80_FR_60021 80 FR 59830 - Sunshine Act Meeting Notice

80 FR 59830 - Sunshine Act Meeting Notice

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 80, Issue 191 (October 2, 2015)

Page Range59830-59831
FR Document2015-25312

Federal Register, Volume 80 Issue 191 (Friday, October 2, 2015)
[Federal Register Volume 80, Number 191 (Friday, October 2, 2015)]
[Notices]
[Pages 59830-59831]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-25312]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2015-0001]


Sunshine Act Meeting Notice

DATES: October 5, 12, 19, 26, November 2, 9, 2015.

PLACE: Commissioners' Conference Room, 11555 Rockville Pike, Rockville, 
Maryland.

STATUS: Public and Closed.

Week of October 5, 2015

    There are no meetings scheduled for the week of October 5, 2015.

Week of October 12, 2015--Tentative

    There are no meetings scheduled for the week of October 12, 2015.

Week of October 19, 2015--Tentative

Monday, October 19, 2015

9:30 a.m. Briefing on Security Issues (Closed--Ex. 1)

Wednesday, October 21, 2015

9 a.m. Joint Meeting of the Federal Energy Regulatory Commission (FERC) 
and the Nuclear Regulatory Commission (NRC) (Part 1) (Public Meeting)
    To be held at FERC Headquarters, 888 First Street NE., Washington, 
DC.
    (Contact: Tania Martinez-Navedo: 301-415-6561)

    This meeting will be webcast live at the Web address--www.ferc.gov.
11:20 a.m. Joint Meeting of the Federal Energy Regulatory Commission 
(FERC) and the Nuclear Regulatory Commission (NRC) (Part 2) (Closed--
Ex. 1 & 3)
    To be held at FERC Headquarters, 888 First Street NE., Washington, 
DC.

Week of October 26, 2015--Tentative

    There are no meetings scheduled for the week of October 26, 2015.

Week of November 2, 2015--Tentative

    There are no meetings scheduled for the week of November 2, 2015

Week of November 9, 2015--Tentative

    There are no meetings scheduled for the week of November 9, 2015
* * * * *
The schedule for Commission meetings is subject to change on short 
notice. For more information or to verify the status of meetings, 
contact Glenn Ellmers at 301-415-0442 or via email at 
Glenn.Ellmers@nrc.gov.
* * * * *
The NRC Commission Meeting Schedule can be found on the Internet at: 
http://www.nrc.gov/public-involve/public-meetings/schedule.html.
* * * * *
    The NRC provides reasonable accommodation to individuals with 
disabilities where appropriate. If you need a reasonable accommodation 
to participate in these public meetings, or need this meeting notice or 
the transcript or other information from the public meetings in another 
format (e.g. braille, large print), please notify Kimberly Meyer, NRC 
Disability Program Manager, at 301-287-0727, by videophone at 240-428-
3217, or by email at Kimberly.Meyer-Chambers@nrc.gov. Determinations on 
requests for reasonable accommodation will be made on a case-by-case 
basis.
* * * * *
    Members of the public may request to receive this information 
electronically.

[[Page 59831]]

If you would like to be added to the distribution, please contact the 
Nuclear Regulatory Commission, Office of the Secretary, Washington, DC 
20555 (301-415-1969), or email Brenda.Akstulewicz@nrc.gov or 
Patricia.Jimenez@nrc.gov.

    Dated: September 30, 2015.
Glenn Ellmers,
Policy Coordinator, Office of the Secretary.
[FR Doc. 2015-25312 Filed 9-30-15; 4:15 pm]
 BILLING CODE 7590-01-P



                                                  59830                          Federal Register / Vol. 80, No. 191 / Friday, October 2, 2015 / Notices

                                                  Commissioner Baran to discuss items of                  7th–10th meeting date may be closed, as               Week of October 19, 2015—Tentative
                                                  mutual interest.                                        specifically noted above. Use of still,
                                                    2:00 p.m.–6:00 p.m.: Preparation of                                                                         Monday, October 19, 2015
                                                                                                          motion picture, and television cameras
                                                  ACRS Reports (Open/Closed)—The                          during the meeting may be limited to                  9:30 a.m. Briefing on Security Issues
                                                  Committee will continue its discussion                  selected portions of the meeting as                       (Closed—Ex. 1)
                                                  of proposed ACRS reports on matters                     determined by the Chairman. Electronic                Wednesday, October 21, 2015
                                                  discussed during this meeting.                          recordings will be permitted only
                                                                                                          during the open portions of the meeting.              9 a.m. Joint Meeting of the Federal
                                                    Note: A portion of this meeting may be                                                                          Energy Regulatory Commission
                                                  closed in order to discuss and protect                     ACRS meeting agendas, meeting
                                                  information designated as proprietary                   transcripts, and letter reports are                       (FERC) and the Nuclear Regulatory
                                                  pursuant to 5 U.S.C. 552b(c)(4).                        available through the NRC Public                          Commission (NRC) (Part 1) (Public
                                                                                                          Document Room at pdr.resource@                            Meeting)
                                                  Saturday, October 10, 2015, Conference                  nrc.gov, or by calling the PDR at 1–800–                To be held at FERC Headquarters, 888
                                                  Room T2–B1, 11545 Rockville Pike,                       397–4209, or from the Publicly                            First Street NE., Washington, DC.
                                                  Rockville, Maryland                                                                                             (Contact: Tania Martinez-Navedo:
                                                                                                          Available Records System (PARS)
                                                                                                                                                                    301–415–6561)
                                                    8:30 a.m.–11:30 a.m.: Preparation of                  component of NRC’s document system
                                                                                                          (ADAMS) which is accessible from the                    This meeting will be webcast live at
                                                  ACRS Reports (Open/Closed)—The                                                                                the Web address—www.ferc.gov.
                                                  Committee will continue its discussion                  NRC Web site at http://www.nrc.gov/
                                                                                                          reading-rm/adams.html or http://                      11:20 a.m. Joint Meeting of the Federal
                                                  of proposed ACRS reports.                                                                                         Energy Regulatory Commission
                                                                                                          www.nrc.gov/reading-rm/doc-
                                                    Note: A portion of this meeting may be
                                                                                                          collections/ACRS/.                                        (FERC) and the Nuclear Regulatory
                                                  closed in order to discuss and protect                                                                            Commission (NRC) (Part 2)
                                                  information designated as proprietary                      Video teleconferencing service is
                                                                                                          available for observing open sessions of                  (Closed—Ex. 1 & 3)
                                                  pursuant to 5 U.S.C. 552b(c)(4).]                                                                               To be held at FERC Headquarters, 888
                                                                                                          ACRS meetings. Those wishing to use
                                                     11:30 a.m.–12:00 p.m.: Miscellaneous                                                                           First Street NE., Washington, DC.
                                                                                                          this service should contact Mr. Theron
                                                  (Open)—The Committee will continue                      Brown, ACRS Audio Visual Technician                   Week of October 26, 2015—Tentative
                                                  its discussion related to the conduct of                (301–415–8066), between 7:30 a.m. and
                                                  Committee activities and specific issues                                                                        There are no meetings scheduled for
                                                                                                          3:45 p.m. (ET), at least 10 days before               the week of October 26, 2015.
                                                  that were not completed during                          the meeting to ensure the availability of
                                                  previous meetings.                                      this service. Individuals or                          Week of November 2, 2015—Tentative
                                                     Procedures for the conduct of and
                                                                                                          organizations requesting this service                   There are no meetings scheduled for
                                                  participation in ACRS meetings were
                                                                                                          will be responsible for telephone line                the week of November 2, 2015
                                                  published in the Federal Register on
                                                                                                          charges and for providing the
                                                  October 1, 2014 (79 FR 59307). In                                                                             Week of November 9, 2015—Tentative
                                                                                                          equipment and facilities that they use to
                                                  accordance with those procedures, oral                                                                           There are no meetings scheduled for
                                                                                                          establish the video teleconferencing
                                                  or written views may be presented by                                                                          the week of November 9, 2015
                                                                                                          link. The availability of video
                                                  members of the public, including
                                                                                                          teleconferencing services is not                      *      *     *    *      *
                                                  representatives of the nuclear industry.
                                                                                                          guaranteed.                                           The schedule for Commission meetings
                                                  Persons desiring to make oral statements
                                                                                                            Dated at Rockville, Maryland, this 28th day         is subject to change on short notice. For
                                                  should notify Quynh Nguyen, Cognizant
                                                                                                          of September, 2015.                                   more information or to verify the status
                                                  ACRS Staff (Telephone: 301–415–5844,
                                                                                                            For the Nuclear Regulatory Commission.              of meetings, contact Glenn Ellmers at
                                                  Email: Quynh.Nguyen@nrc.gov), 5 days
                                                                                                          Annette L. Vietti-Cook,                               301–415–0442 or via email at
                                                  before the meeting, if possible, so that
                                                                                                                                                                Glenn.Ellmers@nrc.gov.
                                                  appropriate arrangements can be made                    Acting, Advisory Committee Management
                                                  to allow necessary time during the                      Officer.                                              *      *     *    *      *
                                                  meeting for such statements. In view of                 [FR Doc. 2015–25116 Filed 10–1–15; 8:45 am]
                                                                                                                                                                The NRC Commission Meeting
                                                  the possibility that the schedule for                                                                         Schedule can be found on the Internet
                                                                                                          BILLING CODE 7590–01–P
                                                  ACRS meetings may be adjusted by the                                                                          at: http://www.nrc.gov/public-involve/
                                                  Chairman as necessary to facilitate the                                                                       public-meetings/schedule.html.
                                                  conduct of the meeting, persons                         NUCLEAR REGULATORY                                    *      *     *    *      *
                                                  planning to attend should check with                    COMMISSION                                               The NRC provides reasonable
                                                  the Cognizant ACRS Staff if such                                                                              accommodation to individuals with
                                                                                                          [NRC–2015–0001]                                       disabilities where appropriate. If you
                                                  rescheduling would result in major
                                                  inconvenience.                                          Sunshine Act Meeting Notice                           need a reasonable accommodation to
                                                     Thirty-five hard copies of each                                                                            participate in these public meetings, or
                                                  presentation or handout should be                       DATES:  October 5, 12, 19, 26, November               need this meeting notice or the
                                                  provided 30 minutes before the meeting.                 2, 9, 2015.                                           transcript or other information from the
                                                  In addition, one electronic copy of each                PLACE: Commissioners’ Conference                      public meetings in another format (e.g.
                                                  presentation should be emailed to the                   Room, 11555 Rockville Pike, Rockville,                braille, large print), please notify
                                                  Cognizant ACRS Staff one day before                     Maryland.                                             Kimberly Meyer, NRC Disability
                                                  meeting. If an electronic copy cannot be                STATUS: Public and Closed.
                                                                                                                                                                Program Manager, at 301–287–0727, by
                                                                                                                                                                videophone at 240–428–3217, or by
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  provided within this timeframe,
                                                  presenters should provide the Cognizant                 Week of October 5, 2015                               email at Kimberly.Meyer-Chambers@
                                                  ACRS Staff with a CD containing each                      There are no meetings scheduled for                 nrc.gov. Determinations on requests for
                                                  presentation at least 30 minutes before                 the week of October 5, 2015.                          reasonable accommodation will be
                                                  the meeting.                                                                                                  made on a case-by-case basis.
                                                     In accordance with Subsection 10(d)                  Week of October 12, 2015—Tentative                    *      *     *    *      *
                                                  of Public Law 92–463 and 5 U.S.C.                         There are no meetings scheduled for                    Members of the public may request to
                                                  552b(c), certain portions of the October                the week of October 12, 2015.                         receive this information electronically.


                                             VerDate Sep<11>2014   20:43 Oct 01, 2015   Jkt 238001   PO 00000   Frm 00111   Fmt 4703   Sfmt 4703   E:\FR\FM\02OCN1.SGM   02OCN1


                                                                                 Federal Register / Vol. 80, No. 191 / Friday, October 2, 2015 / Notices                                         59831

                                                  If you would like to be added to the                    published in the Federal Register on                  DPR–79 were effective on September 28,
                                                  distribution, please contact the Nuclear                October 1, 2014, (79 FR 59307).                       2015.
                                                  Regulatory Commission, Office of the                       Detailed meeting agendas and meeting               ADDRESSES: Please refer to Docket ID
                                                  Secretary, Washington, DC 20555 (301–                   transcripts are available on the NRC                  NRC–2013–0037 when contacting the
                                                  415–1969), or email                                     Web site at http://www.nrc.gov/reading-               NRC about the availability of
                                                  Brenda.Akstulewicz@nrc.gov or                           rm/doc-collections/acrs. Information                  information regarding this document.
                                                  Patricia.Jimenez@nrc.gov.                               regarding topics to be discussed,                     You may obtain publicly-available
                                                    Dated: September 30, 2015.                            changes to the agenda, whether the                    information related to this document
                                                                                                          meeting has been canceled or                          using any of the following methods:
                                                  Glenn Ellmers,
                                                  Policy Coordinator, Office of the Secretary.
                                                                                                          rescheduled, and the time allotted to                    • Federal Rulemaking Web site: Go to
                                                                                                          present oral statements can be obtained               http://www.regulations.gov and search
                                                  [FR Doc. 2015–25312 Filed 9–30–15; 4:15 pm]             from the Web site cited above or by                   for Docket ID NRC–2013–0037. Address
                                                  BILLING CODE 7590–01–P                                  contacting the identified DFO.                        questions about NRC dockets to Carol
                                                                                                          Moreover, in view of the possibility that             Gallagher; telephone: 301–415–3463;
                                                                                                          the schedule for ACRS meetings may be                 email: Carol.Gallagher@nrc.gov. For
                                                  NUCLEAR REGULATORY                                      adjusted by the Chairman as necessary
                                                  COMMISSION                                                                                                    technical questions, contact the
                                                                                                          to facilitate the conduct of the meeting,             individual listed in the FOR FURTHER
                                                  Advisory Committee on Reactor                           persons planning to attend should check               INFORMATION CONTACT section of this
                                                  Safeguards; Meeting of the ACRS                         with these references if such                         document.
                                                  Subcommittee on Future Plant                            rescheduling would result in a major                     • NRC’s Agencywide Documents
                                                  Designs; Notice of Meeting                              inconvenience.                                        Access and Management System
                                                                                                             If attending this meeting, please enter            (ADAMS): You may obtain publicly-
                                                     The ACRS Subcommittee on Future                      through the One White Flint North                     available documents online in the
                                                  Plant Designs will hold a meeting on                    building, 11555 Rockville Pike,                       ADAMS Public Documents collection at
                                                  October 7, 2015, Room T–2B1, 11545                      Rockville, MD. After registering with                 http://www.nrc.gov/reading-rm/
                                                  Rockville Pike, Rockville, Maryland.                    security, please contact Mr. Theron                   adams.html. To begin the search, select
                                                     The meeting will be open to public                   Brown (Telephone 240–888–9835) to be                  ‘‘ADAMS Public Documents’’ and then
                                                  attendance.                                             escorted to the meeting room.                         select ‘‘Begin Web-based ADAMS
                                                     The agenda for the subject meeting                     Dated: September 24, 2015.                          Search.’’ For problems with ADAMS,
                                                  shall be as follows:
                                                                                                          Mark L. Banks,                                        please contact the NRC’s Public
                                                  Wednesday, October 7, 2015–8:30 a.m.                    Chief, Technical Support Branch, Advisory             Document Room (PDR) reference staff at
                                                  Until 1:00 p.m.                                         Committee on Reactor Safeguards.                      1–800–397–4209, 301–415–4737, or by
                                                    The Subcommittee will discuss                         [FR Doc. 2015–25118 Filed 10–1–15; 8:45 am]           email to pdr.resource@nrc.gov. The
                                                  sections of the NuScale Design-Specific                 BILLING CODE 7590–01–P                                ADAMS accession number for each
                                                  Review Standard. The Subcommittee                                                                             document referenced (if that document
                                                  will hear presentations by and hold                                                                           is available in ADAMS) is provided the
                                                  discussions with the NRC staff and                      NUCLEAR REGULATORY                                    first time that a document is referenced.
                                                  other interested persons regarding this                 COMMISSION                                               • NRC’s PDR: You may examine and
                                                  matter. The Subcommittee will gather                    [Docket No. 50–327 and 50–328; NRC–2013–
                                                                                                                                                                purchase copies of public documents at
                                                  information, analyze relevant issues and                0037]                                                 the NRC’s PDR, Room O1–F21, One
                                                  facts, and formulate proposed positions                                                                       White Flint North, 11555 Rockville
                                                  and actions, as appropriate, for                        License Renewal for Sequoyah Nuclear                  Pike, Rockville, Maryland 20852.
                                                  deliberation by the Full Committee.                     Plant, Units 1 and 2                                  FOR FURTHER INFORMATION CONTACT:
                                                    Members of the public desiring to                                                                           Emmanuel Sayoc, Office of Nuclear
                                                                                                          AGENCY:  Nuclear Regulatory
                                                  provide oral statements and/or written                  Commission.                                           Reactor Regulation, U.S. Nuclear
                                                  comments should notify the Designated                                                                         Regulatory Commission, Washington,
                                                                                                          ACTION: License renewal and record of
                                                  Federal Official (DFO), Maitri Banerjee                                                                       DC 20555; telephone: 301–415–4084;
                                                                                                          decision; issuance.                                   email: Emmanuel.Sayoc@nrc.gov.
                                                  (Telephone 301–415–6973 or Email:
                                                  Maitri.Banerjee@nrc.gov) five days prior                SUMMARY:   The U.S. Nuclear Regulatory                SUPPLEMENTARY INFORMATION: Notice is
                                                  to the meeting, if possible, so that                    Commission (NRC) has issued renewed                   hereby given that the NRC has issued
                                                  appropriate arrangements can be made.                   facility operating licenses Nos. DPR–77               renewed facility operating licenses Nos.
                                                  Thirty-five hard copies of each                         and DPR–79 to Tennessee Valley                        DPR–77 and DPR–79 to Tennessee
                                                  presentation or handout should be                       Authority, the operator of the Sequoyah               Valley Authority, the operator of SQN.
                                                  provided to the DFO thirty minutes                      Nuclear Plant, Units 1 and 2 (SQN).                   Renewed facility operating licenses Nos.
                                                  before the meeting. In addition, one                    Renewed facility operating licenses Nos.              DPR–77 and DPR–79 authorize
                                                  electronic copy of each presentation                    DPR–77 and DPR–79 authorize                           operation of SQN by the licensee at
                                                  should be emailed to the DFO one day                    operation of SQN by the licensee at                   reactor core power levels not in excess
                                                  before the meeting. If an electronic copy               reactor core power levels not in excess               of 3455 megawatts thermal, in
                                                  cannot be provided within this                          of 3455 megawatts thermal, in                         accordance with the provisions of the
                                                  timeframe, presenters should provide                    accordance with the provisions of the                 SQN renewed licenses and technical
                                                                                                          SQN renewed licenses and technical
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  the DFO with a CD containing each                                                                             specifications. The NRC’s ROD that
                                                  presentation at least thirty minutes                    specifications. In addition, the NRC has              supports the NRC’s decision to renew
                                                  before the meeting. Electronic                          prepared a record of decision (ROD) that              facility operating licenses Nos. DPR–77
                                                  recordings will be permitted only                       supports the NRC’s decision to renew                  and DPR–79 is available in ADAMS
                                                  during those portions of the meeting                    facility operating licenses Nos. DPR–77               under Accession No. ML15104A689. As
                                                  that are open to the public. Detailed                   and DPR–79.                                           discussed in the ROD and the final
                                                  procedures for the conduct of and                       DATES: The license renewal of facility                supplemental environmental impact
                                                  participation in ACRS meetings were                     operating licenses Nos. DPR–77 and                    statement (FSEIS) for SQN, Supplement


                                             VerDate Sep<11>2014   20:43 Oct 01, 2015   Jkt 238001   PO 00000   Frm 00112   Fmt 4703   Sfmt 4703   E:\FR\FM\02OCN1.SGM   02OCN1



Document Created: 2015-12-15 08:44:45
Document Modified: 2015-12-15 08:44:45
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
DatesOctober 5, 12, 19, 26, November 2, 9, 2015.
FR Citation80 FR 59830 

2024 Federal Register | Disclaimer | Privacy Policy