
the Commission's rules of practice set forth in Subpart C ``Rules of 
General Applicability: Hearing Requests, Petitions to Intervene, 
Availability of Documents, Selection of Specific Hearing Procedures, 
Presiding Officer Powers, and General Hearing Management for NRC 
Adjudicatory Hearings,'' of 10 CFR part 2. In particular, such requests 
and petitions must comply with the requirements set forth in 10 CFR 
2.309, which is available at the NRC's PDR, located at O1F21, 11555 
Rockville Pike (first floor), Rockville, Maryland 20852. The NRC 
regulations are accessible electronically from the NRC Library on the 
NRC's public Web site at http://www.nrc.gov/reading-rm/doc-collections/cfr/.
    As required by 10 CFR 2.309, a request for hearing or petition for 
leave to intervene must set forth with particularity the interest of 
the petitioner in the proceeding and how that interest may be affected 
by the results of the proceeding. The hearing request or petition must 
specifically explain the reasons why intervention should be permitted, 
with particular reference to the following general requirements: (1) 
The name, address, and telephone number of the requestor

[[Page 55658]]

or petitioner; (2) the nature of the requestor's/petitioner's right 
under the Act to be made a party to the proceeding; (3) the nature and 
extent of the requestor's/petitioner's property, financial, or other 
interest in the proceeding; and (4) the possible effect of any decision 
or order which may be entered in the proceeding on the requestor's/
petitioner's interest. The hearing request or petition must also 
include the specific contentions that the requestor/petitioner seeks to 
have litigated at the proceeding.
    For each contention, the requestor/petitioner must provide a 
specific statement of the issue of law or fact to be raised or 
controverted, as well as a brief explanation of the basis for the 
contention. Additionally, the requestor/petitioner must demonstrate 
that the issue raised by each contention is within the scope of the 
proceeding and is material to the findings that the NRC must make to 
support the granting of a license amendment in response to the 
application. The hearing request or petition must also include a 
concise statement of the alleged facts or expert opinion that support 
the contention and on which the requestor/petitioner intends to rely at 
the hearing, together with references to those specific sources and 
documents. The hearing request or petition must provide sufficient 
information to show that a genuine dispute exists with the applicant on 
a material issue of law or fact, including references to specific 
portions of the application for amendment that the petitioner disputes 
and the supporting reasons for each dispute. If the requestor/
petitioner believes that the application for amendment fails to contain 
information on a relevant matter as required by law, the requestor/
petitioner must identify each failure and the supporting reasons for 
the requestor's/petitioner's belief. Each contention must be one which, 
if proven, would entitle the requestor/petitioner to relief. A 
requestor/petitioner who does not satisfy these requirements for at 
least one contention will not be permitted to participate as a party.
    Those permitted to intervene become parties to the proceeding, 
subject to any limitations in the order granting leave to intervene, 
and have the opportunity to participate fully in the conduct of the 
hearing with respect to resolution of that person's admitted 
contentions, including the opportunity to present evidence and to 
submit a cross-examination plan for cross-examination of witnesses, 
consistent with NRC regulations, policies, and procedures. The Atomic 
Safety and Licensing Board will set the time and place for any 
prehearing conferences and evidentiary hearings, and the appropriate 
notices will be provided.
    Requests for hearing, petitions for leave to intervene, and motions 
for leave to file contentions after the deadline in 10 CFR 2.309(b) 
will not be entertained absent a determination by the presiding officer 
that the new or amended filing demonstrates good cause by satisfying 
the three factors in 10 CFR 2.309(c)(1).
    A State, local governmental body, Federally-recognized Indian 
Tribe, or agency thereof may submit a petition to the Commission to 
participate as a party under 10 CFR 2.309(h)(1). The petition should 
state the nature and extent of the petitioner's interest in the 
proceeding. The petition should be submitted to the Commission by 
October 6, 2015. The petition must be filed in accordance with the 
filing instructions in Section IV of this document, and should meet the 
requirements for petitions for leave to intervene set forth in this 
section, except that under Sec.  2.309(h)(2) a State, local 
governmental body, or Federally-recognized Indian Tribe, or agency 
thereof does not need to address the standing requirements in 10 CFR 
2.309(d) if the facility is located within its boundaries. A State, 
local governmental body, Federally-recognized Indian Tribe, or agency 
thereof may also have the opportunity to participate under 10 CFR 
2.315(c).
    If a hearing is granted, any person who does not wish, or is not 
qualified, to become a party to the proceeding may, in the discretion 
of the presiding officer, be permitted to make a limited appearance 
pursuant to the provisions of 10 CFR 2.315(a). A person making a 
limited appearance may make an oral or written statement of position on 
the issues, but may not otherwise participate in the proceeding. A 
limited appearance may be made at any session of the hearing or at any 
prehearing conference, subject to the limits and conditions as may be 
imposed by the presiding officer. Persons desiring to make a limited 
appearance are requested to inform the Secretary of the Commission by 
November 16, 2015.

V. Electronic Submissions (E-Filing)

    All documents filed in NRC adjudicatory proceedings, including a 
request for hearing, a petition for leave to intervene, any motion or 
other document filed in the proceeding prior to the submission of a 
request for hearing or petition to intervene, and documents filed by 
interested governmental entities participating under 10 CFR 2.315(c), 
must be filed in accordance with the NRC's E-Filing rule (72 FR 49139; 
August 28, 2007). The E-Filing process requires participants to submit 
and serve all adjudicatory documents over the internet, or in some 
cases to mail copies on electronic storage media. Participants may not 
submit paper copies of their filings unless they seek an exemption in 
accordance with the procedures described below.
    To comply with the procedural requirements of E-Filing, at least 10 
days prior to the filing deadline, the participant should contact the 
Office of the Secretary by email at [email protected], or by 
telephone at 301-415-1677, to request (1) a digital identification (ID) 
certificate, which allows the participant (or its counsel or 
representative) to digitally sign documents and access the E-Submittal 
server for any proceeding in which it is participating; and (2) advise 
the Secretary that the participant will be submitting a request or 
petition for hearing (even in instances in which the participant, or 
its counsel or representative, already holds an NRC-issued digital ID 
certificate). Based upon this information, the Secretary will establish 
an electronic docket for the hearing in this proceeding if the 
Secretary has not already established an electronic docket.
    Information about applying for a digital ID certificate is 
available on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals/getting-started.html. System requirements for accessing 
the E-Submittal server are detailed in the NRC's ``Guidance for 
Electronic Submission,'' which is available on the agency's public Web 
site at http://www.nrc.gov/site-help/e-submittals.html. Participants 
may attempt to use other software not listed on the Web site, but 
should note that the NRC's E-Filing system does not support unlisted 
software, and the NRC Meta System Help Desk will not be able to offer 
assistance in using unlisted software.
    If a participant is electronically submitting a document to the NRC 
in accordance with the E-Filing rule, the participant must file the 
document using the NRC's online, Web-based submission form. In order to 
serve documents through the Electronic Information Exchange System, 
users will be required to install a Web browser plug-in from the NRC's 
Web site. Further information on the Web-based submission form, 
including the installation of the Web browser plug-in, is available on 
the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals.html.

[[Page 55659]]

    Once a participant has obtained a digital ID certificate and a 
docket has been created, the participant can then submit a request for 
hearing or petition for leave to intervene. Submissions should be in 
Portable Document Format (PDF) in accordance with NRC guidance 
available on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the 
documents are submitted through the NRC's E-Filing system. To be 
timely, an electronic filing must be submitted to the E-Filing system 
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of 
a transmission, the E-Filing system time-stamps the document and sends 
the submitter an email notice confirming receipt of the document. The 
E-Filing system also distributes an email notice that provides access 
to the document to the NRC's Office of the General Counsel and any 
others who have advised the Office of the Secretary that they wish to 
participate in the proceeding, so that the filer need not serve the 
documents on those participants separately. Therefore, applicants and 
other participants (or their counsel or representative) must apply for 
and receive a digital ID certificate before a hearing request/petition 
to intervene is filed so that they can obtain access to the document 
via the E-Filing system.
    A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System 
Help Desk through the ``Contact Us'' link located on the NRC's public 
Web site at http://www.nrc.gov/site-help/e-submittals.html, by email to 
[email protected], or by a toll-free call at 1-866-672-7640. The 
NRC Meta System Help Desk is available between 8 a.m. and 8 p.m., 
Eastern Time, Monday through Friday, excluding government holidays.
    Participants who believe that they have a good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted by: (1) First class mail 
addressed to the Office of the Secretary of the Commission, U.S. 
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: 
Rulemaking and Adjudications Staff; or (2) courier, express mail, or 
expedited delivery service to the Office of the Secretary, Sixteenth 
Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 
20852, Attention: Rulemaking and Adjudications Staff. Participants 
filing a document in this manner are responsible for serving the 
document on all other participants. Filing is considered complete by 
first-class mail as of the time of deposit in the mail, or by courier, 
express mail, or expedited delivery service upon depositing the 
document with the provider of the service. A presiding officer, having 
granted an exemption request from using E-Filing, may require a 
participant or party to use E-Filing if the presiding officer 
subsequently determines that the reason for granting the exemption from 
use of E-Filing no longer exists.
    Documents submitted in adjudicatory proceedings will appear in the 
NRC's electronic hearing docket which is available to the public at 
http://ehd1.nrc.gov/ehd/, unless excluded pursuant to an order of the 
Commission, or the presiding officer. Participants are requested not to 
include personal privacy information, such as social security numbers, 
home addresses, or home phone numbers in their filings, unless an NRC 
regulation or other law requires submission of such information. 
However, in some instances, a request to intervene will require 
including information on local residence in order to demonstrate a 
proximity assertion of interest in the proceeding. With respect to 
copyrighted works, except for limited excerpts that serve the purpose 
of the adjudicatory filings and would constitute a Fair Use 
application, participants are requested not to include copyrighted 
materials in their submission.
    The Commission will issue a notice or order granting or denying a 
hearing request or intervention petition, designating the issues for 
any hearing that will be held and designating the Presiding Officer. A 
notice granting a hearing will be published in the Federal Register and 
served on the parties to the hearing.
    For further details with respect to this application, see the 
application dated June 30, 2015.

Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information for Contention Preparation

    A. This Order contains instructions regarding how potential parties 
to this proceeding may request access to documents containing SUNSI.
    B. Within 10 days after publication of this notice of hearing and 
opportunity to petition for leave to intervene, any potential party who 
believes access to SUNSI is necessary to respond to this notice may 
request such access. A ``potential party'' is any person who intends to 
participate as a party by demonstrating standing and filing an 
admissible contention under 10 CFR 2.309. Requests for access to SUNSI 
submitted later than 10 days after publication of this notice will not 
be considered absent a showing of good cause for the late filing, 
addressing why the request could not have been filed earlier.
    C. The requester shall submit a letter requesting permission to 
access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001, Attention: Rulemakings and 
Adjudications Staff, and provide a copy to the Associate General 
Counsel for Hearings, Enforcement and Administration, Office of the 
General Counsel, Washington, DC 20555-0001. The expedited delivery or 
courier mail address for both offices is: U.S. Nuclear Regulatory 
Commission, 11555 Rockville Pike, Rockville, Maryland 20852. The email 
address for the Office of the Secretary and the Office of the General 
Counsel are [email protected] and [email protected], 
respectively.\1\ The request must include the following information:
---------------------------------------------------------------------------

    \1\ While a request for hearing or petition to intervene in this 
proceeding must comply with the filing requirements of the NRC's 
``E-Filing Rule,'' the initial request to access SUNSI under these 
procedures should be submitted as described in this paragraph.
---------------------------------------------------------------------------

    (1) A description of the licensing action with a citation to this 
Federal Register notice;
    (2) The name and address of the potential party and a description 
of the potential party's particularized interest that could be harmed 
by the action identified in C.(1); and
    (3) The identity of the individual or entity requesting access to 
SUNSI and the requester's basis for the need for the information in 
order to meaningfully participate in this adjudicatory proceeding. In 
particular, the request must explain why publicly-available versions of 
the information requested would not be sufficient to provide the basis 
and specificity for a proffered contention.
    D. Based on an evaluation of the information submitted under 
paragraph C.(3) the NRC staff will determine within 10 days of receipt 
of the request whether:
    (1) There is a reasonable basis to believe the petitioner is likely 
to establish standing to participate in this NRC proceeding; and
    (2) The requestor has established a legitimate need for access to 
SUNSI.
    E. If the NRC staff determines that the requestor satisfies both 
D.(1) and D.(2)

[[Page 55660]]

above, the NRC staff will notify the requestor in writing that access 
to SUNSI has been granted. The written notification will contain 
instructions on how the requestor may obtain copies of the requested 
documents, and any other conditions that may apply to access to those 
documents. These conditions may include, but are not limited to, the 
signing of a Non-Disclosure Agreement or Affidavit, or Protective Order 
\2\ setting forth terms and conditions to prevent the unauthorized or 
inadvertent disclosure of SUNSI by each individual who will be granted 
access to SUNSI.
---------------------------------------------------------------------------

    \2\ Any motion for Protective Order or draft Non-Disclosure 
Affidavit or Agreement for SUNSI must be filed with the presiding 
officer or the Chief Administrative Judge if the presiding officer 
has not yet been designated, within 30 days of the deadline for the 
receipt of the written access request.
---------------------------------------------------------------------------

    F. Filing of Contentions. Any contentions in these proceedings that 
are based upon the information received as a result of the request made 
for SUNSI must be filed by the requestor no later than 25 days after 
the requestor is granted access to that information. However, if more 
than 25 days remain between the date the petitioner is granted access 
to the information and the deadline for filing all other contentions 
(as established in the notice of hearing or opportunity for hearing), 
the petitioner may file its SUNSI contentions by that later deadline. 
This provision does not extend the time for filing a request for a 
hearing and petition to intervene, which must comply with the 
requirements of 10 CFR 2.309.
    G. Review of Denials of Access.
    (1) If the request for access to SUNSI is denied by the NRC staff 
after a determination on standing and need for access, the NRC staff 
shall immediately notify the requestor in writing, briefly stating the 
reason or reasons for the denial.
    (2) The requester may challenge the NRC staff's adverse 
determination by filing a challenge within 5 days of receipt of that 
determination with: (a) The presiding officer designated in this 
proceeding; (b) if no presiding officer has been appointed, the Chief 
Administrative Judge, or if he or she is unavailable, another 
administrative judge, or an administrative law judge with jurisdiction 
pursuant to 10 CFR 2.318(a); or (c) officer if that officer has been 
designated to rule on information access issues.
    H. Review of Grants of Access. A party other than the requester may 
challenge an NRC staff determination granting access to SUNSI whose 
release would harm that party's interest independent of the proceeding. 
Such a challenge must be filed with the Chief Administrative Judge 
within 5 days of the notification by the NRC staff of its grant of 
access.
    If challenges to the NRC staff determinations are filed, these 
procedures give way to the normal process for litigating disputes 
concerning access to information. The availability of interlocutory 
review by the Commission of orders ruling on such NRC staff 
determinations (whether granting or denying access) is governed by 10 
CFR 2.311.\3\
---------------------------------------------------------------------------

    \3\ Requesters should note that the filing requirements of the 
NRC's E-Filing Rule (72 FR 49139; August 28, 2007) apply to appeals 
of NRC staff determinations (because they must be served on a 
presiding officer or the Commission, as applicable), but not to the 
initial SUNSI request submitted to the NRC staff under these 
procedures.
---------------------------------------------------------------------------

    I. The Commission expects that the NRC staff and presiding officers 
(and any other reviewing officers) will consider and resolve requests 
for access to SUNSI, and motions for protective orders, in a timely 
fashion in order to minimize any unnecessary delays in identifying 
those petitioners who have standing and who have propounded contentions 
meeting the specificity and basis requirements in 10 CFR part 2. 
Attachment 1 to this Order summarizes the general target schedule for 
processing and resolving requests under these procedures.
    It is so ordered.

    Dated at Rockville, Maryland, this 8th day of September, 2015.

    For the Nuclear Regulatory Commission.
Richard J. Laufer, Acting,
Secretary of the Commission.

   Attachment 1--General Target Schedule for Processing and Resolving
Requests for Access to Sensitive Unclassified Non-Safeguards Information
                           in This Proceeding
------------------------------------------------------------------------
           Day                             Event/activity
------------------------------------------------------------------------
0........................  Publication of Federal Register notice of
                            hearing and opportunity to petition for
                            leave to intervene, including order with
                            instructions for access requests.
10.......................  Deadline for submitting requests for access
                            to Sensitive Unclassified Non-Safeguards
                            Information (SUNSI) with information:
                            Supporting the standing of a potential party
                            identified by name and address; describing
                            the need for the information in order for
                            the potential party to participate
                            meaningfully in an adjudicatory proceeding.
60.......................  Deadline for submitting petition for
                            intervention containing: (i) Demonstration
                            of standing; and (ii) all contentions whose
                            formulation does not require access to SUNSI
                            (+25 Answers to petition for intervention;
                            +7 petitioner/requestor reply).
20.......................  U.S. Nuclear Regulatory Commission (NRC)
                            staff informs the requester of the staff's
                            determination whether the request for access
                            provides a reasonable basis to believe
                            standing can be established and shows need
                            for SUNSI. (NRC staff also informs any party
                            to the proceeding whose interest independent
                            of the proceeding would be harmed by the
                            release of the information.) If NRC staff
                            makes the finding of need for SUNSI and
                            likelihood of standing, NRC staff begins
                            document processing (preparation of
                            redactions or review of redacted documents).
25.......................  If NRC staff finds no ``need'' or no
                            likelihood of standing, the deadline for
                            petitioner/requester to file a motion
                            seeking a ruling to reverse the NRC staff's
                            denial of access; NRC staff files copy of
                            access determination with the presiding
                            officer (or Chief Administrative Judge or
                            other designated officer, as appropriate).
                            If NRC staff finds ``need'' for SUNSI, the
                            deadline for any party to the proceeding
                            whose interest independent of the proceeding
                            would be harmed by the release of the
                            information to file a motion seeking a
                            ruling to reverse the NRC staff's grant of
                            access.
30.......................  Deadline for NRC staff reply to motions to
                            reverse NRC staff determination(s).
40.......................  (Receipt +30) If NRC staff finds standing and
                            need for SUNSI, deadline for NRC staff to
                            complete information processing and file
                            motion for Protective Order and draft Non-
                            Disclosure Affidavit. Deadline for applicant/
                            licensee to file Non-Disclosure Agreement
                            for SUNSI.
A........................  If access granted: Issuance of presiding
                            officer or other designated officer decision
                            on motion for protective order for access to
                            sensitive information (including schedule
                            for providing access and submission of
                            contentions) or decision reversing a final
                            adverse determination by the NRC staff.
A + 3....................  Deadline for filing executed Non-Disclosure
                            Affidavits. Access provided to SUNSI
                            consistent with decision issuing the
                            protective order.

[[Page 55661]]

 
A + 28...................  Deadline for submission of contentions whose
                            development depends upon access to SUNSI.
                            However, if more than 25 days remain between
                            the petitioner's receipt of (or access to)
                            the information and the deadline for filing
                            all other contentions (as established in the
                            notice of hearing or opportunity for
                            hearing), the petitioner may file its SUNSI
                            contentions by that later deadline.
A + 53...................  (Contention receipt +25) Answers to
                            contentions whose development depends upon
                            access to SUNSI.
A + 60...................  (Answer receipt +7) Petitioner/Intervenor
                            reply to answers.
>A + 60..................  Decision on contention admission.
------------------------------------------------------------------------

[FR Doc. 2015-23183 Filed 9-15-15; 8:45 am]
 BILLING CODE 7590-01-P


Current View
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionApplication for direct transfer of license; opportunity to comment, request a hearing, and petition for leave to intervene; order.
DatesComments must be filed by October 16, 2015. A request for a hearing must be filed by October 6, 2015. Any potential party as defined in Sec. 2.4 of Title 10 of the Code of Federal Regulations (10 CFR), who believes access to SUNSI is necessary to respond to this notice must request document access by September 28, 2015.
ContactKimberly Green, Office of Nuclear Reactor Regulation, telephone: 301-415-1627, email: [email protected]; U.S. Nuclear Regulatory Commission, Washington DC 20555-0001.
FR Citation80 FR 55656 