80_FR_65461 80 FR 65255 - Advisory Committee on Reactor Safeguards; Notice of Meeting

80 FR 65255 - Advisory Committee on Reactor Safeguards; Notice of Meeting

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 80, Issue 206 (October 26, 2015)

Page Range65255-65256
FR Document2015-27192

Federal Register, Volume 80 Issue 206 (Monday, October 26, 2015)
[Federal Register Volume 80, Number 206 (Monday, October 26, 2015)]
[Notices]
[Pages 65255-65256]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-27192]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION


Advisory Committee on Reactor Safeguards; Notice of Meeting

    In accordance with the purposes of sections 29 and 182b of the 
Atomic Energy Act (42 U.S.C. 2039, 2232b), the Advisory Committee on 
Reactor Safeguards (ACRS) will hold a meeting

[[Page 65256]]

on November 4-7, 2015, 11545 Rockville Pike, Rockville, Maryland.

Wednesday, November 4, 2015, Conference Room T2-B1, 11545 Rockville 
Pike, Rockville, Maryland

    8:30 a.m.-8:35 a.m.: Opening Remarks by the ACRS Chairman (Open)--
The ACRS Chairman will make opening remarks regarding the conduct of 
the meeting.
    8:35 a.m.-11:00 a.m.: Risk Management Regulatory Framework (RMRF) 
(Open)--The Committee will hear presentations by and hold discussions 
with representatives of the staff regarding the draft SECY paper on 
possible RMRF implementation.
    1:00 p.m.-4:00 p.m.: Davis-Besse Nuclear Power Station License 
Renewal (Open)--The Committee will hear presentations by and hold 
discussions with representatives of FirstEnergy, and the staff 
regarding the safety evaluation associated with the Davis-Besse License 
Renewal Application.
    4:00 p.m.-6:00 p.m.: Preparation of ACRS Reports (Open)--The 
Committee will discuss proposed ACRS reports on matters discussed 
during this meeting.

Thursday, November 5, 2015, Conference Room T2-B1, 11545 Rockville 
Pike, Rockville, Maryland

    8:30 a.m.-8:35 a.m.: Opening Remarks by the ACRS Chairman (Open)--
The ACRS Chairman will make opening remarks regarding the conduct of 
the meeting.
    8:35 a.m.-11:00 a.m.: Fukushima Tier 2/3 (Open)--The Committee will 
hear presentations by and hold discussions with representatives of the 
staff regarding Fukushima Tier 2/3 action discussion in support of a 
SECY paper.
    1:00 p.m.-3:00 p.m.: Status of the Revised Fuel Cycle Oversight 
Process (RFCOP) Cornerstones (Open)--The Committee will hear 
presentations by and hold discussions with representatives of the staff 
regarding the status of the RFCOP Cornerstones.
    3:00 p.m.-6:00 p.m.: Preparation of ACRS Reports (Open)--The 
Committee will discuss proposed ACRS reports on matters discussed 
during this meeting.

Friday, November 6, 2015, Conference Room T2-B1, 11545 Rockville Pike, 
Rockville, Maryland

    8:30 a.m.-10:00 a.m.: Future ACRS Activities/Report of the Planning 
and Procedures Subcommittee (Open/Closed)--The Committee will discuss 
the recommendations of the Planning and Procedures Subcommittee 
regarding items proposed for consideration by the Full Committee during 
future ACRS Meetings, and matters related to the conduct of ACRS 
business, including anticipated workload and member assignments. [Note: 
A portion of this meeting may be closed pursuant to 5 U.S.C. 552b 
(c)(2) and (6) to discuss organizational and personnel matters that 
relate solely to internal personnel rules and practices of ACRS, and 
information the release of which would constitute a clearly unwarranted 
invasion of personal privacy.]
    10:00 a.m.-10:15 a.m.: Reconciliation of ACRS Comments and 
Recommendations (Open)--The Committee will discuss the responses from 
the NRC Executive Director for Operations to comments and 
recommendations included in recent ACRS reports and letters.
    1:00 p.m.-6:00 p.m.: Preparation of ACRS Reports (Open)--The 
Committee will continue its discussion of proposed ACRS reports on 
matters discussed during this meeting.

Saturday, November 7, 2015, Conference Room T2-B1, 11545 Rockville 
Pike, Rockville, Maryland

    8:30 a.m.-11:30 a.m.: Preparation of ACRS Reports (Open)--The 
Committee will continue its discussion of proposed ACRS reports.
    11:30 a.m.-12:00 p.m.: Miscellaneous (Open)--The Committee will 
continue its discussion related to the conduct of Committee activities 
and specific issues that were not completed during previous meetings.
    Procedures for the conduct of and participation in ACRS meetings 
were published in the Federal Register on October 1, 2014 (79 FR 
59307). In accordance with those procedures, oral or written views may 
be presented by members of the public, including representatives of the 
nuclear industry. Persons desiring to make oral statements should 
notify Quynh Nguyen, Cognizant ACRS Staff (Telephone: 301-415-5844, 
Email: [email protected]), five days before the meeting, if 
possible, so that appropriate arrangements can be made to allow 
necessary time during the meeting for such statements. In view of the 
possibility that the schedule for ACRS meetings may be adjusted by the 
Chairman as necessary to facilitate the conduct of the meeting, persons 
planning to attend should check with the Cognizant ACRS staff if such 
rescheduling would result in major inconvenience.
    Thirty-five hard copies of each presentation or handout should be 
provided 30 minutes before the meeting. In addition, one electronic 
copy of each presentation should be emailed to the Cognizant ACRS Staff 
one day before meeting. If an electronic copy cannot be provided within 
this timeframe, presenters should provide the Cognizant ACRS Staff with 
a CD containing each presentation at least 30 minutes before the 
meeting.
    In accordance with subsection 10(d) of Public Law 92-463 and 5 
U.S.C. 552b(c), certain portions of the November 6th meeting may be 
closed, as specifically noted above. Use of still, motion picture, and 
television cameras during the meeting may be limited to selected 
portions of the meeting as determined by the Chairman. Electronic 
recordings will be permitted only during the open portions of the 
meeting.
    ACRS meeting agendas, meeting transcripts, and letter reports are 
available through the NRC Public Document Room at [email protected], 
or by calling the PDR at 1-800-397-4209, or from the Publicly Available 
Records System (PARS) component of NRC's document system (ADAMS) which 
is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html or http://www.nrc.gov/reading-rm/doc-collections/ACRS/.
    Video teleconferencing service is available for observing open 
sessions of ACRS meetings. Those wishing to use this service should 
contact Mr. Theron Brown, ACRS Audio Visual Technician (301-415-8066), 
between 7:30 a.m. and 3:45 p.m. (ET), at least 10 days before the 
meeting to ensure the availability of this service. Individuals or 
organizations requesting this service will be responsible for telephone 
line charges and for providing the equipment and facilities that they 
use to establish the video teleconferencing link. The availability of 
video teleconferencing services is not guaranteed.

    Dated at Rockville, Maryland, this 20th day of October, 2015.

    For the Nuclear Regulatory Commission.
Andrew L. Bates,
Advisory Committee Management Officer.
[FR Doc. 2015-27192 Filed 10-23-15; 8:45 am]
 BILLING CODE 7590-01-P



                                                                                 Federal Register / Vol. 80, No. 206 / Monday, October 26, 2015 / Notices                                                65255

                                                    training records, and documentation                     adams.html. To begin the search, select               III. Congressional Review Act
                                                    that certain activities have occurred.                  ‘‘ADAMS Public Documents’’ and then                      This RG is a rule as defined in the
                                                    The NRC uses the information required                   select ‘‘Begin Web-based ADAMS                        Congressional Review Act (5 U.S.C.
                                                    by 10 CFR part 37 to fulfill its                        Search.’’ For problems with ADAMS,                    801–808). However, the Office of
                                                    responsibilities to respond to,                         please contact the NRC’s Public                       Management and Budget has not found
                                                    investigate, and correct situations that                Document Room (PDR) reference staff at                it to be a major rule as defined in the
                                                    adversely affect public health and safety               1–800–397–4209, 301–415–4737, or by                   Congressional Review Act.
                                                    or the common defense and security.                     email to pdr.resource@nrc.gov. The
                                                      Dated at Rockville, Maryland, this 20th day           ADAMS accession number for each                       IV. Backfitting and Issue Finality
                                                    of October 2015.                                        document referenced in this notice (if                   This RG provides guidance to
                                                      For the Nuclear Regulatory Commission.                that document is available in ADAMS)                  applicants and licensees for defining the
                                                    Kristen Benney,
                                                                                                            is provided the first time that a                     direct current load and size of lead-acid
                                                                                                            document is referenced. Revision 1 of                 batteries needed to supply the defined
                                                    Acting NRC Clearance Officer, Office of
                                                    Information Services.
                                                                                                            RG 1.212, is available in ADAMS under                 load for full float stationary applications
                                                                                                            Accession No. ML15170A003. The                        to support nuclear power plant
                                                    [FR Doc. 2015–27063 Filed 10–23–15; 8:45 am]
                                                                                                            regulatory analysis may be found in                   operations. This RG does not constitute
                                                    BILLING CODE 7590–01–P
                                                                                                            ADAMS under Accession No.                             backfitting as defined in § 50.109 of title
                                                                                                            ML14031A264.                                          10 of the Code of Federal Regulations
                                                    NUCLEAR REGULATORY                                         • NRC’s PDR: You may examine and                   (10 CFR) (the Backfit Rule), and is not
                                                    COMMISSION                                              purchase copies of public documents at                otherwise inconsistent with the issue
                                                                                                            the NRC’s PDR, Room O1–F21, One                       finality provisions in 10 CFR part 52,
                                                    [NRC–2015–0099]                                         White Flint North, 11555 Rockville                    ‘‘Licenses, Certifications and Approvals
                                                                                                            Pike, Rockville, Maryland 20852.                      for Nuclear Power Plants.’’ As discussed
                                                    Sizing of Large Lead-Acid Storage                          Regulatory guides are not
                                                    Batteries                                                                                                     in the ‘‘Implementation’’ section of the
                                                                                                            copyrighted, and NRC approval is not                  RG, the NRC has no current intention to
                                                    AGENCY:  Nuclear Regulatory                             required to reproduce them.                           impose this RG on current holders of
                                                    Commission.                                             FOR FURTHER INFORMATION CONTACT:                      part 50 operating licenses or part 52
                                                    ACTION: Regulatory guide; issuance.                     Liliana Ramadan, email,                               combined licenses.
                                                                                                            Liliana.Ramadan@nrc.gov, telephone:                      This RG may be applied to
                                                    SUMMARY:    The U.S. Nuclear Regulatory                 301–415–2463: or Mark Orr, email,                     applications for operating licenses and
                                                    Commission (NRC) is issuing Revision 1                  Mark.Orr@nrc.gov, telephone:                          combined licenses docketed by the NRC
                                                    of Regulatory Guide (RG) 1.212, ‘‘Sizing                301.415.6003. Both of the Office of                   as of the date of issuance of the RG, as
                                                    of Large Lead-Acid Storage Batteries.’’                 Nuclear Regulatory Research, U.S.                     well as future applications for operating
                                                    This RG endorses, with certain                          Nuclear Regulatory Commission,                        licenses and combined licenses
                                                    clarifications, the Institute of Electrical             Washington, DC 20555–0001.                            submitted after the issuance of the RG.
                                                    and Electronic Engineers (IEEE)                         SUPPLEMENTARY INFORMATION:                            Such action does not constitute
                                                    Standard 485–2010, ‘‘IEEE                                                                                     backfitting as defined in 10 CFR
                                                    Recommended Practice for Sizing Lead-                   I. Introduction
                                                                                                                                                                  50.109(a)(1) and is not otherwise
                                                    Acid Batteries for Stationary                              The NRC is issuing a revision to an                inconsistent with the applicable issue
                                                    Applications.’’ This RG describes                       existing guide in the NRC’s ‘‘Regulatory              finality provision in 10 CFR part 52,
                                                    methods acceptable to the NRC for                       Guide’’ series. This series was                       inasmuch as such applicants or
                                                    complying with the design requirements                  developed to describe and make                        potential applicants, with exceptions
                                                    for vented lead-acid batteries used in                  available to the public information                   not applicable here, are not within the
                                                    stationary applications under full float                regarding methods that are acceptable to              scope of entities protected by the Backfit
                                                    operation for nuclear power plants.                     the NRC staff for implementing specific               Rule or the relevant issue finality
                                                    ADDRESSES: Please refer to Docket ID                    parts of the agency’s regulations,                    provisions in part 52.
                                                    NRC–2015–0099 when contacting the                       techniques that the staff uses in                        Dated at Rockville, Maryland, this 20th day
                                                    NRC about the availability of                           evaluating specific issues or postulated              of October 2015.
                                                    information regarding this document.                    events, and data that the staff needs in                 For the Nuclear Regulatory Commission.
                                                    You may obtain publically-available                     its review of applications for permits
                                                                                                                                                                  Thomas H. Boyce,
                                                    information related to this document,                   and licenses. Revision 1 of RG 1.212
                                                    using the following methods:                            was issued with a temporary                           Chief, Regulatory Guidance and Generic
                                                      • Federal Rulemaking Web site: Go to                                                                        Issues Branch, Division of Engineering, Office
                                                                                                            identification as Draft Regulatory Guide,             of Nuclear Regulatory Research.
                                                    http://www.regulations.gov and search                   DG–1311. This RG is being updated to
                                                                                                                                                                  [FR Doc. 2015–27110 Filed 10–23–15; 8:45 am]
                                                    for Docket ID NRC–2015–0099. Address                    provide guidance to applicants and
                                                    questions about NRC dockets to Carol                                                                          BILLING CODE 7590–01–P
                                                                                                            licensees for defining the direct current
                                                    Gallagher; telephone: 301–415–3463;                     load and size of vented lead acid
                                                    email: Carol.Gallagher@nrc.gov. For                     batteries for full float stationary
                                                                                                                                                                  NUCLEAR REGULATORY
                                                    technical questions, contact the                        applications to support nuclear power
                                                                                                                                                                  COMMISSION
                                                    individual(s) listed in the FOR FURTHER
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                                                                            plant operations.
                                                    INFORMATION CONTACT section of this                                                                           Advisory Committee on Reactor
                                                    document.                                               II. Additional Information
                                                                                                                                                                  Safeguards; Notice of Meeting
                                                      • NRC’s Agencywide Documents                            DG–1313 was published in the
                                                    Access and Management System                            Federal Register on April 20, 2015 (80                  In accordance with the purposes of
                                                    (ADAMS): You may obtain publicly-                       FR 21774) for a 60-day public comment                 sections 29 and 182b of the Atomic
                                                    available documents online in the                       period. The public comment period                     Energy Act (42 U.S.C. 2039, 2232b), the
                                                    ADAMS Public Document collection at                     closed on June 19, 2015, and no                       Advisory Committee on Reactor
                                                    http://www.nrc.gov/reading-rm/                          comments were received.                               Safeguards (ACRS) will hold a meeting


                                               VerDate Sep<11>2014   18:53 Oct 23, 2015   Jkt 238001   PO 00000   Frm 00061   Fmt 4703   Sfmt 4703   E:\FR\FM\26OCN1.SGM   26OCN1


                                                    65256                        Federal Register / Vol. 80, No. 206 / Monday, October 26, 2015 / Notices

                                                    on November 4–7, 2015, 11545                            conduct of ACRS business, including                   provided within this timeframe,
                                                    Rockville Pike, Rockville, Maryland.                    anticipated workload and member                       presenters should provide the Cognizant
                                                                                                            assignments. [Note: A portion of this                 ACRS Staff with a CD containing each
                                                    Wednesday, November 4, 2015,
                                                                                                            meeting may be closed pursuant to 5                   presentation at least 30 minutes before
                                                    Conference Room T2–B1, 11545
                                                                                                            U.S.C. 552b (c)(2) and (6) to discuss                 the meeting.
                                                    Rockville Pike, Rockville, Maryland                     organizational and personnel matters                     In accordance with subsection 10(d)
                                                      8:30 a.m.–8:35 a.m.: Opening                          that relate solely to internal personnel              of Public Law 92–463 and 5 U.S.C.
                                                    Remarks by the ACRS Chairman                            rules and practices of ACRS, and                      552b(c), certain portions of the
                                                    (Open)—The ACRS Chairman will make                      information the release of which would                November 6th meeting may be closed,
                                                    opening remarks regarding the conduct                   constitute a clearly unwarranted                      as specifically noted above. Use of still,
                                                    of the meeting.                                         invasion of personal privacy.]                        motion picture, and television cameras
                                                      8:35 a.m.–11:00 a.m.: Risk                              10:00 a.m.–10:15 a.m.: Reconciliation               during the meeting may be limited to
                                                    Management Regulatory Framework                         of ACRS Comments and                                  selected portions of the meeting as
                                                    (RMRF) (Open)—The Committee will                        Recommendations (Open)—The                            determined by the Chairman. Electronic
                                                    hear presentations by and hold                          Committee will discuss the responses                  recordings will be permitted only
                                                    discussions with representatives of the                 from the NRC Executive Director for                   during the open portions of the meeting.
                                                    staff regarding the draft SECY paper on                 Operations to comments and                               ACRS meeting agendas, meeting
                                                    possible RMRF implementation.                           recommendations included in recent                    transcripts, and letter reports are
                                                      1:00 p.m.–4:00 p.m.: Davis-Besse                      ACRS reports and letters.                             available through the NRC Public
                                                    Nuclear Power Station License Renewal                     1:00 p.m.–6:00 p.m.: Preparation of                 Document Room at
                                                    (Open)—The Committee will hear                          ACRS Reports (Open)—The Committee                     pdr.resource@nrc.gov, or by calling the
                                                    presentations by and hold discussions                   will continue its discussion of proposed              PDR at 1–800–397–4209, or from the
                                                    with representatives of FirstEnergy, and                ACRS reports on matters discussed                     Publicly Available Records System
                                                    the staff regarding the safety evaluation               during this meeting.                                  (PARS) component of NRC’s document
                                                    associated with the Davis-Besse License                 Saturday, November 7, 2015,                           system (ADAMS) which is accessible
                                                    Renewal Application.                                    Conference Room T2–B1, 11545                          from the NRC Web site at http://
                                                      4:00 p.m.–6:00 p.m.: Preparation of                                                                         www.nrc.gov/reading-rm/adams.html or
                                                                                                            Rockville Pike, Rockville, Maryland
                                                    ACRS Reports (Open)—The Committee                                                                             http://www.nrc.gov/reading-rm/doc-
                                                    will discuss proposed ACRS reports on                      8:30 a.m.–11:30 a.m.: Preparation of               collections/ACRS/.
                                                    matters discussed during this meeting.                  ACRS Reports (Open)—The Committee                        Video teleconferencing service is
                                                                                                            will continue its discussion of proposed              available for observing open sessions of
                                                    Thursday, November 5, 2015,                             ACRS reports.
                                                    Conference Room T2–B1, 11545                                                                                  ACRS meetings. Those wishing to use
                                                                                                               11:30 a.m.–12:00 p.m.: Miscellaneous
                                                    Rockville Pike, Rockville, Maryland                                                                           this service should contact Mr. Theron
                                                                                                            (Open)—The Committee will continue
                                                                                                                                                                  Brown, ACRS Audio Visual Technician
                                                      8:30 a.m.–8:35 a.m.: Opening                          its discussion related to the conduct of
                                                                                                                                                                  (301–415–8066), between 7:30 a.m. and
                                                    Remarks by the ACRS Chairman                            Committee activities and specific issues
                                                                                                                                                                  3:45 p.m. (ET), at least 10 days before
                                                    (Open)—The ACRS Chairman will make                      that were not completed during
                                                                                                                                                                  the meeting to ensure the availability of
                                                    opening remarks regarding the conduct                   previous meetings.
                                                                                                                                                                  this service. Individuals or
                                                    of the meeting.                                            Procedures for the conduct of and
                                                                                                                                                                  organizations requesting this service
                                                      8:35 a.m.–11:00 a.m.: Fukushima Tier                  participation in ACRS meetings were
                                                                                                                                                                  will be responsible for telephone line
                                                    2/3 (Open)—The Committee will hear                      published in the Federal Register on
                                                                                                                                                                  charges and for providing the
                                                    presentations by and hold discussions                   October 1, 2014 (79 FR 59307). In
                                                                                                                                                                  equipment and facilities that they use to
                                                    with representatives of the staff                       accordance with those procedures, oral
                                                                                                                                                                  establish the video teleconferencing
                                                    regarding Fukushima Tier 2/3 action                     or written views may be presented by
                                                                                                                                                                  link. The availability of video
                                                    discussion in support of a SECY paper.                  members of the public, including
                                                                                                                                                                  teleconferencing services is not
                                                      1:00 p.m.–3:00 p.m.: Status of the                    representatives of the nuclear industry.
                                                                                                                                                                  guaranteed.
                                                    Revised Fuel Cycle Oversight Process                    Persons desiring to make oral statements
                                                    (RFCOP) Cornerstones (Open)—The                         should notify Quynh Nguyen, Cognizant                   Dated at Rockville, Maryland, this 20th day
                                                    Committee will hear presentations by                    ACRS Staff (Telephone: 301–415–5844,                  of October, 2015.
                                                    and hold discussions with                               Email: Quynh.Nguyen@nrc.gov), five                      For the Nuclear Regulatory Commission.
                                                    representatives of the staff regarding the              days before the meeting, if possible, so              Andrew L. Bates,
                                                    status of the RFCOP Cornerstones.                       that appropriate arrangements can be                  Advisory Committee Management Officer.
                                                      3:00 p.m.–6:00 p.m.: Preparation of                   made to allow necessary time during the               [FR Doc. 2015–27192 Filed 10–23–15; 8:45 am]
                                                    ACRS Reports (Open)—The Committee                       meeting for such statements. In view of               BILLING CODE 7590–01–P
                                                    will discuss proposed ACRS reports on                   the possibility that the schedule for
                                                    matters discussed during this meeting.                  ACRS meetings may be adjusted by the
                                                                                                            Chairman as necessary to facilitate the               POSTAL REGULATORY COMMISSION
                                                    Friday, November 6, 2015, Conference                    conduct of the meeting, persons
                                                    Room T2–B1, 11545 Rockville Pike,                       planning to attend should check with                  [Docket Nos. CP2016–9; Order No. 2767]
                                                    Rockville, Maryland                                     the Cognizant ACRS staff if such
                                                       8:30 a.m.–10:00 a.m.: Future ACRS                    rescheduling would result in major                    Change in Postal Rates
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    Activities/Report of the Planning and                   inconvenience.                                        AGENCY:   Postal Regulatory Commission.
                                                    Procedures Subcommittee (Open/                             Thirty-five hard copies of each                    ACTION:   Notice.
                                                    Closed)—The Committee will discuss                      presentation or handout should be
                                                    the recommendations of the Planning                     provided 30 minutes before the meeting.               SUMMARY:   The Commission is noticing a
                                                    and Procedures Subcommittee regarding                   In addition, one electronic copy of each              recent Postal Service filing concerning
                                                    items proposed for consideration by the                 presentation should be emailed to the                 the Postal Service’s intention to change
                                                    Full Committee during future ACRS                       Cognizant ACRS Staff one day before                   rates of general applicability for
                                                    Meetings, and matters related to the                    meeting. If an electronic copy cannot be              competitive products. This notice


                                               VerDate Sep<11>2014   18:53 Oct 23, 2015   Jkt 238001   PO 00000   Frm 00062   Fmt 4703   Sfmt 4703   E:\FR\FM\26OCN1.SGM   26OCN1



Document Created: 2018-02-27 08:56:23
Document Modified: 2018-02-27 08:56:23
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 65255 

2025 Federal Register | Disclaimer | Privacy Policy