DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 202 (October 20, 2015)

Page Range63548-63549
FR Document2015-26544

Federal Register, Volume 80 Issue 202 (Tuesday, October 20, 2015)
[Federal Register Volume 80, Number 202 (Tuesday, October 20, 2015)]
[Notices]
[Pages 63548-63549]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-26544]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13642-003]


GB Energy Park, LLC; Notice of Application Tendered for Filing 
with the Commission and Soliciting Additional Study Requests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Unconstructed Major Project.

[[Page 63549]]

    b. Project No.: 13642-003.
    c. Date filed: October 1, 2015.
    d. Applicant: GB Energy Park, LLC.
    e. Name of Project: Gordon Butte Pumped Storage Project.
    f. Location: Approximately 3 miles west of the City of Martinsdale, 
Meagher County, Montana. The proposed project would not occupy any 
federal lands.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r)
    h. Applicant Contact: Carl. E. Borgquist, President, GB Energy 
Park, LLC, 209 Wilson Avenue, P.O. Box 309, Bozeman, MT 59771; (406) 
585-3006; [email protected].
    i. FERC Contact: Mike Tust; (202) 502-6522; [email protected].
    j. Cooperating agencies: Federal, state, local, and tribal agencies 
with jurisdiction and/or special expertise with respect to 
environmental issues that wish to cooperate in the preparation of the 
environmental document should follow the instructions for filing such 
requests described in item l below. Cooperating agencies should note 
the Commission's policy that agencies that cooperate in the preparation 
of the environmental document cannot also intervene. See, 94 FERC ] 
61,076 (2001).
    k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's 
regulations, if any resource agency, Indian Tribe, or person believes 
that an additional scientific study should be conducted in order to 
form an adequate factual basis for a complete analysis of the 
application on its merit, the resource agency, Indian Tribe, or person 
must file a request for a study with the Commission not later than 60 
days from the date of filing of the application, and serve a copy of 
the request on the applicant.
    l. Deadline for filing additional study requests and requests for 
cooperating agency status: November 30, 2015.
    The Commission strongly encourages electronic filing. Please file 
additional study requests and requests for cooperating agency status 
using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support 
at [email protected], (866) 208-3676 (toll free), or (202) 
502-8659 (TTY). In lieu of electronic filing, please send a paper copy 
to: Secretary, Federal Energy Regulatory Commission, 888 First Street 
NE., Washington, DC 20426. The first page of any filing should include 
docket number P-13642-003.
    m. The application is not ready for environmental analysis at this 
time.
    n. The Gordon Butte Pumped Storage Project would consist of the 
following new facilities: (1) A manually operated head gate on an 
existing irrigation canal that provides initial fill and annual make-up 
water to the lower reservoir from the existing irrigation canal; (2) a 
3,000-foot-long, 1,000-foot-wide upper reservoir created by a 60-foot-
high, 7,500-foot-long concrete-faced rockfill dam; (3) a reinforced 
concrete intake/outlet structure at the upper reservoir with six gated 
intake bays converging into a central 18-foot-diameter, 750-foot-long 
vertical shaft; (4) an 18-foot-diameter, 3,000-foot-long concrete and 
steel-lined penstock tunnel leading from the upper reservoir to the 
lower reservoir; (5) a 2,300-foot-long, 1,900-foot-wide lower reservoir 
created by a combination of excavation and two 60-foot-high, 500- and 
750-foot-long concrete-faced rockfill dams; (6) a partially buried 338-
foot-long, 109-foot-wide, 74-foot-high reinforced concrete and steel 
powerhouse with four 100-megawatt (MW) ternary Pelton turbine/pump/
generators; (7) a 600-foot-long, 200-foot-wide substation at the 
powerhouse site with 13.8- kilovolt (kV) to 230-kV step-up 
transformers; (8) a 5.7-mile-long, 230-kV transmission line; (9) a 
substation with a 230-kV to 500-kV step-up transformer, connecting to 
an existing non-project 500-kV transmission line; and (11) appurtenant 
facilities. The project is estimated to provide 1,300 gigawatt-hours 
annually. No federal lands are included in the project.
    o. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    p. Procedural schedule: The application will be processed according 
to the following preliminary Hydro Licensing Schedule. Revisions to the 
schedule will be made as appropriate.

Issue Acceptance or Deficiency Letter   November 2015.
 (if needed).
Request for Additional Information....  November 2015.
Issue Notice of Acceptance/Notice of    January 2016.
 Ready for Environmental Analysis.
Commission Issues EA..................  July 2016.
Comments on EA........................  August 2016.
 


    Dated: October 14, 2015.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2015-26544 Filed 10-19-15; 8:45 am]
BILLING CODE 6717-01-P



                                                  63548                        Federal Register / Vol. 80, No. 202 / Tuesday, October 20, 2015 / Notices

                                                  SPP RSC                                                 Docket No. ER14–2851, Southwest                       Docket No. ER15–2540, Southwest
                                                    October 26, 2015 (1:00 p.m.–5:00                         Power Pool, Inc.                                       Power Pool, Inc.
                                                  p.m.)                                                   Docket No. ER15–1163, Southwest                       Docket No. ER15–2542, Southwest
                                                                                                             Power Pool, Inc.                                       Power Pool, Inc.
                                                  SPP Members/Board of Directors                          Docket No. ER15–1293, Southwest                       Docket No. ER15–2543, Southwest
                                                     October 27, 2015 (8:00 a.m.–3:00                        Power Pool, Inc.                                       Power Pool, Inc.
                                                  p.m.)                                                   Docket No. ER15–1499, Southwest                       Docket No. ER15–2560, Southwest
                                                     The discussions may address matters                     Power Pool, Inc.                                       Power Pool, Inc.
                                                  at issue in the following proceedings:                  Docket No. ER15–1737, Southwest                       Docket No. ER15–2596, Southwest
                                                  Docket No. EL05–19, Southwestern                           Power Pool, Inc.                                       Power Pool, Inc.
                                                       Public Service Company                             Docket No. ER15–1775, Southwest                       Docket No. ER15–2629, Southwest
                                                  Docket No. ER05–168, Southwestern                          Power Pool, Inc.                                       Power Pool, Inc.
                                                                                                          Docket No. ER15–1906, Southwest                       Docket No. ER15–2624, Southwest
                                                       Public Service Company
                                                  Docket No. ER06–274, Southwestern                          Power Pool, Inc.                                       Power Pool, Inc.
                                                                                                          Docket No. ER15–1918, Southwest                       Docket No. ER15–2636, Southwest
                                                       Public Service Company
                                                  Docket No. EL11–34, Midcontinent                           Power Pool, Inc.                                       Power Pool, Inc.
                                                                                                          Docket No. ER15–2268, Southwest                       Docket No. ER15–2646, Southwest
                                                       Independent System Operator, Inc.
                                                                                                             Power Pool, Inc.                                       Power Pool, Inc.
                                                  Docket No. ER11–1844, Midcontinent
                                                                                                          Docket No. ER15–2295, Southwest                       Docket No. ER15–2652, Southwest
                                                       Independent System Operator, Inc.
                                                                                                             Power Pool, Inc.                                       Power Pool, Inc.
                                                  Docket No. EL12–28, Xcel Energy
                                                                                                          Docket No. ER15–2423, Southwest                       Docket No. ER15–2669, Southwest
                                                       Services Inc., et al.
                                                                                                             Power Pool, Inc.                                       Power Pool, Inc.
                                                  Docket No. EL12–59, Golden Spread                       Docket No. ER15–2432, Southwest
                                                       Electric Cooperative, Inc.                                                                               Docket No. ER15–2690, Southwest
                                                                                                             Power Pool, Inc.                                       Power Pool, Inc.
                                                  Docket No. EL12–60, Southwest Power                     Docket No. ER15–2433, Southwest
                                                       Pool, Inc., et al.                                                                                       Docket No. ER15–2705, Southwest
                                                                                                             Power Pool, Inc.                                       Power Pool, Inc.
                                                  Docket No. ER12–480, Midcontinent                       Docket No. ER15–2434, Southwest
                                                       Independent System Operator, Inc.                                                                        Docket No. ER16–6, Southwest Power
                                                                                                             Power Pool, Inc.                                       Pool, Inc.
                                                  Docket No. ER12–1179, Southwest                         Docket No. ER15–2439, Southwest
                                                       Power Pool, Inc.                                                                                         Docket No. ER16–7, Southwest Power
                                                                                                             Power Pool, Inc.                                       Pool, Inc.
                                                  Docket No. ER12–1586, Southwest                         Docket No. ER15–2452, Southwest
                                                       Power Pool, Inc.                                                                                         Docket No. ER16–13, Southwest Power
                                                                                                             Power Pool, Inc.                                       Pool, Inc.
                                                  Docket No. ER13–1864, Southwest                         Docket No. ER15–2459, Southwest
                                                       Power Pool, Inc.                                                                                         Docket No. ER16–25, Southwest Power
                                                                                                             Power Pool, Inc.                                       Pool, Inc.
                                                  Docket No. ER13–1937, Southwest                         Docket No. ER15–2460, Southwest
                                                       Power Pool, Inc.                                                                                         Docket No. ER16–31, Southwest Power
                                                                                                             Power Pool, Inc.                                       Pool, Inc.
                                                  Docket No. ER13–1939, Southwest                         Docket No. ER15–2461, Southwest
                                                       Power Pool, Inc.                                                                                         Docket No. ER16–37, Southwest Power
                                                                                                             Power Pool, Inc.                                       Pool, Inc.
                                                  Docket No. EL14–30, Midcontinent                        Docket No. ER15–2462, Southwest
                                                       Independent System Operator, Inc.                                                                          These meetings are open to the
                                                                                                             Power Pool, Inc.                                   public.
                                                  Docket No. EL14–93, Kansas                              Docket No. ER15–2494, Southwest
                                                       Corporation Commission v. Westar                                                                           For more information, contact Patrick
                                                                                                             Power Pool, Inc.                                   Clarey, Office of Energy Market
                                                       Energy, Inc.                                       Docket No. ER15–2496, Southwest
                                                  Docket No. EL15–66, Southern                                                                                  Regulation, Federal Energy Regulatory
                                                                                                             Power Pool, Inc.                                   Commission at (317) 249–5937 or
                                                       Company Services, et al. v.                        Docket No. ER15–2497, Southwest
                                                       Midcontinent Independent System                                                                          patrick.clarey@ferc.gov.
                                                                                                             Power Pool, Inc.
                                                       Operator                                           Docket No. ER15–2498, Southwest                         Dated: October 14, 2015.
                                                  Docket No. EL15–77, Morgan Stanley                         Power Pool, Inc.                                   Kimberly D. Bose,
                                                       Capital Group Inc. v. Midcontinent                 Docket No. ER15–2506, Southwest                       Secretary.
                                                       Independent System Operator, Inc.                     Power Pool, Inc.                                   [FR Doc. 2015–26547 Filed 10–19–15; 8:45 am]
                                                  Docket No. ER14–67, Southwest Power                     Docket No. ER15–2507, Southwest                       BILLING CODE 6717–01–P
                                                       Pool, Inc.                                            Power Pool, Inc.
                                                  Docket No. ER14–781, Southwest Power                    Docket No. ER15–2508, Southwest
                                                       Pool, Inc.                                            Power Pool, Inc.                                   DEPARTMENT OF ENERGY
                                                  Docket No. ER14–1174, Southwest                         Docket No. ER15–2512, Southwest
                                                       Power Pool, Inc.                                      Power Pool, Inc.                                   Federal Energy Regulatory
                                                  Docket No. ER14–1713, Midcontinent                      Docket No. ER15–2513, Southwest                       Commission
                                                       Independent System Operator, Inc.                     Power Pool, Inc.                                   [Project No. 13642–003]
                                                  Docket No. ER14–2022, Midcontinent                      Docket No. ER15–2514, Southwest
                                                       Independent System Operator, Inc.                     Power Pool, Inc.                                   GB Energy Park, LLC; Notice of
                                                  Docket No. ER14–2363, Southwestern                      Docket No. ER15–2519, Southwest                       Application Tendered for Filing with
                                                       Public Service Company                                Power Pool, Inc.                                   the Commission and Soliciting
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  Docket No. ER14–2445, Midcontinent                      Docket No. ER15–2520, Southwest                       Additional Study Requests
                                                       Independent System Operator, Inc.                     Power Pool, Inc.
                                                  Docket No. ER14–2553, Southwest                         Docket No. ER15–2521, Southwest                         Take notice that the following
                                                       Power Pool, Inc.                                      Power Pool, Inc.                                   hydroelectric application has been filed
                                                  Docket No. ER14–2570, Southwest                         Docket No. ER15–2531, Southwest                       with the Commission and is available
                                                       Power Pool, Inc.                                      Power Pool, Inc.                                   for public inspection.
                                                  Docket No. ER14–2850, Southwest                         Docket No. ER15–2532, Southwest                         a. Type of Application: Unconstructed
                                                       Power Pool, Inc.                                      Power Pool, Inc.                                   Major Project.


                                             VerDate Sep<11>2014   17:55 Oct 19, 2015   Jkt 238001   PO 00000   Frm 00051   Fmt 4703   Sfmt 4703   E:\FR\FM\20OCN1.SGM   20OCN1


                                                                                       Federal Register / Vol. 80, No. 202 / Tuesday, October 20, 2015 / Notices                                                                                     63549

                                                     b. Project No.: 13642–003.                                           serve a copy of the request on the                                        foot-high, 500- and 750-foot-long
                                                     c. Date filed: October 1, 2015.                                      applicant.                                                                concrete-faced rockfill dams; (6) a
                                                     d. Applicant: GB Energy Park, LLC.                                     l. Deadline for filing additional study                                 partially buried 338-foot-long, 109-foot-
                                                     e. Name of Project: Gordon Butte                                     requests and requests for cooperating                                     wide, 74-foot-high reinforced concrete
                                                  Pumped Storage Project.                                                 agency status: November 30, 2015.                                         and steel powerhouse with four 100-
                                                     f. Location: Approximately 3 miles                                     The Commission strongly encourages                                      megawatt (MW) ternary Pelton turbine/
                                                  west of the City of Martinsdale, Meagher                                electronic filing. Please file additional                                 pump/generators; (7) a 600-foot-long,
                                                  County, Montana. The proposed project                                   study requests and requests for                                           200-foot-wide substation at the
                                                  would not occupy any federal lands.                                     cooperating agency status using the                                       powerhouse site with 13.8- kilovolt (kV)
                                                     g. Filed Pursuant to: Federal Power                                  Commission’s eFiling system at http://                                    to 230–kV step-up transformers; (8) a
                                                  Act 16 U.S.C. 791(a)–825(r)                                             www.ferc.gov/docs-filing/efiling.asp. For                                 5.7-mile-long, 230-kV transmission line;
                                                     h. Applicant Contact: Carl. E.                                       assistance, please contact FERC Online                                    (9) a substation with a 230–kV to 500–
                                                  Borgquist, President, GB Energy Park,                                   Support at FERCOnlineSupport@                                             kV step-up transformer, connecting to
                                                  LLC, 209 Wilson Avenue, P.O. Box 309,                                   ferc.gov, (866) 208–3676 (toll free), or                                  an existing non-project 500-kV
                                                  Bozeman, MT 59771; (406) 585–3006;                                      (202) 502–8659 (TTY). In lieu of                                          transmission line; and (11) appurtenant
                                                  carl@absarokaenergy.com.                                                electronic filing, please send a paper                                    facilities. The project is estimated to
                                                     i. FERC Contact: Mike Tust; (202)                                    copy to: Secretary, Federal Energy                                        provide 1,300 gigawatt-hours annually.
                                                  502–6522; michael.tust@ferc.gov.                                        Regulatory Commission, 888 First Street                                   No federal lands are included in the
                                                     j. Cooperating agencies: Federal, state,                             NE., Washington, DC 20426. The first                                      project.
                                                  local, and tribal agencies with                                         page of any filing should include docket                                     o. A copy of the application is
                                                  jurisdiction and/or special expertise                                   number P–13642–003.                                                       available for review at the Commission
                                                  with respect to environmental issues                                       m. The application is not ready for
                                                                                                                                                                                                    in the Public Reference Room or may be
                                                  that wish to cooperate in the                                           environmental analysis at this time.
                                                                                                                                                                                                    viewed on the Commission’s Web site at
                                                  preparation of the environmental                                           n. The Gordon Butte Pumped Storage
                                                                                                                                                                                                    http://www.ferc.gov using the
                                                  document should follow the                                              Project would consist of the following
                                                                                                                                                                                                    ‘‘eLibrary’’ link. Enter the docket
                                                  instructions for filing such requests                                   new facilities: (1) A manually operated
                                                                                                                                                                                                    number excluding the last three digits in
                                                  described in item l below. Cooperating                                  head gate on an existing irrigation canal
                                                                                                                                                                                                    the docket number field to access the
                                                  agencies should note the Commission’s                                   that provides initial fill and annual
                                                                                                                                                                                                    document. For assistance, contact FERC
                                                  policy that agencies that cooperate in                                  make-up water to the lower reservoir
                                                                                                                                                                                                    Online Support. A copy is also available
                                                  the preparation of the environmental                                    from the existing irrigation canal; (2) a
                                                                                                                                                                                                    for inspection and reproduction at the
                                                  document cannot also intervene. See, 94                                 3,000-foot-long, 1,000-foot-wide upper
                                                                                                                                                                                                    address in item h above.
                                                  FERC ¶ 61,076 (2001).                                                   reservoir created by a 60-foot-high,
                                                     k. Pursuant to section 4.32(b)(7) of 18                              7,500-foot-long concrete-faced rockfill                                      You may also register online at http://
                                                  CFR of the Commission’s regulations, if                                 dam; (3) a reinforced concrete intake/                                    www.ferc.gov/docs-filing/
                                                  any resource agency, Indian Tribe, or                                   outlet structure at the upper reservoir                                   esubscription.asp to be notified via
                                                  person believes that an additional                                      with six gated intake bays converging                                     email of new filings and issuances
                                                  scientific study should be conducted in                                 into a central 18-foot-diameter, 750-foot-                                related to this or other pending projects.
                                                  order to form an adequate factual basis                                 long vertical shaft; (4) an 18-foot-                                      For assistance, contact FERC Online
                                                  for a complete analysis of the                                          diameter, 3,000-foot-long concrete and                                    Support.
                                                  application on its merit, the resource                                  steel-lined penstock tunnel leading from                                     p. Procedural schedule: The
                                                  agency, Indian Tribe, or person must file                               the upper reservoir to the lower                                          application will be processed according
                                                  a request for a study with the                                          reservoir; (5) a 2,300-foot-long, 1,900-                                  to the following preliminary Hydro
                                                  Commission not later than 60 days from                                  foot-wide lower reservoir created by a                                    Licensing Schedule. Revisions to the
                                                  the date of filing of the application, and                              combination of excavation and two 60-                                     schedule will be made as appropriate.

                                                  Issue Acceptance or Deficiency Letter (if needed) ...................................................................................................................                     November 2015.
                                                  Request for Additional Information ...........................................................................................................................................            November 2015.
                                                  Issue Notice of Acceptance/Notice of Ready for Environmental Analysis .............................................................................                                       January 2016.
                                                  Commission Issues EA ................................................................................................................................................................     July 2016.
                                                  Comments on EA ........................................................................................................................................................................   August 2016.


                                                    Dated: October 14, 2015.                                              DEPARTMENT OF ENERGY                                                      above-referenced docket seeking
                                                  Kimberly D. Bose,                                                                                                                                 authorization under section 3 of the
                                                  Secretary.                                                              Federal Energy Regulatory                                                 Natural Gas Act (NGA) and Part 153 of
                                                                                                                          Commission                                                                the Commission’s regulations to: (i)
                                                  [FR Doc. 2015–26544 Filed 10–19–15; 8:45 am]
                                                                                                                                                                                                    Transfer to Crescent Point the NGA
                                                  BILLING CODE 6717–01–P
                                                                                                                          [Docket No. CP15–561–000]                                                 section 3 authorization and Presidential
                                                                                                                                                                                                    Permit that were issued to Eagle Rock
                                                                                                                          Crescent Point Energy U.S. Corp.,
                                                                                                                                                                                                    on August 5, 2008, in Docket No. CP08–
                                                                                                                          Eagle Rock Exploration Ltd.; Notice of
                                                                                                                                                                                                    90–000; and (ii) amend the section 3
                                                                                                                          Application
                                                                                                                                                                                                    Authorization and Permit so that it
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                                                                                            Take notice that on September 29,                                       reflects Crescent Point as the current
                                                                                                                          2015, Crescent Point Energy U.S. Corp.                                    owner and operator of the existing
                                                                                                                          (Crescent Point), 555 17th Street, Suite                                  border crossing facility located at the
                                                                                                                          1800, Denver, Colorado 80202 and Eagle                                    international boundary between Glacier
                                                                                                                          Rock Exploration Ltd. (Eagle Rock), 300,                                  County, Montana, and the Province of
                                                                                                                          340–12th Avenue SW., Calgary, Alberta                                     Alberta, Canada (Border Crossing
                                                                                                                          T2R IL5, filed a joint application in the                                 Facility). Additionally, Crescent Point


                                             VerDate Sep<11>2014        17:55 Oct 19, 2015        Jkt 238001      PO 00000       Frm 00052       Fmt 4703      Sfmt 4703      E:\FR\FM\20OCN1.SGM              20OCN1



Document Created: 2015-12-14 15:25:45
Document Modified: 2015-12-14 15:25:45
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 63548 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR