80_FR_59954 80 FR 59763 - FFP Project 92, LLC; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions

80 FR 59763 - FFP Project 92, LLC; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 191 (October 2, 2015)

Page Range59763-59764
FR Document2015-25011

Federal Register, Volume 80 Issue 191 (Friday, October 2, 2015)
[Federal Register Volume 80, Number 191 (Friday, October 2, 2015)]
[Notices]
[Pages 59763-59764]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-25011]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14276-002; Docket No. AD13-9-000]


FFP Project 92, LLC; Notice of Application Accepted for Filing, 
Soliciting Motions To Intervene and Protests, Ready for Environmental 
Analysis, and Soliciting Comments, Recommendations, Preliminary Terms 
and Conditions, and Preliminary Fishway Prescriptions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Original Major License.
    b. Project No.: 14276-002.
    c. Date filed: April 16, 2015.
    d. Applicant: FFP Project 92, LLC.
    e. Name of Project: Kentucky River Lock and Dam No. 11 
Hydroelectric Project.
    f. Location: The proposed project would be located on the Kentucky 
River in Estill and Madison Counties, Kentucky, at the existing 
Kentucky River Lock and Dam No. 11 which is owned by the Commonwealth 
of Kentucky and operated by the Kentucky River Authority. The project 
would not affect federal land.
    g. Filed Pursuant to: 18 CFR part 5 of the Commission's regulations 
and Hydropower Regulatory Efficiency Act of 2013.
    h. Applicant Contact: Kellie Doherty, Rye Development, LLC, 745 
Atlantic Avenue, 8th floor, Boston, MA 02111; Telephone (781) 856-2030; 
kellie@ryedevelopment.com.
    i. FERC Contact: Sarah Salazar, Telephone (202) 502-6863, and email 
sarah.salazar@ferc.gov.
    j. Deadline for filing motions to intervene and protests, comments, 
recommendations, preliminary terms and conditions, and preliminary 
prescriptions: 60 days from the issuance date of this notice; reply 
comments are due 75 days from the issuance date of this notice.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene, protests, comments, recommendations, preliminary 
terms and conditions, and preliminary fishway prescriptions using the 
Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
http://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14276-002.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted for filing and is now ready 
for environmental analysis.
    l. The proposed project would be located at the Commonwealth of 
Kentucky's existing Kentucky River Lock and Dam No. 11, which was 
originally constructed from 1904 to 1906 by the U.S. Corps of Engineers 
for the purpose of transportation. There is a single lock chamber with 
a total length of 148 feet and width of 52 feet on the south end of the 
dam. However, a concrete bulkhead and miter gates were installed in 
front of the lock structure and it is no longer being used for 
navigational purposes. The Kentucky River Authority currently operates 
the dam to maintain the upriver channel depth and an impoundment to 
withdraw water for municipal drinking water purposes. The impoundment 
also serves the purposes of providing opportunities for recreation and 
habitat for fish and wildlife.
    The proposed project would be operated in a run-of-river mode. The 
proposed project would include: (1) The existing 579-acre impoundment, 
with a normal pool elevation of 585.60 feet North American Vertical 
Datum of 1988; (2) the existing 208-foot-long, 35-foot-high fixed crest 
dam; (3) a new 275-foot-long, 75-foot-wide reinforced concrete intake 
channel equipped with trashracks with 3-inch bar spacing; (4) a new 
140-foot-long, 64.5-foot-wide powerhouse that includes a 30-foot-long, 
47-foot- high, 64.5-foot-wide intake and headgate structure built 
within the existing lock structure; (5) two new horizontal Pit Kaplan 
turbine generator units each rated at 2.5 megawatts (MW); (6) a new 
190-foot-long, 78-foot-wide tailrace; (7) a new 40-foot-long, 40-foot-
wide substation; (8) a new 212-foot, 4.16 kilovolt (kV) underground 
transmission cable from the generators to the new substation and a new 
approximately 4.5-mile-long, 69- kV overhead transmission line 
extending from the new substation at the powerhouse to an existing 
substation located near Waco, Kentucky; and (9) appurtenant facilities. 
The proposed project would generate about 18,500 megawatt-hours 
annually, which would be sold to a local utility.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the

[[Page 59764]]

``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, contact FERC Online Support. A copy is also available for 
inspection and reproduction at the address in item h above.
    Register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Anyone may submit comments, a protest, or a motion to intervene 
in accordance with the requirements of Rules of Practice and Procedure, 
18 CFR 385.210, .211, and .214. In determining the appropriate action 
to take, the Commission will consider all protests or other comments 
filed, but only those who file a motion to intervene in accordance with 
the Commission's Rules may become a party to the proceeding. Any 
comments, protests, or motions to intervene must be received on or 
before the specified comment date for the particular application.
    All filings must (1) bear in all capital letters the title 
``PROTEST'', ``MOTION TO INTERVENE'', ``COMMENTS,'' ``REPLY COMMENTS,'' 
``RECOMMENDATIONS,'' ``PRELIMINARY TERMS AND CONDITIONS,'' or 
``PRELIMINARY FISHWAY PRESCRIPTIONS;'' (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, recommendations, terms and conditions or prescriptions must 
set forth their evidentiary basis and otherwise comply with the 
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
application directly from the applicant. A copy of any protest or 
motion to intervene must be served upon each representative of the 
applicant specified in the particular application. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.
    o. Any qualified applicant desiring to file a competing application 
must submit to the Commission, on or before the specified intervention 
deadline date, a competing development application, or a notice of 
intent to file such an application. Submission of a timely notice of 
intent allows an interested person to file the competing development 
application no later than 120 days after the specified intervention 
deadline date. Applications for preliminary permits will not be 
accepted in response to this notice.
    A notice of intent must specify the exact name, business address, 
and telephone number of the prospective applicant, and must include an 
unequivocal statement of intent to submit a development application. A 
notice of intent must be served on the applicant named in this public 
notice.

    Dated: September 25, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-25011 Filed 10-1-15; 8:45 am]
BILLING CODE 6717-01-P



                                                                                 Federal Register / Vol. 80, No. 191 / Friday, October 2, 2015 / Notices                                          59763

                                                     Filed Date: 9/22/15.                                 with the Commission and is available                  or documents with the Commission
                                                     Accession Number: 20150922–5163.                     for public inspection.                                relating to the merits of an issue that
                                                     Comments Due: 5 p.m. ET 10/13/15.                       a. Type of Application: Original Major             may affect the responsibilities of a
                                                     Docket Numbers: ER15–2693–000.                       License.                                              particular resource agency, they must
                                                     Applicants: Baltimore Power                             b. Project No.: 14276–002.                         also serve a copy of the document on
                                                  Company LLC.                                               c. Date filed: April 16, 2015.                     that resource agency.
                                                     Description: Baseline eTariff Filing:                   d. Applicant: FFP Project 92, LLC.                    k. This application has been accepted
                                                  Baseline new to be effective 10/30/2015.                   e. Name of Project: Kentucky River                 for filing and is now ready for
                                                     Filed Date: 9/23/15.                                 Lock and Dam No. 11 Hydroelectric                     environmental analysis.
                                                     Accession Number: 20150923–5001.                     Project.                                                 l. The proposed project would be
                                                     Comments Due: 5 p.m. ET 10/14/15.                       f. Location: The proposed project                  located at the Commonwealth of
                                                                                                          would be located on the Kentucky River                Kentucky’s existing Kentucky River
                                                     Docket Numbers: ER15–2694–000.                       in Estill and Madison Counties,
                                                     Applicants: Crosswind Transmission,                                                                        Lock and Dam No. 11, which was
                                                                                                          Kentucky, at the existing Kentucky                    originally constructed from 1904 to
                                                  LLC.
                                                                                                          River Lock and Dam No. 11 which is                    1906 by the U.S. Corps of Engineers for
                                                     Description: Baseline eTariff Filing:
                                                                                                          owned by the Commonwealth of                          the purpose of transportation. There is
                                                  Crosswind Transmission and Clear
                                                                                                          Kentucky and operated by the Kentucky                 a single lock chamber with a total length
                                                  View Transmission & Interconnection
                                                                                                          River Authority. The project would not                of 148 feet and width of 52 feet on the
                                                  Agreement to be effective 11/22/2015.
                                                                                                          affect federal land.                                  south end of the dam. However, a
                                                     Filed Date: 9/23/15.
                                                                                                             g. Filed Pursuant to: 18 CFR part 5 of             concrete bulkhead and miter gates were
                                                     Accession Number: 20150923–5147.
                                                                                                          the Commission’s regulations and                      installed in front of the lock structure
                                                     Comments Due: 5 p.m. ET 10/14/15.
                                                                                                          Hydropower Regulatory Efficiency Act                  and it is no longer being used for
                                                     The filings are accessible in the                    of 2013.                                              navigational purposes. The Kentucky
                                                  Commission’s eLibrary system by                            h. Applicant Contact: Kellie Doherty,              River Authority currently operates the
                                                  clicking on the links or querying the                   Rye Development, LLC, 745 Atlantic                    dam to maintain the upriver channel
                                                  docket number.                                          Avenue, 8th floor, Boston, MA 02111;                  depth and an impoundment to
                                                     Any person desiring to intervene or                  Telephone (781) 856–2030; kellie@                     withdraw water for municipal drinking
                                                  protest in any of the above proceedings                 ryedevelopment.com.                                   water purposes. The impoundment also
                                                  must file in accordance with Rules 211                     i. FERC Contact: Sarah Salazar,                    serves the purposes of providing
                                                  and 214 of the Commission’s                             Telephone (202) 502–6863, and email                   opportunities for recreation and habitat
                                                  Regulations (18 CFR 385.211 and                         sarah.salazar@ferc.gov.                               for fish and wildlife.
                                                  385.214) on or before 5:00 p.m. Eastern                    j. Deadline for filing motions to                     The proposed project would be
                                                  time on the specified comment date.                     intervene and protests, comments,                     operated in a run-of-river mode. The
                                                  Protests may be considered, but                         recommendations, preliminary terms                    proposed project would include: (1) The
                                                  intervention is necessary to become a                   and conditions, and preliminary                       existing 579-acre impoundment, with a
                                                  party to the proceeding.                                prescriptions: 60 days from the issuance              normal pool elevation of 585.60 feet
                                                     eFiling is encouraged. More detailed                 date of this notice; reply comments are               North American Vertical Datum of 1988;
                                                  information relating to filing                          due 75 days from the issuance date of                 (2) the existing 208-foot-long, 35-foot-
                                                  requirements, interventions, protests,                  this notice.                                          high fixed crest dam; (3) a new 275-foot-
                                                  service, and qualifying facilities filings                 The Commission strongly encourages                 long, 75-foot-wide reinforced concrete
                                                  can be found at: http://www.ferc.gov/                   electronic filing. Please file motions to             intake channel equipped with
                                                  docs-filing/efiling/filing-req.pdf. For                 intervene, protests, comments,                        trashracks with 3-inch bar spacing; (4) a
                                                  other information, call (866) 208–3676                  recommendations, preliminary terms                    new 140-foot-long, 64.5-foot-wide
                                                  (toll free). For TTY, call (202) 502–8659.              and conditions, and preliminary                       powerhouse that includes a 30-foot-
                                                    Dated: September 23, 2015.                            fishway prescriptions using the                       long, 47-foot- high, 64.5-foot-wide
                                                  Nathaniel J. Davis, Sr.,                                Commission’s eFiling system at http://                intake and headgate structure built
                                                  Deputy Secretary.                                       www.ferc.gov/docs-filing/efiling.asp.                 within the existing lock structure; (5)
                                                                                                          Commenters can submit brief comments                  two new horizontal Pit Kaplan turbine
                                                  [FR Doc. 2015–25013 Filed 10–1–15; 8:45 am]
                                                                                                          up to 6,000 characters, without prior                 generator units each rated at 2.5
                                                  BILLING CODE 6717–01–P
                                                                                                          registration, using the eComment system               megawatts (MW); (6) a new 190-foot-
                                                                                                          at http://www.ferc.gov/docs-filing/                   long, 78-foot-wide tailrace; (7) a new 40-
                                                  DEPARTMENT OF ENERGY                                    ecomment.asp. You must include your                   foot-long, 40-foot-wide substation; (8) a
                                                                                                          name and contact information at the end               new 212-foot, 4.16 kilovolt (kV)
                                                  Federal Energy Regulatory                               of your comments. For assistance,                     underground transmission cable from
                                                  Commission                                              please contact FERC Online Support at                 the generators to the new substation and
                                                                                                          FERCOnlineSupport@ferc.gov, (866)                     a new approximately 4.5-mile-long, 69-
                                                  [Project No. 14276–002; Docket No. AD13–                208–3676 (toll free), or (202) 502–8659               kV overhead transmission line
                                                  9–000]
                                                                                                          (TTY). In lieu of electronic filing, please           extending from the new substation at
                                                  FFP Project 92, LLC; Notice of                          send a paper copy to: Secretary, Federal              the powerhouse to an existing
                                                  Application Accepted for Filing,                        Energy Regulatory Commission, 888                     substation located near Waco, Kentucky;
                                                  Soliciting Motions To Intervene and                     First Street NE., Washington, DC 20426.               and (9) appurtenant facilities. The
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  Protests, Ready for Environmental                       The first page of any filing should                   proposed project would generate about
                                                  Analysis, and Soliciting Comments,                      include docket number P–14276–002.                    18,500 megawatt-hours annually, which
                                                  Recommendations, Preliminary Terms                         The Commission’s Rules of Practice                 would be sold to a local utility.
                                                  and Conditions, and Preliminary                         require all intervenors filing documents                 m. A copy of the application is
                                                  Fishway Prescriptions                                   with the Commission to serve a copy of                available for review at the Commission
                                                                                                          that document on each person on the                   in the Public Reference Room or may be
                                                    Take notice that the following                        official service list for the project.                viewed on the Commission’s Web site at
                                                  hydroelectric application has been filed                Further, if an intervenor files comments              http://www.ferc.gov using the


                                             VerDate Sep<11>2014   20:43 Oct 01, 2015   Jkt 238001   PO 00000   Frm 00044   Fmt 4703   Sfmt 4703   E:\FR\FM\02OCN1.SGM   02OCN1


                                                  59764                          Federal Register / Vol. 80, No. 191 / Friday, October 2, 2015 / Notices

                                                  ‘‘eLibrary’’ link. Enter the docket                     notice of intent allows an interested                 contact is: Stephen Fisk, General
                                                  number excluding the last three digits in               person to file the competing                          Manager, Mansfield Hollow Hydro, LLC,
                                                  the docket number field to access the                   development application no later than                 c/o O’Connell Energy Group, 57 Suffolk
                                                  document. For assistance, contact FERC                  120 days after the specified intervention             Street, Suite 200, Holyoke, MA 01040.
                                                  Online Support. A copy is also available                deadline date. Applications for                         Dated: September 25, 2015.
                                                  for inspection and reproduction at the                  preliminary permits will not be                       Nathaniel J. Davis, Sr.,
                                                  address in item h above.                                accepted in response to this notice.
                                                     Register online at http://                                                                                 Deputy Secretary.
                                                                                                             A notice of intent must specify the
                                                  www.ferc.gov/docs-filing/                               exact name, business address, and                     [FR Doc. 2015–25010 Filed 10–1–15; 8:45 am]
                                                  esubscription.asp to be notified via                    telephone number of the prospective                   BILLING CODE 6717–01–P
                                                  email of new filings and issuances                      applicant, and must include an
                                                  related to this or other pending projects.              unequivocal statement of intent to
                                                  For assistance, contact FERC Online                     submit a development application. A                   DEPARTMENT OF ENERGY
                                                  Support.                                                notice of intent must be served on the
                                                     n. Anyone may submit comments, a                                                                           Federal Energy Regulatory
                                                                                                          applicant named in this public notice.                Commission
                                                  protest, or a motion to intervene in
                                                                                                            Dated: September 25, 2015.
                                                  accordance with the requirements of                                                                           [Project No. 5596–018]
                                                  Rules of Practice and Procedure, 18 CFR                 Nathaniel J. Davis, Sr.,
                                                  385.210, .211, and .214. In determining                 Deputy Secretary.                                     Town of Bedford, Virginia; Notice of
                                                  the appropriate action to take, the                     [FR Doc. 2015–25011 Filed 10–1–15; 8:45 am]           Application for Amendment and
                                                  Commission will consider all protests or                BILLING CODE 6717–01–P                                Soliciting Comments, Motions To
                                                  other comments filed, but only those                                                                          Intervene, and Protests
                                                  who file a motion to intervene in
                                                  accordance with the Commission’s                        DEPARTMENT OF ENERGY                                     Take notice that the following
                                                  Rules may become a party to the                                                                               hydroelectric application has been filed
                                                  proceeding. Any comments, protests, or                  Federal Energy Regulatory                             with the Commission and is available
                                                  motions to intervene must be received                   Commission                                            for public inspection:
                                                  on or before the specified comment date                                                                          a. Application Type: Request to
                                                                                                          [Project No. 12551–008]
                                                  for the particular application.                                                                               permanently amend the minimum flow
                                                     All filings must (1) bear in all capital             Salvatore & Michelle Shifrin; Mansfield               requirement in bypass reach.
                                                  letters the title ‘‘PROTEST’’, ‘‘MOTION                 Hollow Hydro, LLC; Notice of Transfer                    b. Project No.: 5596–018.
                                                  TO INTERVENE’’, ‘‘COMMENTS,’’                           of Exemption                                             c. Date Filed: May 22, 2015.
                                                  ‘‘REPLY COMMENTS,’’                                                                                              d. Applicant: Town of Bedford,
                                                  ‘‘RECOMMENDATIONS,’’                                       1. By letter filed November 26, 2014,              Virginia.
                                                  ‘‘PRELIMINARY TERMS AND                                 and supplemented on July 23, 2015,                       e. Name of Project: Bedford
                                                  CONDITIONS,’’ or ‘‘PRELIMINARY                          Mansfield Hollow Hydro, LLC                           Hydroelectric Project.
                                                  FISHWAY PRESCRIPTIONS;’’ (2) set                        (Mansfield Hydro) informed the                           f. Location: The project is located on
                                                  forth in the heading the name of the                    Commission that the exemption from                    the James River in Bedford and Amherst
                                                  applicant and the project number of the                 licensing for the Mansfield Hollow                    Counties, Virginia.
                                                  application to which the filing                         Hydroelectric Project No. 12551, had                     g. Filed Pursuant to: Federal Power
                                                  responds; (3) furnish the name, address,                been transferred to Mansfield Hydro.1                 Act, 16 U.S.C. 791(a)–825(r).
                                                  and telephone number of the person                      The project is located on the Natchaug                   h. Applicant Contact: Charles P.
                                                  protesting or intervening; and (4)                      River in Tolland County, Connecticut.                 Kolakowski, Town Manager, Town of
                                                  otherwise comply with the requirements                     2. The exemption was originally                    Bedford, 215 East Main Street, Bedford,
                                                  of 18 CFR 385.2001 through 385.2005.                    issued to Salvatore and Michelle Shifrin              VA 24523; telephone: (540) 587–6002.
                                                  All comments, recommendations, terms                    (Shifrins) on June 17, 2009.2 The                        i. FERC Contact: Kurt Powers,
                                                  and conditions or prescriptions must set                November 26, 2014 letter gave notice                  telephone: (202) 502–8949, and email
                                                  forth their evidentiary basis and                       that the Shifrins had leased the right to             address: kurt.powers@ferc.gov.
                                                  otherwise comply with the requirements                  operate the project to Mansfield Hydro.                  j. Deadline for filing comments,
                                                  of 18 CFR 4.34(b). Agencies may obtain                  The July 23, 2015 filing contained a                  motions to intervene, and protests is 15
                                                  copies of the application directly from                 copy of the lease showing that all                    days from the issuance date of this
                                                  the applicant. A copy of any protest or                 project lands and facilities were also                notice by the Commission.
                                                  motion to intervene must be served                      leased to Mansfield Hydro, with                          All documents may be filed
                                                  upon each representative of the                         exception of the five 100-kilowatt                    electronically via the Internet. See 18
                                                  applicant specified in the particular                   turbines, which Mansfield Hydro owns.                 CFR 385.2001(a)(1)(iii) and the
                                                  application. A copy of all other filings                   3. The transfer of an exemption does               instructions on the Commission’s Web
                                                  in reference to this application must be                not require Commission approval. Thus,                site at http://www.ferc.gov/docs-filing/
                                                  accompanied by proof of service on all                  the Shifrins’ lease of project properties             efiling.asp. Commenters can submit
                                                  persons listed in the service list                      and operating rights to Mansfield Hydro               brief comments up to 6,000 characters,
                                                  prepared by the Commission in this                      effectively transferred the exemption to              without prior registration, using the
                                                  proceeding, in accordance with 18 CFR                   Mansfield Hydro.                                      eComment system at http://
                                                                                                             4. Mansfield Hydro is the exemptee of
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  4.34(b) and 385.2010.                                                                                         www.ferc.gov/docs-filing/
                                                     o. Any qualified applicant desiring to               the Mansfield Hollow Hydroelectric                    ecomment.asp. You must include your
                                                  file a competing application must                       Project No. 12551. The exemptee’s                     name and contact information at the end
                                                  submit to the Commission, on or before                                                                        of your comments. For assistance,
                                                                                                            1 O’Connell Energy Group made the filing on
                                                  the specified intervention deadline date,                                                                     please contact FERC Online Support at
                                                                                                          behalf of Mansfield Hydro, which is owned by
                                                  a competing development application,                    O’Connell Development Group, Inc.                     FERCOnlineSupport@ferc.gov or toll
                                                  or a notice of intent to file such an                     2 127 FERC ¶ 62,216, Order Granting Exemption       free at 1–866–208–3676, or for TTY,
                                                  application. Submission of a timely                     From Licensing (5 MW or Less) (2009).                 (202) 502–8659. Although the


                                             VerDate Sep<11>2014   20:43 Oct 01, 2015   Jkt 238001   PO 00000   Frm 00045   Fmt 4703   Sfmt 4703   E:\FR\FM\02OCN1.SGM   02OCN1



Document Created: 2015-12-15 08:44:47
Document Modified: 2015-12-15 08:44:47
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 59763 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR