80_FR_59932 80 FR 59741 - Notice of Open House-Draft Environmental Impact Statement for Updated Water Control Manuals for the Apalachicola-Chattahoochee-Flint River Basin

80 FR 59741 - Notice of Open House-Draft Environmental Impact Statement for Updated Water Control Manuals for the Apalachicola-Chattahoochee-Flint River Basin

DEPARTMENT OF DEFENSE
Department of the Army, Corps of Engineers

Federal Register Volume 80, Issue 191 (October 2, 2015)

Page Range59741-59742
FR Document2015-25057

Notice is hereby given that the U.S. Army Corps of Engineers, Mobile District (USACE), has released the Draft Environmental Impact Statement (DEIS) and will conduct open house style meetings and accept comments on the Draft DEIS for the update of the Apalachicola- Chattahoochee-Flint Basin (ACF) Water Control Master Manual (Master Manual).

Federal Register, Volume 80 Issue 191 (Friday, October 2, 2015)
[Federal Register Volume 80, Number 191 (Friday, October 2, 2015)]
[Notices]
[Pages 59741-59742]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-25057]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

Department of the Army, Corps of Engineers


Notice of Open House--Draft Environmental Impact Statement for 
Updated Water Control Manuals for the Apalachicola-Chattahoochee-Flint 
River Basin

AGENCY: Department of the Army, U.S. Army Corps of Engineers, DoD.

ACTION: Notice of Availability.

-----------------------------------------------------------------------

SUMMARY: Notice is hereby given that the U.S. Army Corps of Engineers, 
Mobile District (USACE), has released the Draft Environmental Impact 
Statement (DEIS) and will conduct open house style meetings and accept 
comments on the Draft DEIS for the update of the Apalachicola-
Chattahoochee-Flint Basin (ACF) Water Control Master Manual (Master 
Manual).

DATES: Comments on the DEIS are due not later than December 1, 2015.

ADDRESSES: Submit comments as indicated in the SUPPLEMENTARY 
INFORMATION section.

FOR FURTHER INFORMATION CONTACT: Mr. Lewis Sumner at telephone (251) 
694-3857.

SUPPLEMENTARY INFORMATION: The Master Manual includes appendices 
prepared for individual projects in the ACF Basin and is the guide used 
by USACE to operate a system of five federal reservoir projects in the 
basin--Buford Dam and Lake Lanier, West Point Dam and Lake, Walter F. 
George Lock and Dam and Lake, George W. Andrews Lock and Dam and Lake, 
and Jim Woodruff Lock and Dam and Lake Seminole.
    The purpose and need for the federal action is to determine how 
federal projects in the ACF Basin should be operated for their 
authorized purposes, in light of current conditions and applicable law, 
and to implement those operations through updated water control plans 
and manuals. The proposed action will result in an updated Master 
Manual and individual project water control manuals (WCMs) that comply 
with existing USACE regulations and reflect operations under existing 
congressional authorizations, taking into account changes in basin 
hydrology and demands from years of growth and development, new/
rehabilitated structural features, legal developments, and 
environmental issues. The action includes updates to account for a June 
28, 2011, decision of the 11th Circuit Court of Appeals.
    On May 16, 2000, the Governor of the State of Georgia submitted a 
formal request to the Assistant Secretary of the Army (Civil Works) to 
adjust the operation of Lake Lanier, and to enter into agreements with 
the State or water supply providers to accommodate increases in water 
supply withdrawals from Lake Lanier and downstream at Atlanta over the 
next 30 years, culminating in total gross withdrawals of 705 million 
gallons per day (mgd)--297 mgd from Lake Lanier and 408 mgd downstream 
by the year 2030. The Assistant Secretary of the Army (Civil Works) in 
2002 denied Georgia's request. The 2011 decision of the 11th Circuit 
Court of Appeals ordered USACE to reconsider whether it has the legal 
authority to operate the Buford project to accommodate Georgia's 
request. USACE provided a legal opinion concluding that it has 
sufficient authority under applicable law to accommodate that request, 
but noted that any decision to take action on Georgia's request would 
require a separate analysis. On January 11, 2013, the Governor of the 
State of Georgia provided updated demographic and water demand data to 
confirm the continued need for 705 mgd to meet Georgia's water needs 
from Lake Lanier and the Chattahoochee River to approximately the year 
2040 rather than 2030 as specified in the 2000 request.
    USACE's objectives for the Master Manual are to develop a Water 
Control Plan that meets the existing water resources needs of the 
basin, fulfills its responsibilities in operating for the authorized 
project purposes, and complies with all pertinent laws. The DEIS 
presents the results of USACE's analysis of the environmental effects 
of the Proposed Action Alternative (PAA) that the USACE believes 
accomplishes these objectives.
    USACE evaluated an array of potential water management alternatives 
and optional water supply amounts during the Master Manual update 
process, resulting in the selection of the PAA. Additional information 
on the components of the PAA can be found at http://www.sam.usace.army.mil/Missions/PlanningEnvironmental/ACFMasterWaterControlManualUpdate/ACFDocumentLibrary.aspx. One 
alternative available to USACE is to continue with current operations. 
This approach is termed the No Action Alternative (NAA). The PAA would 
update the water control plans and manuals for the ACF Basin as 
directed by Secretary of the Army Pete Geren on January 30, 2008. 
Additionally, the PAA would provide for releases from Buford Dam to 
satisfy Georgia's 2040 need of

[[Page 59742]]

408 mgd from the Chattahoochee River for Metro Atlanta and would 
reallocate storage in Lake Lanier of 189,497 acre-feet to satisfy a 
portion of Georgia's 2040 need and support average annual water supply 
withdrawals of up to 165 mgd.

Document Availability

    The DEIS and appendices are available to the public for review in 
the following formats:
     Online as PDF documents at http://www.sam.usace.army.mil/Missions/PlanningEnvironmental/ACFMasterWaterControlManualUpdate/ACFDocumentLibrary.aspx.
     As a CD when requested in writing to: Commander, U.S. Army 
Corps of Engineers, Mobile District, Attn: PD-EI (ACF-EIS), P.O. Box 
2288, Mobile, AL 36628.
     A limited number of CD copies will also be available at 
the DEIS public meetings.

Public Review and Comment

    The public comment period will commence with the publication of 
this notice and will end 60 days after its publication. USACE 
recognizes that the decisions made concerning revisions to the water 
control operations at USACE projects within the ACF Basin will have 
wide-ranging effects and encourages the public to submit comments on 
the content of the DEIS. All persons and organizations that have a 
potential interest in the proposed action, including minority, low-
income, disadvantaged, and Native American groups, are urged to 
participate in this NEPA environmental analysis process by reviewing 
the DEIS and submitting comments for consideration.
    Comments may be submitted via the following methods:
     Onsite at open houses through comment forms;
     Verbally through the court reporter at public meetings;
     By emailing [email protected];
     By letter addressed to: Commander, U.S. Army Corps of 
Engineers, Mobile District, Attn: PD-EI (ACF-DEIS), P.O. Box 2288, 
Mobile, AL 36628.
    Further information regarding the update of the Master Manual, 
including all available documents, background and historical 
information, and updates is available online at the Web site given 
above.

Open Houses

    Open houses are scheduled to be held at the following locations and 
times:
     Monday, October 26, 2015, 4:00 p.m.-7:00 p.m. Eastern 
time, Gainesville Civic Center, 830 Green Street NE., Gainesville, GA 
30501.
     Tuesday, October 27, 2015, 4:00 p.m.-7:00 p.m. Eastern 
time, West Point Depot, 500 3rd Avenue, West Point, GA. 31833.
     Wednesday, October 28, 2015, 4:00 p.m.-7:00 p.m. Central 
time, James S. Clark Center, 333 E. Broad Street, Eufaula AL, 36027.
     Thursday, October 29, 2015, 4:00 p.m.-7:00 p.m. Eastern 
time, Bainbridge State College, Charles H. Kirbo Regional Center, 2500 
E. Shotwell Street (US Highway 84), Bainbridge, GA 39819.
     Monday, November 9, 2015, 4:00 p.m.-7:00 p.m., 
Apalachicola National Estuarine Research Reserve, 108 Island Drive, 
Eastpoint, FL 32328.

Next Steps

    All comments will be catalogued and reviewed after the 60-day 
public comment period. The final EIS (FEIS) is scheduled to be 
completed and filed with the USEPA in 2016. The Record of Decision, if 
appropriate, will be signed following the FEIS and the Master Manual is 
scheduled to be approved in March 2017.

    Dated: September 23, 2015.
Jon J. Chytka,
Colonel, District Commander, Mobile District, U.S. Army Corps of 
Engineers.
[FR Doc. 2015-25057 Filed 10-1-15; 8:45 am]
BILLING CODE 3720-58-P



                                                                                 Federal Register / Vol. 80, No. 191 / Friday, October 2, 2015 / Notices                                          59741

                                                     The following services are proposed                  DEPARTMENT OF DEFENSE                                    On May 16, 2000, the Governor of the
                                                  for addition to the Procurement List for                                                                      State of Georgia submitted a formal
                                                  production by the nonprofit agencies                    Department of the Army, Corps of                      request to the Assistant Secretary of the
                                                  listed:                                                 Engineers                                             Army (Civil Works) to adjust the
                                                                                                                                                                operation of Lake Lanier, and to enter
                                                  Services                                                Notice of Open House—Draft                            into agreements with the State or water
                                                  Service Type: Custodial Service                         Environmental Impact Statement for                    supply providers to accommodate
                                                  Service is Mandatory For: DoDEA, Domestic               Updated Water Control Manuals for the                 increases in water supply withdrawals
                                                      Dependent Elementary and Secondary                  Apalachicola-Chattahoochee-Flint                      from Lake Lanier and downstream at
                                                      Schools, Andersen Elementary and                    River Basin                                           Atlanta over the next 30 years,
                                                      Middle Schools, Andersen AFB, 1600                                                                        culminating in total gross withdrawals
                                                                                                          AGENCY: Department of the Army, U.S.
                                                      Ponape Avenue, Yigo, GU                                                                                   of 705 million gallons per day (mgd)—
                                                                                                          Army Corps of Engineers, DoD.
                                                    District Superintendent’s Office, Naval                                                                     297 mgd from Lake Lanier and 408 mgd
                                                      Hospital Base, 101 Johnson Road, Agana              ACTION: Notice of Availability.
                                                                                                                                                                downstream by the year 2030. The
                                                      Heights, GU                                                                                               Assistant Secretary of the Army (Civil
                                                                                                          SUMMARY:   Notice is hereby given that
                                                    Guam High School, Naval Hospital Base,                                                                      Works) in 2002 denied Georgia’s
                                                                                                          the U.S. Army Corps of Engineers,
                                                      Agana Heights, GU                                                                                         request. The 2011 decision of the 11th
                                                                                                          Mobile District (USACE), has released
                                                    Commander William C. McCool                                                                                 Circuit Court of Appeals ordered
                                                      Elementary/Middle School, US Naval
                                                                                                          the Draft Environmental Impact
                                                                                                          Statement (DEIS) and will conduct open                USACE to reconsider whether it has the
                                                      Base Guam, 311 Amaryllis Avenue,                                                                          legal authority to operate the Buford
                                                      Sumay, GU
                                                                                                          house style meetings and accept
                                                                                                          comments on the Draft DEIS for the                    project to accommodate Georgia’s
                                                  Mandatory Source(s) of Supply: iCAN                                                                           request. USACE provided a legal
                                                      Resources, Inc., Dededo, GU                         update of the Apalachicola-
                                                                                                          Chattahoochee-Flint Basin (ACF) Water                 opinion concluding that it has sufficient
                                                  Contracting Activity: Dept of Defense                                                                         authority under applicable law to
                                                      Education Activity (DODEA), Dodds                   Control Master Manual (Master
                                                                                                          Manual).                                              accommodate that request, but noted
                                                      Pacific Director’s Office, APO, AP                                                                        that any decision to take action on
                                                  Service Type: Janitorial Service                        DATES:  Comments on the DEIS are due                  Georgia’s request would require a
                                                  Service is Mandatory For: USDA Forest                   not later than December 1, 2015.                      separate analysis. On January 11, 2013,
                                                      Service, Salmon/Cobalt Ranger District,             ADDRESSES: Submit comments as                         the Governor of the State of Georgia
                                                      Salmon-Challis National Forest, 311                 indicated in the SUPPLEMENTARY                        provided updated demographic and
                                                      McPherson Street, Salmon, ID                        INFORMATION section.                                  water demand data to confirm the
                                                  Mandatory Source(s) of Supply: Development                                                                    continued need for 705 mgd to meet
                                                      Workshop, Inc., Idaho Falls, ID                     FOR FURTHER INFORMATION CONTACT: Mr.
                                                                                                          Lewis Sumner at telephone (251) 694–                  Georgia’s water needs from Lake Lanier
                                                  Contracting Activity: Department of                                                                           and the Chattahoochee River to
                                                      Agriculture, Forest Service, Caribou-               3857.
                                                                                                                                                                approximately the year 2040 rather than
                                                      Targhee National Forest, Idaho Falls, ID            SUPPLEMENTARY INFORMATION: The
                                                                                                                                                                2030 as specified in the 2000 request.
                                                  Service Type: Landscaping Service                       Master Manual includes appendices                        USACE’s objectives for the Master
                                                  Service is Mandatory For: GSA PBS Region                prepared for individual projects in the               Manual are to develop a Water Control
                                                      1, John F. Kennedy Federal Building, 25             ACF Basin and is the guide used by                    Plan that meets the existing water
                                                      New Sudbury Street, Boston, MA                      USACE to operate a system of five                     resources needs of the basin, fulfills its
                                                  Mandatory Source(s) of Supply: Work,                    federal reservoir projects in the basin—              responsibilities in operating for the
                                                      Incorporated, Dorchester, MA                        Buford Dam and Lake Lanier, West                      authorized project purposes, and
                                                  Contracting Activity: GSA/Public Buildings              Point Dam and Lake, Walter F. George                  complies with all pertinent laws. The
                                                      Service, Boston, MA                                 Lock and Dam and Lake, George W.                      DEIS presents the results of USACE’s
                                                                                                          Andrews Lock and Dam and Lake, and                    analysis of the environmental effects of
                                                  Deletion
                                                                                                          Jim Woodruff Lock and Dam and Lake                    the Proposed Action Alternative (PAA)
                                                    The following service is proposed for                 Seminole.                                             that the USACE believes accomplishes
                                                  deletion from the Procurement List:                        The purpose and need for the federal               these objectives.
                                                                                                          action is to determine how federal                       USACE evaluated an array of
                                                  Service                                                 projects in the ACF Basin should be                   potential water management alternatives
                                                  Service Type/Location: Custodial Service,               operated for their authorized purposes,               and optional water supply amounts
                                                      Isle Royale National Park & Ranger III              in light of current conditions and                    during the Master Manual update
                                                      Vessel, 800 East Lakeshore Drive,                   applicable law, and to implement those                process, resulting in the selection of the
                                                      Houghton, MI                                        operations through updated water                      PAA. Additional information on the
                                                  Mandatory Source(s) of Supply: Goodwill                 control plans and manuals. The                        components of the PAA can be found at
                                                      Industries of Northern Wisconsin &                  proposed action will result in an                     http://www.sam.usace.army.mil/
                                                      Upper Michigan, Inc., Marinette, WI                 updated Master Manual and individual                  Missions/PlanningEnvironmental/
                                                  Contracting Activity: Dept of the Interior,             project water control manuals (WCMs)                  ACFMasterWaterControlManualUpdate/
                                                      National Park Service, MWR Regional                 that comply with existing USACE                       ACFDocumentLibrary.aspx. One
                                                      Contracting, Omaha, NE                              regulations and reflect operations under              alternative available to USACE is to
                                                  Barry S. Lineback,
                                                                                                          existing congressional authorizations,                continue with current operations. This
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                                                                          taking into account changes in basin                  approach is termed the No Action
                                                  Director, Business Operations.                          hydrology and demands from years of                   Alternative (NAA). The PAA would
                                                  [FR Doc. 2015–25103 Filed 10–1–15; 8:45 am]             growth and development, new/                          update the water control plans and
                                                  BILLING CODE 6353–01–P                                  rehabilitated structural features, legal              manuals for the ACF Basin as directed
                                                                                                          developments, and environmental                       by Secretary of the Army Pete Geren on
                                                                                                          issues. The action includes updates to                January 30, 2008. Additionally, the PAA
                                                                                                          account for a June 28, 2011, decision of              would provide for releases from Buford
                                                                                                          the 11th Circuit Court of Appeals.                    Dam to satisfy Georgia’s 2040 need of


                                             VerDate Sep<11>2014   20:43 Oct 01, 2015   Jkt 238001   PO 00000   Frm 00022   Fmt 4703   Sfmt 4703   E:\FR\FM\02OCN1.SGM   02OCN1


                                                  59742                          Federal Register / Vol. 80, No. 191 / Friday, October 2, 2015 / Notices

                                                  408 mgd from the Chattahoochee River                      • Tuesday, October 27, 2015, 4:00                   SUPPLEMENTARY INFORMATION:      On
                                                  for Metro Atlanta and would reallocate                  p.m.–7:00 p.m. Eastern time, West Point               December 22, 2011, the Commission
                                                  storage in Lake Lanier of 189,497 acre-                 Depot, 500 3rd Avenue, West Point, GA.                confirmed and approved on a final basis
                                                  feet to satisfy a portion of Georgia’s 2040             31833.                                                Wholesale Power Rate Schedules CBR–
                                                  need and support average annual water                     • Wednesday, October 28, 2015, 4:00                 1–H, CSI–1–H, CEK–1–H, CM–1–H, CC–
                                                  supply withdrawals of up to 165 mgd.                    p.m.–7:00 p.m. Central time, James S.                 1–I, CK–1–H, CTV–1–H, CTVI–1–A, and
                                                                                                          Clark Center, 333 E. Broad Street,                    Replacement-3 for the period from
                                                  Document Availability
                                                                                                          Eufaula AL, 36027.                                    October 1, 2011, to September 30, 2013
                                                    The DEIS and appendices are                             • Thursday, October 29, 2015, 4:00                  (137 FERC ¶ 62,249). On July 10, 2013,
                                                  available to the public for review in the               p.m.–7:00 p.m. Eastern time, Bainbridge
                                                  following formats:                                                                                            the Deputy Secretary approved an
                                                                                                          State College, Charles H. Kirbo Regional              extension of the rate schedules through
                                                    • Online as PDF documents at http://                  Center, 2500 E. Shotwell Street (US
                                                  www.sam.usace.army.mil/Missions/                                                                              September 30, 2015 (78 FR 42764).
                                                                                                          Highway 84), Bainbridge, GA 39819.
                                                  PlanningEnvironmental/                                    • Monday, November 9, 2015, 4:00                      The Southeastern Power
                                                  ACFMasterWaterControlManualUpdate/                      p.m.–7:00 p.m., Apalachicola National                 Administration’s power marketing
                                                  ACFDocumentLibrary.aspx.                                Estuarine Research Reserve, 108 Island                policy (58 FR 41762, Aug. 5, 1993)
                                                    • As a CD when requested in writing                   Drive, Eastpoint, FL 32328.                           provides peaking capacity, along with
                                                  to: Commander, U.S. Army Corps of                                                                             1500 kilowatt-hours of energy with each
                                                  Engineers, Mobile District, Attn: PD–EI                 Next Steps
                                                                                                                                                                kilowatt of capacity, to customers
                                                  (ACF–EIS), P.O. Box 2288, Mobile, AL                      All comments will be catalogued and                 outside the Tennessee Valley Authority
                                                  36628.                                                  reviewed after the 60-day public
                                                    • A limited number of CD copies will                                                                        (TVA) transmission system. Due to
                                                                                                          comment period. The final EIS (FEIS) is               restrictions on the operations of the
                                                  also be available at the DEIS public                    scheduled to be completed and filed
                                                  meetings.                                                                                                     Center Hill Project imposed by the U.S.
                                                                                                          with the USEPA in 2016. The Record of                 Army Corps of Engineers (Corps) as a
                                                  Public Review and Comment                               Decision, if appropriate, will be signed              precaution to prevent failure of the dam,
                                                     The public comment period will                       following the FEIS and the Master                     Southeastern has not been able to
                                                  commence with the publication of this                   Manual is scheduled to be approved in
                                                                                                                                                                provide full peaking capacity to these
                                                  notice and will end 60 days after its                   March 2017.
                                                                                                                                                                customers. A revised interim operating
                                                  publication. USACE recognizes that the                    Dated: September 23, 2015.                          plan for the Cumberland System
                                                  decisions made concerning revisions to                  Jon J. Chytka,                                        provides these customers with energy
                                                  the water control operations at USACE                   Colonel, District Commander, Mobile District,         that includes a proportional percentage
                                                  projects within the ACF Basin will have                 U.S. Army Corps of Engineers.                         of normal marketed capacity.
                                                  wide-ranging effects and encourages the                 [FR Doc. 2015–25057 Filed 10–1–15; 8:45 am]
                                                  public to submit comments on the                                                                                A current repayment study using
                                                                                                          BILLING CODE 3720–58–P
                                                  content of the DEIS. All persons and                                                                          present rates shows that revenues will
                                                  organizations that have a potential                                                                           not be adequate to meet repayment
                                                  interest in the proposed action,                                                                              criteria. A revised study with a revenue
                                                                                                          DEPARTMENT OF ENERGY
                                                  including minority, low-income,                                                                               requirement increase of $3,900,000, or
                                                  disadvantaged, and Native American                      Notice of Interim Approval for                        about seven percent, shows that the
                                                  groups, are urged to participate in this                Southeastern Power Administration                     rates established in this notice will be
                                                  NEPA environmental analysis process                     Cumberland System                                     adequate to meet repayment criteria.
                                                  by reviewing the DEIS and submitting                                                                          The rate schedules have been developed
                                                  comments for consideration.                             AGENCY: Southeastern Power                            to cover the differing marketing
                                                     Comments may be submitted via the                    Administration, DOE.                                  arrangements in the Cumberland System
                                                  following methods:                                      ACTION: Notice of interim approval.                   under normal operation conditions. The
                                                     • Onsite at open houses through                                                                            Rate Schedules CBR–1–I, CSI–1–I, and
                                                  comment forms;                                          SUMMARY:   The Deputy Secretary of
                                                     • Verbally through the court reporter                                                                      CM–1–I, include rates for customers
                                                                                                          Energy confirmed and approved, on an
                                                  at public meetings;                                     interim basis, Rate Schedules CBR–1–I,                who receive 1500 kilowatt-hours of
                                                     • By emailing acf-wcm@                               CSI–1–I, CEK–1–I, CM–1–I, CC–1–J,                     energy annually for each kilowatt of
                                                  usace.army.mil;                                         CK–1–I, CTV–1–I, CTVI–1–B, and                        capacity. Rate Schedule CEK–1–I is for
                                                     • By letter addressed to: Commander,                 Replacement-3. The rates were                         East Kentucky Power Cooperative,
                                                  U.S. Army Corps of Engineers, Mobile                    approved on an interim basis through                  which receives a fixed quantity of
                                                  District, Attn: PD–EI (ACF–DEIS), P.O.                  September 30, 2020. The new rates take                energy annually from projects
                                                  Box 2288, Mobile, AL 36628.                             effect on October 1, 2015, and are                    connected to the TVA transmission
                                                     Further information regarding the                    subject to confirmation and approval on               system plus the output of the Laurel
                                                  update of the Master Manual, including                  a final basis by the Federal Energy                   Project. Rate Schedule CK–1–I is for
                                                  all available documents, background                     Regulatory Commission (Commission).                   customers in Kentucky who receive
                                                  and historical information, and updates                                                                       1800 kilowatt-hours of energy annually
                                                                                                          DATES: Approval of the rate schedules
                                                  is available online at the Web site given                                                                     for each kilowatt of capacity. Rate
                                                                                                          on an interim basis is effective October
                                                  above.                                                                                                        Schedule CC–1–J is for customers on the
                                                                                                          1, 2015, through September 30, 2020.
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  Open Houses                                             FOR FURTHER INFORMATION CONTACT:                      Duke Energy Progress, Western
                                                     Open houses are scheduled to be held                 Virgil G. Hobbs, III, Assistant                       Division, (formerly Carolina Power &
                                                  at the following locations and times:                   Administrator, Finance & Marketing,                   Light, Western Division). Rate Schedule
                                                     • Monday, October 26, 2015, 4:00                     Southeastern Power Administration,                    CTV–1–I is for TVA and TVPPA. Rate
                                                  p.m.–7:00 p.m. Eastern time, Gainesville                Department of Energy, 1166 Athens                     Schedule CTVI–1–B is for customers
                                                  Civic Center, 830 Green Street NE.,                     Tech Road, Elberton, Georgia 30635–                   inside the TVA system who choose a
                                                  Gainesville, GA 30501.                                  6711, (706) 213–3838.                                 power supplier other than TVA.


                                             VerDate Sep<11>2014   20:43 Oct 01, 2015   Jkt 238001   PO 00000   Frm 00023   Fmt 4703   Sfmt 4703   E:\FR\FM\02OCN1.SGM   02OCN1



Document Created: 2015-12-15 08:44:09
Document Modified: 2015-12-15 08:44:09
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of Availability.
DatesComments on the DEIS are due not later than December 1, 2015.
ContactMr. Lewis Sumner at telephone (251) 694-3857.
FR Citation80 FR 59741 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR