80_FR_60574 80 FR 60381 - Jordan Cove Energy Project LP; Pacific Connector Gas Pipeline LP; Notice of Availability of the Final Environmental Impact Statement for the Proposed Jordan Cove Liquefaction and Pacific Connector Pipeline Projects

80 FR 60381 - Jordan Cove Energy Project LP; Pacific Connector Gas Pipeline LP; Notice of Availability of the Final Environmental Impact Statement for the Proposed Jordan Cove Liquefaction and Pacific Connector Pipeline Projects

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 193 (October 6, 2015)

Page Range60381-60382
FR Document2015-25386

Federal Register, Volume 80 Issue 193 (Tuesday, October 6, 2015)
[Federal Register Volume 80, Number 193 (Tuesday, October 6, 2015)]
[Notices]
[Pages 60381-60382]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-25386]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP13-483-000; Docket No. CP13-492-000]


Jordan Cove Energy Project LP; Pacific Connector Gas Pipeline LP; 
Notice of Availability of the Final Environmental Impact Statement for 
the Proposed Jordan Cove Liquefaction and Pacific Connector Pipeline 
Projects

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) has prepared a final environmental impact statement (EIS) 
for the Jordan Cove Liquefaction Project proposed by Jordan Cove Energy 
Project LP (Jordan Cove) and the Pacific Connector Pipeline Project 
proposed by Pacific Connector Gas Pipeline LP (Pacific Connector) in 
the above-referenced dockets. Jordan Cove requests authorization under 
section 3 of the Natural Gas Act (NGA) to produce a maximum of 6.8 
million metric tonnes per annum of liquefied natural gas (LNG) at a 
terminal in Coos County, Oregon for export to overseas markets. Pacific 
Connector seeks a Certificate of Public Convenience and Necessity under 
section 7 of the NGA to transport about 1.07 billion cubic feet per day 
of natural gas in a pipeline from the Malin hub to the Jordan Cove 
terminal, crossing portions of Klamath, Jackson, Douglas, and Coos 
Counties, Oregon.
    The final EIS assesses the potential environmental effects of the 
construction and operation of the Jordan Cove Liquefaction and Pacific 
Connector Pipeline Projects in accordance with the requirements of the 
National Environmental Policy Act (NEPA). The FERC staff concludes that 
the proposed projects would have some limited adverse environmental 
impacts. However, with implementation of Jordan Cove's and Pacific 
Connector's proposed mitigation measures, and the additional mitigation 
measures recommended by the FERC staff and federal land managing 
agencies in the EIS, most of these impacts would be avoided or reduced 
to less-than-significant levels.
    The United States (U.S.) Department of Agriculture Forest Service 
(Forest Service); U.S. Army Corps of Engineers; U.S. Department of 
Energy; U.S. Environmental Protection Agency; U.S. Department of 
Homeland Security Coast Guard; U.S. Department of the Interior Bureau 
of Land Management (BLM), Bureau of Reclamation (Reclamation), and Fish 
and Wildlife Service; and the Pipeline and Hazardous Materials Safety 
Administration within the U.S. Department of Transportation 
participated as cooperating agencies in preparation of the EIS. 
Cooperating agencies have jurisdiction by law or special expertise with 
respect to resources potentially affected by the proposals and 
participated in the NEPA analysis.
    The BLM, with the concurrence of the Forest Service and 
Reclamation, would adopt and use the EIS to consider issuing a Right-
of-Way Grant for the portion of the Pacific Connector pipeline easement 
on federal lands. Both the BLM and the Forest Service would also use 
this EIS to evaluate proposed amendments to their District or National 
Forest land management plans to make provision for the Pacific 
Connector pipeline. Other cooperating agencies would use this EIS in 
their regulatory process, and to satisfy compliance with the NEPA and 
other federal environmental laws. Although the cooperating agencies 
provided input to the conclusions and recommendations presented in the 
EIS, the agencies would present their own conclusions and 
recommendations in their respective Records of Decision for the 
projects.
    Jordan Cove's proposed facilities would include an access channel 
from the existing Coos Bay navigation channel; a terminal marine slip 
including a single LNG vessel berth and tug boat berth; a barge berth; 
a loading platform and transfer pipeline; two LNG storage tanks; four 
liquefaction trains and associated refrigerant storage bullets; fire 
water ponds; ground flares; 420-megawatt South Dune Power Plant; 
support buildings; utility and access corridor between the terminal and 
the power plant; Southwest Oregon Resource Security Center; and a 
natural gas treatment plant.
    Pacific Connector's proposed facilities would include a 232-mile-
long, 36-inch-diameter underground welded steel pipeline between Malin 
and Coos Bay; the 41,000 horsepower Klamath Compressor Station; the 
Klamath-Eagle Receipt Meter Station and Klamath-Beaver Receipt Meter 
Station within the compressor station tract; the Clarks Branch Delivery 
Meter Station at the interconnection with Northwest Pipeline's Grants 
Pass Lateral; the Jordan Cove Delivery Meter Station at the 
interconnection with the Jordan Cove LNG terminal; 5 pig \1\ launchers 
and receivers; 17 mainline block valves;

[[Page 60382]]

and 11 communication towers co-located with other facilities.
---------------------------------------------------------------------------

    \1\ A ``pig'' is a tool for cleaning and inspecting the inside 
of a pipeline.
---------------------------------------------------------------------------

    The FERC staff mailed copies of the EIS to federal, state, and 
local government agencies; elected officials; regional environmental 
groups and non-governmental organizations; Indian tribes; affected 
landowners; newspapers and libraries in the project area; other 
interested individuals; and parties to the proceedings. Paper copy 
versions of the EIS were mailed to those specifically requesting them; 
all others received a compact disc version. In addition, the EIS is 
available for public viewing on the FERC's Web site (www.ferc.gov) 
using the eLibrary link. A limited number of copies are available for 
distribution and public inspection at: Federal Energy Regulatory 
Commission, Public Reference Room, 888 First Street NE., Room 2A, 
Washington, DC 20426, (202) 502-8371.
    Additional information about the projects are available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site (www.ferc.gov) using the eLibrary link. Click on the 
eLibrary link, click on ``General Search,'' and enter the docket number 
excluding the last three digits in the Docket Number field (i.e., CP13-
483). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676; for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.

    Dated: September 30, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-25386 Filed 10-5-15; 8:45 am]
 BILLING CODE 6717-01-P



                                                                           Federal Register / Vol. 80, No. 193 / Tuesday, October 6, 2015 / Notices                                                      60381

                                                FFP Project 92, LLC, 745 Atlantic                     DEPARTMENT OF ENERGY                                  Pipeline and Hazardous Materials Safety
                                                Avenue, 8th Floor, Boston, MA 02111.                                                                        Administration within the U.S.
                                                                                                      Federal Energy Regulatory                             Department of Transportation
                                              Kellie Doherty, Rye Development acting
                                                                                                      Commission                                            participated as cooperating agencies in
                                                as Agent for: FFP Project 92, LLC, 745
                                                Atlantic Avenue, 8th Floor, Boston,                   [Docket No. CP13–483–000; Docket No.                  preparation of the EIS. Cooperating
                                                                                                      CP13–492–000]                                         agencies have jurisdiction by law or
                                                MA 02111.
                                                                                                                                                            special expertise with respect to
                                              Patricia Stallings, Senior Historian/                   Jordan Cove Energy Project LP;                        resources potentially affected by the
                                                Program Manager, Brockington and                      Pacific Connector Gas Pipeline LP;                    proposals and participated in the NEPA
                                                Associates, Inc., 3850 Holcomb Bridge                 Notice of Availability of the Final                   analysis.
                                                Road, Suite 105, Norcross, GA 30092.                  Environmental Impact Statement for                       The BLM, with the concurrence of the
                                                                                                      the Proposed Jordan Cove                              Forest Service and Reclamation, would
                                                 Any person on the official service list
                                                                                                      Liquefaction and Pacific Connector                    adopt and use the EIS to consider
                                              for the above-captioned proceeding may                  Pipeline Projects
                                              request inclusion on the restricted                                                                           issuing a Right-of-Way Grant for the
                                                                                                        The staff of the Federal Energy                     portion of the Pacific Connector
                                              service list, or may request that a
                                                                                                      Regulatory Commission (FERC or                        pipeline easement on federal lands.
                                              restricted service list not be established,
                                                                                                      Commission) has prepared a final                      Both the BLM and the Forest Service
                                              by filing a motion to that effect within
                                                                                                      environmental impact statement (EIS)                  would also use this EIS to evaluate
                                              15 days of this notice date. In a request                                                                     proposed amendments to their District
                                              for inclusion, please identify the                      for the Jordan Cove Liquefaction Project
                                                                                                      proposed by Jordan Cove Energy Project                or National Forest land management
                                              reason(s) why there is an interest to be                                                                      plans to make provision for the Pacific
                                              included. Also please identify any                      LP (Jordan Cove) and the Pacific
                                                                                                      Connector Pipeline Project proposed by                Connector pipeline. Other cooperating
                                              concerns about historic properties,                                                                           agencies would use this EIS in their
                                                                                                      Pacific Connector Gas Pipeline LP
                                              including Traditional Cultural                                                                                regulatory process, and to satisfy
                                                                                                      (Pacific Connector) in the above-
                                              Properties. If historic properties are to               referenced dockets. Jordan Cove                       compliance with the NEPA and other
                                              be identified within the motion, please                 requests authorization under section 3                federal environmental laws. Although
                                              use a separate page, and label it NON-                  of the Natural Gas Act (NGA) to produce               the cooperating agencies provided input
                                              PUBLIC Information.                                     a maximum of 6.8 million metric tonnes                to the conclusions and
                                                 Any such motions may be filed                        per annum of liquefied natural gas                    recommendations presented in the EIS,
                                              electronically via the Internet. See 18                 (LNG) at a terminal in Coos County,                   the agencies would present their own
                                              CFR 385.2001(a)(1)(iii) and the                         Oregon for export to overseas markets.                conclusions and recommendations in
                                              instructions on the Commission’s Web                    Pacific Connector seeks a Certificate of              their respective Records of Decision for
                                              site (http://www.ferc.gov/docs-filing/                  Public Convenience and Necessity                      the projects.
                                              ferconline.asp) under the ‘‘eFiling’’ link.             under section 7 of the NGA to transport                  Jordan Cove’s proposed facilities
                                              For a simpler method of submitting text                 about 1.07 billion cubic feet per day of              would include an access channel from
                                              only comments, click on ‘‘eComment.’’                   natural gas in a pipeline from the Malin              the existing Coos Bay navigation
                                                                                                      hub to the Jordan Cove terminal,                      channel; a terminal marine slip
                                              For assistance, please contact FERC
                                                                                                      crossing portions of Klamath, Jackson,                including a single LNG vessel berth and
                                              Online Support at
                                                                                                      Douglas, and Coos Counties, Oregon.                   tug boat berth; a barge berth; a loading
                                              FERCOnlineSupport@ferc.gov; call toll-                                                                        platform and transfer pipeline; two LNG
                                                                                                        The final EIS assesses the potential
                                              free at (866) 208–3676; or, for TTY,                                                                          storage tanks; four liquefaction trains
                                                                                                      environmental effects of the
                                              contact (202) 502–8659. Although the                    construction and operation of the Jordan              and associated refrigerant storage
                                              Commission strongly encourages                          Cove Liquefaction and Pacific                         bullets; fire water ponds; ground flares;
                                              electronic filing, documents may also be                Connector Pipeline Projects in                        420-megawatt South Dune Power Plant;
                                              paper-filed. To paper-file, mail an                     accordance with the requirements of the               support buildings; utility and access
                                              original and seven copies to: Kimberly                  National Environmental Policy Act                     corridor between the terminal and the
                                              D. Bose, Secretary, Federal Energy                      (NEPA). The FERC staff concludes that                 power plant; Southwest Oregon
                                              Regulatory Commission, 888 First Street                 the proposed projects would have some                 Resource Security Center; and a natural
                                              NE., Washington, DC 20426. Please put                   limited adverse environmental impacts.                gas treatment plant.
                                              the project number (P–14276–002) on                     However, with implementation of                          Pacific Connector’s proposed facilities
                                              the first page of the filing.                           Jordan Cove’s and Pacific Connector’s                 would include a 232-mile-long, 36-inch-
                                                 If no such motions are filed, the                    proposed mitigation measures, and the                 diameter underground welded steel
                                              restricted service list will be effective at            additional mitigation measures                        pipeline between Malin and Coos Bay;
                                              the end of the 15 day period. Otherwise,                recommended by the FERC staff and                     the 41,000 horsepower Klamath
                                              a further notice will be issued ruling on               federal land managing agencies in the                 Compressor Station; the Klamath-Eagle
                                              the motion.                                             EIS, most of these impacts would be                   Receipt Meter Station and Klamath-
                                                                                                      avoided or reduced to less-than-                      Beaver Receipt Meter Station within the
                                                Dated: September 30, 2015.                            significant levels.                                   compressor station tract; the Clarks
                                              Kimberly D. Bose,                                         The United States (U.S.) Department                 Branch Delivery Meter Station at the
                                              Secretary.                                              of Agriculture Forest Service (Forest                 interconnection with Northwest
                                              [FR Doc. 2015–25385 Filed 10–5–15; 8:45 am]             Service); U.S. Army Corps of Engineers;               Pipeline’s Grants Pass Lateral; the
tkelley on DSK3SPTVN1PROD with NOTICES




                                                                                                      U.S. Department of Energy; U.S.                       Jordan Cove Delivery Meter Station at
                                              BILLING CODE 6717–01–P
                                                                                                      Environmental Protection Agency; U.S.                 the interconnection with the Jordan
                                                                                                      Department of Homeland Security Coast                 Cove LNG terminal; 5 pig 1 launchers
                                                                                                      Guard; U.S. Department of the Interior                and receivers; 17 mainline block valves;
                                                                                                      Bureau of Land Management (BLM),
                                                                                                      Bureau of Reclamation (Reclamation),                    1 A ‘‘pig’’ is a tool for cleaning and inspecting the

                                                                                                      and Fish and Wildlife Service; and the                inside of a pipeline.



                                         VerDate Sep<11>2014   18:31 Oct 05, 2015   Jkt 238001   PO 00000   Frm 00033   Fmt 4703   Sfmt 4703   E:\FR\FM\06OCN1.SGM   06OCN1


                                              60382                        Federal Register / Vol. 80, No. 193 / Tuesday, October 6, 2015 / Notices

                                              and 11 communication towers co-                         DEPARTMENT OF ENERGY                                  adjacent to the Corps Lower St. Anthony
                                              located with other facilities.                                                                                Falls Dam from the project boundary.
                                                                                                      Federal Energy Regulatory                             The application explains that the parcel
                                                 The FERC staff mailed copies of the
                                                                                                      Commission                                            of land is not necessary for the
                                              EIS to federal, state, and local
                                                                                                      [Project No. 12451–034]                               operation and maintenance of the
                                              government agencies; elected officials;
                                                                                                                                                            project. The application also includes
                                              regional environmental groups and non-
                                                                                                      SAF Hydroelectric, LLC; Notice of                     revised Exhibits A and G that the
                                              governmental organizations; Indian                                                                            application revised to reflect as-built
                                              tribes; affected landowners; newspapers                 Application Accepted for Filing,
                                                                                                      Soliciting Comments, Motions To                       conditions of the project.
                                              and libraries in the project area; other                                                                         l. Locations of the Application: A
                                                                                                      Intervene, and Protests
                                              interested individuals; and parties to the                                                                    copy of the application is available for
                                              proceedings. Paper copy versions of the                    Take notice that the following                     inspection and reproduction at the
                                              EIS were mailed to those specifically                   hydroelectric application has been filed              Commission’s Public Reference Room,
                                              requesting them; all others received a                  with the Commission and is available                  located at 888 First Street NE., Room
                                              compact disc version. In addition, the                  for public inspection:                                2A, Washington, DC 20426, or by calling
                                              EIS is available for public viewing on                     a. Type of Application: Request to                 (202) 502–8371. This filing may also be
                                              the FERC’s Web site (www.ferc.gov)                      amend the project boundary.                           viewed on the Commission’s Web site at
                                              using the eLibrary link. A limited                         b. Project No.: 12451–034.                         http://www.ferc.gov/docs-filing/
                                              number of copies are available for                         c. Date Filed: August 31, 2015.                    elibrary.asp. Enter the docket number
                                                                                                         d. Applicant: SAF Hydroelectric, LLC.              excluding the last three digits in the
                                              distribution and public inspection at:                     e. Name of Project: Lower St. Anthony
                                              Federal Energy Regulatory Commission,                                                                         docket number field to access the
                                                                                                      Falls Hydroelectric Project.                          document. You may also register online
                                              Public Reference Room, 888 First Street                    f. Location: The existing U.S. Army
                                              NE., Room 2A, Washington, DC 20426,                                                                           at http://www.ferc.gov/docs-filing/
                                                                                                      Corps of Engineers’ (Corps) Lower St.                 esubscription.asp to be notified via
                                              (202) 502–8371.                                         Anthony Falls Lock and Dam on the                     email of new filings and issuances
                                                 Additional information about the                     Mississippi River, in the city of                     related to this or other pending projects.
                                              projects are available from the                         Minneapolis, Hennepin County,                         For assistance, call 1–866–208- 3676 or
                                              Commission’s Office of External Affairs,                Minnesota.                                            email FERCOnlineSupport@ferc.gov, for
                                              at (866) 208–FERC, or on the FERC Web                      g. Filed Pursuant to: Federal Power                TTY, call (202) 502–8659. A copy is also
                                              site (www.ferc.gov) using the eLibrary                  Act, 16 U.S.C. 791a–825r.                             available for inspection and
                                              link. Click on the eLibrary link, click on                 h. Applicant Contact: Mr. Bruce                    reproduction at the address in item (h)
                                              ‘‘General Search,’’ and enter the docket                Welbourne, Licensing & Compliance                     above.
                                              number excluding the last three digits in               Manager, Brookfield Renewable Energy                     m. Individuals desiring to be included
                                                                                                      Group, 243 Industrial Park Cr., Sault                 on the Commission’s mailing list should
                                              the Docket Number field (i.e., CP13–
                                                                                                      Ste. Marie, ON P6B 5P3, (705) 256–                    so indicate by writing to the Secretary
                                              483). Be sure you have selected an
                                                                                                      4493, bruce.welboume@                                 of the Commission.
                                              appropriate date range. For assistance,                 brookfieldrenewable.com.                                 n. Comments, Motions To Intervene,
                                              please contact FERC Online Support at                      i. FERC Contact: Mr. Jeremy Jessup,                or Protests: Anyone may submit
                                              FercOnlineSupport@ferc.gov or toll free                 (202) 502–6779, Jeremy.Jessup@ferc.gov.               comments, a motion to intervene, or a
                                              at (866) 208–3676; for TTY, contact                        j. Deadline for filing comments,                   protest in accordance with the
                                              (202) 502–8659. The eLibrary link also                  motions to intervene, and protests, is 30             requirements of Rules of Practice and
                                              provides access to the texts of formal                  days from the issuance date of this                   Procedure, 18 CFR 385.210, .211, .214.
                                              documents issued by the Commission,                     notice by the Commission. The                         In determining the appropriate action to
                                              such as orders, notices, and                            Commission strongly encourages                        take, the Commission will consider all
                                              rulemakings.                                            electronic filing. Please file comments,              protests or other comments filed, but
                                                 In addition, the Commission offers a                 motions to intervene, and protests using              only those who file a motion to
                                              free service called eSubscription which                 the Commission’s eFiling system at                    intervene in accordance with the
                                              allows you to keep track of all formal                  http://www.ferc.gov/docs-filing/                      Commission’s Rules may become a
                                              issuances and submittals in specific                    efiling.asp. Commenters can submit                    party to the proceeding. Any comments,
                                              dockets. This can reduce the amount of                  brief comments up to 6,000 characters,                motions to intervene, or protests must
                                                                                                      without prior registration, using the                 be received on or before the specified
                                              time you spend researching proceedings
                                                                                                      eComment system at http://                            comment date for the particular
                                              by automatically providing you with
                                                                                                      www.ferc.gov/doc-sfiling/                             application.
                                              notification of these filings, document                 ecomment.asp. You must include your                      o. Filing and Service of Responsive
                                              summaries, and direct links to the                      name and contact information at the end               Documents: Any filing must (1) bear in
                                              documents. Go to www.ferc.gov/docs-                     of your comments. For assistance,                     all capital letters the title
                                              filing/esubscription.asp.                               please contact FERC Online Support at                 ‘‘COMMENTS’’, ‘‘MOTION TO
                                                Dated: September 30, 2015.                            FERCOnlineSupport@ferc.gov, (866)                     INTERVENE’’, or ‘‘PROTEST’’ as
                                              Kimberly D. Bose,                                       208–3676 (toll free), or (202) 502–8659               applicable; (2) set forth in the heading
                                                                                                      (TTY). In lieu of electronic filing, please           the name of the applicant and the
                                              Secretary.
                                                                                                      send a paper copy to: Secretary, Federal              project number of the application to
                                              [FR Doc. 2015–25386 Filed 10–5–15; 8:45 am]
                                                                                                      Energy Regulatory Commission, 888                     which the filing responds; (3) furnish
tkelley on DSK3SPTVN1PROD with NOTICES




                                              BILLING CODE 6717–01–P                                  First Street NE., Washington, DC 20426.               the name, address, and telephone
                                                                                                      The first page of any filing should                   number of the person intervening or
                                                                                                      include docket number P–12451–034.                    protesting; and (4) otherwise comply
                                                                                                         k. Description of Request: The                     with the requirements of 18 CFR
                                                                                                      applicant proposes remove                             385.2001 through 385.2005. All
                                                                                                      approximately 0.53 acre of land along                 comments, motions to intervene, or
                                                                                                      the south shore of the Mississippi River              protests must set forth their evidentiary


                                         VerDate Sep<11>2014   18:31 Oct 05, 2015   Jkt 238001   PO 00000   Frm 00034   Fmt 4703   Sfmt 4703   E:\FR\FM\06OCN1.SGM   06OCN1



Document Created: 2015-12-15 08:51:24
Document Modified: 2015-12-15 08:51:24
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106: