80_FR_58918 80 FR 58729 - Shenango Dam Hydroelectric Company, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

80 FR 58729 - Shenango Dam Hydroelectric Company, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 189 (September 30, 2015)

Page Range58729-58729
FR Document2015-24742

Federal Register, Volume 80 Issue 189 (Wednesday, September 30, 2015)
[Federal Register Volume 80, Number 189 (Wednesday, September 30, 2015)]
[Notices]
[Page 58729]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-24742]



[[Page 58729]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14698-000]


Shenango Dam Hydroelectric Company, LLC; Notice of Preliminary 
Permit Application Accepted for Filing and Soliciting Comments, Motions 
To Intervene, and Competing Applications

    On August 11, 2015, Shenango Dam Hydroelectric Company, LLC, filed 
an application for a preliminary permit, pursuant to section 4(f) of 
the Federal Power Act (FPA), proposing to study the feasibility of 
hydropower at the U.S. Army Corps of Engineers' (Corps) Shenango dam 
located on the Shenango River, near the Borough of Sharpsburg, Mercer 
County, Pennsylvania. The sole purpose of a preliminary permit, if 
issued, is to grant the permit holder priority to file a license 
application during the permit term. A preliminary permit does not 
authorize the permit holder to perform any land-disturbing activities 
or otherwise enter upon lands or waters owned by others without the 
owners' express permission.
    The proposed Shenango Hydroelectric Project would consist of the 
following: (1) Five bulb turbines/generators having a total installed 
capacity of 2,500 kilowatts to be installed on the upstream face of the 
existing dam in five of the seven discharge conduits; (2) a proposed 
steel equipment building 11 feet wide by 40 feet long housing the 
switchgear and transformer; (3) a 400-foot-long, 14.7-kilovolt 
transmission line extending to an existing FirstEnergy transmission 
system; and (4) appurtenant facilities. The proposed project would have 
an average annual generation of 10,000 megawatthours.
    Applicant Contact: Mr. David C. Sinclair, Advanced Hydro Solutions, 
LLC, 3000 Auburn Drive, Suite 430, Beachwood, OH 44122; phone: (216) 
472-5581.
    FERC Contact: Timothy Looney; phone: (202) 502-6096.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14698-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14698) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: September 24, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-24742 Filed 9-29-15; 8:45 am]
 BILLING CODE 6717-01-P



                                                                          Federal Register / Vol. 80, No. 189 / Wednesday, September 30, 2015 / Notices                                                 58729

                                                  DEPARTMENT OF ENERGY                                    up to 6,000 characters, without prior                 control, as more fully explained in the
                                                                                                          registration, using the eComment system               petition.
                                                  Federal Energy Regulatory                               at http://www.ferc.gov/docs-filing/                      Any person desiring to intervene or to
                                                  Commission                                              ecomment.asp. You must include your                   protest this filing must file in
                                                  [Project No. 14698–000]                                 name and contact information at the end               accordance with Rules 211 and 214 of
                                                                                                          of your comments. For assistance,                     the Commission’s Rules of Practice and
                                                  Shenango Dam Hydroelectric                              please contact FERC Online Support at                 Procedure (18 CFR 385.211, 385.214).
                                                  Company, LLC; Notice of Preliminary                     FERCOnlineSupport@ferc.gov, (866)                     Protests will be considered by the
                                                  Permit Application Accepted for Filing                  208–3676 (toll free), or (202) 502–8659               Commission in determining the
                                                  and Soliciting Comments, Motions To                     (TTY). In lieu of electronic filing, please           appropriate action to be taken, but will
                                                  Intervene, and Competing Applications                   send a paper copy to: Secretary, Federal              not serve to make protestants parties to
                                                                                                          Energy Regulatory Commission, 888                     the proceeding. Any person wishing to
                                                     On August 11, 2015, Shenango Dam                     First Street NE., Washington, DC 20426.               become a party must file a notice of
                                                  Hydroelectric Company, LLC, filed an                    The first page of any filing should                   intervention or motion to intervene, as
                                                  application for a preliminary permit,                   include docket number P–14698–000.                    appropriate. Such notices, motions, or
                                                  pursuant to section 4(f) of the Federal                                                                       protests must be filed on or before the
                                                                                                             More information about this project,
                                                  Power Act (FPA), proposing to study the                                                                       comment date. Anyone filing a motion
                                                                                                          including a copy of the application, can
                                                  feasibility of hydropower at the U.S.                                                                         to intervene or protest must serve a copy
                                                                                                          be viewed or printed on the ‘‘eLibrary’’
                                                  Army Corps of Engineers’ (Corps)                                                                              of that document on the Petitioner.
                                                                                                          link of the Commission’s Web site at
                                                  Shenango dam located on the Shenango                                                                             The Commission encourages
                                                                                                          http://www.ferc.gov/docs-filing/
                                                  River, near the Borough of Sharpsburg,                                                                        electronic submission of protests and
                                                                                                          elibrary.asp. Enter the docket number
                                                  Mercer County, Pennsylvania. The sole                                                                         interventions in lieu of paper using the
                                                                                                          (P–14698) in the docket number field to
                                                  purpose of a preliminary permit, if                                                                           ‘‘eFiling’’ link at http://www.ferc.gov.
                                                                                                          access the document. For assistance,
                                                  issued, is to grant the permit holder                                                                         Persons unable to file electronically
                                                                                                          contact FERC Online Support.
                                                  priority to file a license application                                                                        should submit an original and 5 copies
                                                  during the permit term. A preliminary                     Dated: September 24, 2015.
                                                                                                                                                                of the protest or intervention to the
                                                  permit does not authorize the permit                    Nathaniel J. Davis, Sr.,
                                                                                                                                                                Federal Energy Regulatory Commission,
                                                  holder to perform any land-disturbing                   Deputy Secretary.                                     888 First Street NE., Washington, DC
                                                  activities or otherwise enter upon lands                [FR Doc. 2015–24742 Filed 9–29–15; 8:45 am]           20426
                                                  or waters owned by others without the                   BILLING CODE 6717–01–P                                   This filing is accessible on-line at
                                                  owners’ express permission.                                                                                   http://www.ferc.gov, using the
                                                     The proposed Shenango Hydroelectric                                                                        ‘‘eLibrary’’ link and is available for
                                                  Project would consist of the following:                 DEPARTMENT OF ENERGY                                  review in the Commission’s Public
                                                  (1) Five bulb turbines/generators having                                                                      Reference Room in Washington, DC.
                                                  a total installed capacity of 2,500                     Federal Energy Regulatory                             There is an ‘‘eSubscription’’ link on the
                                                  kilowatts to be installed on the                        Commission                                            Web site that enables subscribers to
                                                  upstream face of the existing dam in five                                                                     receive email notification when a
                                                  of the seven discharge conduits; (2) a                  [Docket No. EL15–103–000]                             document is added to a subscribed
                                                  proposed steel equipment building 11                                                                          docket(s). For assistance with any FERC
                                                  feet wide by 40 feet long housing the                   San Diego Gas & Electric Company;                     Online service, please email
                                                  switchgear and transformer; (3) a 400-                  Notice of Petition for Declaratory Order              FERCOnlineSupport@ferc.gov, or call
                                                  foot-long, 14.7-kilovolt transmission                                                                         (866) 208–3676 (toll free). For TTY, call
                                                  line extending to an existing FirstEnergy                 Take notice that on September 23,
                                                                                                                                                                (202) 502–8659.
                                                  transmission system; and (4)                            2015, pursuant to Rule 207 of the
                                                                                                                                                                   Comment Date: 5:00 p.m. Eastern time
                                                  appurtenant facilities. The proposed                    Federal Energy Regulatory
                                                                                                                                                                on October 23, 2015.
                                                  project would have an average annual                    Commission’s (Commission) Rules of
                                                                                                          Practice and Procedure, 18 CFR                          Dated: September 24, 2015.
                                                  generation of 10,000 megawatthours.
                                                     Applicant Contact: Mr. David C.                      385.207(a), section 219 of the Federal                Nathaniel J. Davis, Sr.,
                                                  Sinclair, Advanced Hydro Solutions,                     Power Act, 16 U.S.C. 824(s), and Order                Deputy Secretary.
                                                  LLC, 3000 Auburn Drive, Suite 430,                      No. 679,1 San Diego Gas & Electric                    [FR Doc. 2015–24737 Filed 9–29–15; 8:45 am]
                                                  Beachwood, OH 44122; phone: (216)                       Company (SDG&E or Petitioner), filed a                BILLING CODE 6717–01–P
                                                  472–5581.                                               petition for declaratory order requesting
                                                     FERC Contact: Timothy Looney;                        authorization of incentive treatment for
                                                  phone: (202) 502–6096.                                  the South Orange County Reliability                   FEDERAL HOUSING FINANCE
                                                     Deadline for filing comments, motions                Enhancement Project. SDG&E requests                   AGENCY
                                                  to intervene, competing applications                    incentive rate treatment for application
                                                  (without notices of intent), or notices of              to the Project that will authorize                    [No. 2015–N–08]
                                                  intent to file competing applications: 60               recovery of one hundred percent of all
                                                                                                                                                                Submission for OMB Review;
                                                  days from the issuance of this notice.                  prudently incurred development and
                                                                                                                                                                Comment Request
                                                  Competing applications and notices of                   construction costs if the Project is
                                                  intent must meet the requirements of 18                 abandoned or cancelled, in whole or in                AGENCY:  Federal Housing Finance
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  CFR 4.36.                                               part, for reasons beyond SDG&E’s                      Agency.
                                                     The Commission strongly encourages                                                                         ACTION: 30-Day Notice of Submission of
                                                  electronic filing. Please file comments,                  1 Promoting Transmission Investment through
                                                                                                                                                                Information Collection for Approval
                                                  motions to intervene, notices of intent,                Pricing Reform, Order No. 679, 71 FR 43294 (Jul.      from the Office of Management and
                                                  and competing applications using the                    31, 2006), FERC Stats. & Regs. ¶ 31,222 (2006)
                                                                                                          (Order No. 679), order on reh’g, Order No. 679–A,     Budget.
                                                  Commission’s eFiling system at http://                  72 FR 1152 (Jan. 10, 2007), FERC Stats. & Regs. ¶
                                                  www.ferc.gov/docs-filing/efiling.asp.                   31,236 (‘‘Order No. 679–A’’), order on reh’g, 119     SUMMARY: In accordance with the
                                                  Commenters can submit brief comments                    FERC ¶ 61,062 (2007).                                 requirements of the Paperwork


                                             VerDate Sep<11>2014   18:27 Sep 29, 2015   Jkt 235001   PO 00000   Frm 00028   Fmt 4703   Sfmt 4703   E:\FR\FM\30SEN1.SGM   30SEN1



Document Created: 2015-12-15 09:31:39
Document Modified: 2015-12-15 09:31:39
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 58729 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR