80_FR_57991 80 FR 57805 - Cascade Clean Energy, Inc.; Kingdom Energy Products; Notice of Transfer of Exemption

80 FR 57805 - Cascade Clean Energy, Inc.; Kingdom Energy Products; Notice of Transfer of Exemption

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 186 (September 25, 2015)

Page Range57805-57805
FR Document2015-24383

Federal Register, Volume 80 Issue 186 (Friday, September 25, 2015)
[Federal Register Volume 80, Number 186 (Friday, September 25, 2015)]
[Notices]
[Page 57805]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-24383]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 5069-011]


Cascade Clean Energy, Inc.; Kingdom Energy Products; Notice of 
Transfer of Exemption

    1. By letter filed August 19, 2015, Neva Van Hook, d/b/a Kingdom 
Energy Products (KEP) informed the Commission that the exemption from 
licensing for the Sygitowicz Creek Power Project, FERC No. 5069, 
originally issued July 14, 1982,\1\ has been transferred to Kingdom 
Energy Products. The project is located on the Sygitowicz Creek, 
Whatcom County, Washington. The transfer of an exemption does not 
require Commission approval.
---------------------------------------------------------------------------

    \1\ 20 FERC ] 62,051, Order Granting Exemption From Licensing of 
a Small Hydroelectric Project of 5 Megawatts or Less (1982).
---------------------------------------------------------------------------

    2. Kingdom Energy Products is now the exemptee of the Sygitowicz 
Creek Power Project, FERC No. 5069. All correspondence should be 
forwarded to: Mr. Alan Van Hook, Kingdom Energy Products, Box 557, 
Klawock, AK 99925.

    Dated: September 3, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-24383 Filed 9-24-15; 8:45 am]
 BILLING CODE 6717-01-P



                                                                               Federal Register / Vol. 80, No. 186 / Friday, September 25, 2015 / Notices                                                   57805

                                                                                       TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                           Satisfies
                                                                  Statutory provision                                                               Description                                             (Y/N)

                                                  FPA 30(a)(3)(A), as amended by HREA .....             The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or            Y
                                                                                                          similar manmade water conveyance that is operated for the distribution of water for
                                                                                                          agricultural, municipal, or industrial consumption and not primarily for the generation
                                                                                                          of electricity.
                                                  FPA 30(a)(3)(C)(i), as amended by HREA ..             The facility is constructed, operated, or maintained for the generation of electric power         Y
                                                                                                          and uses for such generation only the hydroelectric potential of a non-federally
                                                                                                          owned conduit.
                                                  FPA 30(a)(3)(C)(ii), as amended by HREA               The facility has an installed capacity that does not exceed 5 megawatts .......................   Y
                                                  FPA 30(a)(3)(C)(iii), as amended by HREA              On or before August 9, 2013, the facility is not licensed, or exempted from the licens-           Y
                                                                                                          ing requirements of Part I of the FPA.



                                                     Preliminary Determination: Based                      ecomment.asp. You must include your                    Products (KEP) informed the
                                                  upon the above criteria, Commission                      name and contact information at the end                Commission that the exemption from
                                                  staff preliminarily determines that the                  of your comments. For assistance,                      licensing for the Sygitowicz Creek
                                                  proposal satisfies the requirements for a                please contact FERC Online Support at                  Power Project, FERC No. 5069,
                                                  qualifying conduit hydropower facility,                  FERCOnlineSupport@ferc.gov, (866)                      originally issued July 14, 1982,1 has
                                                  which is not required to be licensed or                  208–3676 (toll free), or (202) 502–8659                been transferred to Kingdom Energy
                                                  exempted from licensing.                                 (TTY). In lieu of electronic filing, please            Products. The project is located on the
                                                     Comments and Motions to Intervene:                    send a paper copy to: Secretary, Federal               Sygitowicz Creek, Whatcom County,
                                                  Deadline for filing comments contesting                  Energy Regulatory Commission, 888                      Washington. The transfer of an
                                                  whether the facility meets the qualifying                First Street NE., Washington, DC 20426.                exemption does not require Commission
                                                  criteria is 45 days from the issuance                    A copy of all other filings in reference               approval.
                                                  date of this notice.                                     to this application must be accompanied                   2. Kingdom Energy Products is now
                                                     Deadline for filing motions to                        by proof of service on all persons listed              the exemptee of the Sygitowicz Creek
                                                  intervene is 30 days from the issuance                   in the service list prepared by the                    Power Project, FERC No. 5069. All
                                                  date of this notice.                                     Commission in this proceeding, in                      correspondence should be forwarded to:
                                                     Anyone may submit comments or a                       accordance with 18 CFR 4.34(b) and                     Mr. Alan Van Hook, Kingdom Energy
                                                  motion to intervene in accordance with                   385.2010.                                              Products, Box 557, Klawock, AK 99925.
                                                  the requirements of Rules of Practice                      Locations of Notice of Intent: Copies                  Dated: September 3, 2015.
                                                  and Procedure, 18 CFR 385.210 and                        of the notice of intent can be obtained
                                                  385.214. Any motions to intervene must                                                                          Nathaniel J. Davis, Sr.,
                                                                                                           directly from the applicant or such                    Deputy Secretary.
                                                  be received on or before the specified                   copies can be viewed and reproduced at
                                                  deadline date for the particular                                                                                [FR Doc. 2015–24383 Filed 9–24–15; 8:45 am]
                                                                                                           the Commission in its Public Reference
                                                  proceeding.                                              Room, Room 2A, 888 First Street NE.,
                                                                                                                                                                  BILLING CODE 6717–01–P
                                                     Filing and Service of Responsive
                                                                                                           Washington, DC 20426. The filing may
                                                  Documents: All filings must (1) bear in
                                                                                                           also be viewed on the Web at http://                   DEPARTMENT OF ENERGY
                                                  all capital letters the ‘‘COMMENTS
                                                                                                           www.ferc.gov/docs-filing/elibrary.asp
                                                  CONTESTING QUALIFICATION FOR A
                                                                                                           using the ‘‘eLibrary’’ link. Enter the                 Federal Energy Regulatory
                                                  CONDUIT HYDROPOWER FACILITY’’
                                                                                                           docket number (i.e., CD15–33) in the                   Commission
                                                  or ‘‘MOTION TO INTERVENE,’’ as
                                                                                                           docket number field to access the
                                                  applicable; (2) state in the heading the                                                                        [Docket No. RM98–1–000]
                                                                                                           document. For assistance, call toll-free
                                                  name of the applicant and the project
                                                                                                           1–866–208–3676 or email                                Records Governing Off-the-Record
                                                  number of the application to which the
                                                                                                           FERCOnlineSupport@ferc.gov. For TTY,                   Communications; Public Notice
                                                  filing responds; (3) state the name,
                                                                                                           call (202) 502–8659.
                                                  address, and telephone number of the                                                                              This constitutes notice, in accordance
                                                  person filing; and (4) otherwise comply                    Dated: September 3, 2015.
                                                                                                                                                                  with 18 CFR 385.2201(b), of the receipt
                                                  with the requirements of sections                        Nathaniel J. Davis, Sr.,
                                                                                                                                                                  of prohibited and exempt off-the-record
                                                  385.2001 through 385.2005 of the                         Deputy Secretary.                                      communications. Order No. 607 (64 FR
                                                  Commission’s regulations.1 All                           [FR Doc. 2015–24375 Filed 9–24–15; 8:45 am]            51222, September 22, 1999) requires
                                                  comments contesting Commission staff’s                   BILLING CODE 6717–01–P                                 Commission decisional employees, who
                                                  preliminary determination that the                                                                              make or receive a prohibited or exempt
                                                  facility meets the qualifying criteria                                                                          off-the-record communication relevant
                                                  must set forth their evidentiary basis.                  DEPARTMENT OF ENERGY                                   to the merits of a contested proceeding,
                                                     The Commission strongly encourages
                                                                                                                                                                  to deliver to the Secretary of the
                                                  electronic filing. Please file motions to                Federal Energy Regulatory
                                                                                                                                                                  Commission, a copy of the
                                                  intervene and comments using the                         Commission
                                                                                                                                                                  communication, if written, or a
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  Commission’s eFiling system at http://                   [Project No. 5069–011]                                 summary of the substance of any oral
                                                  www.ferc.gov/docs-filing/efiling.asp.
                                                                                                                                                                  communication.
                                                  Commenters can submit brief comments                     Cascade Clean Energy, Inc.; Kingdom                      Prohibited communications are
                                                  up to 6,000 characters, without prior                    Energy Products; Notice of Transfer of                 included in a public, non-decisional file
                                                  registration, using the eComment system                  Exemption
                                                  at http://www.ferc.gov/docs-filing/                                                                               1 20 FERC ¶ 62,051, Order Granting Exemption
                                                                                                            1. By letter filed August 19, 2015,                   From Licensing of a Small Hydroelectric Project of
                                                    1 18   CFR 385.2001–2005 (2015).                       Neva Van Hook, d/b/a Kingdom Energy                    5 Megawatts or Less (1982).



                                             VerDate Sep<11>2014    19:58 Sep 24, 2015   Jkt 235001   PO 00000   Frm 00023   Fmt 4703   Sfmt 4703   E:\FR\FM\25SEN1.SGM   25SEN1



Document Created: 2018-02-26 10:20:12
Document Modified: 2018-02-26 10:20:12
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 57805 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR