80_FR_56634 80 FR 56453 - Western Area Power Administration; Notice of Filing

80 FR 56453 - Western Area Power Administration; Notice of Filing

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 181 (September 18, 2015)

Page Range56453-56453
FR Document2015-23428

Federal Register, Volume 80 Issue 181 (Friday, September 18, 2015)
[Federal Register Volume 80, Number 181 (Friday, September 18, 2015)]
[Notices]
[Page 56453]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-23428]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EF15-10-000]


Western Area Power Administration; Notice of Filing

    Take notice that on September 3, 2015 the Western Area Power 
Administration submitted a tariff filing: Rate Adjustment for Salt Lake 
City Area Integrated Projects Firm Power (Colorado River Storage 
Project Transmission and Ancillary Services--Rate Order No. WAPA-169) 
to be effective October 1, 2015.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. On or 
before the comment date, it is not necessary to serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at http://www.ferc.gov. Persons unable to file electronically should submit an 
original and 5 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE., Washington, DC 
20426.
    This filing is accessible on-line at http://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern Time on October 5, 2015.

    Dated: September 11, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-23428 Filed 9-17-15; 8:45 am]
BILLING CODE 6717-01-P



                                                                          Federal Register / Vol. 80, No. 181 / Friday, September 18, 2015 / Notices                                          56453

                                              Protests may be considered, but                         Reference Room in Washington, DC.                        • Segment 1: replace approximately
                                              intervention is necessary to become a                   There is an ‘‘eSubscription’’ link on the             14 miles with 14.9 miles from the Hero
                                              party to the proceeding.                                Web site that enables subscribers to                  Valve to Waynesburg Compressor
                                                 eFiling is encouraged. More detailed                 receive email notification when a                     Station in Greene County.
                                              information relating to filing                          document is added to a subscribed                        • Segment 2: replace approximately 8
                                              requirements, interventions, protests,                  docket(s). For assistance with any FERC               miles with 10.7 miles from the Redd
                                              service, and qualifying facilities filings              Online service, please email                          Farm Station to Sharp Farm Station in
                                              can be found at: http://www.ferc.gov/                   FERCOnlineSupport@ferc.gov, or call                   Washington County.
                                              docs-filing/efiling/filing-req.pdf. For                 (866) 208–3676 (toll free). For TTY, call                • Segment 3: replace approximately
                                              other information, call (866) 208–3676                  (202) 502–8659.                                       12 miles with 11.9 miles from the Sharp
                                              (toll free). For TTY, call (202) 502–8659.                Comment Date: 5:00 p.m. Eastern                     Farm Station in Washington County to
                                                                                                      Time on October 5, 2015.                              the Walker Farm Station in Washington
                                                Dated: September 11, 2015.
                                                                                                                                                            and Allegheny Counties.
                                              Kimberly D. Bose,                                         Dated: September 11, 2015.                             Total construction length with the
                                              Secretary.                                              Kimberly D. Bose,                                     incorporation of minor reroutes is
                                              [FR Doc. 2015–23421 Filed 9–17–15; 8:45 am]             Secretary.                                            approximately 34 miles of 20-inch-
                                              BILLING CODE 6717–01–P                                  [FR Doc. 2015–23428 Filed 9–17–15; 8:45 am]           diameter pipe. The pipeline would also
                                                                                                      BILLING CODE 6717–01–P                                include associated appurtenant facilities
                                                                                                                                                            including bi-directional pig launcher/
                                              DEPARTMENT OF ENERGY                                                                                          receivers, cathodic protection, main line
                                                                                                      DEPARTMENT OF ENERGY                                  valves, and taps.
                                              Federal Energy Regulatory                                                                                        The FERC staff mailed copies of the
                                              Commission                                              Federal Energy Regulatory                             EA to federal, state, and local
                                                                                                      Commission                                            government representatives and
                                              [Docket No. EF15–10–000]
                                                                                                      [Docket No. CP15–95–000]                              agencies; elected officials;
                                              Western Area Power Administration;                                                                            environmental and public interest
                                              Notice of Filing                                        Columbia Gas Transmission, LLC;                       groups; Native American tribes;
                                                                                                      Notice of Availability of the                         potentially affected landowners and
                                                 Take notice that on September 3, 2015                Environmental Assessment for the                      other interested individuals and groups;
                                              the Western Area Power Administration                   Proposed Tri-County Bare Steel                        newspapers and libraries in the project
                                              submitted a tariff filing: Rate                         Replacement Project                                   area; and parties to this proceeding. In
                                              Adjustment for Salt Lake City Area                                                                            addition, the EA is available for public
                                              Integrated Projects Firm Power                            The staff of the Federal Energy                     viewing on the FERC’s Web site
                                              (Colorado River Storage Project                         Regulatory Commission (FERC or                        (www.ferc.gov) using the eLibrary link.
                                              Transmission and Ancillary Services—                    Commission) has prepared an                           A limited number of copies of the EA
                                              Rate Order No. WAPA–169) to be                          environmental assessment (EA) for the                 are available for distribution and public
                                              effective October 1, 2015.                              Tri-County Bare Steel Replacement                     inspection at: Federal Energy Regulatory
                                                 Any person desiring to intervene or to               Project, proposed by Columbia Gas                     Commission, Public Reference Room,
                                              protest this filing must file in                        Transmission, LLC (Columbia) in the                   888 First Street NE., Room 2A,
                                              accordance with Rules 211 and 214 of                    above-referenced docket. Columbia                     Washington, DC 20426, (202) 502–8371.
                                              the Commission’s Rules of Practice and                  requests authorization to replace about                  Any person wishing to comment on
                                              Procedure (18 CFR 385.211, 385.214).                    34 miles of bare steel pipe within                    the EA may do so. Your comments
                                              Protests will be considered by the                      Columbia’s existing Line 1570 pipeline                should focus on the potential
                                              Commission in determining the                           in three replacement segments spanning                environmental effects, reasonable
                                              appropriate action to be taken, but will                Allegheny, Washington, and Greene                     alternatives, and measures to avoid or
                                              not serve to make protestants parties to                Counties (i.e., the Tri-County),                      lessen environmental impacts. The more
                                              the proceeding. Any person wishing to                   Pennsylvania. The Project is part of                  specific your comments, the more useful
                                              become a party must file a notice of                    Columbia’s modernization program to                   they will be. To ensure that the
                                              intervention or motion to intervene, as                 replace segments of existing, aging,                  Commission has the opportunity to
                                              appropriate. Such notices, motions, or                  infrastructure in order to improve the                consider your comments prior to
                                              protests must be filed on or before the                 safety of its pipeline system and                     making its decision on this project, it is
                                              comment date. On or before the                          increase service reliability.                         important that we receive your
                                              comment date, it is not necessary to                      The EA assesses the potential                       comments in Washington, DC on or
                                              serve motions to intervene or protests                  environmental effects of the                          before October 14, 2015.
                                              on persons other than the Applicant.                    construction and operation of the Tri-                   For your convenience, there are three
                                                 The Commission encourages                            County Bare Steel Replacement Project                 methods you can use to file your
                                              electronic submission of protests and                   in accordance with the requirements of                comments with the Commission. In all
                                              interventions in lieu of paper using the                the National Environmental Policy Act                 instances, please reference the project
                                              ‘‘eFiling’’ link at http://www.ferc.gov.                (NEPA). The FERC staff concludes that                 docket number (CP15–95–000) with
                                              Persons unable to file electronically                   approval of the proposed project, with                your submission. The Commission
                                              should submit an original and 5 copies                  appropriate mitigating measures, would                encourages electronic filing of
                                              of the protest or intervention to the                   not constitute a major federal action                 comments and has expert staff available
tkelley on DSK3SPTVN1PROD with NOTICES




                                              Federal Energy Regulatory Commission,                   significantly affecting the quality of the            to assist you at 202–502–8258 or
                                              888 First Street NE., Washington, DC                    human environment.                                    efiling@ferc.gov.
                                              20426.                                                    The proposed Tri-County Bare Steel                     (1) You can file your comments
                                                 This filing is accessible on-line at                 Replacement Project includes replacing                electronically using the eComment
                                              http://www.ferc.gov, using the                          34 miles of 20-inch-diameter bare steel               feature located on the Commission’s
                                              ‘‘eLibrary’’ link and is available for                  piping with coated steel pipeline at the              Web site (www.ferc.gov) under the link
                                              review in the Commission’s Public                       following locations:                                  to Documents and Filings. This is an


                                         VerDate Sep<11>2014   18:47 Sep 17, 2015   Jkt 235001   PO 00000   Frm 00017   Fmt 4703   Sfmt 4703   E:\FR\FM\18SEN1.SGM   18SEN1



Document Created: 2015-12-15 09:27:50
Document Modified: 2015-12-15 09:27:50
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates5:00 p.m. Eastern Time on October 5, 2015.
FR Citation80 FR 56453 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR