80 FR 66933 - Notice of Intent To Prepare an Environmental Impact Report/Environmental Impact Statement for the Sacramento Regional County Sanitation District South County Ag Water Recycling Program

DEPARTMENT OF THE INTERIOR
Bureau of Reclamation

Federal Register Volume 80, Issue 210 (October 30, 2015)

Page Range66933-66934
FR Document2015-27716

The Bureau of Reclamation, the lead Federal agency, and the Sacramento Regional County Sanitation District (Regional San), the lead state agency, will prepare a joint Environmental Impact Report/ Environmental Impact Statement (EIR/EIS) for the South County Ag Water Recycling Program (Project). The Project would deliver approximately 45,000 acre-feet per year of Title 22 disinfected tertiary treated recycled water to about 16,000 acres of irrigated lands in southern Sacramento County for agricultural and urban landscape uses and to the Stone Lakes National Wildlife Refuge. The Project could also provide an additional 5,000 acre-feet per year of recycled water for groundwater recharge, for a total recycled water delivery of 50,000 acre-feet per year.

Federal Register, Volume 80 Issue 210 (Friday, October 30, 2015)
[Federal Register Volume 80, Number 210 (Friday, October 30, 2015)]
[Notices]
[Pages 66933-66934]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-27716]


-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Bureau of Reclamation

[RR02030700, XXXR0680R1, RR.17529652.MP70012]


Notice of Intent To Prepare an Environmental Impact Report/
Environmental Impact Statement for the Sacramento Regional County 
Sanitation District South County Ag Water Recycling Program

AGENCY: Bureau of Reclamation, Interior.

ACTION: Notice of intent.

-----------------------------------------------------------------------

SUMMARY: The Bureau of Reclamation, the lead Federal agency, and the 
Sacramento Regional County Sanitation District (Regional San), the lead 
state agency, will prepare a joint Environmental Impact Report/
Environmental Impact Statement (EIR/EIS) for the South County Ag Water 
Recycling Program (Project). The Project would deliver approximately 
45,000 acre-feet per year of Title 22 disinfected tertiary treated 
recycled water to about 16,000 acres of irrigated lands in southern 
Sacramento County for agricultural and urban landscape uses and to the 
Stone Lakes National Wildlife Refuge. The Project could also provide an 
additional 5,000 acre-feet per year of recycled water for groundwater 
recharge, for a total recycled water delivery of 50,000 acre-feet per 
year.

DATES: Submit written comments on the scope of the EIR/EIS by November 
30, 2015.

ADDRESSES: Send written comments on the scope of the EIR/EIS to Mr. 
Jose Ramirez, Project Manager, Sacramento County Regional Sanitation 
District (Regional San), 10060 Goethe Road, Sacramento, California 
95827; or by email to [email protected].

FOR FURTHER INFORMATION CONTACT: Mr. Jose Ramirez, Regional San at 
(916) 879-6059, email at [email protected]; or Mr. Douglas 
Kleinsmith, Bureau of Reclamation, (916) 978-5034, email at 
[email protected].

SUPPLEMENTARY INFORMATION: The Project water comes from the Regional 
San Sacramento Regional Water Treatment Plant (SRWTP) located in Elk 
Grove, California. Presently, the SRWTP treats and discharges secondary 
effluent into the Sacramento River and operates a 5-million-gallon-per-
day (mgd) Water Recycling Facility to produce tertiary effluent. In 
December 2010, the Central Valley Regional Water Quality Control Board 
adopted new Waste Discharge Requirements (WDRs) for Regional San. The 
new WDRs require treatment upgrades to be operational by December 2023, 
and have prompted Regional San to evaluate a multitude of technologies 
to produce up to 181 mgd of Title 22 disinfected tertiary recycled 
water or `equivalent' quality effluent. Following a pilot study of 
various technologies, one technology has been selected to treat 
wastewater to Title 22 disinfected tertiary level, which is suitable 
for agriculture.
    Title 22 disinfected tertiary recycled water generated at the SRWTP 
would be conveyed to agricultural and urban customers using a new pump 
station at the SRWTP and through a new network of recycled water 
pipelines (transmission, distribution, and laterals) located within 
public road rights-of-way, private roads, and agricultural land. The 
proposed Project would also include a potential recharge area to 
increase recycled water usage and benefit the local groundwater basin 
through increasing groundwater table levels and recharging the basin; 
with the potential recharge area, the delivery of recycled water could 
increase by approximately 5,000 acre-feet per year. In addition, the 
Project includes provision of recycled water to support wetland habitat 
at the Stone Lakes National Wildlife Refuge (NWR) to protect the 
sensitive resources at the refuge during drought conditions.
    The average annual recycled water delivered to potential customers 
is approximately 50,000 acre-feet per year. Recycled water would be 
delivered to approximately 16,000 acres of irrigated lands (and some 
limited recharge areas) and to managed wetlands at Stone Lakes NWR. The 
actual monthly demand would vary seasonally with the maximum demand 
occurring during the irrigation season, from May through September. The 
project is designed to deliver up to two-thirds of the maximum month 
demand during the irrigation season. The remaining demand would be met 
by groundwater pumping, the existing source of water supply. As treated 
wastewater would be beneficially reused, there would be a commensurate 
reduction in the discharge of treated wastewater into the Sacramento 
River.

Project Objectives

    The objectives of the proposed Project are as follows:
     Reduce groundwater pumping in the Central Basin by 
supplying recycled water to agricultural and urban customers in south 
Sacramento County.
     Minimize conveyance costs while maximizing demand served.
     Improve environmental resources and benefit habitats and 
ecosystems to
    [cir] Reduce streamflow losses in the Cosumnes River by raising 
groundwater levels.
    [cir] Support improved riparian habitat along the Cosumnes River as 
a result of elevated groundwater levels along the stream margins.
    [cir] Provide recycled water to wetlands.
    The proposed Project consists of the following proposed project 
elements and their level of environmental evaluation in the joint EIR/
EIS:
     New pump station at the SRWTP (project-level evaluation)
     30- to 60-inch transmission pipeline from the pump station 
to Twin Cities Road (project-level evaluation)
     Distribution mainlines from the transmission pipeline and 
lateral service connections to potential customers (agriculture and 
Stone Lakes NWR) (program-level evaluation)
     Potential Recharge Area and wells to produce water to the 
meet the dilution requirements for groundwater recharge (program-level 
evaluation)
    The EIR/EIS will also evaluate the No Project Alternative, an 
alternative that does not include funding by Reclamation, and a 
smaller-scale project alternative that would supply less recycled water 
to a smaller area in South Sacramento County.

Previous Scoping

    Regional San mailed a notice of preparation of a Draft EIR 
regarding the proposed Project to the public on January 30, 2015 and 
held a scoping meeting on February 18, 2015 at the Sacramento Farm 
Bureau in Elk Grove, California.

Public Disclosure

    Before including your address, phone number, email address, or 
other

[[Page 66934]]

personal identifying information in your comment, you should be aware 
that your entire comment--including your personal identifying 
information--may be made publicly available at any time. While you can 
ask us in your comment to withhold your personal identifying 
information from public review, we cannot guarantee that we will be 
able to do so.

    Dated: September 21, 2015.
Jason Phillips,
Deputy Regional Director, Mid-Pacific Region.
[FR Doc. 2015-27716 Filed 10-29-15; 8:45 am]
BILLING CODE 4332-90-P



                                                                            Federal Register / Vol. 80, No. 210 / Friday, October 30, 2015 / Notices                                         66933

                                              public record. Before including your                    Sacramento, California 95827; or by                   September. The project is designed to
                                              address, phone number, email address,                   email to ramirezj@sacsewer.com.                       deliver up to two-thirds of the
                                              or other personal identifying                           FOR FURTHER INFORMATION CONTACT: Mr.                  maximum month demand during the
                                              information in your comment, you                        Jose Ramirez, Regional San at (916) 879–              irrigation season. The remaining
                                              should be aware that your entire                        6059, email at ramirezj@sacsewer.com;                 demand would be met by groundwater
                                              comment, including your personal                        or Mr. Douglas Kleinsmith, Bureau of                  pumping, the existing source of water
                                              identifying information, may be made                    Reclamation, (916) 978–5034, email at                 supply. As treated wastewater would be
                                              publicly available at any time. While                   dkleinsmith@usbr.gov.                                 beneficially reused, there would be a
                                              you can ask us or OMB in your                           SUPPLEMENTARY INFORMATION: The                        commensurate reduction in the
                                              comment to withhold your personal                       Project water comes from the Regional                 discharge of treated wastewater into the
                                              identifying information from public                     San Sacramento Regional Water                         Sacramento River.
                                              review, we cannot guarantee that it will                Treatment Plant (SRWTP) located in Elk                Project Objectives
                                              be done.                                                Grove, California. Presently, the SRWTP
                                                Dated: October 26, 2015.                              treats and discharges secondary effluent                 The objectives of the proposed Project
                                                                                                      into the Sacramento River and operates                are as follows:
                                              Madonna L. Baucum,
                                                                                                                                                               • Reduce groundwater pumping in
                                              Information Collection Clearance Officer,               a 5-million-gallon-per-day (mgd) Water
                                                                                                                                                            the Central Basin by supplying recycled
                                              National Park Service.                                  Recycling Facility to produce tertiary
                                                                                                                                                            water to agricultural and urban
                                              [FR Doc. 2015–27714 Filed 10–29–15; 8:45 am]            effluent. In December 2010, the Central
                                                                                                                                                            customers in south Sacramento County.
                                                                                                      Valley Regional Water Quality Control
                                              BILLING CODE 4310–EH–P                                                                                           • Minimize conveyance costs while
                                                                                                      Board adopted new Waste Discharge
                                                                                                                                                            maximizing demand served.
                                                                                                      Requirements (WDRs) for Regional San.                    • Improve environmental resources
                                              DEPARTMENT OF THE INTERIOR                              The new WDRs require treatment                        and benefit habitats and ecosystems to
                                                                                                      upgrades to be operational by December                   Æ Reduce streamflow losses in the
                                              Bureau of Reclamation                                   2023, and have prompted Regional San                  Cosumnes River by raising groundwater
                                                                                                      to evaluate a multitude of technologies               levels.
                                              [RR02030700, XXXR0680R1,                                to produce up to 181 mgd of Title 22                     Æ Support improved riparian habitat
                                              RR.17529652.MP70012]                                    disinfected tertiary recycled water or                along the Cosumnes River as a result of
                                                                                                      ‘equivalent’ quality effluent. Following              elevated groundwater levels along the
                                              Notice of Intent To Prepare an                          a pilot study of various technologies,                stream margins.
                                              Environmental Impact Report/                            one technology has been selected to                      Æ Provide recycled water to wetlands.
                                              Environmental Impact Statement for                      treat wastewater to Title 22 disinfected                 The proposed Project consists of the
                                              the Sacramento Regional County                          tertiary level, which is suitable for                 following proposed project elements
                                              Sanitation District South County Ag                     agriculture.                                          and their level of environmental
                                              Water Recycling Program                                    Title 22 disinfected tertiary recycled             evaluation in the joint EIR/EIS:
                                                                                                      water generated at the SRWTP would be                    • New pump station at the SRWTP
                                              AGENCY:   Bureau of Reclamation,
                                                                                                      conveyed to agricultural and urban                    (project-level evaluation)
                                              Interior.
                                                                                                      customers using a new pump station at                    • 30- to 60-inch transmission pipeline
                                              ACTION: Notice of intent.                               the SRWTP and through a new network                   from the pump station to Twin Cities
                                                                                                      of recycled water pipelines                           Road (project-level evaluation)
                                              SUMMARY:    The Bureau of Reclamation,
                                                                                                      (transmission, distribution, and laterals)               • Distribution mainlines from the
                                              the lead Federal agency, and the
                                                                                                      located within public road rights-of-                 transmission pipeline and lateral service
                                              Sacramento Regional County Sanitation
                                                                                                      way, private roads, and agricultural                  connections to potential customers
                                              District (Regional San), the lead state
                                                                                                      land. The proposed Project would also                 (agriculture and Stone Lakes NWR)
                                              agency, will prepare a joint
                                                                                                      include a potential recharge area to                  (program-level evaluation)
                                              Environmental Impact Report/
                                                                                                      increase recycled water usage and                        • Potential Recharge Area and wells
                                              Environmental Impact Statement (EIR/
                                                                                                      benefit the local groundwater basin                   to produce water to the meet the
                                              EIS) for the South County Ag Water
                                                                                                      through increasing groundwater table                  dilution requirements for groundwater
                                              Recycling Program (Project). The Project
                                                                                                      levels and recharging the basin; with the             recharge (program-level evaluation)
                                              would deliver approximately 45,000
                                                                                                      potential recharge area, the delivery of                 The EIR/EIS will also evaluate the No
                                              acre-feet per year of Title 22 disinfected
                                                                                                      recycled water could increase by                      Project Alternative, an alternative that
                                              tertiary treated recycled water to about
                                                                                                      approximately 5,000 acre-feet per year.               does not include funding by
                                              16,000 acres of irrigated lands in
                                                                                                      In addition, the Project includes                     Reclamation, and a smaller-scale project
                                              southern Sacramento County for
                                                                                                      provision of recycled water to support                alternative that would supply less
                                              agricultural and urban landscape uses
                                                                                                      wetland habitat at the Stone Lakes                    recycled water to a smaller area in
                                              and to the Stone Lakes National Wildlife
                                                                                                      National Wildlife Refuge (NWR) to                     South Sacramento County.
                                              Refuge. The Project could also provide
                                                                                                      protect the sensitive resources at the
                                              an additional 5,000 acre-feet per year of                                                                     Previous Scoping
                                                                                                      refuge during drought conditions.
                                              recycled water for groundwater                             The average annual recycled water
                                              recharge, for a total recycled water                                                                            Regional San mailed a notice of
                                                                                                      delivered to potential customers is                   preparation of a Draft EIR regarding the
                                              delivery of 50,000 acre-feet per year.                  approximately 50,000 acre-feet per year.              proposed Project to the public on
                                              DATES: Submit written comments on the                   Recycled water would be delivered to                  January 30, 2015 and held a scoping
                                              scope of the EIR/EIS by November 30,
tkelley on DSK3SPTVN1PROD with NOTICES




                                                                                                      approximately 16,000 acres of irrigated               meeting on February 18, 2015 at the
                                              2015.                                                   lands (and some limited recharge areas)               Sacramento Farm Bureau in Elk Grove,
                                              ADDRESSES: Send written comments on                     and to managed wetlands at Stone Lakes                California.
                                              the scope of the EIR/EIS to Mr. Jose                    NWR. The actual monthly demand
                                              Ramirez, Project Manager, Sacramento                    would vary seasonally with the                        Public Disclosure
                                              County Regional Sanitation District                     maximum demand occurring during the                     Before including your address, phone
                                              (Regional San), 10060 Goethe Road,                      irrigation season, from May through                   number, email address, or other


                                         VerDate Sep<11>2014   17:37 Oct 29, 2015   Jkt 238001   PO 00000   Frm 00068   Fmt 4703   Sfmt 4703   E:\FR\FM\30OCN1.SGM   30OCN1


                                              66934                         Federal Register / Vol. 80, No. 210 / Friday, October 30, 2015 / Notices

                                              personal identifying information in your                during official business hours (8:45 a.m.             issue, which shall be limited to the
                                              comment, you should be aware that                       to 5:15 p.m.) in the Office of the                    statutory public interest factors set forth
                                              your entire comment—including your                      Secretary, U.S. International Trade                   in 19 U.S.C. 1337(d)(1), (f)(1), (g)(1);
                                              personal identifying information—may                    Commission, 500 E Street SW., Room                       (3) For the purpose of the
                                              be made publicly available at any time.                 112, Washington, DC 20436, telephone                  investigation so instituted, the following
                                              While you can ask us in your comment                    (202) 205–2000. Hearing impaired                      are hereby named as parties upon which
                                              to withhold your personal identifying                   individuals are advised that information              this notice of investigation shall be
                                              information from public review, we                      on this matter can be obtained by                     served:
                                              cannot guarantee that we will be able to                contacting the Commission’s TDD                          (a) The complainants are:
                                              do so.                                                  terminal on (202) 205–1810. Persons                   Varian Medical Systems, Inc., 3100
                                                Dated: September 21, 2015.                            with mobility impairments who will                       Hansen Way, Palo Alto, CA 94304.
                                              Jason Phillips,                                         need special assistance in gaining access             Varian Medical Systems International
                                              Deputy Regional Director, Mid-Pacific Region.
                                                                                                      to the Commission should contact the                     AG, Hinterbergstrasse 14, 6330 Cham,
                                                                                                      Office of the Secretary at (202) 205–                    ZG, Switzerland.
                                              [FR Doc. 2015–27716 Filed 10–29–15; 8:45 am]
                                                                                                      2000. General information concerning                     (b) The respondents are the following
                                              BILLING CODE 4332–90–P
                                                                                                      the Commission may also be obtained                   entities alleged to be in violation of
                                                                                                      by accessing its internet server at                   section 337, and are the parties upon
                                                                                                      http://www.usitc.gov. The public record               which the complaint is to be served:
                                              INTERNATIONAL TRADE                                     for this investigation may be viewed on
                                              COMMISSION                                                                                                    Elekta AB, Kungstensgatan 18, SE–103
                                                                                                      the Commission’s electronic docket                       93 Stockholm, Sweden.
                                              [Inv. No. 337–TA–968]                                   (EDIS) at http://edis.usitc.gov.                      Elekta Ltd., Linac House, Fleming Way,
                                                                                                      FOR FURTHER INFORMATION CONTACT: The                     RH10 9RR Crawley, United Kingdom.
                                              Certain Radiotherapy Systems and                        Office of Unfair Import Investigations,               Elekta GmbH, Borsteler Chaussee 49,
                                              Treatment Planning Software, and                        U.S. International Trade Commission,                     22453 Hamburg, Germany.
                                              Components Thereof; Institution of                      telephone (202) 205–2560.                             Elekta Inc., 400 Perimeter Center
                                              Investigation                                                                                                    Terrace, Suite 50, Atlanta, GA 30346.
                                                                                                        Authority: The authority for institution of
                                              AGENCY: U.S. International Trade                        this investigation is contained in section 337        IMPAC Medical Systems, Inc., 100
                                              Commission.                                             of the Tariff Act of 1930, as amended, and               Mathilda Place, 5th Floor, Sunnyvale,
                                              ACTION: Notice.
                                                                                                      in section 210.10 of the Commission’s Rules              CA 94086 .
                                                                                                      of Practice and Procedure, 19 CFR 210.10              Elekta Instrument (Shanghai) Limited,
                                              SUMMARY:    Notice is hereby given that a               (2015).                                                  Room 3202 & 3203, Pangu Plaza,
                                              complaint was filed with the U.S.                          Scope of Investigation: Having                        Office Building, Block A, No. 27
                                              International Trade Commission on                       considered the complaint, the U.S.                       Fourth Ring Mid Road, Chaoyang
                                              September 25, 2015, under section 337                   International Trade Commission, on                       District, 100101 Shanghai, China.
                                              of the Tariff Act of 1930, as amended,                  October 26, 2015, ordered that—                       Elekta Beijing Medical Systems Co. Ltd.,
                                              19 U.S.C. 1337, on behalf of Varian                        (1) Pursuant to subsection (b) of                     No. 21, Chuang Xin Road, Science, &
                                              Medical Systems, Inc. of Palo Alto,                     section 337 of the Tariff Act of 1930, as                Technology Park, Chang Ping, Beijing,
                                              California and Varian Medical Systems                   amended, an investigation be instituted                  102200, China.
                                              International AG of Switzerland.                        to determine whether there is a                          (c) The Office of Unfair Import
                                              Supplements were filed on October 13,                   violation of subsection (a)(1)(B) of                  Investigations, U.S. International Trade
                                              2015. The complaint, as supplemented,                   section 337 in the importation into the               Commission, 500 E Street SW., Suite
                                              alleges violations of section 337 based                 United States, the sale for importation,              401, Washington, DC 20436; and
                                              upon the importation into the United                    or the sale within the United States after               (4) For the investigation so instituted,
                                              States, the sale for importation, and the               importation of certain radiotherapy                   the Chief Administrative Law Judge,
                                              sale within the United States after                     systems and treatment planning                        U.S. International Trade Commission,
                                              importation of certain radiotherapy                     software, and components thereof by                   shall designate the presiding
                                              systems and treatment planning                          reason of infringement of one or more of              Administrative Law Judge.
                                              software, and components thereof by                     claims 1, 2, 4–9, 11–16, 53–56, and 58–                  Responses to the complaint and the
                                              reason of infringement of certain claims                62 of the ’021 patent; claims 1–4, 6–10,              notice of investigation must be
                                              of U.S. Patent No. 7,945,021 (‘‘the ’021                12, 18, and 19 of the ’430 patent; claims             submitted by the named respondents in
                                              patent’’); U.S. Patent No. 8,116,430 (‘‘the             1–10, 12–15, and 17–21 of the ’703                    accordance with section 210.13 of the
                                              ’430 patent’’); U.S. Patent No. 8,867,703               patent; claims 19–28 and 33–36 of the                 Commission’s Rules of Practice and
                                              (‘‘the ’703 patent’’); U.S. Patent No.                  ’154 patent; claims 61–63, 65, and 67–                Procedure, 19 CFR 210.13. Pursuant to
                                              7,880,154 (‘‘the ’154 patent’’); U.S.                   70 of the ’770 patent; and claims 23, 25,             19 CFR 201.16(e) and 210.13(a), such
                                              Patent No. 7,906,770 (‘‘the ’770 patent’’);             26, 39–42, 45, and 50 of the ’538 patent,             responses will be considered by the
                                              and U.S. Patent No. 8,696,538 (‘‘the ’538               and whether an industry in the United                 Commission if received not later than 20
                                              patent’’). The complaint further alleges                States exists as required by subsection               days after the date of service by the
                                              that an industry in the United States                   (a)(2) of section 337;                                Commission of the complaint and the
                                              exists as required by subsection (a)(2) of                 (2) Pursuant to Commission Rule                    notice of investigation. Extensions of
                                              section 337.                                            210.50(b)(1), 19 CFR 210.50(b)(1), the                time for submitting responses to the
                                                 The complainants request that the                    presiding administrative law judge shall              complaint and the notice of
tkelley on DSK3SPTVN1PROD with NOTICES




                                              Commission institute an investigation                   take evidence or other information and                investigation will not be granted unless
                                              and, after the investigation, issue a                   hear arguments from the parties and                   good cause therefor is shown.
                                              limited exclusion order and cease and                   other interested persons with respect to                 Failure of a respondent to file a timely
                                              desist orders.                                          the public interest in this investigation,            response to each allegation in the
                                              ADDRESSES: The complaint, except for                    as appropriate, and provide the                       complaint and in this notice may be
                                              any confidential information contained                  Commission with findings of fact and a                deemed to constitute a waiver of the
                                              therein, is available for inspection                    recommended determination on this                     right to appear and contest the


                                         VerDate Sep<11>2014   17:37 Oct 29, 2015   Jkt 238001   PO 00000   Frm 00069   Fmt 4703   Sfmt 4703   E:\FR\FM\30OCN1.SGM   30OCN1



Document Created: 2015-12-14 15:29:45
Document Modified: 2015-12-14 15:29:45
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of intent.
DatesSubmit written comments on the scope of the EIR/EIS by November 30, 2015.
ContactMr. Jose Ramirez, Regional San at (916) 879-6059, email at [email protected]; or Mr. Douglas Kleinsmith, Bureau of Reclamation, (916) 978-5034, email at [email protected]
FR Citation80 FR 66933 