80 FR 56936 - Review and Approval of Projects

SUSQUEHANNA RIVER BASIN COMMISSION

Federal Register Volume 80, Issue 182 (September 21, 2015)

Page Range56936-56939
FR Document2015-23304

This document contains proposed rules that would amend the regulations of the Susquehanna River Basin Commission (Commission) to simplify and clarify the process for transferring approvals and to add sections dealing with general permits and modifications to approvals. These rules are designed to improve the Commission's administrative processes and add regulatory clarity.

Federal Register, Volume 80 Issue 182 (Monday, September 21, 2015)
[Federal Register Volume 80, Number 182 (Monday, September 21, 2015)]
[Proposed Rules]
[Pages 56936-56939]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-23304]


=======================================================================
-----------------------------------------------------------------------

SUSQUEHANNA RIVER BASIN COMMISSION

18 CFR Part 806


Review and Approval of Projects

AGENCY: Susquehanna River Basin Commission.

ACTION: Notice of proposed rulemaking; notice of public hearing.

-----------------------------------------------------------------------

SUMMARY: This document contains proposed rules that would amend the 
regulations of the Susquehanna River Basin Commission (Commission) to 
simplify and clarify the process for transferring approvals and to add 
sections dealing with general permits and modifications to approvals. 
These rules are designed to improve the Commission's administrative 
processes and add regulatory clarity.

DATES: Comments on the proposed rulemaking may be submitted to the 
Commission on or before November 9, 2015. The Commission has scheduled 
a public hearing on the proposed rulemaking, to be held October 29, 
2015, in Grantville, Pennsylvania. The location of the public hearing 
is listed in the ADDRESSES section of this document.

ADDRESSES: Comments may be mailed to: Jason E. Oyler, Esq., General 
Counsel, Susquehanna River Basin Commission, 4423 N. Front Street, 
Harrisburg, PA 17110-1788, or by email to regcomments@srbc.net.
    The public hearing will be held on October 29, 2015, at 7:00 p.m., 
at the East Hanover Township Municipal Building, Main Hall, 8848 
Jonestown Road, Grantville, Pa. Those wishing to testify are asked to 
notify the Commission in advance, if possible, at the regular or 
electronic addresses given below.

FOR FURTHER INFORMATION CONTACT: Jason E. Oyler, Esq., General Counsel, 
telephone: 717-238-0423, ext. 1312;

[[Page 56937]]

fax: 717-238-2436; email: joyler@srbc.net. Also, for further 
information on the proposed rulemaking, visit the Commission's Web site 
at www.srbc.net.

SUPPLEMENTARY INFORMATION: The Commission is proposing to make 
regulatory changes to improve its administrative processes and add 
regulatory clarity. The major focus of these changes is to revise and 
simplify the Commission's transfer regulation, explicitly add 
provisions for the modification of a Commission approved project, and 
establish a process for the Commission to develop general permits.
    1. 18 CFR 806.6. Transfer of approvals. The Commission proposes to 
delete the current section and replace it with simplified and easier to 
understand regulatory language. This revision still allows the 
Executive Director to approve transfers of approvals. For approvals 
greater than 10 years old, the current regulation requires the project 
sponsor to submit entirely new applications in order to transfer the 
project. The Commission has received complaints that this requirement 
is onerous and has the effect of cutting short the term of the approval 
solely because ownership is changing, despite no changes to the project 
itself or the use of the water. The revised language will allow the 
transfer to occur conditioned on the submission of an updated metering 
and monitoring plan consistent with 18 CFR 806.30. For projects 
undergoing a change of ownership that have an unapproved withdrawal, 
consumptive use and/or diversion associated with them, usually referred 
to as grandfathered aspects of the project, the current requirement to 
submit applications for these grandfathered aspects contained in 18 CFR 
806.6(c) and 18 CFR 806.4(a)(1)(iv), (a)(2)(v) and (a)(3)(iv) is 
retained. However, the revised language removes the requirement that 
these applications must be made within 90 days of the date of a change 
in ownership. The Commission found that it was difficult for project 
sponsors to meet this deadline. The revised language will allow the 
Executive Director to approve the transfer with a condition requiring 
these applications to be made. This will allow the Commission to 
consider the complexity and number of grandfathered sources that will 
be subject to the application requirements and establish an appropriate 
and realistic timeframe in the condition for these applications to be 
submitted. Due to the revision of the language in 18 CFR 806.6, a 
corresponding revision was required to 18 CFR 806.4(c).
    2. 18 CFR 806.15. Notice of Application. In paragraph (a), the 
Commission proposes to amend the time for notices to be published from 
10 days to 20 days. The Commission has received feedback that the 10 
days is not always sufficient, especially when newspaper notices are 
required. Extending this time frame allows project sponsors more time 
to complete the notices without compromising the public's opportunity 
to provide comment. New paragraphs (h) and (i) were added to provide 
specific requirements for the newly proposed 18 CFR 806.17 (regarding 
general permits) and 18 CFR 806.18 (regarding minor modifications), 
respectively.
    3. New 18 CFR 806.17. General Permits. Currently, the Commission 
does not have a process to establish general permits. The Commission is 
proposing a new section that would provide the Commission the ability 
to develop, issue and administer general permits. The new regulation 
provides procedures for issuance and administration of permits, as well 
as standards for denial of coverage and when an individual approval 
would be required. In crafting this regulation, the Commission looked 
to similar regulations of its member jurisdictions for guidance. In 
addition, changes to 18 CFR 806.4 and 806.14 were necessary to 
accommodate the addition of this new section.
    4. New 18 CFR 806.18. Approval modifications. The Commission is 
proposing to add a section specific to modifications of approvals. The 
Commission currently accepts applications for modification, but does 
not have a clear process set forth in the regulations. The proposed 
section also establishes the concept of minor and major modifications. 
The process for minor modifications provides a process for minor 
changes to approval conditions that are more likely to be 
administrative in nature and have a low degree of controversy, and 
therefore can appropriately be authorized by the Executive Director. In 
addition, a change to 18 CFR 806.14 is necessary to provide specific 
application requirements for minor modifications. Minor modifications 
are specifically listed. All modifications that are not specifically 
listed as a minor modification are major modifications. As a part of 
the rulemaking, the Commission has included a non-exhaustive list of 
common major modifications to provide guidance to the public and the 
regulated community.

List of Subjects in 18 CFR Part 806

    Administrative practice and procedure, Water resources.

    Accordingly, for the reasons set forth in the preamble, the 
Susquehanna River Basin Commission proposes to amend 18 CFR part 806 as 
follows:

PART 806--REVIEW AND APPROVAL OF PROJECTS

0
1. The authority citation for Part 806 continues to read as follows:

    Authority:  Secs. 3.4, 3.5(5), 3.8, 3.10 and 15.2, Pub. L. 91-
575, 84 Stat. 1509 et seq.

0
2. Amend Sec.  806.4 by adding paragraph (a)(9) and revising paragraph 
(c) to read as follows:


Sec.  806.4  Projects requiring review and approval.

    (a) * * *
    (9) Any project subject to coverage under a general permit issued 
under Sec.  806.17.
* * * * *
    (c) Any project that did not require Commission approval prior to 
January 1, 2007, and not otherwise exempt from the requirements of 
paragraph (a)(1)(iv), (a)(2)(v), or (a)(3)(iv) pursuant to paragraph 
(b) of this section, may be undertaken by a new project sponsor upon a 
change of ownership pending action on a transfer application under 
Sec.  806.6.
0
3. Revise Sec.  806.6 to read as follows:


Sec.  806.6  Transfer of approvals.

    (a) An existing Commission approval may be transferred to a new 
project sponsor by the Executive Director provided:
    (1) The application for transfer is submitted within 90 days of a 
transfer or change in ownership of a project.
    (2) The new project sponsor operates the project subject to the 
same terms and conditions of the existing approval pending approval of 
the transfer application.
    (3) Any noncompliance by the existing project sponsor associated 
with the project or by the new project sponsor associated with other 
projects is resolved to the Commission's satisfaction.
    (4) If the existing approval is greater than 10 years old, the 
transfer shall be conditioned to require the submission of an updated 
metering and monitoring plan consistent with the requirements of Sec.  
806.30.
    (5) If the existing project has an unapproved withdrawal, 
consumptive use and/or diversion listed in paragraph (b), the transfer 
shall be conditioned to require the submission of a new

[[Page 56938]]

application for review and approval of the unapproved withdrawal, 
consumptive use and/or diversion consistent with Sec. Sec.  806.4 and 
806.14.
    (6) Any modifications proposed by the new project sponsor shall be 
subject to a separate application and review process under Sec. Sec.  
806.14. and 806.18.
    (b) Previously unapproved activities associated with a project 
subject to transfer under paragraph (a) of this section include:
    (1) The project has an associated pre-compact consumptive water use 
that has not been subject to approval or had mitigation approved by the 
Commission.
    (2) The project has an associated diversion that was initiated 
prior to January 23, 1971.
    (3) The project has an associated groundwater withdrawal that was 
initiated prior to July 13, 1978 and that has not been approved by the 
Commission.
    (4) The project has an associated surface water withdrawal that was 
initiated prior to November 11, 1995 and that has not been approved by 
the Commission.
    (5) The project has a consumptive water use approval and has an 
associated withdrawal that has not been approved by the Commission.
    (c) Upon undergoing a change of name that does not affect ownership 
or control of the project, the project sponsor must request a 
reissuance of the project's approval by the Executive Director within 
90 days from the date of the change.
0
4. Amend Sec.  806.14 by revising paragraph (a) introductory text and 
adding paragraph (d) to read as follows:


Sec.  806.14  Contents of applications.

    (a) Except with respect to applications to renew an existing 
Commission approval and Notices of Intent for approvals by rule and 
general permits, applications shall include, but not be limited to, the 
following information and, where applicable, shall be submitted on 
forms and in the manner prescribed by the Commission. Renewal 
applications shall include such information that the Commission 
determines to be necessary for the review of same, shall be subject to 
the standards set forth in Subpart C--Standards for Review and Approval 
of this part, and shall likewise be submitted on forms and in the 
manner prescribed by the Commission.
* * * * *
    (d) Applications for minor modifications must be complete and will 
be on a form and in a manner prescribed by the Commission. Applications 
for minor modifications must contain the following:
    (1) Description of the project;
    (2) Description of all sources, consumptive uses and diversions 
related to the project;
    (3) Description of the requested modification;
    (4) Statement of the need for the requested modification;
    (5) Demonstration that the anticipated impact of the requested 
modification will not adversely impact the water resources of the 
basin; and
    (6) Any other information that the Commission or Executive Director 
deems necessary.
0
5. Amend Sec.  806.15 by revising paragraph (a) and adding paragraphs 
(h) and (i) to read as follows:


Sec.  806.15  Notice of application.

    (a) Any project sponsor submitting an application to the Commission 
shall provide notice thereof to the appropriate agency of the member 
State, each municipality in which the project is located, and the 
county planning agency of each county in which the project is located. 
The project sponsor shall also publish notice of submission of the 
application at least once in a newspaper of general circulation serving 
the area in which the project is located. The project sponsor shall 
also meet any of the notice requirements set forth in paragraphs (b) 
through (f) of this section, if applicable. All notices required under 
this section shall be provided or published no later than 20 days after 
submission of the application to the Commission and shall contain a 
description of the project, its purpose, the requested quantity of 
water to be withdrawn obtained from for sources other than withdrawals 
or consumptively used, and the address, electronic mail address, and 
phone number of the project sponsor and the Commission. All such 
notices shall be in a form and manner as prescribed by the Commission.
* * * * *
    (h) For Notices of Intent (NOI) seeking coverage under a general 
permit, the project sponsor shall provide the NOI to the appropriate 
agency of the member State and each municipality and county planning 
agency in which the project is located and any additional notice 
identified in the general permit.
    (i) For applications for minor modifications, the project sponsor 
shall provide notice of the application to the appropriate agency of 
the member State and each municipality and county planning agency in 
the which the project is located.
0
6. Add Sec.  806.17 to read as follows:


Sec.  806.17  General permits.

    (a) Coverage and purpose. The Commission may issue a general 
permit, in lieu of issuing individual approvals, for a specifically 
described category of diversions, water withdrawals and consumptive 
uses that:
    (1) Involve the same or substantially similar types of operations 
or activities,
    (2) Require the same limitations or operating conditions, or both,
    (3) Require the same or similar monitoring and reporting, and
    (4) Will result in minimal adverse impacts.
    (b) Procedure for issuance. (1) At least 30 days prior to the 
issuance of a general permit, the Commission shall publish notice in 
the Federal Register and the member jurisdiction administrative 
bulletins of the intent to issue a general permit.
    (2) At least 30 days shall be provided for interested members of 
the public and Federal, State and local agencies to provide written 
comments on a proposed general permit.
    (3) The Commission or Executive Director may, in its discretion, 
hold a public hearing on a proposed general permit.
    (4) The issuance of a general permit adopted by the Commission will 
be published in the Federal Register and the member jurisdiction 
administrative bulletins. This notice shall set forth the effective 
date of the general permit.
    (c) Administration of general permits. General permits may be 
issued, amended, suspended, revoked, reissued or terminated under this 
section.
    (1) Any general permit issued under this section shall set forth 
the applicability of the permit and the conditions that apply to any 
diversion, withdrawal or consumptive use authorized by such general 
permit.
    (2) The Commission may fix a term to any general permit issued.
    (3) A project sponsor shall obtain permission to divert, withdraw 
or consumptively use water in accordance with a general permit by 
filing a Notice of Intent (NOI) with the Commission, in a form and 
manner determined by the Commission.
    (4) Approval of coverage under a general permit shall be determined 
by the Executive Director or by any other manner that the Commission 
shall establish for any general permit.
    (5) The Commission may set a fee for NOIs to any general permit.
    (6) A project sponsor shall provide notice for NOIs in accordance 
with Sec.  806.15(h) and any additional notice requirements that the 
Commission may adopt for any general permit.

[[Page 56939]]

    (7) The requirements of Sec.  806.16 apply to the review of NOIs to 
any general permit.
    (8) Upon reissuance or amendment of a general permit, all project 
sponsors permitted to divert, withdraw or consumptively use water in 
accordance with the previous general permit shall be permitted to 
continue to operate with the renewed or modified general permit unless 
otherwise notified by the Commission.
    (d) Denial of coverage. The Executive Director will deny or revoke 
coverage under a general permit when one or more of the following 
conditions exist:
    (1) The project or project sponsor does not or can no longer meet 
the criteria for coverage under a general permit.
    (2) The diversion, withdrawal or consumptive use, individually or 
in combination with other similar Commission regulated activities, is 
causing or has the potential to cause adverse impacts to water 
resources or competing water users.
    (3) The project does not meet the requirements of Sec.  806.21(a) 
or (b).
    (4) The project includes other diversions, withdrawals or 
consumptive uses that require an individual approval and the issuance 
of both an individual approval and a general permit for the project 
would constitute an undue administrative burden on the Commission.
    (5) The Executive Director determines that a project cannot be 
effectively regulated under a general permit and is more effectively 
regulated under an individual approval.
    (e) Requiring an individual approval. If coverage is denied or 
revoked under paragraph (d) of this section, the project sponsor shall 
be notified in writing. The notice will include a brief statement for 
the reasons for the decision. If coverage under a general permit was 
previously granted, the notice will also include a deadline for 
submission of an application for an individual approval. Timely 
submission of a complete application will result in continuation of 
coverage of the applicable withdrawal, consumptive use or diversion 
under the general permit, until the Commission takes final action on 
the pending individual approval application.
    (f) Action of the commission. Action by the Executive Director 
denying or revoking coverage under a general permit under paragraph (d) 
of this section, or requiring an individual approval under paragraph 
(e) of this section, is not a final action of the Commission until the 
project sponsor submits and the Commission takes final action on an 
individual approval application.
0
7. Add Sec.  806.18 to read as follows:


Sec.  806.18  Approval modifications.

    (a) General. A project sponsor shall submit an application for 
modification of a current approval prior to making a change in the 
design, operational plans, or use as presented in the application upon 
which the approval was originally issued, and that will affect the 
terms and conditions of the current approval.
    (b) Applications for modification. (1) A project sponsor may apply 
for a modification of a current approval by submitting an application 
for modification to the Commission.
    (c) Minor modifications. The following are considered minor 
modifications:
    (1) Correction of typographical errors;
    (2) Changes to monitoring or metering conditions;
    (3) Addition of sources of water for consumptive use;
    (4) Changes to the authorized water uses;
    (5) Changes to conditions setting a schedule for developing, 
implementing, and/or reporting on monitoring, data collection and 
analyses;
    (6) Changes to the design of intakes;
    (7) Increases to total system limits that were established based on 
the projected demand of the project; and
    (8) Modify approval to allow the modification of extraction well 
network used for groundwater remediation systems.
    (d) Major modifications. Major modifications are changes not 
considered to be minor modifications. Major modifications may include, 
but are not limited to:
    (1) Increases in the quantity of water withdrawals, consumptive 
uses or diversions;
    (2) Increases to peak day consumptive water use;
    (3) Increases to the instantaneous withdrawal rate or changes from 
a single withdrawal rate to a varied withdrawal rate;
    (4) Changes affecting passby flows requirements; and
    (5) Changes that have the potential for adverse impacts to water 
resources or competing water users.
    (e) Notice and approval. (1) Applications for modifications are 
subject to the notice requirements of Sec.  806.15.
    (2) The Commission or Executive Director may approve, approve with 
conditions or deny an application for minor modification, or direct 
that an application for major modification be made.
    (3) The Commission may approve, approve with conditions or deny an 
application for major modification.

    Dated: September 11, 2015.
Stephanie L. Richardson,
Secretary to the Commission.
[FR Doc. 2015-23304 Filed 9-18-15; 8:45 am]
 BILLING CODE 7040-01-P



                                                 56936               Federal Register / Vol. 80, No. 182 / Monday, September 21, 2015 / Proposed Rules

                                                 airspace, Class E surface area airspace,                List of Subjects in 14 CFR Part 71                      radius of McNary Field from the 164° bearing
                                                 and Class E airspace extending upward                                                                           from the airport clockwise to the 315°
                                                                                                           Airspace, Incorporation by reference,                 bearing, and that airspace within a 6.7-mile
                                                 from 700 feet above the surface at                      Navigation (air).
                                                 McNary Field, Salem, OR. A review of                                                                            radius of McNary Field from the 315° bearing
                                                                                                         The Proposed Amendment                                  from the airport clockwise to the 074°
                                                 the airspace revealed the expanded                                                                              bearing, and that airspace within a 8.2-mile
                                                 airspace is not required for standard                     Accordingly, pursuant to the                          radius of McNary Field from the 074° bearing
                                                 instrument approach procedures for IFR                  authority delegated to me, the Federal                  from the airport clockwise to the 164° bearing
                                                 operations at the airport. Class D                      Aviation Administration proposes to                     of the airport.
                                                 airspace would extend upward from the                   amend 14 CFR part 71 as follows:                          Issued in Seattle, Washington, on
                                                 surface within a 4-mile radius northeast                                                                        September 11, 2015.
                                                 of McNary Field, with a segment                         PART 71—DESIGNATION OF CLASS A,
                                                                                                                                                                 Johanna Forkner,
                                                 extending from the 4-mile radius to 5                   B, C, D, AND E AIRSPACE AREAS; AIR
                                                 miles from the east to the northwest.                                                                           Acting Manager, Operations Support Group,
                                                                                                         TRAFFIC SERVICE ROUTES; AND                             Western Service Center.
                                                 Class E surface area airspace would
                                                 extend upward from the surface within                   REPORTING POINTS                                        [FR Doc. 2015–23508 Filed 9–18–15; 8:45 am]
                                                 a 4-mile radius northeast of McNary                                                                             BILLING CODE 4910–13–P
                                                                                                         ■ 1. The authority citation for 14 CFR
                                                 Field, with a segment extending from                    part 71 continues to read as follows:
                                                 the 4-mile radius of the airport to 5                     Authority: 49 U.S.C. 106(f), 106(g), 40103,
                                                 miles from the east to the northwest.                                                                           SUSQUEHANNA RIVER BASIN
                                                                                                         40113, 40120; E.O. 10854, 24 FR 9565, 3 CFR,
                                                 Class E airspace extending upward from                  1959–1963 Comp., p. 389.                                COMMISSION
                                                 700 feet above the surface would be
                                                 modified to within a 6.2-mile radius                    § 71.1       [Amended]                                  18 CFR Part 806
                                                 south to the northwest of McNary Field,                 ■ 2. The incorporation by reference in
                                                                                                                                                                 Review and Approval of Projects
                                                 with segments extending to 6.7 miles to                 14 CFR 71.1 of FAA Order 7400.9Z,
                                                 the northeast, and 8.2 miles to the                     Airspace Designations and Reporting                     AGENCY:  Susquehanna River Basin
                                                 southeast of the airport.                               Points, dated August 6, 2015, and                       Commission.
                                                    Class D and Class E airspace                         effective September 15, 2015, is                        ACTION: Notice of proposed rulemaking;
                                                 designations are published in paragraph                 amended as follows:                                     notice of public hearing.
                                                 5000, 6002, and 6005, respectively, of
                                                                                                         Paragraph 5000: Class D airspace.
                                                 FAA Order 7400.9Z, dated August 6,                                                                              SUMMARY:    This document contains
                                                 2015 and effective September 15, 2015,                  *        *      *      *       *                        proposed rules that would amend the
                                                 which is incorporated by reference in 14                ANM OR D Salem, OR [Modified]                           regulations of the Susquehanna River
                                                 CFR 71.1. The Class D and Class E                          Salem, McNary Field, OR (lat. 44°54′34″              Basin Commission (Commission) to
                                                 airspace designations listed in this                    N., long. 123°00′09″ W.)                                simplify and clarify the process for
                                                 document will be published                                 That airspace extending upward from the              transferring approvals and to add
                                                 subsequently in the Order.                              surface to and including 2,700 feet MSL                 sections dealing with general permits
                                                                                                         within a 4-mile radius of McNary Field from             and modifications to approvals. These
                                                 Regulatory Notices and Analyses                         the 330° bearing from the airport clockwise             rules are designed to improve the
                                                    The FAA has determined this                          to the 074° bearing, and that airspace within           Commission’s administrative processes
                                                 proposed regulation only involves an                    a 5-mile radius of McNary Field from the
                                                                                                         074° bearing from the airport clockwise to the
                                                                                                                                                                 and add regulatory clarity.
                                                 established body of technical                                                                                   DATES: Comments on the proposed
                                                                                                         330° bearing. This Class D airspace area is
                                                 regulations for which frequent and                      effective during the specific dates and times           rulemaking may be submitted to the
                                                 routine amendments are necessary to                     established in advance by a Notice to                   Commission on or before November 9,
                                                 keep them operationally current.                        Airmen. The effective date and time will                2015. The Commission has scheduled a
                                                 Therefore, this proposed regulation; (1)                thereafter be continuously published in the             public hearing on the proposed
                                                 is not a ‘‘significant regulatory action’’              Airport/Facility Directory.                             rulemaking, to be held October 29, 2015,
                                                 under Executive Order 12866; (2) is not                 Paragraph 6002: Class E Airspace Designated             in Grantville, Pennsylvania. The
                                                 a ‘‘significant rule’’ under DOT                        as Surface Areas.                                       location of the public hearing is listed
                                                 Regulatory Policies and Procedures (44                                                                          in the ADDRESSES section of this
                                                                                                         *        *      *      *       *
                                                 FR 11034; February 26, 1979); and (3)                                                                           document.
                                                 does not warrant preparation of a                       ANM OR E2 Salem, OR [Modified]
                                                 regulatory evaluation as the anticipated                  Salem, McNary Field, OR (lat. 44°54′34″               ADDRESSES: Comments may be mailed
                                                 impact is so minimal. Since this is a                   N., long. 123°00′09″ W.)                                to: Jason E. Oyler, Esq., General
                                                 routine matter that will only affect air                  That airspace extending upward from the               Counsel, Susquehanna River Basin
                                                 traffic procedures and air navigation, it               surface within a 4-mile radius of McNary                Commission, 4423 N. Front Street,
                                                 is certified this proposed rule, when                   Field from the 330° bearing from the airport            Harrisburg, PA 17110–1788, or by email
                                                                                                         clockwise to the 074° bearing, and that                 to regcomments@srbc.net.
                                                 promulgated, would not have a                           airspace within a 5-mile radius of McNary
                                                 significant economic impact on a                                                                                   The public hearing will be held on
                                                                                                         Field from the 074° bearing from the airport            October 29, 2015, at 7:00 p.m., at the
                                                 substantial number of small entities                    clockwise to the 330° bearing.
                                                 under the criteria of the Regulatory                                                                            East Hanover Township Municipal
                                                                                                         Paragraph 6005: Class E Airspace areas                  Building, Main Hall, 8848 Jonestown
                                                 Flexibility Act.
rmajette on DSK7SPTVN1PROD with PROPOSALS




                                                                                                         extending upward from 700 feet or more                  Road, Grantville, Pa. Those wishing to
                                                 Environmental Review                                    above the surface of the earth.                         testify are asked to notify the
                                                    This proposal will be subject to an                  *        *      *      *       *                        Commission in advance, if possible, at
                                                 environmental analysis in accordance                    ANM OR E5 Salem, OR [Modified]                          the regular or electronic addresses given
                                                 with FAA Order 1050.1E,                                                                                         below.
                                                                                                           Salem, McNary Field, OR (lat. 44°54′34″
                                                 ‘‘Environmental Impacts: Policies and                   N., long. 123°00′09″ W.)                                FOR FURTHER INFORMATION CONTACT:
                                                 Procedures’’ prior to any FAA final                       That airspace extending upward from 700               Jason E. Oyler, Esq., General Counsel,
                                                 regulatory action.                                      feet above the surface within a 6.2-mile                telephone: 717–238–0423, ext. 1312;


                                            VerDate Sep<11>2014   13:56 Sep 18, 2015   Jkt 235001   PO 00000   Frm 00002     Fmt 4702   Sfmt 4702   E:\FR\FM\21SEP1.SGM   21SEP1


                                                                     Federal Register / Vol. 80, No. 182 / Monday, September 21, 2015 / Proposed Rules                                                56937

                                                 fax: 717–238–2436; email: joyler@                          2. 18 CFR 806.15. Notice of                        List of Subjects in 18 CFR Part 806
                                                 srbc.net. Also, for further information                 Application. In paragraph (a), the                      Administrative practice and
                                                 on the proposed rulemaking, visit the                   Commission proposes to amend the                      procedure, Water resources.
                                                 Commission’s Web site at www.srbc.net.                  time for notices to be published from 10
                                                                                                                                                                 Accordingly, for the reasons set forth
                                                 SUPPLEMENTARY INFORMATION:        The                   days to 20 days. The Commission has                   in the preamble, the Susquehanna River
                                                 Commission is proposing to make                         received feedback that the 10 days is not             Basin Commission proposes to amend
                                                 regulatory changes to improve its                       always sufficient, especially when                    18 CFR part 806 as follows:
                                                 administrative processes and add                        newspaper notices are required.
                                                 regulatory clarity. The major focus of                  Extending this time frame allows project              PART 806—REVIEW AND APPROVAL
                                                 these changes is to revise and simplify                 sponsors more time to complete the                    OF PROJECTS
                                                 the Commission’s transfer regulation,                   notices without compromising the
                                                 explicitly add provisions for the                       public’s opportunity to provide                       ■ 1. The authority citation for Part 806
                                                                                                         comment. New paragraphs (h) and (i)                   continues to read as follows:
                                                 modification of a Commission approved
                                                 project, and establish a process for the                were added to provide specific                          Authority: Secs. 3.4, 3.5(5), 3.8, 3.10 and
                                                 Commission to develop general permits.                  requirements for the newly proposed 18                15.2, Pub. L. 91–575, 84 Stat. 1509 et seq.
                                                                                                         CFR 806.17 (regarding general permits)                ■ 2. Amend § 806.4 by adding paragraph
                                                    1. 18 CFR 806.6. Transfer of
                                                                                                         and 18 CFR 806.18 (regarding minor                    (a)(9) and revising paragraph (c) to read
                                                 approvals. The Commission proposes to
                                                                                                         modifications), respectively.                         as follows:
                                                 delete the current section and replace it
                                                 with simplified and easier to                              3. New 18 CFR 806.17. General                      § 806.4 Projects requiring review and
                                                 understand regulatory language. This                    Permits. Currently, the Commission                    approval.
                                                 revision still allows the Executive                     does not have a process to establish                     (a) * * *
                                                 Director to approve transfers of                        general permits. The Commission is                       (9) Any project subject to coverage
                                                 approvals. For approvals greater than 10                proposing a new section that would                    under a general permit issued under
                                                 years old, the current regulation                       provide the Commission the ability to                 § 806.17.
                                                 requires the project sponsor to submit                  develop, issue and administer general                 *      *     *      *     *
                                                 entirely new applications in order to                   permits. The new regulation provides                     (c) Any project that did not require
                                                 transfer the project. The Commission                    procedures for issuance and                           Commission approval prior to January 1,
                                                 has received complaints that this                       administration of permits, as well as                 2007, and not otherwise exempt from
                                                 requirement is onerous and has the                      standards for denial of coverage and                  the requirements of paragraph (a)(1)(iv),
                                                 effect of cutting short the term of the                 when an individual approval would be                  (a)(2)(v), or (a)(3)(iv) pursuant to
                                                 approval solely because ownership is                    required. In crafting this regulation, the            paragraph (b) of this section, may be
                                                 changing, despite no changes to the                     Commission looked to similar                          undertaken by a new project sponsor
                                                 project itself or the use of the water. The             regulations of its member jurisdictions               upon a change of ownership pending
                                                 revised language will allow the transfer                for guidance. In addition, changes to 18              action on a transfer application under
                                                 to occur conditioned on the submission                  CFR 806.4 and 806.14 were necessary to                § 806.6.
                                                 of an updated metering and monitoring                   accommodate the addition of this new                  ■ 3. Revise § 806.6 to read as follows:
                                                 plan consistent with 18 CFR 806.30. For                 section.
                                                 projects undergoing a change of                                                                               § 806.6    Transfer of approvals.
                                                                                                            4. New 18 CFR 806.18. Approval
                                                 ownership that have an unapproved                       modifications. The Commission is                        (a) An existing Commission approval
                                                 withdrawal, consumptive use and/or                                                                            may be transferred to a new project
                                                                                                         proposing to add a section specific to
                                                 diversion associated with them, usually                                                                       sponsor by the Executive Director
                                                                                                         modifications of approvals. The
                                                 referred to as grandfathered aspects of                                                                       provided:
                                                                                                         Commission currently accepts
                                                 the project, the current requirement to                                                                         (1) The application for transfer is
                                                                                                         applications for modification, but does
                                                 submit applications for these                                                                                 submitted within 90 days of a transfer
                                                                                                         not have a clear process set forth in the
                                                 grandfathered aspects contained in 18                                                                         or change in ownership of a project.
                                                 CFR 806.6(c) and 18 CFR 806.4(a)(1)(iv),                regulations. The proposed section also                  (2) The new project sponsor operates
                                                 (a)(2)(v) and (a)(3)(iv) is retained.                   establishes the concept of minor and                  the project subject to the same terms
                                                 However, the revised language removes                   major modifications. The process for                  and conditions of the existing approval
                                                 the requirement that these applications                 minor modifications provides a process                pending approval of the transfer
                                                 must be made within 90 days of the date                 for minor changes to approval                         application.
                                                 of a change in ownership. The                           conditions that are more likely to be                   (3) Any noncompliance by the
                                                 Commission found that it was difficult                  administrative in nature and have a low               existing project sponsor associated with
                                                 for project sponsors to meet this                       degree of controversy, and therefore can              the project or by the new project
                                                 deadline. The revised language will                     appropriately be authorized by the                    sponsor associated with other projects is
                                                 allow the Executive Director to approve                 Executive Director. In addition, a                    resolved to the Commission’s
                                                 the transfer with a condition requiring                 change to 18 CFR 806.14 is necessary to               satisfaction.
                                                 these applications to be made. This will                provide specific application                            (4) If the existing approval is greater
                                                 allow the Commission to consider the                    requirements for minor modifications.                 than 10 years old, the transfer shall be
                                                 complexity and number of                                Minor modifications are specifically                  conditioned to require the submission of
rmajette on DSK7SPTVN1PROD with PROPOSALS




                                                 grandfathered sources that will be                      listed. All modifications that are not                an updated metering and monitoring
                                                 subject to the application requirements                 specifically listed as a minor                        plan consistent with the requirements of
                                                 and establish an appropriate and                        modification are major modifications.                 § 806.30.
                                                 realistic timeframe in the condition for                As a part of the rulemaking, the                        (5) If the existing project has an
                                                 these applications to be submitted. Due                 Commission has included a non-                        unapproved withdrawal, consumptive
                                                 to the revision of the language in 18 CFR               exhaustive list of common major                       use and/or diversion listed in paragraph
                                                 806.6, a corresponding revision was                     modifications to provide guidance to the              (b), the transfer shall be conditioned to
                                                 required to 18 CFR 806.4(c).                            public and the regulated community.                   require the submission of a new


                                            VerDate Sep<11>2014   13:56 Sep 18, 2015   Jkt 235001   PO 00000   Frm 00003   Fmt 4702   Sfmt 4702   E:\FR\FM\21SEP1.SGM    21SEP1


                                                 56938               Federal Register / Vol. 80, No. 182 / Monday, September 21, 2015 / Proposed Rules

                                                 application for review and approval of                  Applications for minor modifications                  § 806.17   General permits.
                                                 the unapproved withdrawal,                              must contain the following:                              (a) Coverage and purpose. The
                                                 consumptive use and/or diversion                          (1) Description of the project;                     Commission may issue a general permit,
                                                 consistent with §§ 806.4 and 806.14.                      (2) Description of all sources,                     in lieu of issuing individual approvals,
                                                    (6) Any modifications proposed by                    consumptive uses and diversions                       for a specifically described category of
                                                 the new project sponsor shall be subject                related to the project;                               diversions, water withdrawals and
                                                 to a separate application and review                      (3) Description of the requested                    consumptive uses that:
                                                 process under §§ 806.14. and 806.18.                    modification;                                            (1) Involve the same or substantially
                                                    (b) Previously unapproved activities                   (4) Statement of the need for the                   similar types of operations or activities,
                                                 associated with a project subject to                    requested modification;                                  (2) Require the same limitations or
                                                 transfer under paragraph (a) of this                      (5) Demonstration that the anticipated              operating conditions, or both,
                                                 section include:                                        impact of the requested modification                     (3) Require the same or similar
                                                    (1) The project has an associated pre-               will not adversely impact the water                   monitoring and reporting, and
                                                 compact consumptive water use that has                  resources of the basin; and                              (4) Will result in minimal adverse
                                                 not been subject to approval or had                       (6) Any other information that the                  impacts.
                                                 mitigation approved by the                              Commission or Executive Director                         (b) Procedure for issuance. (1) At least
                                                 Commission.                                             deems necessary.                                      30 days prior to the issuance of a
                                                    (2) The project has an associated
                                                                                                         ■ 5. Amend § 806.15 by revising                       general permit, the Commission shall
                                                 diversion that was initiated prior to
                                                                                                         paragraph (a) and adding paragraphs (h)               publish notice in the Federal Register
                                                 January 23, 1971.
                                                                                                         and (i) to read as follows:                           and the member jurisdiction
                                                    (3) The project has an associated
                                                                                                                                                               administrative bulletins of the intent to
                                                 groundwater withdrawal that was                         § 806.15    Notice of application.
                                                                                                                                                               issue a general permit.
                                                 initiated prior to July 13, 1978 and that                 (a) Any project sponsor submitting an
                                                 has not been approved by the                                                                                     (2) At least 30 days shall be provided
                                                                                                         application to the Commission shall                   for interested members of the public and
                                                 Commission.                                             provide notice thereof to the appropriate
                                                    (4) The project has an associated                                                                          Federal, State and local agencies to
                                                                                                         agency of the member State, each                      provide written comments on a
                                                 surface water withdrawal that was                       municipality in which the project is
                                                 initiated prior to November 11, 1995                                                                          proposed general permit.
                                                                                                         located, and the county planning agency                  (3) The Commission or Executive
                                                 and that has not been approved by the                   of each county in which the project is
                                                 Commission.                                                                                                   Director may, in its discretion, hold a
                                                                                                         located. The project sponsor shall also               public hearing on a proposed general
                                                    (5) The project has a consumptive
                                                                                                         publish notice of submission of the                   permit.
                                                 water use approval and has an
                                                                                                         application at least once in a newspaper                 (4) The issuance of a general permit
                                                 associated withdrawal that has not been
                                                                                                         of general circulation serving the area in            adopted by the Commission will be
                                                 approved by the Commission.
                                                    (c) Upon undergoing a change of                      which the project is located. The project             published in the Federal Register and
                                                 name that does not affect ownership or                  sponsor shall also meet any of the notice             the member jurisdiction administrative
                                                 control of the project, the project                     requirements set forth in paragraphs (b)              bulletins. This notice shall set forth the
                                                 sponsor must request a reissuance of the                through (f) of this section, if applicable.           effective date of the general permit.
                                                 project’s approval by the Executive                     All notices required under this section                  (c) Administration of general permits.
                                                 Director within 90 days from the date of                shall be provided or published no later               General permits may be issued,
                                                 the change.                                             than 20 days after submission of the                  amended, suspended, revoked, reissued
                                                 ■ 4. Amend § 806.14 by revising
                                                                                                         application to the Commission and shall               or terminated under this section.
                                                 paragraph (a) introductory text and                     contain a description of the project, its                (1) Any general permit issued under
                                                 adding paragraph (d) to read as follows:                purpose, the requested quantity of water              this section shall set forth the
                                                                                                         to be withdrawn obtained from for                     applicability of the permit and the
                                                 § 806.14   Contents of applications.                    sources other than withdrawals or                     conditions that apply to any diversion,
                                                   (a) Except with respect to applications               consumptively used, and the address,                  withdrawal or consumptive use
                                                 to renew an existing Commission                         electronic mail address, and phone                    authorized by such general permit.
                                                 approval and Notices of Intent for                      number of the project sponsor and the                    (2) The Commission may fix a term to
                                                 approvals by rule and general permits,                  Commission. All such notices shall be                 any general permit issued.
                                                 applications shall include, but not be                  in a form and manner as prescribed by                    (3) A project sponsor shall obtain
                                                 limited to, the following information                   the Commission.                                       permission to divert, withdraw or
                                                 and, where applicable, shall be                         *     *     *     *     *                             consumptively use water in accordance
                                                 submitted on forms and in the manner                      (h) For Notices of Intent (NOI) seeking             with a general permit by filing a Notice
                                                 prescribed by the Commission. Renewal                   coverage under a general permit, the                  of Intent (NOI) with the Commission, in
                                                 applications shall include such                         project sponsor shall provide the NOI to              a form and manner determined by the
                                                 information that the Commission                         the appropriate agency of the member                  Commission.
                                                 determines to be necessary for the                      State and each municipality and county                   (4) Approval of coverage under a
                                                 review of same, shall be subject to the                 planning agency in which the project is               general permit shall be determined by
                                                 standards set forth in Subpart C—                       located and any additional notice                     the Executive Director or by any other
                                                 Standards for Review and Approval of                    identified in the general permit.                     manner that the Commission shall
rmajette on DSK7SPTVN1PROD with PROPOSALS




                                                 this part, and shall likewise be                          (i) For applications for minor                      establish for any general permit.
                                                 submitted on forms and in the manner                    modifications, the project sponsor shall                 (5) The Commission may set a fee for
                                                 prescribed by the Commission.                           provide notice of the application to the              NOIs to any general permit.
                                                 *     *     *     *     *                               appropriate agency of the member State                   (6) A project sponsor shall provide
                                                   (d) Applications for minor                            and each municipality and county                      notice for NOIs in accordance with
                                                 modifications must be complete and                      planning agency in the which the                      § 806.15(h) and any additional notice
                                                 will be on a form and in a manner                       project is located.                                   requirements that the Commission may
                                                 prescribed by the Commission.                           ■ 6. Add § 806.17 to read as follows:                 adopt for any general permit.


                                            VerDate Sep<11>2014   13:56 Sep 18, 2015   Jkt 235001   PO 00000   Frm 00004   Fmt 4702   Sfmt 4702   E:\FR\FM\21SEP1.SGM   21SEP1


                                                                     Federal Register / Vol. 80, No. 182 / Monday, September 21, 2015 / Proposed Rules                                                 56939

                                                    (7) The requirements of § 806.16                     action on an individual approval                        (3) The Commission may approve,
                                                 apply to the review of NOIs to any                      application.                                          approve with conditions or deny an
                                                 general permit.                                         ■ 7. Add § 806.18 to read as follows:                 application for major modification.
                                                    (8) Upon reissuance or amendment of                                                                          Dated: September 11, 2015.
                                                                                                         § 806.18    Approval modifications.
                                                 a general permit, all project sponsors                                                                        Stephanie L. Richardson,
                                                 permitted to divert, withdraw or                           (a) General. A project sponsor shall
                                                                                                         submit an application for modification                Secretary to the Commission.
                                                 consumptively use water in accordance
                                                                                                         of a current approval prior to making a               [FR Doc. 2015–23304 Filed 9–18–15; 8:45 am]
                                                 with the previous general permit shall
                                                 be permitted to continue to operate with                change in the design, operational plans,              BILLING CODE 7040–01–P

                                                 the renewed or modified general permit                  or use as presented in the application
                                                 unless otherwise notified by the                        upon which the approval was originally
                                                 Commission.                                             issued, and that will affect the terms                DEPARTMENT OF DEFENSE
                                                    (d) Denial of coverage. The Executive                and conditions of the current approval.
                                                                                                            (b) Applications for modification. (1)             Defense Acquisition Regulations
                                                 Director will deny or revoke coverage                                                                         System
                                                 under a general permit when one or                      A project sponsor may apply for a
                                                 more of the following conditions exist:                 modification of a current approval by
                                                                                                         submitting an application for                         48 CFR Parts 202, 212, 246, and 252
                                                    (1) The project or project sponsor does
                                                 not or can no longer meet the criteria for              modification to the Commission.                       [Docket No. 2015–0038]
                                                 coverage under a general permit.                           (c) Minor modifications. The
                                                                                                         following are considered minor                        RIN 0750–AI58
                                                    (2) The diversion, withdrawal or
                                                 consumptive use, individually or in                     modifications:                                        Defense Federal Acquisition
                                                 combination with other similar                             (1) Correction of typographical errors;            Regulation Supplement: Detection and
                                                                                                            (2) Changes to monitoring or metering              Avoidance of Counterfeit Electronic
                                                 Commission regulated activities, is
                                                                                                         conditions;                                           Parts—Further Implementation
                                                 causing or has the potential to cause
                                                                                                            (3) Addition of sources of water for
                                                 adverse impacts to water resources or                                                                         (DFARS Case 2014–D005)
                                                                                                         consumptive use;
                                                 competing water users.
                                                                                                            (4) Changes to the authorized water                AGENCY:  Defense Acquisition
                                                    (3) The project does not meet the                    uses;                                                 Regulations System, Department of
                                                 requirements of § 806.21(a) or (b).                        (5) Changes to conditions setting a                Defense (DoD).
                                                    (4) The project includes other                       schedule for developing, implementing,                ACTION: Proposed rule.
                                                 diversions, withdrawals or consumptive                  and/or reporting on monitoring, data
                                                 uses that require an individual approval                collection and analyses;                              SUMMARY:   DoD is proposing to amend
                                                 and the issuance of both an individual                     (6) Changes to the design of intakes;              the Defense Federal Acquisition
                                                 approval and a general permit for the                      (7) Increases to total system limits that          Regulation Supplement (DFARS) to
                                                 project would constitute an undue                       were established based on the projected               further implement a requirement of the
                                                 administrative burden on the                            demand of the project; and                            National Defense Authorization Act for
                                                 Commission.                                                (8) Modify approval to allow the                   Fiscal Year 2012, as modified by a
                                                    (5) The Executive Director determines                modification of extraction well network               section of the National Defense
                                                 that a project cannot be effectively                    used for groundwater remediation                      Authorization Act for Fiscal Year 2015,
                                                 regulated under a general permit and is                 systems.                                              that addresses required sources of
                                                 more effectively regulated under an                        (d) Major modifications. Major                     electronic parts for defense contractors
                                                 individual approval.                                    modifications are changes not                         and subcontractors.
                                                    (e) Requiring an individual approval.                considered to be minor modifications.                 DATES: Comments on the proposed rule
                                                 If coverage is denied or revoked under                  Major modifications may include, but                  should be submitted in writing to the
                                                 paragraph (d) of this section, the project              are not limited to:                                   address shown below on or before
                                                 sponsor shall be notified in writing. The                  (1) Increases in the quantity of water             November 20, 2015, to be considered in
                                                 notice will include a brief statement for               withdrawals, consumptive uses or                      the formation of a final rule.
                                                 the reasons for the decision. If coverage               diversions;                                           ADDRESSES: Submit comments
                                                 under a general permit was previously                      (2) Increases to peak day consumptive              identified by DFARS Case 2014–D005,
                                                 granted, the notice will also include a                 water use;                                            using any of the following methods:
                                                 deadline for submission of an                              (3) Increases to the instantaneous                    Æ Regulations.gov: http://
                                                 application for an individual approval.                 withdrawal rate or changes from a single              www.regulations.gov. Submit comments
                                                 Timely submission of a complete                         withdrawal rate to a varied withdrawal                via the Federal eRulemaking portal by
                                                 application will result in continuation                 rate;                                                 entering ‘‘DFARS Case 2014–D005’’
                                                 of coverage of the applicable                              (4) Changes affecting passby flows                 under the heading ‘‘Enter keyword or
                                                 withdrawal, consumptive use or                          requirements; and                                     ID’’ and selecting ‘‘Search.’’ Select the
                                                 diversion under the general permit,                        (5) Changes that have the potential for            link ‘‘Submit a Comment’’ that
                                                 until the Commission takes final action                 adverse impacts to water resources or                 corresponds with ‘‘DFARS Case 2014–
                                                 on the pending individual approval                      competing water users.                                D005.’’ Follow the instructions provided
                                                 application.                                               (e) Notice and approval. (1)                       at the ‘‘Submit a Comment’’ screen.
                                                    (f) Action of the commission. Action                 Applications for modifications are                    Please include your name, company
rmajette on DSK7SPTVN1PROD with PROPOSALS




                                                 by the Executive Director denying or                    subject to the notice requirements of                 name (if any), and ‘‘DFARS Case 2014–
                                                 revoking coverage under a general                       § 806.15.                                             D005’’ on your attached document.
                                                 permit under paragraph (d) of this                         (2) The Commission or Executive                       Æ Email: osd.dfars@mail.mil. Include
                                                 section, or requiring an individual                     Director may approve, approve with                    DFARS Case 2014–D005 in the subject
                                                 approval under paragraph (e) of this                    conditions or deny an application for                 line of the message.
                                                 section, is not a final action of the                   minor modification, or direct that an                    Æ Fax: 571–372–6094.
                                                 Commission until the project sponsor                    application for major modification be                    Æ Mail: Defense Acquisition
                                                 submits and the Commission takes final                  made.                                                 Regulations System, Attn: Ms. Amy G.


                                            VerDate Sep<11>2014   13:56 Sep 18, 2015   Jkt 235001   PO 00000   Frm 00005   Fmt 4702   Sfmt 4702   E:\FR\FM\21SEP1.SGM   21SEP1



Document Created: 2015-12-15 09:39:20
Document Modified: 2015-12-15 09:39:20
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionProposed Rules
ActionNotice of proposed rulemaking; notice of public hearing.
DatesComments on the proposed rulemaking may be submitted to the Commission on or before November 9, 2015. The Commission has scheduled a public hearing on the proposed rulemaking, to be held October 29, 2015, in Grantville, Pennsylvania. The location of the public hearing
ContactJason E. Oyler, Esq., General Counsel, telephone: 717-238-0423, ext. 1312; fax: 717-238-2436; email: [email protected] Also, for further information on the proposed rulemaking, visit the Commission's Web site at www.srbc.net.
FR Citation80 FR 56936 
CFR AssociatedAdministrative Practice and Procedure and Water Resources