80_FR_69819 80 FR 69602 - Drawbridge Operation Regulation; Steamboat Slough (Snohomish River), Marysville, WA

80 FR 69602 - Drawbridge Operation Regulation; Steamboat Slough (Snohomish River), Marysville, WA

DEPARTMENT OF HOMELAND SECURITY
Coast Guard

Federal Register Volume 80, Issue 217 (November 10, 2015)

Page Range69602-69602
FR Document2015-28538

The Coast Guard has issued a temporary deviation from the operating schedule that governs the Burlington Northern Santa Fe Railway Company (BNSF) Railroad Bridge (BNSF Steamboat Slough Bridge) across Steamboat Slough (Snohomish River), mile 1.0 near Marysville, WA. The deviation is necessary to accommodate scheduled bridge rail joint maintenance and replacement. The deviation allows the bridge to remain in the closed-to-navigation position during the maintenance to allow safe movement of work crews.

Federal Register, Volume 80 Issue 217 (Tuesday, November 10, 2015)
[Federal Register Volume 80, Number 217 (Tuesday, November 10, 2015)]
[Rules and Regulations]
[Page 69602]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-28538]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2015-1003]


Drawbridge Operation Regulation; Steamboat Slough (Snohomish 
River), Marysville, WA

AGENCY: Coast Guard, DHS.

ACTION: Notice of temporary deviation from regulations.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the Burlington Northern Santa Fe 
Railway Company (BNSF) Railroad Bridge (BNSF Steamboat Slough Bridge) 
across Steamboat Slough (Snohomish River), mile 1.0 near Marysville, 
WA. The deviation is necessary to accommodate scheduled bridge rail 
joint maintenance and replacement. The deviation allows the bridge to 
remain in the closed-to-navigation position during the maintenance to 
allow safe movement of work crews.

DATES: This deviation is effective from 6 a.m. on November 29, 2015 to 
11:59 p.m. on December 20, 2015.

ADDRESSES: The docket for this deviation, [USCG-2015-1003] is available 
at http://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH.'' Click on Open Docket Folder on the line 
associated with this deviation.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email the Bridge Administrator, Coast 
Guard Thirteenth District; telephone 206-220-7282 email d13-pf-d13bridges@uscg.mil.

SUPPLEMENTARY INFORMATION: BNSF has requested a temporary deviation 
from the operating schedule for the BNSF Steamboat Slough Bridge, mile 
1.0, crossing Steamboat Slough (Snohomish River), near Marysville, WA. 
BNSF requested the BNSF Steamboat Slough Bridge remain in the closed-
to-navigation position for rail maintenance. This maintenance has been 
scheduled and is funded as part of the Cascade Corridor Improvement 
Project.
    The normal operating schedule for this bridge operates in 
accordance with 33 CFR 117.1059, which states the draw shall open on 
signal if at least four hours notice is given. BNSF Steamboat Slough 
Bridge is a swing bridge and provides 8 feet of vertical clearance 
above mean high water elevation while in the closed-to-navigation 
position.
    This deviation allows the BNSF Steamboat Slough Bridge at mile 1.0 
crossing Steamboat Slough on the Snohomish River, to remain in the 
closed-to-navigation position, and need not open for maritime traffic 
from 6 a.m. on November 29, 2015 to 11:59 p.m. on December 20, 2015. 
The bridge shall operate in accordance to 33 CFR 117.1059 at all other 
times.
    Vessels able to pass through the bridge in the closed-to-navigation 
position may do so at anytime. The bridge will be required to open, if 
needed, for vessels engaged in emergency response operations during 
this closure period, but any time lost to emergency openings will 
necessitate a time extension added to the approved dates. Waterway 
usage on this part of the Snohomish River and Steamboat Slough includes 
tug and barge to small pleasure craft. The BNSF Steamboat Slough Bridge 
receives an average number of three opening request during the month of 
December. BNSF has coordinated with Steamboat Slough users that 
frequently request bridge openings during this time of year. No 
immediate alternate route for vessels to pass is available on this part 
of the river. The Coast Guard will also inform the users of the 
waterways through our Local and Broadcast Notices to Mariners of the 
change in operating schedule for the bridge so that vessels can arrange 
their transits to minimize any impact caused by the temporary 
deviation.
    In accordance with 33 CFR 117.35(e), the drawbridges must return to 
their regular operating schedule immediately at the end of the 
effective period of this temporary deviation. This deviation from the 
operating regulations is authorized under 33 CFR 117.35.

    Dated: November 3, 2015.
Steven M. Fischer,
Bridge Administrator, Thirteenth Coast Guard District.
[FR Doc. 2015-28538 Filed 11-9-15; 8:45 am]
BILLING CODE 9110-04-P



                                             69602            Federal Register / Vol. 80, No. 217 / Tuesday, November 10, 2015 / Rules and Regulations

                                             can receive any of the HIP services                     Click on Open Docket Folder on the line                  In accordance with 33 CFR 117.35(e),
                                             identified in § 256.7. If you request                   associated with this deviation.                       the drawbridges must return to their
                                             Category B services and your mobile                     FOR FURTHER INFORMATION CONTACT: If                   regular operating schedule immediately
                                             home has exterior walls less than three                 you have questions on this temporary                  at the end of the effective period of this
                                             inches thick, you must be considered for                deviation, call or email the Bridge                   temporary deviation. This deviation
                                             Category C services.                                    Administrator, Coast Guard Thirteenth                 from the operating regulations is
                                                                                                     District; telephone 206–220–7282 email                authorized under 33 CFR 117.35.
                                             § 256.29 Can HIP resources be combined
                                             with other available resources?                         d13-pf-d13bridges@uscg.mil.                             Dated: November 3, 2015.
                                                                                                     SUPPLEMENTARY INFORMATION: BNSF has                   Steven M. Fischer,
                                               Yes. HIP resources may be
                                             supplemented with other available                       requested a temporary deviation from                  Bridge Administrator, Thirteenth Coast Guard
                                             resources (e.g., in-kind assistance; tribal             the operating schedule for the BNSF                   District.
                                             or housing authority; and any other                     Steamboat Slough Bridge, mile 1.0,                    [FR Doc. 2015–28538 Filed 11–9–15; 8:45 am]
                                             leveraging mechanism identified in                      crossing Steamboat Slough (Snohomish                  BILLING CODE 9110–04–P
                                             § 256.3(d)) to increase the number of                   River), near Marysville, WA. BNSF
                                             HIP recipients.                                         requested the BNSF Steamboat Slough
                                                                                                     Bridge remain in the closed-to-                       ENVIRONMENTAL PROTECTION
                                             § 256.30 Can I appeal actions taken under               navigation position for rail                          AGENCY
                                             this part?                                              maintenance. This maintenance has
                                               You may appeal action or inaction by                  been scheduled and is funded as part of               40 CFR Part 52
                                             a BIA official, in accordance with 25                   the Cascade Corridor Improvement
                                                                                                     Project.                                              [EPA–R07–OAR–2015–0268; FRL 9936–72–
                                             CFR part 2.                                                                                                   Region 7]
                                               Dated: November 2, 2015.
                                                                                                       The normal operating schedule for
                                                                                                     this bridge operates in accordance with               Approval and Promulgation of
                                             Kevin K. Washburn,
                                                                                                     33 CFR 117.1059, which states the draw                Implementation Plans; State of
                                             Assistant SecretaryÐIndian Affairs.                     shall open on signal if at least four
                                             [FR Doc. 2015–28547 Filed 11–9–15; 8:45 am]
                                                                                                                                                           Missouri; Control of Petroleum Liquid
                                                                                                     hours notice is given. BNSF Steamboat                 Storage, Loading and Transfer
                                             BILLING CODE 4337–15–P                                  Slough Bridge is a swing bridge and
                                                                                                     provides 8 feet of vertical clearance                 AGENCY:  Environmental Protection
                                                                                                     above mean high water elevation while                 Agency (EPA).
                                             DEPARTMENT OF HOMELAND                                  in the closed-to-navigation position.                 ACTION: Final rule.
                                             SECURITY                                                  This deviation allows the BNSF
                                                                                                     Steamboat Slough Bridge at mile 1.0                   SUMMARY:    The Environmental Protection
                                             Coast Guard                                             crossing Steamboat Slough on the                      Agency (EPA) is taking final action to
                                                                                                     Snohomish River, to remain in the                     approve the State Implementation Plan
                                             33 CFR Part 117                                         closed-to-navigation position, and need               (SIP) revision submitted by the state of
                                                                                                     not open for maritime traffic from 6 a.m.             Missouri. This revision includes
                                             [Docket No. USCG–2015–1003]
                                                                                                     on November 29, 2015 to 11:59 p.m. on                 regulatory amendments that remove the
                                             Drawbridge Operation Regulation;                        December 20, 2015. The bridge shall                   requirements of stage II vapor recovery
                                             Steamboat Slough (Snohomish River),                     operate in accordance to 33 CFR                       control systems at gasoline dispensing
                                             Marysville, WA                                          117.1059 at all other times.                          facilities in the St. Louis area, revise
                                                                                                       Vessels able to pass through the                    certification and testing procedures for
                                             AGENCY: Coast Guard, DHS.                               bridge in the closed-to-navigation                    stage I vapor recovery systems, prohibit
                                             ACTION: Notice of temporary deviation                   position may do so at anytime. The                    above ground storage tanks at gasoline
                                             from regulations.                                       bridge will be required to open, if                   dispensing facilities, and include
                                                                                                     needed, for vessels engaged in                        general revisions to better clarify the
                                             SUMMARY:   The Coast Guard has issued a                 emergency response operations during                  rule. These revisions to Missouri’s SIP
                                             temporary deviation from the operating                  this closure period, but any time lost to             do not have an adverse effect on air
                                             schedule that governs the Burlington                    emergency openings will necessitate a                 quality as demonstrated in Missouri’s
                                             Northern Santa Fe Railway Company                       time extension added to the approved                  technical demonstration document and
                                             (BNSF) Railroad Bridge (BNSF                            dates. Waterway usage on this part of                 EPA’s technical support demonstration
                                             Steamboat Slough Bridge) across                         the Snohomish River and Steamboat                     which is a part of this docket.
                                             Steamboat Slough (Snohomish River),                     Slough includes tug and barge to small                DATES: This final rule is effective on
                                             mile 1.0 near Marysville, WA. The                       pleasure craft. The BNSF Steamboat                    December 10, 2015.
                                             deviation is necessary to accommodate                   Slough Bridge receives an average                     ADDRESSES: EPA has established a
                                             scheduled bridge rail joint maintenance                 number of three opening request during                docket for this action under Docket ID
                                             and replacement. The deviation allows                   the month of December. BNSF has                       No. EPA–R07–OAR–2015–0268. All
                                             the bridge to remain in the closed-to-                  coordinated with Steamboat Slough                     documents in the docket are listed on
                                             navigation position during the                          users that frequently request bridge                  the www.regulations.gov Web site.
                                             maintenance to allow safe movement of                   openings during this time of year. No                 Although listed in the index, some
                                             work crews.                                             immediate alternate route for vessels to              information is not publicly available,
                                             DATES: This deviation is effective from                 pass is available on this part of the river.          i.e., CBI or other information whose
                                             6 a.m. on November 29, 2015 to 11:59                    The Coast Guard will also inform the                  disclosure is restricted by statute.
rmajette on DSK2TPTVN1PROD with RULES




                                             p.m. on December 20, 2015.                              users of the waterways through our                    Certain other material, such as
                                             ADDRESSES: The docket for this                          Local and Broadcast Notices to Mariners               copyrighted material, is not placed on
                                             deviation, [USCG–2015–1003] is                          of the change in operating schedule for               the Internet and will be publicly
                                             available at http://www.regulations.gov.                the bridge so that vessels can arrange                available only in hard copy form.
                                             Type the docket number in the                           their transits to minimize any impact                 Publicly available docket materials are
                                             ‘‘SEARCH’’ box and click ‘‘SEARCH.’’                    caused by the temporary deviation.                    available either electronically through


                                        VerDate Sep<11>2014   13:26 Nov 09, 2015   Jkt 238001   PO 00000   Frm 00040   Fmt 4700   Sfmt 4700   E:\FR\FM\10NOR1.SGM   10NOR1



Document Created: 2018-03-01 11:25:23
Document Modified: 2018-03-01 11:25:23
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionNotice of temporary deviation from regulations.
DatesThis deviation is effective from 6 a.m. on November 29, 2015 to 11:59 p.m. on December 20, 2015.
ContactIf you have questions on this temporary deviation, call or email the Bridge Administrator, Coast Guard Thirteenth District; telephone 206-220-7282 email d13-pf- [email protected]
FR Citation80 FR 69602 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR