80_FR_58432 80 FR 58245 - New England Hydropower Company, LLC; Notice of Application Accepted for Filing With the Commission, Intent To Waive Scoping, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Terms and Conditions, and Recommendations, and Establishing an Expedited Schedule for Processing

80 FR 58245 - New England Hydropower Company, LLC; Notice of Application Accepted for Filing With the Commission, Intent To Waive Scoping, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Terms and Conditions, and Recommendations, and Establishing an Expedited Schedule for Processing

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 187 (September 28, 2015)

Page Range58245-58246
FR Document2015-24539

Federal Register, Volume 80 Issue 187 (Monday, September 28, 2015)
[Federal Register Volume 80, Number 187 (Monday, September 28, 2015)]
[Notices]
[Pages 58245-58246]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-24539]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14550-001]


New England Hydropower Company, LLC; Notice of Application 
Accepted for Filing With the Commission, Intent To Waive Scoping, 
Soliciting Motions To Intervene and Protests, Ready for Environmental 
Analysis, and Soliciting Comments, Terms and Conditions, and 
Recommendations, and Establishing an Expedited Schedule for Processing

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Exemption from Licensing.
    b. Project No.: 14550-001.
    c. Date filed: June 26, 2015.
    d. Applicant: New England Hydropower Company, LLC.
    e. Name of Project: Hanover Pond Dam Hydroelectric Project.
    f. Location: On the Quinnipiac River, in the City of Meriden, New 
Haven County, Connecticut. The project would not occupy lands of the 
United States.
    g. Filed Pursuant to: Public Utility Regulatory Policies Act of 
1978, 16 U.S.C. 2705, 2708.
    h. Applicant Contact: Michael C. Kerr, New England Hydropower 
Company, LLC, P.O. Box 5524, Beverly, MA 01915; (978) 360-2547.
    i. FERC Contact: Erin Kimsey, (202) 502-8621, or email at 
[email protected].
    j. Deadline for filing motions to intervene and protests, comments, 
terms and conditions, and recommendations: Due to the small size and 
location of this project and the close coordination with state and 
federal agencies during preparation of the application, the 60-day 
timeframe in 18 CFR 4.34(b) is shortened. Instead, motions to intervene 
and protests, comments, terms and conditions, and recommendations are 
due 30 days from the issuance date of this notice. All reply comments 
must be filed with the Commission within 45 days from the issuance date 
of this notice.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene, protests, comments, and recommendations using the 
Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
http://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-13806-004.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. Waiver of Pre-filing Consultation: In its application, the New 
England Hydropower Company requested that the Commission waive the 
requirement to conduct second stage consultation pursuant to section 
4.38(c) of the Commission's regulations. The applicant provided 
documentation indicating that the Connecticut Department of Energy and 
Environmental Protection, National Marine Fisheries Service, and United 
States Fish and Wildlife Service had agreed to waive second stage 
consultation on September 10, 2015, August 26, 2015, and August 26, 
2015, respectively. Therefore, we are waiving the requirement to 
conduct second stage consultation pursuant to section 4.38(c) of the 
regulations and accepting the application.

[[Page 58246]]

    l. This application has been accepted for filing and is now ready 
for environmental analysis.
    m. The proposed Hanover Pond Dam Hydroelectric Project would 
consist of: (1) An existing 25-foot-high, 150-foot-long earth 
embankment dam with four low-level sluice gates and a 250-foot-long 
concrete spillway; (2) an existing 71.0-acre impoundment (i.e., Hanover 
Pond) with a storage capacity of 1,800 acre-feet at a normal operating 
elevation of about 87.3 feet National Geodetic Vertical Datum of 1929 
(NGVD29); (3) an existing 175-foot-long, 16.0-foot-wide fish ladder; 
(4) a new 8-foot-high, 12.5-foot-wide hydraulically-powered sluice gate 
equipped with a new 8-foot-high, 17-foot-wide trashrack with 9-inch bar 
spacing; (5) a new 78-foot-long, 12-foot-diameter buried precast 
concrete penstock; (6) a new 46.5-foot-long, 11.65-foot-wide Archimedes 
screw generator unit, with an installed capacity of 192 kilowatts; (7) 
a new 12-foot-high, 18-foot-long, 16.0-foot-wide concrete powerhouse 
containing a new gearbox, generator, and electrical controls; (8) a new 
15-foot-long, variable-width concrete tailrace; (9) a new 500-foot-
long, 35-kilovolt above-ground transmission line connecting the 
powerhouse to Connecticut Light and Power's distribution system; and 
(10) appurtenant facilities. The estimated annual generation of the 
proposed Hanover Pond Dam Hydroelectric Project would be about 900 
megawatt-hours.
    n. Due to the applicant's close coordination with federal and state 
agencies during the preparation of the application, completed studies 
during pre-filing consultation, and agency recommended preliminary 
terms and conditions, we intend to waive scoping and expedite the 
exemption process. Based on a review of the application, resource 
agency consultation letters including the preliminary 30(c) terms and 
conditions, and comments filed to date, Commission staff intends to 
prepare a single environmental assessment (EA). Commission staff 
determined that the issues that need to be addressed in its EA have 
been adequately identified during the pre-filing period, which included 
a public scoping meeting and site visit, and no new issues are likely 
to be identified through additional scoping. The EA will consider 
assessing the potential effects of project construction and operation 
on geology and soils, aquatic, terrestrial, threatened and endangered 
species, recreation and land use, aesthetic, and cultural and historic 
resources.
    o. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. For assistance, contact FERC Online Support. A 
copy is also available for inspection and reproduction at the address 
in item h above.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    p. Any qualified applicant desiring to file a competing application 
must submit to the Commission, on or before the specified intervention 
deadline date, a competing development application, or a notice of 
intent to file such an application. Submission of a timely notice of 
intent allows an interested person to file the competing development 
application no later than 120 days after the specified intervention 
deadline date. Applications for preliminary permits will not be 
accepted in response to this notice.
    A notice of intent must specify the exact name, business address, 
and telephone number of the prospective applicant, and must include an 
unequivocal statement of intent to submit a development application. A 
notice of intent must be served on the applicant(s) named in this 
public notice.
    Anyone may submit comments, a protest, or a motion to intervene in 
accordance with the requirements of Rules of Practice and Procedure, 18 
CFR 385.210, .211, .214. In determining the appropriate action to take, 
the Commission will consider all protests or other comments filed, but 
only those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    All filings must (1) bear in all capital letters the title 
``PROTEST'', ``MOTION TO INTERVENE'', ``NOTICE OF INTENT TO FILE 
COMPETING APPLICATION,'' ``COMPETING APPLICATION,'' ``COMMENTS,'' 
``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' or ``TERMS AND CONDITIONS;'' 
(2) set forth in the heading the name of the applicant and the project 
number of the application to which the filing responds; (3) furnish the 
name, address, and telephone number of the person protesting or 
intervening; and (4) otherwise comply with the requirements of 18 CFR 
385.2001 through 385.2005. All comments, recommendations, terms and 
conditions or prescriptions must set forth their evidentiary basis and 
otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may 
obtain copies of the application directly from the applicant. A copy of 
any protest or motion to intervene must be served upon each 
representative of the applicant specified in the particular 
application. A copy of all other filings in reference to this 
application must be accompanied by proof of service on all persons 
listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    q. Procedural Schedule: The application will be processed according 
to the following procedural schedule. Revisions to the schedule may be 
made as appropriate.

------------------------------------------------------------------------
               Milestone                           Target date
------------------------------------------------------------------------
Notice of the availability of the EA..  January 2016.
------------------------------------------------------------------------


    Dated: September 16, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-24539 Filed 9-25-15; 8:45 am]
BILLING CODE 6717-01-P



                                                                        Federal Register / Vol. 80, No. 187 / Monday, September 28, 2015 / Notices                                             58245

                                                 Docket Numbers: RP15–1279–000.                          Any person desiring to intervene or                and conditions, and recommendations:
                                                 Applicants: Texas Eastern                            protest in any of the above proceedings               Due to the small size and location of
                                              Transmission, LP.                                       must file in accordance with Rules 211                this project and the close coordination
                                                 Description: § 4(d) Rate Filing: Pro                 and 214 of the Commission’s                           with state and federal agencies during
                                              Forma Operational Balancing                             Regulations (18 CFR 385.211 and                       preparation of the application, the 60-
                                              Agreement to be effective 11/1/2015.                    § 385.214) on or before 5:00 p.m. Eastern             day timeframe in 18 CFR 4.34(b) is
                                                 Filed Date: 9/17/15.                                 time on the specified comment date.                   shortened. Instead, motions to intervene
                                                 Accession Number: 20150917–5099.                     Protests may be considered, but                       and protests, comments, terms and
                                                 Comments Due: 5 p.m. ET 9/29/15.                     intervention is necessary to become a                 conditions, and recommendations are
                                                 Docket Numbers: RP15–1280–000.                       party to the proceeding.                              due 30 days from the issuance date of
                                                 Applicants: Enable Gas Transmission,                    eFiling is encouraged. More detailed               this notice. All reply comments must be
                                              LLC.                                                    information relating to filing                        filed with the Commission within 45
                                                 Description: § 4(d) Rate Filing: Fuel                requirements, interventions, protests,                days from the issuance date of this
                                              Tracker Filing Effective November 2015                  service, and qualifying facilities filings            notice.
                                              to be effective 11/1/2015.                              can be found at: http://www.ferc.gov/                    The Commission strongly encourages
                                                 Filed Date: 9/18/15.                                 docs-filing/efiling/filing-req.pdf. For               electronic filing. Please file motions to
                                                 Accession Number: 20150918–5066.                     other information, call (866) 208–3676                intervene, protests, comments, and
                                                 Comments Due: 5 p.m. ET 9/30/15.                     (toll free). For TTY, call (202) 502–8659.            recommendations using the
                                                 Docket Numbers: RP15–1281–000.                                                                             Commission’s eFiling system at http://
                                                                                                        Dated September 21, 2015.
                                                 Applicants: ANR Pipeline Company.                                                                          www.ferc.gov/docs-filing/efiling.asp.
                                                                                                      Nathaniel J. Davis, Sr.,
                                                 Description: § 4(d) Rate Filing:                                                                           Commenters can submit brief comments
                                                                                                      Deputy Secretary.                                     up to 6,000 characters, without prior
                                              Compliance to CP14–514—Sulphur
                                                                                                      [FR Doc. 2015–24532 Filed 9–25–15; 8:45 am]           registration, using the eComment system
                                              Springs Revisions to be effective 11/1/
                                              2015.                                                   BILLING CODE 6717–01–P                                at http://www.ferc.gov/docs-filing/
                                                 Filed Date: 9/18/15.                                                                                       ecomment.asp. You must include your
                                                 Accession Number: 20150918–5109.                                                                           name and contact information at the end
                                                                                                      DEPARTMENT OF ENERGY                                  of your comments. For assistance,
                                                 Comments Due: 5 p.m. ET 9/30/15.
                                                 Docket Numbers: RP15–1282–000.                                                                             please contact FERC Online Support at
                                                                                                      Federal Energy Regulatory                             FERCOnlineSupport@ferc.gov, (866)
                                                 Applicants: Equitrans, L.P.                          Commission
                                                 Description: § 4(d) Rate Filing: GSS                                                                       208–3676 (toll free), or (202) 502–8659
                                              Storage Ratchet and Maximum Storage                     [Project No. 14550–001]                               (TTY). In lieu of electronic filing, please
                                              Balance Filing to be effective 11/1/2015.                                                                     send a paper copy to: Secretary, Federal
                                                                                                      New England Hydropower Company,                       Energy Regulatory Commission, 888
                                                 Filed Date: 9/18/15.
                                                                                                      LLC; Notice of Application Accepted                   First Street NE., Washington, DC 20426.
                                                 Accession Number: 20150918–5115.
                                                 Comments Due: 5 p.m. ET 9/30/15.                     for Filing With the Commission, Intent                The first page of any filing should
                                                                                                      To Waive Scoping, Soliciting Motions                  include docket number P–13806–004.
                                                 Docket Numbers: RP15–1283–000.                       To Intervene and Protests, Ready for                     The Commission’s Rules of Practice
                                                 Applicants: Equitrans, L.P.                          Environmental Analysis, and Soliciting                require all intervenors filing documents
                                                 Description: § 4(d) Rate Filing:
                                                                                                      Comments, Terms and Conditions, and                   with the Commission to serve a copy of
                                              Amendment of Formula-Based                                                                                    that document on each person on the
                                                                                                      Recommendations, and Establishing
                                              Negotiated Rate Agreement Filing                                                                              official service list for the project.
                                                                                                      an Expedited Schedule for Processing
                                              Effective 11/01/2015 to be effective                                                                          Further, if an intervenor files comments
                                              11/1/2015.                                                 Take notice that the following                     or documents with the Commission
                                                 Filed Date: 9/18/15.                                 hydroelectric application has been filed              relating to the merits of an issue that
                                                 Accession Number: 20150918–5116.                     with the Commission and is available                  may affect the responsibilities of a
                                                 Comments Due: 5 p.m. ET 9/30/15.                     for public inspection.                                particular resource agency, they must
                                                 Docket Numbers: RP15–1284–000.                          a. Type of Application: Exemption
                                                                                                                                                            also serve a copy of the document on
                                                 Applicants: Centra Pipelines                         from Licensing.
                                                                                                                                                            that resource agency.
                                              Minnesota Inc.                                             b. Project No.: 14550–001.
                                                                                                                                                               k. Waiver of Pre-filing Consultation: In
                                                 Description: Petition for Approval of                   c. Date filed: June 26, 2015.
                                                                                                         d. Applicant: New England                          its application, the New England
                                              Settlement submitted by Centra                                                                                Hydropower Company requested that
                                              Pipelines Minnesota Inc. under RP15–                    Hydropower Company, LLC.
                                                                                                         e. Name of Project: Hanover Pond                   the Commission waive the requirement
                                              1284.                                                                                                         to conduct second stage consultation
                                                 Filed Date: 9/18/15.                                 Dam Hydroelectric Project.
                                                                                                         f. Location: On the Quinnipiac River,              pursuant to section 4.38(c) of the
                                                 Accession Number: 20150918–5118.                                                                           Commission’s regulations. The
                                                 Comments Due: 5 p.m. ET 9/30/15.                     in the City of Meriden, New Haven
                                                                                                      County, Connecticut. The project would                applicant provided documentation
                                                 Docket Numbers: RP15–1285–000.                       not occupy lands of the United States.                indicating that the Connecticut
                                                 Applicants: Enable Mississippi River                    g. Filed Pursuant to: Public Utility               Department of Energy and
                                              Transmission, L.                                        Regulatory Policies Act of 1978, 16                   Environmental Protection, National
                                                 Description: § 4(d) Rate Filing: 2015                U.S.C. 2705, 2708.                                    Marine Fisheries Service, and United
                                              Fuel Adjustment Filing to be effective                     h. Applicant Contact: Michael C. Kerr,             States Fish and Wildlife Service had
                                              11/1/2015.                                              New England Hydropower Company,                       agreed to waive second stage
tkelley on DSK3SPTVN1PROD with NOTICES




                                                 Filed Date: 9/18/15.                                 LLC, P.O. Box 5524, Beverly, MA 01915;                consultation on September 10, 2015,
                                                 Accession Number: 20150918–5133.                     (978) 360–2547.                                       August 26, 2015, and August 26, 2015,
                                                 Comments Due: 5 p.m. ET 9/30/15.                        i. FERC Contact: Erin Kimsey, (202)                respectively. Therefore, we are waiving
                                                 The filings are accessible in the                    502–8621, or email at erin.kimsey@                    the requirement to conduct second stage
                                              Commission’s eLibrary system by                         ferc.gov.                                             consultation pursuant to section 4.38(c)
                                              clicking on the links or querying the                      j. Deadline for filing motions to                  of the regulations and accepting the
                                              docket number.                                          intervene and protests, comments, terms               application.


                                         VerDate Sep<11>2014   17:19 Sep 25, 2015   Jkt 235001   PO 00000   Frm 00015   Fmt 4703   Sfmt 4703   E:\FR\FM\28SEN1.SGM   28SEN1


                                              58246                     Federal Register / Vol. 80, No. 187 / Monday, September 28, 2015 / Notices

                                                 l. This application has been accepted                in the Public Reference Room or may be                number of the person protesting or
                                              for filing and is now ready for                         viewed on the Commission’s Web site at                intervening; and (4) otherwise comply
                                              environmental analysis.                                 http://www.ferc.gov using the                         with the requirements of 18 CFR
                                                 m. The proposed Hanover Pond Dam                     ‘‘eLibrary’’ link. Enter the docket                   385.2001 through 385.2005. All
                                              Hydroelectric Project would consist of:                 number excluding the last three digits in             comments, recommendations, terms and
                                              (1) An existing 25-foot-high, 150-foot-                 the docket number field to access the                 conditions or prescriptions must set
                                              long earth embankment dam with four                     document. For assistance, contact FERC                forth their evidentiary basis and
                                              low-level sluice gates and a 250-foot-                  Online Support. For assistance, contact               otherwise comply with the requirements
                                              long concrete spillway; (2) an existing                 FERC Online Support. A copy is also                   of 18 CFR 4.34(b). Agencies may obtain
                                              71.0-acre impoundment (i.e., Hanover                    available for inspection and                          copies of the application directly from
                                              Pond) with a storage capacity of 1,800                  reproduction at the address in item h                 the applicant. A copy of any protest or
                                              acre-feet at a normal operating elevation               above.                                                motion to intervene must be served
                                              of about 87.3 feet National Geodetic                       You may also register online at http://            upon each representative of the
                                              Vertical Datum of 1929 (NGVD29); (3)                    www.ferc.gov/docs-filing/                             applicant specified in the particular
                                              an existing 175-foot-long, 16.0-foot-wide               esubscription.asp to be notified via                  application. A copy of all other filings
                                              fish ladder; (4) a new 8-foot-high, 12.5-               email of new filings and issuances                    in reference to this application must be
                                              foot-wide hydraulically-powered sluice                  related to this or other pending projects.            accompanied by proof of service on all
                                              gate equipped with a new 8-foot-high,                   For assistance, contact FERC Online                   persons listed in the service list
                                              17-foot-wide trashrack with 9-inch bar                  Support.                                              prepared by the Commission in this
                                              spacing; (5) a new 78-foot-long, 12-foot-                  p. Any qualified applicant desiring to             proceeding, in accordance with 18 CFR
                                              diameter buried precast concrete                        file a competing application must                     4.34(b) and 385.2010.
                                              penstock; (6) a new 46.5-foot-long,                     submit to the Commission, on or before                  q. Procedural Schedule: The
                                              11.65-foot-wide Archimedes screw                        the specified intervention deadline date,             application will be processed according
                                              generator unit, with an installed                       a competing development application,                  to the following procedural schedule.
                                              capacity of 192 kilowatts; (7) a new 12-                or a notice of intent to file such an                 Revisions to the schedule may be made
                                              foot-high, 18-foot-long, 16.0-foot-wide                 application. Submission of a timely                   as appropriate.
                                              concrete powerhouse containing a new                    notice of intent allows an interested
                                              gearbox, generator, and electrical                      person to file the competing                                   Milestone               Target date
                                              controls; (8) a new 15-foot-long,                       development application no later than
                                              variable-width concrete tailrace; (9) a                 120 days after the specified intervention             Notice of the availability   January 2016.
                                              new 500-foot-long, 35-kilovolt above-                   deadline date. Applications for                         of the EA.
                                              ground transmission line connecting the                 preliminary permits will not be
                                              powerhouse to Connecticut Light and                     accepted in response to this notice.                    Dated: September 16, 2015.
                                              Power’s distribution system; and (10)                      A notice of intent must specify the                Nathaniel J. Davis, Sr.,
                                              appurtenant facilities. The estimated                   exact name, business address, and
                                                                                                                                                            Deputy Secretary.
                                              annual generation of the proposed                       telephone number of the prospective
                                                                                                                                                            [FR Doc. 2015–24539 Filed 9–25–15; 8:45 am]
                                              Hanover Pond Dam Hydroelectric                          applicant, and must include an
                                                                                                                                                            BILLING CODE 6717–01–P
                                              Project would be about 900 megawatt-                    unequivocal statement of intent to
                                              hours.                                                  submit a development application. A
                                                 n. Due to the applicant’s close                      notice of intent must be served on the
                                                                                                      applicant(s) named in this public notice.             DEPARTMENT OF ENERGY
                                              coordination with federal and state
                                              agencies during the preparation of the                     Anyone may submit comments, a                      Federal Energy Regulatory
                                              application, completed studies during                   protest, or a motion to intervene in                  Commission
                                              pre-filing consultation, and agency                     accordance with the requirements of
                                              recommended preliminary terms and                       Rules of Practice and Procedure, 18 CFR               Combined Notice of Filings #2
                                              conditions, we intend to waive scoping                  385.210, .211, .214. In determining the
                                              and expedite the exemption process.                     appropriate action to take, the                       September 22, 2015.
                                              Based on a review of the application,                   Commission will consider all protests or                 Take notice that the Commission
                                              resource agency consultation letters                    other comments filed, but only those                  received the following exempt
                                              including the preliminary 30(c) terms                   who file a motion to intervene in                     wholesale generator filings:
                                              and conditions, and comments filed to                   accordance with the Commission’s                         Docket Numbers: EG15–129–000.
                                              date, Commission staff intends to                       Rules may become a party to the                          Applicants: Eden Solar, LLC.
                                              prepare a single environmental                          proceeding. Any comments, protests, or                   Description: Notice of Self-
                                              assessment (EA). Commission staff                       motions to intervene must be received                 Certification of Exempt Wholesale
                                              determined that the issues that need to                 on or before the specified comment date               Generator Status of Eden Solar, LLC.
                                              be addressed in its EA have been                        for the particular application.                          Filed Date: 9/22/15.
                                              adequately identified during the pre-                      All filings must (1) bear in all capital              Accession Number: 20150922–5159.
                                              filing period, which included a public                  letters the title ‘‘PROTEST’’, ‘‘MOTION                  Comments Due: 5 p.m. ET 10/13/15.
                                              scoping meeting and site visit, and no                  TO INTERVENE’’, ‘‘NOTICE OF                              Take notice that the Commission
                                              new issues are likely to be identified                  INTENT TO FILE COMPETING                              received the following electric rate
                                              through additional scoping. The EA will                 APPLICATION,’’ ‘‘COMPETING                            filings:
                                              consider assessing the potential effects                APPLICATION,’’ ‘‘COMMENTS,’’                             Docket Numbers: ER10–2331–035;
tkelley on DSK3SPTVN1PROD with NOTICES




                                              of project construction and operation on                ‘‘REPLY COMMENTS,’’                                   ER14–630–012; ER10–2319–027; ER10–
                                              geology and soils, aquatic, terrestrial,                ‘‘RECOMMENDATIONS,’’ or ‘‘TERMS                       2317–027; ER14–1468–011; ER13–1351–
                                              threatened and endangered species,                      AND CONDITIONS;’’ (2) set forth in the                009; ER10–2330–034.
                                              recreation and land use, aesthetic, and                 heading the name of the applicant and                    Applicants: J.P. Morgan Ventures
                                              cultural and historic resources.                        the project number of the application to              Energy Corporation, AlphaGen Power
                                                 o. A copy of the application is                      which the filing responds; (3) furnish                LLC, BE Alabama LLC, BE CA LLC,
                                              available for review at the Commission                  the name, address, and telephone                      KMC Thermo, LLC, Florida Power


                                         VerDate Sep<11>2014   17:19 Sep 25, 2015   Jkt 235001   PO 00000   Frm 00016   Fmt 4703   Sfmt 4703   E:\FR\FM\28SEN1.SGM   28SEN1



Document Created: 2018-02-26 10:22:08
Document Modified: 2018-02-26 10:22:08
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 58245 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR