A Notice of Intent (NOI) for this project was first published in the Federal Register (75 FR 81210) on December 27, 2010. Subsequent NOIs were published in the Federal Register noting the passage of time and procedural changes. This NOI is being published (1) to update the project schedule, (2) to note that M. Earl Stewart is the new Forest Supervisor of the Tongass National Forest and is the Responsible Official for this Project, (3) to note that the Proposed Action contains fewer acres for timber harvest, and (4) that the Forest Service is no longer proposing project-specific Forest Plan amendments in the alternatives.

Federal Register, Volume 80 Issue 207 (Tuesday, October 27, 2015)
[Federal Register Volume 80, Number 207 (Tuesday, October 27, 2015)]
[Notices]
[Pages 65691-65692]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-27204]


-----------------------------------------------------------------------

DEPARTMENT OF AGRICULTURE

Forest Service


Tongass National Forest Wrangell Ranger District; Alaska; 
Wrangell Island Project Environmental Impact Statement

AGENCY: Forest Service, USDA.

ACTION: Corrected Notice of Intent to prepare an environmental impact 
statement.

-----------------------------------------------------------------------

SUMMARY: A Notice of Intent (NOI) for this project was first published 
in the Federal Register (75 FR 81210) on December 27, 2010. Subsequent 
NOIs were published in the Federal Register noting the passage of time 
and procedural changes. This NOI is being published (1) to update the 
project schedule, (2) to note that M. Earl Stewart is the new Forest 
Supervisor of the Tongass National Forest and is the Responsible 
Official for this Project, (3) to note that the Proposed Action 
contains fewer acres for timber harvest, and (4) that the Forest 
Service is no longer proposing project-specific Forest Plan amendments 
in the alternatives.

DATES: Comments submitted previously will be considered in the 
analysis. This corrected NOI triggers a public comment opportunity 
during which persons wishing to obtain standing under the pre-
decisional administrative review, or ``objection'' process (36 CFR 218, 
Subpart B), may submit timely, written comments regarding the project. 
New or additional comments should be received by the Wrangell Ranger 
District by November 27, 2015, 30 days from date of publication of this 
Corrected NOI in the Federal Register. The draft environmental impact 
statement is expected in February 2016, and the final environmental 
impact statement is expected in May 2016.

ADDRESSES: Send written comments to: Tongass National Forest, c/o 
Andrea Slusser, P.O. Box 51, Wrangell, AK 99929, Attn: Wrangell Island 
Project EIS. Comments may be hand-delivered to the Wrangell Ranger 
District, 525 Bennett Drive, Wrangell, AK 99929, Attn: Wrangell Island 
Project EIS. Comments may also be sent via email to: 
[email protected], or via facsimile to 907-874-
7595, Attn: Wrangell Island Project EIS.
    In all correspondence, please include your name, address, and 
organization name if you are commenting as a representative of an 
organization.

FOR FURTHER INFORMATION CONTACT: Andrea Slusser, Team Leader; Wrangell 
Ranger District, P.O. Box 51, Wrangell, AK 99929, 907-874-2323.
    Individuals who use telecommunication devices for the deaf (TDD) 
may call the Federal Information Relay Service (FIRS) at 1-800-877-8339 
between 8 a.m. and 8 p.m., Eastern Time, Monday through Friday.

SUPPLEMENTARY INFORMATION: 

Purpose and Need for Action

    The purpose of the Wrangell Island Project is to respond to the 
goals and objectives identified by the Tongass Land and Resource 
Management Plan (Forest Plan) to guide timber management to support the 
local and regional economies of Southeast Alaska, while moving the 
Wrangell Island Project Area towards the desired future condition for 
all resources.
    The underlying need for the Wrangell Island Project comes from the 
Forest Service's obligation, subject to applicable law, to seek to 
provide a supply of timber from the Tongass National Forest that meets 
market demand annually and for the planning cycle, and to restore and 
improve forest resources to a condition where they provide increased 
benefits to society.
    This project would contribute to the orderly flow of timber to 
large and small timber purchasers, mill operators, and value-added wood 
product industries in Southeast Alaska and benefit the local and 
regional economies of Wrangell and Southeast Alaska while also 
improving forest resource conditions. This project would help provide a 
reliable, long-term supply of ``bridge'' timber that would support 
local jobs and facilitate the industry transition to a sustainable wood 
product industry based on young-growth management on the Tongass 
National Forest.

Proposed Action

    The Forest Service is proposing a multi-year project involving 
timber harvest and associated road construction and forest restoration 
activities. The proposed action includes the harvest of timber from 
approximately 5,290 acres of forested land. The harvest would produce 
an estimated 73 million board feet (MMBF) of sawtimber and utility wood 
that could be made available to industry. Timber harvest would occur 
with both even-aged (clearcut) and uneven-aged (partial cut) harvest 
using cable, helicopter and ground-based methods.
    The timber harvest would require approximately 18 miles of National 
Forest Road construction, six miles of reconstruction and approximately 
13 miles of temporary road construction. Existing road systems and log 
transfer facilities would also be used as needed to transport the 
timber.
    Integrated restoration activities associated with the road system 
used for harvest would include road maintenance and improvements, 
invasive species treatments, erosion control, and fish passage 
improvements. All activities would be conducted in a

[[Page 65692]]

manner conducive to moving resources towards the desired conditions 
described in the Forest Plan.

Possible Alternatives

    In addition to the proposed action and the no action alternative, 
the Forest Service is considering a range of action alternatives with 
varying levels of harvest and road construction based on public input 
received to date. Because the Forest Plan is now undergoing an 
amendment process, the project will not propose any project-specific 
Forest Plan amendments.

Responsible Official

    The responsible official for this project is M. Earl Stewart, 
Forest Supervisor, Tongass National Forest, Federal Building, 648 
Mission Street, Ketchikan, Alaska 99901.

Nature of Decision To Be Made

    The responsible official will decide: (1) The estimated timber 
volume to make available from the project, as well as the location, 
design, and scheduling of timber harvest, road construction and 
reconstruction, and silvicultural practices used; (2) road and access 
management; (3) mitigation measures and monitoring requirements; and 
(4) whether there may be a significant restriction on subsistence uses.

Preliminary Issues

    The initial scoping identified preliminary issues and concerns 
which may be analyzed in the EIS to disclose potential effects of the 
project on the following: Timber supply, timber sale economics, 
supporting the timber industry through the transition from old-growth 
harvest to young-growth management, road and access management, 
economic and rural stability, wildlife habitat, aquatic habitat 
(fisheries/hydrology/watersheds), soil productivity and slope 
stability, invasive species, heritage resources, roadless area 
characteristics, scenery, recreation, subsistence use, and climate 
change and carbon cycling. Preliminary key issues identified include 
timber supply, timber demand, scenery, wildlife habitat and access 
management.

Preliminary List of Permits or Licenses Required

    All necessary permits would be obtained prior to project 
implementation, and may include the following:

U.S. Environmental Protection Agency

     Review Spill Prevention Control and Countermeasure Plan 
State of Alaska, Department of Environmental Conservation;
     Solid Waste Disposal Permit State of Alaska, Department of 
Natural Resources;
     Authorization for occupancy and use of tidelands and 
submerged lands.

Scoping Process

    The initial scoping period started when the NOI was published in 
2010. This proposal has been listed on the Tongass National Forest 
Schedule of Proposed Actions since January, 2011. An updated scoping 
document has been posted on the Tongass National Forest public Web site 
at http://www.fs.usda.gov/goto/R10/Tongass/WrangellEIS, and a project 
update letter will be mailed out to those who previously commented.
    It is important that reviewers provide their comments at such times 
and in such manner that they are useful to the agency's preparation of 
the environmental impact statement. Therefore, comments should be 
provided prior to the close of the comment period and should clearly 
articulate the reviewer's concerns and contentions. Comments received 
in response to this solicitation, including names and addresses of 
those who comment, will be part of the public record. Comments 
submitted anonymously will also be accepted and considered.

    Dated: October 19, 2015.
M. Earl Stewart,
Forest Supervisor.
[FR Doc. 2015-27204 Filed 10-26-15; 8:45 am]
BILLING CODE 3410-11-P



                                                                           Federal Register / Vol. 80, No. 207 / Tuesday, October 27, 2015 / Notices                                         65691

                                              Nutrition Assistance Program (D–SNAP)                   ACTION: Corrected Notice of Intent to                 Purpose and Need for Action
                                              is found in section 5(h) of the Food and                prepare an environmental impact                          The purpose of the Wrangell Island
                                              Nutrition Act of 2008, formerly the Food                statement.                                            Project is to respond to the goals and
                                              Stamp Act of 1977, as amended and the                                                                         objectives identified by the Tongass
                                              Disaster Relief Act of 1974, as amended                 SUMMARY:   A Notice of Intent (NOI) for               Land and Resource Management Plan
                                              by the Robert T. Stafford Disaster Relief               this project was first published in the               (Forest Plan) to guide timber
                                              and Assistance Act of 1988 authorizes                   Federal Register (75 FR 81210) on                     management to support the local and
                                              the Secretary of Agriculture to establish               December 27, 2010. Subsequent NOIs                    regional economies of Southeast Alaska,
                                              temporary emergency standards of                        were published in the Federal Register                while moving the Wrangell Island
                                              eligibility for victims of a disaster if the            noting the passage of time and                        Project Area towards the desired future
                                              commercial channels of food                             procedural changes. This NOI is being                 condition for all resources.
                                              distribution have been disrupted, and                   published (1) to update the project                      The underlying need for the Wrangell
                                              subsequently restored. D–SNAP is a                      schedule, (2) to note that M. Earl                    Island Project comes from the Forest
                                              program that is separate from the                       Stewart is the new Forest Supervisor of               Service’s obligation, subject to
                                              Supplemental Nutrition Assistance                       the Tongass National Forest and is the                applicable law, to seek to provide a
                                              Program (SNAP) and is conducted for a                   Responsible Official for this Project, (3)            supply of timber from the Tongass
                                              specific period of time. In order for a                 to note that the Proposed Action                      National Forest that meets market
                                              State to request to operate a D–SNAP, an                contains fewer acres for timber harvest,              demand annually and for the planning
                                              affected area in the State must have                    and (4) that the Forest Service is no                 cycle, and to restore and improve forest
                                              received a Presidential Declaration of                  longer proposing project-specific Forest              resources to a condition where they
                                              ‘‘Major Disaster’’ with Individual                      Plan amendments in the alternatives.                  provide increased benefits to society.
                                              Assistance.                                             DATES:  Comments submitted previously                    This project would contribute to the
                                                 Need and Use of the Information:                                                                           orderly flow of timber to large and small
                                                                                                      will be considered in the analysis. This
                                              This information collection concerns                                                                          timber purchasers, mill operators, and
                                                                                                      corrected NOI triggers a public comment
                                              information obtained from State                                                                               value-added wood product industries in
                                                                                                      opportunity during which persons
                                              agencies seeking to operate D–SNAP. A                                                                         Southeast Alaska and benefit the local
                                                                                                      wishing to obtain standing under the
                                              State agency request to operate a D–                                                                          and regional economies of Wrangell and
                                                                                                      pre-decisional administrative review, or
                                              SNAP must contain the following                                                                               Southeast Alaska while also improving
                                                                                                      ‘‘objection’’ process (36 CFR 218,
                                              information: Description of incident;                                                                         forest resource conditions. This project
                                                                                                      Subpart B), may submit timely, written
                                              geographic area; application period;                                                                          would help provide a reliable, long-term
                                                                                                      comments regarding the project. New or
                                              benefit period; eligibility criteria;                                                                         supply of ‘‘bridge’’ timber that would
                                                                                                      additional comments should be received
                                              ongoing household eligibility; affected                                                                       support local jobs and facilitate the
                                                                                                      by the Wrangell Ranger District by
                                              population; electronic benefit card                                                                           industry transition to a sustainable
                                                                                                      November 27, 2015, 30 days from date
                                              issuance process; logistical plans for                                                                        wood product industry based on young-
                                                                                                      of publication of this Corrected NOI in
                                              Disaster SNAP rollout; staffing; public                                                                       growth management on the Tongass
                                                                                                      the Federal Register. The draft
                                              information outreach; duplicate                                                                               National Forest.
                                                                                                      environmental impact statement is
                                              participation check process; fraud
                                                                                                      expected in February 2016, and the final              Proposed Action
                                              prevention strategies; and employee
                                                                                                      environmental impact statement is
                                              application procedures. The Food and                                                                            The Forest Service is proposing a
                                                                                                      expected in May 2016.
                                              Nutrition Service reviews the request to                                                                      multi-year project involving timber
                                              ensure that all the necessary                           ADDRESSES:   Send written comments to:                harvest and associated road
                                              requirements to conduct a D–SNAP are                    Tongass National Forest, c/o Andrea                   construction and forest restoration
                                              met. If this collection is not conducted,               Slusser, P.O. Box 51, Wrangell, AK                    activities. The proposed action includes
                                              D–SNAP would not be available to help                   99929, Attn: Wrangell Island Project                  the harvest of timber from
                                              meet the nutritional needs of disaster                  EIS. Comments may be hand-delivered                   approximately 5,290 acres of forested
                                              victims.                                                to the Wrangell Ranger District, 525                  land. The harvest would produce an
                                                 Description of Respondents: State,                   Bennett Drive, Wrangell, AK 99929,                    estimated 73 million board feet (MMBF)
                                              Local, or Tribal Government.                            Attn: Wrangell Island Project EIS.                    of sawtimber and utility wood that
                                                 Number of Respondents: 9.                            Comments may also be sent via email to:               could be made available to industry.
                                                 Frequency of Responses: Reporting:                   wrangell_island_project_eis@fs.fed.us,                Timber harvest would occur with both
                                              On occasion.                                            or via facsimile to 907–874–7595, Attn:
                                                 Total Burden Hours: 90.                                                                                    even-aged (clearcut) and uneven-aged
                                                                                                      Wrangell Island Project EIS.                          (partial cut) harvest using cable,
                                              Ruth Brown,                                               In all correspondence, please include               helicopter and ground-based methods.
                                              Departmental Information Collection                     your name, address, and organization                    The timber harvest would require
                                              Clearance Officer.                                      name if you are commenting as a                       approximately 18 miles of National
                                              [FR Doc. 2015–27187 Filed 10–26–15; 8:45 am]            representative of an organization.                    Forest Road construction, six miles of
                                              BILLING CODE 3410–30–P                                  FOR FURTHER INFORMATION CONTACT:                      reconstruction and approximately 13
                                                                                                      Andrea Slusser, Team Leader; Wrangell                 miles of temporary road construction.
                                                                                                      Ranger District, P.O. Box 51, Wrangell,               Existing road systems and log transfer
                                              DEPARTMENT OF AGRICULTURE                               AK 99929, 907–874–2323.                               facilities would also be used as needed
                                                                                                                                                            to transport the timber.
                                              Forest Service                                             Individuals who use
tkelley on DSK3SPTVN1PROD with NOTICES




                                                                                                                                                              Integrated restoration activities
                                                                                                      telecommunication devices for the deaf                associated with the road system used for
                                              Tongass National Forest Wrangell                        (TDD) may call the Federal Information                harvest would include road
                                              Ranger District; Alaska; Wrangell                       Relay Service (FIRS) at 1–800–877–8339                maintenance and improvements,
                                              Island Project Environmental Impact                     between 8 a.m. and 8 p.m., Eastern                    invasive species treatments, erosion
                                              Statement                                               Time, Monday through Friday.                          control, and fish passage improvements.
                                              AGENCY:    Forest Service, USDA.                        SUPPLEMENTARY INFORMATION:                            All activities would be conducted in a


                                         VerDate Sep<11>2014   19:58 Oct 26, 2015   Jkt 238001   PO 00000   Frm 00005   Fmt 4703   Sfmt 4703   E:\FR\FM\27OCN1.SGM   27OCN1


                                              65692                        Federal Register / Vol. 80, No. 207 / Tuesday, October 27, 2015 / Notices

                                              manner conducive to moving resources                    Alaska, Department of Environmental                   expiration date for the volunteer Interest
                                              towards the desired conditions                          Conservation;                                         and Placement Summary form and the
                                              described in the Forest Plan.                             • Solid Waste Disposal Permit State                 Timesheet form to December 31, 2018.
                                                                                                      of Alaska, Department of Natural                      The collected information helps NRCS
                                              Possible Alternatives                                   Resources;                                            to match the skills of individuals
                                                 In addition to the proposed action and                 • Authorization for occupancy and                   interested in volunteering for
                                              the no action alternative, the Forest                   use of tidelands and submerged lands.                 opportunities that will further the
                                              Service is considering a range of action                Scoping Process                                       agency’s mission. Information will be
                                              alternatives with varying levels of                                                                           collected from potential volunteers who
                                              harvest and road construction based on                    The initial scoping period started                  are 14 years of age or older.
                                                                                                      when the NOI was published in 2010.
                                              public input received to date. Because                                                                        DATES: Comments received by December
                                                                                                      This proposal has been listed on the
                                              the Forest Plan is now undergoing an                                                                          28, 2015 will be considered.
                                                                                                      Tongass National Forest Schedule of
                                              amendment process, the project will not                                                                       ADDRESSES: Comments should be
                                                                                                      Proposed Actions since January, 2011.
                                              propose any project-specific Forest Plan                                                                      submitted and identified by Docket
                                                                                                      An updated scoping document has been
                                              amendments.                                                                                                   Number NRCS–2015–0012, using either
                                                                                                      posted on the Tongass National Forest
                                              Responsible Official                                    public Web site at http://                            of the following methods:
                                                                                                      www.fs.usda.gov/goto/R10/Tongass/                        • Government-wide rulemaking Web
                                                The responsible official for this                                                                           site: http://regulations.gov. Follow the
                                                                                                      WrangellEIS, and a project update letter
                                              project is M. Earl Stewart, Forest                                                                            instructions for sending comments
                                                                                                      will be mailed out to those who
                                              Supervisor, Tongass National Forest,                                                                          electronically.
                                                                                                      previously commented.
                                              Federal Building, 648 Mission Street,                     It is important that reviewers provide                 • Mail: Public Comments Processing,
                                              Ketchikan, Alaska 99901.                                their comments at such times and in                   Attention: Docket No. NRCS–2015–
                                              Nature of Decision To Be Made                           such manner that they are useful to the               0012, Regulatory and Agency Policy
                                                                                                      agency’s preparation of the                           Team, Strategic Planning and
                                                The responsible official will decide:                 environmental impact statement.                       Accountability, Department of
                                              (1) The estimated timber volume to                      Therefore, comments should be                         Agriculture, Natural Resources
                                              make available from the project, as well                provided prior to the close of the                    Conservation Service, 5601 Sunnyside
                                              as the location, design, and scheduling                 comment period and should clearly                     Avenue, Building 1–1112D, Beltsville,
                                              of timber harvest, road construction and                articulate the reviewer’s concerns and                Maryland 20705.
                                              reconstruction, and silvicultural                       contentions. Comments received in                        NRCS will post comments on http://
                                              practices used; (2) road and access                     response to this solicitation, including              www.regulations.gov. Do not include
                                              management; (3) mitigation measures                     names and addresses of those who                      personal identifying information (PII)
                                              and monitoring requirements; and (4)                    comment, will be part of the public                   with your comments. In general,
                                              whether there may be a significant                      record. Comments submitted                            personal information provided with
                                              restriction on subsistence uses.                        anonymously will also be accepted and                 comments will be posted. If your
                                              Preliminary Issues                                      considered.                                           comment includes your address,
                                                                                                                                                            telephone number, email address, or
                                                 The initial scoping identified                         Dated: October 19, 2015.                            other PII, this information, including
                                              preliminary issues and concerns which                   M. Earl Stewart,                                      PII, may be available to the public. You
                                              may be analyzed in the EIS to disclose                  Forest Supervisor.                                    may ask, in your comment, that your PII
                                              potential effects of the project on the                 [FR Doc. 2015–27204 Filed 10–26–15; 8:45 am]          be withheld from public view, but this
                                              following: Timber supply, timber sale                   BILLING CODE 3410–11–P                                cannot be guaranteed.
                                              economics, supporting the timber                                                                              FOR FURTHER INFORMATION CONTACT:
                                              industry through the transition from                                                                          Requests for additional information or
                                              old-growth harvest to young-growth                      DEPARTMENT OF AGRICULTURE                             copies of the information collection
                                              management, road and access                                                                                   instrument should be directed to
                                              management, economic and rural                          Natural Resources Conservation
                                                                                                      Service                                               Michele Brown, National Volunteer
                                              stability, wildlife habitat, aquatic habitat                                                                  Coordinator, 4407 121st Street,
                                              (fisheries/hydrology/watersheds), soil                  [Docket No. NRCS–2015–0012]                           Urbandale, Iowa 50323; telephone: (515)
                                              productivity and slope stability,                                                                             270–4864, ext. 102, and email:
                                              invasive species, heritage resources,                   Notice of Request To Extend an                        Michele.brown@ia.usda.gov.
                                              roadless area characteristics, scenery,                 Information Collection
                                                                                                                                                            SUPPLEMENTARY INFORMATION:
                                              recreation, subsistence use, and climate                AGENCY:  Natural Resources
                                              change and carbon cycling. Preliminary                  Conservation Service (NRCS), United                   Volunteer Interest and Placement
                                              key issues identified include timber                    States Department of Agriculture                      Summary Form
                                              supply, timber demand, scenery,                         (USDA).                                                  Title: NRCS–PER–002, Volunteer
                                              wildlife habitat and access management.                 ACTION: Notice and request for                        Interest and Placement Summary Form.
                                              Preliminary List of Permits or Licenses                 comments.                                                OMB Number: 0578–0024.
                                              Required                                                                                                         Expiration Date of Approval: 3 years
                                                                                                      SUMMARY:   In accordance with the                     from approval date.
                                                All necessary permits would be                        Paperwork Reduction Act of 1995 (44                      Type of Request: Revision of a
tkelley on DSK3SPTVN1PROD with NOTICES




                                              obtained prior to project                               U.S.C. Chapter 35), this notice                       currently approved collection.
                                              implementation, and may include the                     announces NRCS’ intent to request an                     Abstract: Collection of this
                                              following:                                              extension for currently approved                      information is necessary to match
                                                                                                      information collection, Volunteer                     volunteer assignment to agency mission
                                              U.S. Environmental Protection Agency
                                                                                                      Program—Earth Team. This information                  as required by Federal Personnel
                                                • Review Spill Prevention Control                     collection is set to expire December 31,              Manual, Supplement 296–33,
                                              and Countermeasure Plan State of                        2015. NRCS is seeking to extend the                   Subchapter 3. Agencies are authorized


                                         VerDate Sep<11>2014   19:58 Oct 26, 2015   Jkt 238001   PO 00000   Frm 00006   Fmt 4703   Sfmt 4703   E:\FR\FM\27OCN1.SGM   27OCN1



Document Created: 2015-12-14 15:35:33
Document Modified: 2015-12-14 15:35:33
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionCorrected Notice of Intent to prepare an environmental impact statement.
DatesComments submitted previously will be considered in the analysis. This corrected NOI triggers a public comment opportunity during which persons wishing to obtain standing under the pre- decisional administrative review, or ``objection'' process (36 CFR 218, Subpart B), may submit timely, written comments regarding the project. New or additional comments should be received by the Wrangell Ranger District by November 27, 2015, 30 days from date of publication of this Corrected NOI in the Federal Register. The draft environmental impact statement is expected in February 2016, and the final environmental impact statement is expected in May 2016.
ContactAndrea Slusser, Team Leader; Wrangell Ranger District, P.O. Box 51, Wrangell, AK 99929, 907-874-2323.
FR Citation80 FR 65691 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR