80_FR_60568 80 FR 60375 - FirstLight Hydro Generating Company; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests

80 FR 60375 - FirstLight Hydro Generating Company; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 193 (October 6, 2015)

Page Range60375-60376
FR Document2015-25390

Federal Register, Volume 80 Issue 193 (Tuesday, October 6, 2015)
[Federal Register Volume 80, Number 193 (Tuesday, October 6, 2015)]
[Notices]
[Pages 60375-60376]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-25390]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2485-070]


FirstLight Hydro Generating Company; Notice of Application 
Accepted for Filing, Soliciting Comments, Motions To Intervene, and 
Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Application for Amendment of Minimum and 
Maximum Reservoir Elevation Requirement.
    b. Project No.: 2485-070.
    c. Date Filed: September 1, 2015.
    d. Applicant: FirstLight Hydro Generating Company (Firstlight).
    e. Name of Project: Northfield Mountain Pumped Storage Project.
    f. Location: The project is located on the east side of the 
Connecticut River, in the towns of Northfield and Erving, in Franklin 
County, Massachusetts.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Mr. John S. Howard, Director FERC Compliance, 
FirstLight Hydro Generating Company, Northfield Mountain Station, 99 
Millers Falls Road, Northfield, MA 01360. Phone (413) 659-4489.

[[Page 60376]]

    i. FERC Contact: Mr. Christopher Chaney, (202) 502-6778, or 
[email protected].
    j. Deadline for filing comments, motions to intervene, and protests 
is 30 days from the issuance date of this notice by the Commission. The 
Commission strongly encourages electronic filing. Please file motions 
to intervene, protests, or comments using the Commission's eFiling 
system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. Please include the project number (P-
2485-070) on any comments, motions to intervene, or protests filed.
    k. Description of Request: FirstLight is seeking authorization to 
modify the upper reservoir's upper and lower water surface elevation 
limits from 1,000.5 feet mean sea level (msl) and 938 feet msl, to 
1,004.5 feet msl and 920 feet msl, respectively. FirstLight proposes to 
use the additional storage capacity annually between December 1 and 
March 31, beginning December 1, 2015, and continuing until the 
Commission issues a new license for the project. According to 
FirstLight, approval of changes in the water surface elevation limits 
would result in an increase in the maximum daily generation from 8,475 
megawatt-hours (MWh) to 10,645 MWh, and provide Independent System 
Operator-New England with additional resources to address winter 
reliability needs.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits 
in the docket number field to access the document (i.e. P-2485). You 
may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, call 1-866-
208-3676 or email [email protected], for TTY, call (202) 502-
8659. A copy is also available for inspection and reproduction at the 
address in item (h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or 
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis and otherwise comply with the requirements of 18 CFR 
4.34(b). All comments, motions to intervene, or protests should relate 
to the amendment request. Agencies may obtain copies of the application 
directly from the applicant. A copy of any protest or motion to 
intervene must be served upon each representative of the applicant 
specified in the particular application. If an intervener files 
comments or documents with the Commission relating to the merits of an 
issue that may affect the responsibilities of a particular resource 
agency, they must also serve a copy of the document on that resource 
agency. A copy of all other filings in reference to this application 
must be accompanied by proof of service on all persons listed in the 
service list prepared by the Commission in this proceeding, in 
accordance with 18 CFR 4.34(b) and 385.2010.

    Dated: September 29, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-25390 Filed 10-5-15; 8:45 am]
 BILLING CODE 6717-01-P



                                                                           Federal Register / Vol. 80, No. 193 / Tuesday, October 6, 2015 / Notices                                                 60375

                                                Dated: September 30, 2015.                            The first page of any filing should                   Power Act (16 U.S.C. 803(j)). Agencies
                                              Kimberly D. Bose,                                       include docket number P–9842–006.                     may obtain copies of the application
                                              Secretary.                                                 The Commission’s Rules of Practice                 directly from the applicant. Each filing
                                              [FR Doc. 2015–25381 Filed 10–5–15; 8:45 am]             require all intervenors filing documents              must be accompanied by proof of
                                              BILLING CODE 6717–01–P
                                                                                                      with the Commission to serve a copy of                service on all persons listed on the
                                                                                                      that document on each person on the                   service list prepared by the Commission
                                                                                                      official service list for the project.                in this proceeding, in accordance with
                                              DEPARTMENT OF ENERGY                                    Further, if an intervenor files comments              18 CFR 4.34(b) and 385.2010.
                                                                                                      or documents with the Commission                         You may also register online at http://
                                              Federal Energy Regulatory                               relating to the merits of an issue that               www.ferc.gov/docs-filing/
                                              Commission                                              may affect the responsibilities of a                  esubscription.asp to be notified via
                                                                                                      particular resource agency, they must                 email of new filings and issuances
                                              [Project No. 9842–006]
                                                                                                      also serve a copy of the document on                  related to this or other pending projects.
                                              Mr. Ray F. Ward; Notice of Application                  that resource agency.                                 For assistance, contact FERC Online
                                                                                                         k. This application has been accepted,             Support.
                                              Ready for Environmental Analysis and
                                                                                                      and is ready for environmental analysis                  n. A license applicant must file no
                                              Soliciting Comments,
                                                                                                      at this time.                                         later than 60 days following the date of
                                              Recommendations, Terms and                                 l. The Ward Mill Project consists of:
                                              Conditions, and Prescriptions                                                                                 issuance of this notice: (1) A copy of the
                                                                                                      (1) A 4.6 acre reservoir with an                      water quality certification; (2) a copy of
                                                 Take notice that the following                       estimated gross storage capacity of 16.3              the request for certification, including
                                              hydroelectric application has been filed                acre-feet; (2) a 130-foot-long by 20-foot-            proof of the date on which the certifying
                                              with the Commission and is available                    high dam; (3) a 14-footlong, 5-foot-wide,             agency received the request; or (3)
                                              for public inspection.                                  and 7.5-foot-tall penstock made of rock,              evidence of waiver of water quality
                                                 a. Type of Application: Minor New                    concrete and reinforced steel; (4) a                  certification.
                                              License.                                                powerhouse containing two generating
                                                 b. Project No.: 9842–006.                            units for a total installed capacity of 168             Dated: September 30, 2015.
                                                 c. Date filed: August 28, 2014.                      kilowatts; (5) interconnection with the               Kimberly D. Bose,
                                                 d. Applicant: Mr. Ray F. Ward.                       utility at the meter point on the                     Secretary.
                                                 e. Name of Project: Ward Mill                        southwest, exterior wall of the                       [FR Doc. 2015–25389 Filed 10–5–15; 8:45 am]
                                              Hydroelectric Project.                                  powerhouse; and (6) appurtenant                       BILLING CODE 6717–01–P
                                                 f. Location: On the Watauga River, in                facilities. The project is estimated to
                                              the Township of Laurel Creek, Watauga                   generate from about 290,000 to about
                                              County, North Carolina. The project                     599,000 kilowatt-hours annually. The                  DEPARTMENT OF ENERGY
                                              does not occupy lands of the United                     dam and existing facilities are owned by
                                              States.                                                 the applicant. No new project facilities              Federal Energy Regulatory
                                                 g. Filed Pursuant to: Federal Power                  are proposed.                                         Commission
                                              Act 16 U.S.C. 791 (a)–825(r).                              m. A copy of the application is                    [Project No. 2485–070]
                                                 h. Applicant Contact: Andrew C.                      available for review at the Commission
                                              Givens, Cardinal Energy Service, Inc.,                  in the Public Reference Room or may be                FirstLight Hydro Generating Company;
                                              620 N. West St., Suite 103, Raleigh,                    viewed on the Commission’s Web site at                Notice of Application Accepted for
                                              North Carolina 27603, (919) 834–0909.                   http://www.ferc.gov using the                         Filing, Soliciting Comments, Motions
                                                 i. FERC Contact: Adam Peer (202)                     ‘‘eLibrary’’ link. Enter the docket                   To Intervene, and Protests
                                              502–8449, adam.peer@ferc.gov.                           number excluding the last three digits in
                                                 j. Deadline for filing comments,                     the docket number field to access the                   Take notice that the following
                                              recommendations, terms and                              document. For assistance, contact FERC                hydroelectric application has been filed
                                              conditions, and prescriptions: 60 days                  Online Support. A copy is also available              with the Commission and is available
                                              from the issuance date of this notice;                  for inspection and reproduction at the                for public inspection:
                                              reply comments are due 105 days from                    address in item h above.                                a. Type of Application: Application
                                              the issuance date of this notice.                          All filings must (1) bear in all capital           for Amendment of Minimum and
                                                 The Commission strongly encourages                   letters the title ‘‘COMMENTS’’, ‘‘REPLY               Maximum Reservoir Elevation
                                              electronic filing. Please file comments,                COMMENTS’’,                                           Requirement.
                                              recommendations, terms and                              ‘‘RECOMMENDATIONS,’’ ‘‘TERMS                            b. Project No.: 2485–070.
                                              conditions, and prescriptions using the                 AND CONDITIONS,’’ or                                    c. Date Filed: September 1, 2015.
                                              Commission’s eFiling system at http://                  ‘‘PRESCRIPTIONS;’’ (2) set forth in the                 d. Applicant: FirstLight Hydro
                                              www.ferc.gov/docs-filing/efiling.asp.                   heading the name of the applicant and                 Generating Company (Firstlight).
                                              Commenters can submit brief comments                    the project number of the application to                e. Name of Project: Northfield
                                              up to 6,000 characters, without prior                   which the filing responds; (3) furnish                Mountain Pumped Storage Project.
                                              registration, using the eComment system                 the name, address, and telephone                        f. Location: The project is located on
                                              at http://www.ferc.gov/docs-filing/                     number of the person submitting the                   the east side of the Connecticut River,
                                              ecomment.asp. You must include your                     filing; and (4) otherwise comply with                 in the towns of Northfield and Erving,
                                              name and contact information at the end                 the requirements of 18 CFR 385.2001                   in Franklin County, Massachusetts.
                                              of your comments. For assistance,                       through 385.2005. All comments,                         g. Filed Pursuant to: Federal Power
tkelley on DSK3SPTVN1PROD with NOTICES




                                              please contact FERC Online Support at                   recommendations, terms and conditions                 Act, 16 U.S.C. 791(a)–825(r).
                                              FERCOnlineSupport@ferc.gov, (866)                       or prescriptions must set forth their                   h. Applicant Contact: Mr. John S.
                                              208–3676 (toll free), or (202) 502–8659                 evidentiary basis and otherwise comply                Howard, Director FERC Compliance,
                                              (TTY). In lieu of electronic filing, please             with the requirements of 18 CFR 4.34(b).              FirstLight Hydro Generating Company,
                                              send a paper copy to: Secretary, Federal                Agencies should indicate which                        Northfield Mountain Station, 99 Millers
                                              Energy Regulatory Commission, 888                       recommendations are being submitted                   Falls Road, Northfield, MA 01360.
                                              First Street NE., Washington, DC 20426.                 pursuant to section 10(j) of the Federal              Phone (413) 659–4489.


                                         VerDate Sep<11>2014   18:31 Oct 05, 2015   Jkt 238001   PO 00000   Frm 00027   Fmt 4703   Sfmt 4703   E:\FR\FM\06OCN1.SGM   06OCN1


                                              60376                        Federal Register / Vol. 80, No. 193 / Tuesday, October 6, 2015 / Notices

                                                 i. FERC Contact: Mr. Christopher                     866–208–3676 or email                                   Dated: September 29, 2015.
                                              Chaney, (202) 502–6778, or                              FERCOnlineSupport@ferc.gov, for TTY,                  Kimberly D. Bose,
                                              christopher.chaney@ferc.gov.                            call (202) 502–8659. A copy is also                   Secretary.
                                                 j. Deadline for filing comments,                     available for inspection and                          [FR Doc. 2015–25390 Filed 10–5–15; 8:45 am]
                                              motions to intervene, and protests is 30                reproduction at the address in item (h)               BILLING CODE 6717–01–P
                                              days from the issuance date of this                     above.
                                              notice by the Commission. The
                                                                                                         m. Individuals desiring to be included
                                              Commission strongly encourages                                                                                DEPARTMENT OF ENERGY
                                                                                                      on the Commission’s mailing list should
                                              electronic filing. Please file motions to
                                                                                                      so indicate by writing to the Secretary
                                              intervene, protests, or comments using                                                                        Federal Energy Regulatory
                                              the Commission’s eFiling system at                      of the Commission.                                    Commission
                                              http://www.ferc.gov/docs-filing/                           n. Comments, Protests, or Motions to
                                                                                                                                                            [Docket No. CP15–132–000]
                                              efiling.asp. Commenters can submit                      Intervene: Anyone may submit
                                              brief comments up to 6,000 characters,                  comments, a protest, or a motion to                   Kern River Transmission Company;
                                              without prior registration, using the                   intervene in accordance with the                      Notice of Availability of the
                                              eComment system at http://                              requirements of Rules of Practice and                 Environmental Assessment for the
                                              www.ferc.gov/docs-filing/                               Procedure, 18 CFR 385.210, .211, .214.                Proposed Summerlin Pipe
                                              ecomment.asp. You must include your                     In determining the appropriate action to              Replacement Project
                                              name and contact information at the end                 take, the Commission will consider all
                                              of your comments. For assistance,                       protests or other comments filed, but                    The staff of the Federal Energy
                                              please contact FERC Online Support at                   only those who file a motion to                       Regulatory Commission (FERC or
                                              FERCOnlineSupport@ferc.gov, (866)                       intervene in accordance with the                      Commission) has prepared an
                                              208–3676 (toll free), or (202) 502–8659                 Commission’s Rules may become a                       environmental assessment (EA) for the
                                              (TTY). In lieu of electronic filing, please             party to the proceeding. Any comments,                Summerlin Pipe Replacement Project,
                                              send a paper copy to: Secretary, Federal                protests, or motions to intervene must                proposed by Kern River Transmission
                                              Energy Regulatory Commission, 888                       be received on or before the specified                Company (Kern River) in the above-
                                              First Street NE., Washington, DC 20426.                 comment date for the particular                       referenced docket. Kern River requests
                                              Please include the project number (P–                   application.                                          authorization to construct, operate, and
                                              2485–070) on any comments, motions to                                                                         maintain a new natural gas pipeline and
                                              intervene, or protests filed.                              o. Filing and Service of Responsive                associated facilities in Clark County,
                                                 k. Description of Request: FirstLight is             Documents: Any filing must (1) bear in                Nevada, and remove a corresponding
                                              seeking authorization to modify the                     all capital letters the title                         segment of existing pipeline.
                                              upper reservoir’s upper and lower water                 ‘‘COMMENTS’’, ‘‘PROTEST’’, or                            The EA assesses the potential
                                              surface elevation limits from 1,000.5                   ‘‘MOTION TO INTERVENE’’ as                            environmental effects of the
                                              feet mean sea level (msl) and 938 feet                  applicable; (2) set forth in the heading              construction and operation of the
                                              msl, to 1,004.5 feet msl and 920 feet                   the name of the applicant and the                     Summerlin Pipe Replacement Project in
                                              msl, respectively. FirstLight proposes to               project number of the application to                  accordance with the requirements of the
                                              use the additional storage capacity                     which the filing responds; (3) furnish                National Environmental Policy Act
                                              annually between December 1 and                         the name, address, and telephone                      (NEPA). The FERC staff concludes that
                                              March 31, beginning December 1, 2015,                   number of the person protesting or                    approval of the proposed project, with
                                              and continuing until the Commission                     intervening; and (4) otherwise comply                 appropriate mitigating measures, would
                                              issues a new license for the project.                   with the requirements of 18 CFR                       not constitute a major federal action
                                              According to FirstLight, approval of                    385.2001 through 385.2005. All                        significantly affecting the quality of the
                                              changes in the water surface elevation                  comments, motions to intervene, or                    human environment.
                                              limits would result in an increase in the               protests must set forth their evidentiary                The U.S. Bureau of Land Management
                                              maximum daily generation from 8,475                     basis and otherwise comply with the                   (BLM) participated as a cooperating
                                              megawatt-hours (MWh) to 10,645 MWh,                     requirements of 18 CFR 4.34(b). All                   agency in the preparation of the EA.
                                              and provide Independent System                          comments, motions to intervene, or                    Cooperating agencies have jurisdiction
                                              Operator-New England with additional                    protests should relate to the amendment               by law or special expertise with respect
                                              resources to address winter reliability                 request. Agencies may obtain copies of                to resources potentially affected by the
                                              needs.                                                  the application directly from the                     proposal and participate in the NEPA
                                                 l. Locations of the Application: A                   applicant. A copy of any protest or                   analysis. The BLM will adopt and use
                                              copy of the application is available for                motion to intervene must be served                    the EA to consider the issuance of a
                                              inspection and reproduction at the                      upon each representative of the                       right-of-way grant for the portion of the
                                              Commission’s Public Reference Room,                     applicant specified in the particular                 project on BLM lands.
                                              located at 888 First Street NE., Room                   application. If an intervener files                      The proposed Summerlin Pipe
                                              2A, Washington, DC 20426, or by calling                 comments or documents with the                        Replacement Project includes replacing
                                              (202) 502–8371. This filing may also be                 Commission relating to the merits of an               a 1.56-mile-long segment of its existing
                                              viewed on the Commission’s Web site at                  issue that may affect the responsibilities            36-inch-diameter A-Line pipeline and
                                              http://www.ferc.gov/docs-filing/                        of a particular resource agency, they                 expanding an existing 0.22-acre valve
                                              elibrary.asp. Enter the docket number                   must also serve a copy of the document                and pig launcher yard to 0.37 acre to
                                              excluding the last three digits in the                  on that resource agency. A copy of all                accommodate a new crossover valve and
tkelley on DSK3SPTVN1PROD with NOTICES




                                              docket number field to access the                       other filings in reference to this                    crossover piping.
                                              document (i.e. P–2485). You may also                    application must be accompanied by                       The FERC staff mailed CD copies of
                                              register online at http://www.ferc.gov/                 proof of service on all persons listed in             the EA to federal, state, and local
                                              docs-filing/esubscription.asp to be                     the service list prepared by the                      government representatives and
                                              notified via email of new filings and                   Commission in this proceeding, in                     agencies; elected officials;
                                              issuances related to this or other                      accordance with 18 CFR 4.34(b) and                    environmental and public interest
                                              pending projects. For assistance, call 1–               385.2010.                                             groups; Native American tribes;


                                         VerDate Sep<11>2014   18:31 Oct 05, 2015   Jkt 238001   PO 00000   Frm 00028   Fmt 4703   Sfmt 4703   E:\FR\FM\06OCN1.SGM   06OCN1



Document Created: 2015-12-15 08:51:34
Document Modified: 2015-12-15 08:51:34
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 60375 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR